CN207330086U - One kind is used for the horizontal ore discharging apparatus of mine multi-rope friction hoisting vertical shaft multiple spot - Google Patents

One kind is used for the horizontal ore discharging apparatus of mine multi-rope friction hoisting vertical shaft multiple spot Download PDF

Info

Publication number
CN207330086U
CN207330086U CN201721420727.0U CN201721420727U CN207330086U CN 207330086 U CN207330086 U CN 207330086U CN 201721420727 U CN201721420727 U CN 201721420727U CN 207330086 U CN207330086 U CN 207330086U
Authority
CN
China
Prior art keywords
ore
rope friction
vertical shaft
friction hoisting
machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721420727.0U
Other languages
Chinese (zh)
Inventor
李国清
陆跃邦
彭天松
严庆文
朱家锐
张志红
王胜开
庄维逊
朱超
许正辉
孔祥文
卢海波
张先敏
习大康
吴骄
张光灿
李兴高
李贵松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Chihong Zinc and Germanium Co Ltd
Original Assignee
Yunnan Chihong Zinc and Germanium Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Chihong Zinc and Germanium Co Ltd filed Critical Yunnan Chihong Zinc and Germanium Co Ltd
Priority to CN201721420727.0U priority Critical patent/CN207330086U/en
Application granted granted Critical
Publication of CN207330086U publication Critical patent/CN207330086U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ship Loading And Unloading (AREA)

Abstract

It the utility model is related to one kind and be used for the horizontal ore discharging apparatus of mine multi-rope friction hoisting vertical shaft multiple spot, belong to deep-well mineral products production technique field, the mine horizontal ore discharging apparatus of multi-rope friction hoisting vertical shaft multiple spot that is used for includes multi-rope friction hoisting machine, skip bucket, 2# discharge points, 1# discharge points, loading depot, stage casing, cage, controller, the design that the utility model passes through multi-rope friction hoisting machine technology, multi-rope friction hoisting machine and dress, the type selecting of unloading equipment facility, the design of elevator running-course control, to realize that same one multi-rope friction hoisting machine skip bucket of pit shaft can be unloaded in two and above discharge point.The utility model can realize two and the unloading of above discharge point, and effective with original production system combines, and save construction investment cost, and reduction maintenance difficulties are big, improve production efficiency.And it is safe and reliable, it is easy to spread.

