CN207331697U - The section steel platform of traffic main artery top supplementary structure construction - Google Patents

The section steel platform of traffic main artery top supplementary structure construction Download PDF

Info

Publication number
CN207331697U
CN207331697U CN201720931579.2U CN201720931579U CN207331697U CN 207331697 U CN207331697 U CN 207331697U CN 201720931579 U CN201720931579 U CN 201720931579U CN 207331697 U CN207331697 U CN 207331697U
Authority
CN
China
Prior art keywords
frame body
platform
formwork
shuttering
structure construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720931579.2U
Other languages
Chinese (zh)
Inventor
丁威
曹建军
黄金龙
田智
徐璐瑶
雷涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201720931579.2U priority Critical patent/CN207331697U/en
Application granted granted Critical
Publication of CN207331697U publication Critical patent/CN207331697U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a kind of section steel platform of traffic main artery top supplementary structure construction, set up on the ground before two-layer structure construction, including sequentially connected support for shuttering, formwork platform, the first frame body, the second frame body and the triframe body that the support for shuttering includes cross bar, upright bar is set up in length and breadth, it is track between second frame body and the first frame body and the second frame body, frame body lower part is provided with bar of sweeping the floor, and frame body surrounding transverse and longitudinal sets continuous bridging by bottom is supreme;Add U-shaped jacking at the top of the support for shuttering and be longitudinally laid with double steel pipe, H profile steel is laterally laid with the double steel pipe, being laid with the first template above the H profile steel forms track formwork platform;Structure formwork is further included in formwork platform upper.Compared with correlation technique, using this Novel section steel formwork platform, it can farthest increase the earthwork and transport of materials amount, alleviate transport pressure, not only reduce construction cost, but also saved the duration.