Description

One kind is used for the horizontal ore discharging apparatus of mine multi-rope friction hoisting vertical shaft multiple spot
Technical field
The utility model belongs to deep-well mineral products production technique field, specifically, is related to one kind and is used for mine multi-rope friction The horizontal ore discharging apparatus of winding shaft multiple spot.
Background technology
Mineral Resources in China will be transferred to deep successively by long-term exploitation, continuous development and Green Mine with science and technology The demand of construction, deep mining also become the important research field of mining industry.Need by ore be promoted to it is original transhipment stage casing into Enter former ore-sorting system, oxide ore(Or debris)It is promoted to earth's surface to be disposed, forms the ultradeep well of two and level above unloading, Be conducive to lift quick development and the combination with original system that mine resources are taken over.And a set of multi-rope friction hoisting machine It is unprecedented at home and abroad, it is necessary to utilize skip bucket to a set of multi-rope friction hoisting machine of ultradeep well using the multilevel unloading of skip bucket The technology for carrying out multilevel unloading is studied.
The content of the invention
In order to overcome problem present in background technology, the utility model provides one kind and is used for mine multi-rope friction hoisting The horizontal ore discharging apparatus of vertical shaft multiple spot;Ultra-deep shaft sets two and above discharge point in same vertical shaft, restricts using one more Friction type winder mixed lifting mode is automatically performed the lifting task of various materials.By the design of elevator technology, The type selecting of unloading equipment facility, the design of elevator running-course control, it is ensured that same multi-rope friction hoisting machine skip bucket energy Unloaded in two and above discharge point, elevator can complete automatic lifting different material between loading depot and each discharge point Task, and meet safe and highly efficient operation requirement.
To achieve the above object, the utility model is achieved by the following technical solution:
It is described be used for the horizontal ore discharging apparatus of mine multi-rope friction hoisting vertical shaft multiple spot include multi-rope friction hoisting machine 1, Skip bucket 2,2# discharge points 4,1# discharge points 8, loading depot 10, stage casing 17, cage 18, controller 32, the multi-rope friction type carry The lift portion for rising machine 1 is installed in vertical shaft 34, and the driving device of multi-rope friction hoisting machine 1 is installed on outside vertical shaft 34, control Device 32 is connected by relay with the driving device of multi-rope friction hoisting machine 1, in the lift portion of multi-rope friction hoisting machine 1 Skip bucket 2, cage 18 are provided with, 2# discharge points 4 are provided with the well head of vertical shaft 34, side is set gradually from top to bottom in vertical shaft 34 There are 1# discharge points 8, a loading depot 10, stage casing 17 is set in vertical shaft 34 on opposite side.
Further, the 2# discharge points 4 include fixed bend 3, ore storage bin 6, distributor 5, and ore storage bin 6 is built on ground On, the top of ore storage bin 6 is provided with distributor 5, and distributor 5 is connected with fixed bend 3.
Further, the 1# discharge points 8 include mobile straight rail 7,1# unloadings storehouse 9, unloading video monitor 19, magnetic inspection Slowdown monitoring switch I 20, hydraulic cylinder 21, oil pipe 22, hydraulic station 23, relief passage 24, magnetic detection switch II 25, slideway 26, it is described Slideway 26 be installed on relief passage 24 in, mobile straight rail 7 is installed in slideway 26, is set on the outer wall of the bucket case 27 of skip bucket 2 There is bearing 28, the end set of bearing 28 has and the matched support roller 29 of mobile straight rail 7, and hook 30 is fixedly installed on support roller 29, Fixture block 31 is fixedly installed on 36 outer wall of body of skip bucket 2, hook 30 is articulated on fixture block 31, the mobile front side of straight rail 7 and rear side Slideway 26 on be separately installed with magnetic detection switch I 20 and magnetic detection switch II 25, magnetic detection switch I 20 is examined with magnetic Slowdown monitoring switch II 25 is connected with controller 32, and controller 32 is connected by relay with the solenoid valve of hydraulic station 23, mobile straight rail 7 It is connected with hydraulic cylinder 21, hydraulic cylinder 21 is connected by oil pipe 22 with the solenoid valve of hydraulic station 23, and relief passage 24 and 1# is unloaded Carry storehouse 9 to connect, the top of relief passage 24 is provided with unloading video monitor 19, and unloading video monitor 19 connects with controller 32 Connect, controller 32 is connected with computer 33.
Further, the loading depot 10 shakes including debris vibration ore dumping machine 11, oxide ore vibration ore dumping machine 12, composite ore Dynamic ore drawing machine 13, belt conveyer 14, weighing hopper 15, slip mouth 16, and belt conveyer 14 is installed in exploitation passage 35, belt fortune The discharge end of defeated machine 14 is connected with the feed end of weighing hopper 15, and the discharge end of weighing hopper 15 is connected with slipping the feed end of mouth 16, is slipped The discharge port of mouth 16 is arranged on the inner wall of vertical shaft 34, and debris vibration ore dumping machine 11, oxide ore vibration ore dumping machine 12, composite ore shake Dynamic ore drawing machine 13 is installed in exploitation passage 35.
The beneficial effects of the utility model:
The utility model can realize two and level above unloading, and different material is transported to respective horizontal, realizes production The combination of system, saves construction investment cost, improves production efficiency, reduces maintenance difficulties and control security risk, is easy to Promote.
Brief description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the partial structural diagram of middle discharge point;
Fig. 3 is skip bucket and the mounting structure top view of mobile straight rail;
Fig. 4 is the control structure block diagram of the utility model;
Fig. 5 is dustpan unloading view.
In figure, 1- multi-rope friction hoisting machines, 2- skip buckets, 3- fix bend, 4-2# discharge points, 5- distributors, 6- ore deposits Storehouse, 7- movements straight rail, 8-1# discharge points, 9-1# unloadings storehouse, 10- loading depots, 11- debris vibration ore dumping machine, the vibration of 12- oxide ores Ore drawing machine, 13- composite ores vibration ore dumping machine, 14- belt conveyers, 15- weighing hoppers, 16- slip mouth, 17- stage casings, 18- cages, 19- unloading video monitor, 20- magnetic detections switch I, 21- hydraulic cylinders, 22- oil pipes, 23- hydraulic stations, 24- relief passages, 25- magnetic detections switch II, 26- slideways, 27- bucket case, 28- bearings, 29- support rollers, 30- hooks, 31- fixture blocks, 32- controllers, 33- computers, 34- vertical shafts, 35- exploitations passage, 36- bodies, 37- shafts.
Embodiment
In order to make the purpose of this utility model, technical solution and beneficial effect clearer, below in conjunction with attached drawing, to this The preferred embodiment of utility model is described in detail, to facilitate the technical staff to understand.
As shown in Figs 1-4, the horizontal ore discharging apparatus of mine multi-rope friction hoisting vertical shaft multiple spot that is used for is rubbed including more ropes Erasing elevator 1, skip bucket 2,2# discharge points 4,1# discharge points 8, loading depot 10, stage casing 17, cage 18, controller 32.
The lift portion of the multi-rope friction hoisting machine 1 is installed in vertical shaft 34, the drive of multi-rope friction hoisting machine 1 Dynamic device is installed on outside vertical shaft 34, and controller 32 is connected by relay with the driving device of multi-rope friction hoisting machine 1, more ropes Skip bucket 2, cage 18 are provided with the lift portion of friction type winder 1, controller 32 realizes multi-rope friction type by relay The start and stop of elevator 1, when pit shaft internal motion of the skip bucket 2 down along well 34, cage 2 is upwards along the pit shaft mouth direction of vertical shaft 34 Movement, so uses a multi-rope friction hoisting machine 1 to carry out material in a manner of skip bucket 2, cage 18 balance mixed lifting each other Lifting, skip bucket 2 are responsible for ore or debris transport, there is the transport of 18 responsible person of cage, equipment and material.
2# discharge points 4 are provided with the well head of vertical shaft 34, side is disposed with 1# discharge points from top to bottom in vertical shaft 34 8th, loading depot 10, by controller 32 control multi-rope friction hoisting machine 1 driving device, it can be achieved that skip bucket 2 in loading depot 10 The automatic running between 2# discharge points 4 or 1# discharge points 8, so as to fulfill by Ore Transportation different in loading depot 10 to corresponding Unloading position.Stage casing 17 is set in vertical shaft 34 on opposite side, and cage 18 is responsible for the transport of 17 personnel of stage casing, equipment and material.
The 2# discharge points 4 include fixed bend 3, ore storage bin 6, distributor 5, and ore storage bin 6 is built on the ground, ore storage bin 6 Top be provided with distributor 5, distributor 5 is connected with fixed bend 3.
The 1# discharge points 8 include mobile straight rail 7,1# unloadings storehouse 9, unloading video monitor 19, magnetic detection switch I 20th, hydraulic cylinder 21, oil pipe 22, hydraulic station 23, relief passage 24, magnetic detection switch II 25, slideway 26, the slideway 26 In relief passage 24, mobile straight rail 7 is installed in slideway 26, bearing 28 is provided with the outer wall of the bucket case 27 of skip bucket 2, The end set of bearing 28 has and the matched support roller 29 of mobile straight rail 7, and hook 30, the sheet of skip bucket 2 are fixedly installed on support roller 29 Fixture block 31 is fixedly installed on 36 outer wall of body, hook 30 is articulated on fixture block 31, on the slideway 26 of the mobile front side of straight rail 7 and rear side It is separately installed with magnetic detection switch I 20 and magnetic detection switch II 25, magnetic detection switch I 20 and magnetic detection switch II 25 It is connected with controller 32, controller 32 is connected by relay with the solenoid valve of hydraulic station 23, mobile straight rail 7 and hydraulic cylinder 21 connections, hydraulic cylinder 21 are connected by oil pipe 22 with the solenoid valve of hydraulic station 23, and relief passage 24 is connected with 1# unloadings storehouse 9, The top of relief passage 24 is provided with unloading video monitor 19, and unloading video monitor 19 is connected with controller 32, controller 32 are connected with computer 33.