Description

The section steel platform of traffic main artery top supplementary structure construction
Technical field
It the utility model is related to technical field of building construction, more particularly to a kind of construction of traffic main artery top supplementary structure Section steel platform.
Background technology
Using central island along work, Liu Tu areas reverse construction, can cause central island superstructure for some building foundation pit constructions Construction is constructed prior to Liu Tu areas superstructure, and when Liu Tu areas, superstructure starts to construct, and the support for shuttering set up by the first floor will cause North and south or thing transport channel are cut off, circular driveway can not be formed, and cause material to increase with earthwork transportation pressure, construction period Elongated, construction cost increase.
Therefore, it is necessary to the section steel platform for providing a kind of supplementary structure construction of traffic main artery top is asked to solve above technology Topic.
Utility model content
The purpose of this utility model is to provide a kind of section steel platform of traffic main artery top supplementary structure construction, by answering It can at utmost alleviate transport pressure with the platform construction, ensure the normal transport of material and the earthwork.
The utility model provides a kind of section steel platform of traffic main artery top supplementary structure construction, and two-layer structure is applied on the ground Set up before work, including sequentially connected support for shuttering, formwork platform, the support for shuttering include cross bar, first that upright bar is set up in length and breadth Frame body, the second frame body and triframe body, are track between the second frame body and the first frame body and the second frame body, and frame body lower part is set Sweep the floor bar, frame body surrounding transverse and longitudinal sets continuous bridging by bottom is supreme;Add U-shaped jacking at the top of the support for shuttering and longitudinally spread If double steel pipe, H profile steel is laterally laid with the double steel pipe, being laid with the first template above the H profile steel forms track formwork platform, As the protective platform on track;Structure formwork is further included in formwork platform upper, is formed by setting up the second template on frame body The formwork of casting concrete, forms the second Rotating fields after casting concrete.
Preferably, the shaped steel spacing 900mm.
Preferably, the support for shuttering cross bar spacing 900mm, upright bar spacing 400mm.
Preferably, the track step pitch 1500mm.
Compared with correlation technique, the section steel platform of traffic main artery top provided by the utility model supplementary structure construction has Following beneficial effect:
It using this Novel section steel formwork platform, can farthest increase the earthwork and transport of materials amount, alleviate transport pressure Power, not only reduces construction cost, but also has saved the duration.
Brief description of the drawings
Fig. 1 is the section steel platform structure diagram of traffic main artery top provided by the utility model supplementary structure construction;
In figure, support for shuttering -1, formwork platform -2, structure formwork -3, cross bar -11, upright bar -12, bar -13 of sweeping the floor, bridging - 14th, jacking -21, double steel pipe -22, H profile steel -23, the first template -24, the second template -31, concrete -32, track -4.
Embodiment
Describe the utility model in detail below with reference to attached drawing and in conjunction with the embodiments.It should be noted that do not conflicting In the case of, the feature in embodiment and embodiment in the utility model can be mutually combined.For sake of convenience, hereinafter such as Occur " upper ", " under ", " left side ", " right side " printed words, only upper and lower, left and right direction of the expression with attached drawing in itself is consistent, not to structure Play restriction effect.
As shown in Figure 1, the section steel platform of traffic main artery top supplementary structure construction, on the ground before two-layer structure construction Set up, including sequentially connected support for shuttering 1, formwork platform 2, the support for shuttering includes cross bar 11, upright bar 12 is set up in length and breadth the One frame body, the second frame body and triframe body, cross bar spacing 900mm, upright bar spacing 400mm, the second frame body and the first frame body and It is track 4 between two frame bodies, step pitch 1500mm, frame body lower part is provided with bar 13 of sweeping the floor, and frame body surrounding transverse and longitudinal is set by bottom is supreme Put continuous bridging 14;Add U-shaped jacking 21 at the top of the support for shuttering and be longitudinally laid with double steel pipe 22, in the double steel pipe laterally H profile steel 23 is laid with, shaped steel spacing 900mm, the H profile steel top is laid with the first template 24 and forms track formwork platform, as car Protective platform on road;Structure formwork 3 is further included in formwork platform upper, is poured by setting up the formation of the second template 31 on frame body The formwork of concrete 32, forms the second Rotating fields after casting concrete.
Concrete water-saving moist keeping maintenance film provided by the utility model is laid with step:
The first step, sets up support for shuttering:Support for shuttering cross bar spacing 900mm, vertical spacing 400mm, step pitch 1500mm, under shaped steel 100mm sets bar of sweeping the floor together, and support for shuttering is linked to be an entirety, and continuous scissors is set by bottom is supreme in frame body surrounding transverse and longitudinal Support, horizontally arranged twice horizontal cross brace.Track is reserved in pre-set position.
Second step, is laid with formwork platform:Add U-shaped jacking at the top of support for shuttering and be longitudinally laid with double steel pipe, laterally spread thereafter If the H profile steel of 150*150*7*10, shaped steel spacing 900mm, top is laid with template.
3rd step, structure formwork:Structure formwork is carried out above formwork platform, before concreting, to track region into Row support for shuttering returns back to top, and transverse and longitudinal spacing 1000mm, step pitch 1500mm, treat superstructure concrete strength up to 60% i.e. dismountable time Top, ensures track normal operation.
Changsha project foundation pit construction is made using central island is suitable, Liu Tu areas reverse construction, therefore causes central island to be tied on the ground Structure construction is constructed prior to Liu Tu areas superstructure, and when Liu Tu areas, superstructure starts to construct, and the support for shuttering set up by the first floor will be led North and south transport channel is cut off, circular driveway can not be formed for cause, and the utility model is auxiliary using section steel platform on traffic main artery top Structure construction is helped, is avoided during Superstructure Construction, using conventional formwork system, cause north and south transport channel to be cut off, Circular driveway can not be formed, and cause material and earthwork transportation pressure increases, construction period is elongated, construction cost increase, using this Novel section steel formwork platform, can farthest increase the earthwork and transport of materials amount, alleviate transport pressure, both reduce construction Cost, and saved the duration.
The above description is only the embodiments of the present invention, and it does not limit the scope of the patent of the present invention, every Equivalent structure or equivalent flow shift made based on the specification and figures of the utility model, is directly or indirectly used in Other relevant technical fields, are equally included in the patent within the scope of the utility model.