The loading depot 10 includes debris vibration ore dumping machine 11, oxide ore vibration ore dumping machine 12, composite ore stop vibratory ore-drawing Machine 13, belt conveyer 14, weighing hopper 15, slip mouth 16, and belt conveyer 14 is installed in exploitation passage 35, belt conveyer 14 Discharge end be connected with the feed end of weighing hopper 15, the discharge end of weighing hopper 15 is connected with slipping the feed end of mouth 16, slips mouth 16 Discharge port is arranged on the inner wall of vertical shaft 34, debris vibration ore dumping machine 11, oxide ore vibration ore dumping machine 12, composite ore stop vibratory ore-drawing Machine 13 is installed in exploitation passage 35.
When selecting the unloading composite ore of 1# discharge points 8, controller 32 passes through the drive that relay controls multi-rope friction hoisting machine 1 Dynamic device, makes skip bucket 2 only be moved between loading depot 10 and 1# discharge points 8.First pass through the electromagnetism of relay control hydraulic station 23 Valve starts, so that mobile straight rail 7 is pushed out in the pit shaft of vertical shaft 34 by hydraulic cylinder 21, when the mobile straight rail 7 and magnetic of irony Property I 20 magnet attraction of detection switch when, which I 20 is passed to controller 32 by magnetic detection switch, and controller 32 passes through relay The solenoid valve of device control hydraulic station 23 is closed, and hydraulic cylinder 21 is stopped.Relay is controlled to start by controller 32 more The driving device of rope friction hoisting machine 1 runs skip bucket 2, then the composite ore vibration ore dumping machine 13 in bootload station 10, And starting belt conveyer 14, composite ore is placed on belt conveyer 14 by composite ore vibration ore dumping machine 13, then passes through belt Transporter 14 is fitted into weighing hopper 15, and after weighing hopper 15 is metered into setting weight, controller 32 stops stop vibratory ore-drawing successively Machine 13, belt conveyer 14;After skip bucket 2 is run to the lower section for slipping mouth 16 of loading depot 10, controller 32 passes through relay control The driving device of multi-rope friction hoisting machine 1 processed stops, and slips mouth 16, the door of weighing hopper 15 is opened composite ore loading skip bucket successively In 2, after skip bucket 2 fills composite ore, close the door of weighing hopper 15 and slip mouth 16, then, relay is controlled by controller 32 Device starts the driving device of multi-rope friction hoisting machine 1, and driving device driving lift portion makes skip bucket 2 run to 1# discharge points 8. Since mobile straight rail 7 is had been located in the pit shaft of vertical shaft 34, when skip bucket 2 is promoted to 1# discharge points 8, the body of end opening thereon 36 cause support roller 29 just to snap onto in the track of mobile straight rail 7, when support roller 29 reaches the middle part of mobile straight rail 7, controller 32 control the driving device of multi-rope friction hoisting machine 1 by relay, so as to cause to carry installed in multi-rope friction hoisting machine 1 Skip bucket 2 on ascending part point stops.Then, start the solenoid valve of liquid hydraulic station 23 by relay by controller 32, make hydraulic oil Cylinder 21 pulls mobile straight rail 7 to be pulled to 24 1 lateral movement of relief passage, mobile straight rail 7 to side, the work of 29 under tension of support roller With the top for the case 27 that struggles against is rotated around fixed shaft 37 on the body 36, and the lower end for the case 27 that struggles against is tilted to 24 side of relief passage Trend, so as to give the power that support roller 29 can be made to be rotated to 24 side of relief passage, support roller 29 rotates under the power, And the hook 30 being fixed thereon is driven to rotate in same direction while the rotation of support roller 29 so that hook 30 leaves fixture block 31, so that Must struggle against case 27 lower end be inclined by pull out by the composite ore in it by relief passage 24 be offloaded to 1# unload storehouse 9 in, such as Fig. 5 institutes Show.In the process, mobile straight rail 7 to the movement of relief passage 24 encounter magnetic detection switch II 25 when, the mobile straight rail 7 of irony II 25 magnet attractions are switched with magnetic detection, which is passed to controller 32 by magnetic detection switch II 25, and controller 32 passes through The solenoid valve of relay control hydraulic station 23, which is closed, to be stopped, so that hydraulic cylinder 21 is stopped.Pass through computer 33 After watching the composite ore completion of discharge in bucket case 27, the electromagnetic opening of hydraulic station 23 is controlled by relay by controller 32, Start hydraulic cylinder 21, hydraulic cylinder 21 by mobile straight rail 7 will struggle against case 27 push back in body 36 when, due to mobile straight rail During 7 thrust body, 36 1 side oscillation, give support roller 29 1 power rotated to 36 side of body, support roller 29 is dynamic at this Drive hook 30 to follow when rotating under power to rotate together, it is final so that hook 30 is connected on fixture block 31.Meanwhile hydraulic cylinder 21 Also mobile straight rail 7 is pushed out in the pit shaft of vertical shaft 34 in case lower task, during this, when the mobile straight rail 7 and magnetic of irony Property I 20 magnet attraction of detection switch when, which I 20 is passed to controller 32 by magnetic detection switch, and controller 32 passes through relay The electromagnetism of device control hydraulic station 23 is closed, and hydraulic cylinder 21 is stopped.Meanwhile unload video monitor 19 and pass through controller 32 can pass to video on computer 33 in real time, so as to fulfill working condition in real-time monitoring 1# discharge points 8.