Claims (4)

1. a kind of section steel platform of traffic main artery top supplementary structure construction, sets up, its feature before two-layer structure construction on the ground Be, including sequentially connected support for shuttering, formwork platform, the support for shuttering include cross bar, the first frame body that upright bar is set up in length and breadth, Second frame body and triframe body, are track between the second frame body and the first frame body and the second frame body, and frame body lower part, which is provided with, sweeps The thin end of the scroll, frame body surrounding transverse and longitudinal set continuous bridging by bottom is supreme;Add U-shaped jacking at the top of the support for shuttering and be longitudinally laid with double Steel pipe, H profile steel is laterally laid with the double steel pipe, and being laid with the first template above the H profile steel forms track formwork platform, as Protective platform on track;Structure formwork is further included in formwork platform upper, is poured by setting up the formation of the second template on frame body The formwork of concrete, forms the second Rotating fields after casting concrete.
2. the section steel platform of traffic main artery top according to claim 1 supplementary structure construction, it is characterised in that H profile steel Spacing 900mm.
3. the section steel platform of traffic main artery top according to claim 1 supplementary structure construction, it is characterised in that the branch Mould bases cross bar spacing 900mm, upright bar spacing 400mm.
4. the section steel platform of traffic main artery top according to claim 1 supplementary structure construction, it is characterised in that the car Road step pitch 1500mm.
CN201720931579.2U 2017-07-28 2017-07-28 The section steel platform of traffic main artery top supplementary structure construction Expired - Fee Related CN207331697U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720931579.2U CN207331697U (en) 2017-07-28 2017-07-28 The section steel platform of traffic main artery top supplementary structure construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720931579.2U CN207331697U (en) 2017-07-28 2017-07-28 The section steel platform of traffic main artery top supplementary structure construction

Publications (1)

Publication Number Publication Date
CN207331697U true CN207331697U (en) 2018-05-08

Family

ID=62376975

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720931579.2U Expired - Fee Related CN207331697U (en) 2017-07-28 2017-07-28 The section steel platform of traffic main artery top supplementary structure construction

Country Status (1)

Country Link
CN (1) CN207331697U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113789986A (en) * 2021-09-27 2021-12-14 中建一局集团建设发展有限公司 Demonstration screen fixing structure adopting light high-strength steel and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113789986A (en) * 2021-09-27 2021-12-14 中建一局集团建设发展有限公司 Demonstration screen fixing structure adopting light high-strength steel and construction method

Similar Documents

Publication Publication Date Title
CN106759354B (en) Layered continuous pouring mode of overlong and super-thick mass concrete foundation
CN107905114B (en) A kind of construction method of large span Successive interference cancellation
CN105714635B (en) A kind of concrete drainage pavement and its construction, method for repairing and mending
CN108193608A (en) The cast-in-place road gully of mobile moldbase and construction method
CN107245953B (en) A kind of crossed construction method of multilayer bridge structure
CN107435335A (en) Brick retaining wall steel bar girder hardened system and method on foundation pit enclosure top beam
CN101349061A (en) Construction method for controlling operation station structure floating in reconstruction and extension of subway junction center station
CN102587663A (en) Concrete construction process of steel tube columns of super-high-rise building
CN110205921A (en) The precast assembly pier stud construction and construction method of bellows connection are inserted by reinforcing bar
CN103397656A (en) Embedded type joist pile plank structure
CN106702912A (en) Construction method of dismantling old beam top and introducing new bridge on existing railway
CN108005094A (en) Pier and pier top beam section construction method in naked rock river bed water
CN207331697U (en) The section steel platform of traffic main artery top supplementary structure construction
CN110593080A (en) Inter-support trestle system combined with inner support system and construction method
CN205296209U (en) Prestressed anchorage cable assembled stake siding wall protective structure
CN207685849U (en) A kind of connection structure of concrete prefabricated cushion cap
CN108708290A (en) The case crane span structure hollow structure and cast-in-situ construction method of minor radius railway curve unit
CN108589769A (en) A kind of embedding rock T shapes combined type column plate high gear wall construction method of overlength
CN105756377B (en) A kind of swimming pool and its construction method
CN207244633U (en) Brick retaining wall steel bar girder hardened system on foundation pit enclosure top beam
CN103266899A (en) Method for controlling floor heave deformation of soft rock roadway by means of anchor pile continuous wall
CN202509530U (en) Post-cast strip water stopping steel plate combined structure of foundation bottom plate
CN112211204A (en) Wall formwork supporting structure of column plate wall slope protection structure and construction method thereof
CN107724252A (en) Continuous box girder hanging basket cantilever method construction and close up block
CN203531348U (en) Self-stability elevator shaft construction operating frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180508

Termination date: 20190728

CF01 Termination of patent right due to non-payment of annual fee