When selecting the unloading oxide ore of 2# discharge points 4 or debris, it need to ensure that mobile straight rail 7 is fully retracted to relief passage 24 It is interior, if the video record being transmitted back to by unloading video monitor 19 on computer 33 monitors that mobile straight rail 7 is not fully retracted Or controller 32 stops multi-rope friction when being not affected by magnetic detection switch II 25 and detecting the signal that mobile straight rail 7 is retracted immediately The work of formula elevator 1, to prevent the stop of mobile straight rail 7, influences skip bucket 2 and runs up to 2# discharge points 4, so as to occur Security incident.On the premise of mobile straight rail 7 is fully retracted to relief passage 24, controlled by controller 32 by relay The driving device of multi-rope friction hoisting machine 1, makes skip bucket 2 only be moved between loading depot 10 and 2# discharge points 4.Pass through controller 32 control relays start the driving device of multi-rope friction hoisting machine 1, and the then oxide ore vibration in bootload station 10 is put Ore deposit machine 12 or debris vibration ore dumping machine 11, and start belt conveyer 14, oxide ore vibration ore dumping machine 12 or debris vibration Oxide ore or debris are placed on belt conveyer 14 by ore drawing machine 11, are then fitted into by belt conveyer 14 in weighing hopper 15, It is metered into by weighing hopper 15 up to after setting value, successively stoppingization ore deposit vibration ore dumping machine 12 or debris vibration ore dumping machine 11 and skin Band transporter 14, after skip bucket 2 is run to the lower section for slipping mouth 16 of loading depot 10, controller 32 controls more ropes to rub by relay The driving device of erasing elevator 1 stops, and stretches out the goalkeeper's oxide ore or debris loading skip bucket 2 for slipping mouth 16 and opening weighing hopper 15 In, after skip bucket 2 fills oxide ore or debris, the door and withdrawal of closing weighing hopper 15 slip mouth 16, then, pass through controller 32 Relay is controlled to start the driving device of multi-rope friction hoisting machine 1, driving device driving lift portion makes skip bucket 2 run to 2# Discharge point 4, opens the door of skip bucket 2 at this time, and the oxide ore in it or debris are offloaded in ore storage bin 6 by fixed bend 3.
The utility model provides one kind and completes two using a multi-rope friction hoisting machine in same vertical shaft And the application technology of level above unloading.Elevator uses a multi-rope friction hoisting machine to be carried in a manner of mixed lifting Rise, skip bucket is responsible for oxide ore(Or debris)Transported with composite ore, cage is responsible for each stage casing responsible person and transport of materials.Same Two and above discharge point are set in vertical shaft, wherein a set of unloading equipment is placed in well head unloads ore deposit using fixed bend, in addition A set of unloading equipment is placed in pit shaft, and ore deposit is unloaded using mobile straight rail;Selected bottom-dump skip can meet fixed dump rail and Mobile straight rail unloads ore deposit requirement.
When selection earth's surface discharge point oxide ore(Or debris)It is mixed in pit shaft when being lifted, and selecting corresponding unloading storehouse Close ore deposit discharge point movement straight rail and be in retracted mode, remaining control of this discharge point, which is in, in addition to signal detection and video monitoring forbids Operating status, and locked loop is formed with elevator, elevator-cup can only be in oxide ore(Or debris)Loading depot is unloaded with earth's surface Carry automatic running between standing;When selecting composite ore transport, middle discharge point hydraulic station starts, and mobile straight rail passes through oil pipe, hydraulic pressure Oil cylinder pushing straight rail extend out to detection signal location in pit shaft, elevator can only among composite ore loading depot and pit shaft discharge point Operation, when skip bucket reach this discharge point it is out of service when, middle discharge point movement straight rail hydraulic station starts, and mobile straight rail passes through oil Pipe, hydraulic cylinder pull straight rail to be retracted to discharge point and unload ore deposit detection signal location.
The utility model can realize two and level above unloading, and different material is transported to respective horizontal, realizes production The combination of system, saves construction investment cost, improves production efficiency, reduces maintenance difficulties and control security risk, is easy to Promote.
Finally illustrate, preferred embodiment above is merely intended for describing the technical solutions of the present application, but not for limiting the present application, to the greatest extent Pipe has been described in detail the utility model by above preferred embodiment, but those skilled in the art should manage Solution, in the form and details can make it various changes, without departing from the utility model claims book institute The scope of restriction.

Claims (4)

1. one kind is used for the horizontal ore discharging apparatus of mine multi-rope friction hoisting vertical shaft multiple spot, it is characterised in that:Described is used for mine The horizontal ore discharging apparatus of multi-rope friction hoisting vertical shaft multiple spot includes multi-rope friction hoisting machine(1), skip bucket(2), 2# discharge points(4)、 1# discharge points(8), loading depot(10), stage casing(17), cage(18), controller(32), the multi-rope friction hoisting machine(1) Lift portion be installed on vertical shaft(34)It is interior, multi-rope friction hoisting machine(1)Driving device be installed on vertical shaft(34)Outside, control Device(32)Pass through relay and multi-rope friction hoisting machine(1)Driving device connection, multi-rope friction hoisting machine(1)Lifting Skip bucket is provided with part(2), cage(18), vertical shaft(34)Well head at be provided with 2# discharge points(4), vertical shaft(34)Interior side 1# discharge points are disposed with from top to bottom(8), loading depot(10), vertical shaft(34)Stage casing is set on interior opposite side(17).
2. one kind according to claim 1 is used for the horizontal ore discharging apparatus of mine multi-rope friction hoisting vertical shaft multiple spot, its feature It is:The 2# discharge points(4)Including fixed bend(3), ore storage bin(6), distributor(5), ore storage bin(6)Build on ground On, ore storage bin(6)Top be provided with distributor(5), distributor(5)With fixed bend(3)Connection.
3. one kind according to claim 1 is used for the horizontal ore discharging apparatus of mine multi-rope friction hoisting vertical shaft multiple spot, its feature It is:The 1# discharge points(8)Including mobile straight rail(7), 1# unloading storehouse(9), unloading video monitor(19), magnetic detection Switch I(20), hydraulic cylinder(21), oil pipe(22), hydraulic station(23), relief passage(24), magnetic detection switch II(25), it is sliding Road(26), the slideway(26)Installed in relief passage(24)It is interior, slideway(26)Mobile straight rail is inside installed(7), skip bucket(2) Bucket case(27)Outer wall on be provided with bearing(28), bearing(28)End set have and mobile straight rail(7)Matched support roller (29), support roller(29)On be fixedly installed hook(30), skip bucket(2)Body(36)Fixture block is fixedly installed on outer wall(31), Hook(30)It is articulated in fixture block(31)On, mobile straight rail(7)Front side and the slideway of rear side(26)On be separately installed with magnetic detection Switch I(20)With magnetic detection switch II(25), magnetic detection switch I(20)With magnetic detection switch II(25)And controller (32)Connection, controller(32)It is connected by relay with the solenoid valve of hydraulic station 23, mobile straight rail(7)With hydraulic cylinder(21) Connection, hydraulic cylinder(21)Pass through oil pipe(22)It is connected with the solenoid valve of hydraulic station 23, relief passage(24)Storehouse is unloaded with 1#(9) Connection, relief passage(24)Top be provided with unloading video monitor(19), unload video monitor(19)With controller (32)Connection, controller(32)With computer(33)Connection.
4. one kind according to claim 1 is used for the horizontal ore discharging apparatus of mine multi-rope friction hoisting vertical shaft multiple spot, its feature It is:The loading depot(10)Including debris vibration ore dumping machine(11), oxide ore vibration ore dumping machine(12), composite ore vibration put Ore deposit machine(13), belt conveyer(14), weighing hopper(15), slip mouth(16), belt conveyer(14)Installed in exploitation passage(35) It is interior, belt conveyer(14)Discharge end and weighing hopper(15)Feed end connection, weighing hopper(15)Discharge end and slip mouth (16)Feed end connection, slip mouth(16)Discharge port be arranged on vertical shaft(34)Inner wall on, debris vibration ore dumping machine(11), oxygen Change ore deposit vibration ore dumping machine(12), composite ore vibration ore dumping machine(13)Installed in exploitation passage(35)It is interior.
CN201721420727.0U 2017-10-31 2017-10-31 One kind is used for the horizontal ore discharging apparatus of mine multi-rope friction hoisting vertical shaft multiple spot Active CN207330086U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721420727.0U CN207330086U (en) 2017-10-31 2017-10-31 One kind is used for the horizontal ore discharging apparatus of mine multi-rope friction hoisting vertical shaft multiple spot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721420727.0U CN207330086U (en) 2017-10-31 2017-10-31 One kind is used for the horizontal ore discharging apparatus of mine multi-rope friction hoisting vertical shaft multiple spot

Publications (1)

Publication Number Publication Date
CN207330086U true CN207330086U (en) 2018-05-08

Family

ID=62364241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721420727.0U Active CN207330086U (en) 2017-10-31 2017-10-31 One kind is used for the horizontal ore discharging apparatus of mine multi-rope friction hoisting vertical shaft multiple spot

Country Status (1)

Country Link
CN (1) CN207330086U (en)

Similar Documents

Publication Publication Date Title
CN108726088B (en) Lifting and feeding device for building
CN112576273A (en) Muck transportation system for shield tunneling machine and transportation method thereof
CN109139102B (en) A kind of continuous delivery system of inclined shaft of solid filling material
CN206872052U (en) A kind of ore loads guide system
CN106744472A (en) A kind of work high above the ground conveying arrangement
CN106429281A (en) Medical dragging type vertical sorting machine with horizontal transporting function
CN102381538B (en) Hoisting machine of tower crane
CN104326283A (en) Grab ship unloader suitable for multi-point material distribution device
CN207330086U (en) One kind is used for the horizontal ore discharging apparatus of mine multi-rope friction hoisting vertical shaft multiple spot
CN102381539B (en) Multifunctional tower crane elevator
CN207330084U (en) A kind of middle ore discharging apparatus for mine multi-rope friction hoisting vertical shaft
CN106081951B (en) A kind of window sluice gate machine
CN208868020U (en) A kind of aerial cableway skip bucket
CN204150734U (en) Be applicable to the grab bucket ship unloader being with multiple spot distributing device
CN207451030U (en) A kind of multiple spot for mine multi-rope friction hoisting vertical shaft fills ore deposit ore discharging apparatus
CN207330085U (en) For three, mine multi-rope friction hoisting vertical shaft and the horizontal dress ore deposit device of the above
CN110697617A (en) Bucket type winch lifting feeding device
CN213415932U (en) Construction machinery material lift
CN212610898U (en) Track accessory product sealing layer processing apparatus
CN113263631A (en) Immersive concrete production plant station aggregate system and production plant station
CN208669350U (en) It is a kind of for storing and having bad luck the mine drop shaft device of material
CN112340482A (en) Traction type front-back bidirectional chute device for bulk materials
CN208034991U (en) Propeller casting mixing device
CN211466953U (en) Concrete conveying device and concrete member processing equipment
CN205637600U (en) High fall concrete grouting machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant