CN207314540U - A kind of full prefabricated buildings of PC components - Google Patents

A kind of full prefabricated buildings of PC components Download PDF

Info

Publication number
CN207314540U
CN207314540U CN201721198047.9U CN201721198047U CN207314540U CN 207314540 U CN207314540 U CN 207314540U CN 201721198047 U CN201721198047 U CN 201721198047U CN 207314540 U CN207314540 U CN 207314540U
Authority
CN
China
Prior art keywords
wallboard
roof
mounting groove
groove
dowel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721198047.9U
Other languages
Chinese (zh)
Inventor
牛永明
范建玲
胡天红
张芳芳
张立东
张岩
陈振宇
廉如意
李华卫
郑娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Wandao Jiejian Co Ltd
Original Assignee
Henan Wandao Jiejian Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Wandao Jiejian Co Ltd filed Critical Henan Wandao Jiejian Co Ltd
Priority to CN201721198047.9U priority Critical patent/CN207314540U/en
Application granted granted Critical
Publication of CN207314540U publication Critical patent/CN207314540U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of full prefabricated buildings of PC components,Including basis,Wallboard,Roof,Mounting groove is provided with the basis of described,Dowel is provided with the mounting groove,The wallboard is arranged in mounting groove,The wallboard is double P plates,The wallboard lower part sets dowel,The wallboard top sets groove,The roof is arranged at the top of wallboard,The lower part on the roof sets connecting pole,The connecting pole is installed in groove,It is bolted between the groove and connecting pole,The roof is precast concrete roof,And the ridge both ends on roof respectively set a hoisting ring,Dowel is also provided with left and right sides of the wallboard,The depth of the mounting groove is 20 ~ 30 ㎝,Generally,The utility model has sound construction,Speed of application is fast,The advantages of easy to lifting construction.

Description

A kind of full prefabricated buildings of PC components
Technical field
Utility model belongs to building field, more particularly to a kind of full prefabricated buildings of PC components.
Background technology
With the development of prefabricated buildings Building technology, more and more building constructions in recent years using fabricated construction into Row is built, and not only increases the speed of application of conventional house building, various modular prefabricated Uniting manufactures, are also house The standardized work of building is laid a good foundation.Prefabricated buildings build, its building structure and construct the number of plies with various prefabricated components Design and connecting node it is closely bound up, especially for skyscraper series, not only consider prefabricated board itself intensity, also Consider the connection mode between various prefabricated boards.Existing Bases in High Building Construction is the requirement for meeting structure design, it is necessary to big Casting concrete is measured to improve the bonding strength between prefabricated board, long construction period, and used connection mode is relative complex, Assembling speed is slow.
The content of the invention
The purpose of this utility model is to provide a kind of full prefabricated buildings of PC components, the full prefabricated buildings structure letter It is single, simple installation is manufactured, is readily transported, speed of application is fast, connection fixed form is firm, there is high use value.
What the purpose of this utility model was realized in:A kind of full prefabricated buildings of PC components, including basis, wallboard, room Top, is provided with mounting groove, dowel is provided with the mounting groove, the wallboard is arranged at mounting groove on the basis of described In, the wallboard is double P plates, and the wallboard lower part sets dowel, and the wallboard top sets groove, the room Top is arranged at the top of wallboard, and the lower part on the roof sets connecting pole, and the connecting pole is installed in groove.
It is bolted between the groove and connecting pole.
The roof is precast concrete roof, and the ridge both ends on roof respectively set a hoisting ring.
Dowel is also provided with left and right sides of the wallboard.
The depth of the mounting groove is 20 ~ 30 ㎝.
The utility model produce beneficial effect be:For the wallboard of the utility model using double P plates, double P plates are in prefabricated board The double-deck precast slab that factory makes, is being spliced after transporting to construction site, and thereto empty position connect pour it is mixed Solidifying soil, reduces and carries out formwork, the flow chart of form removal at the construction field (site), highly shortened the construction period.In addition, this practicality New entirety uses the full fabricated construction of PC components, and speed of application is fast, connection fixed form is firm.
Brief description of the drawings
Fig. 1 is the dimensional structure diagram of the utility model.
Fig. 2 is the dimensional structure diagram on the utility model basis.
Fig. 3 is the dimensional structure diagram of the utility model wallboard.
Fig. 4 is the utility model vertical section structure schematic diagram.
Fig. 5 is wallboard and basic vertical section structure schematic diagram.
In figure:1st, basis 2, wallboard 3, roof 4, mounting groove 5, dowel 6, groove 7, connecting pole 8, Bolt 9, hoisting ring.
Embodiment
Below in conjunction with the accompanying drawings to the embodiment further instruction of the utility model.
Embodiment 1
As shown in attached drawing 1-5, a kind of full prefabricated buildings of PC components, including basis 1, wallboard 2, roof 3, the basis Mounting groove 4 is provided with 1, dowel 5 is provided with the mounting groove 4, the wallboard 2 is arranged in mounting groove 4, described Wallboard 2 be double P plates, 2 lower part of wallboard sets dowel 5, and 2 top of wallboard sets groove 6, the roof 3 are arranged at the top of wallboard 2, and the lower part on the roof 3 sets connecting pole 7, and the connecting pole 7 is installed in groove 6.
Connected between the groove 6 and connecting pole 7 by bolt 8.
The roof 3 is precast concrete roof, and the ridge both ends on roof 3 respectively set a hoisting ring 9.
The left and right sides of the wallboard 2 is also provided with dowel 5.
The depth of the mounting groove 4 is 25 ㎝.
The utility model is when in use:A kind of full prefabricated buildings of PC components, including basis, wallboard, roof, the base in house Plinth is constructed at the scene, and basic top sets mounting groove, and dowel is set in mounting groove;Wallboard is using double P plates, the lower part of wallboard Set dowel be used for and mounting groove in dowel be attached, dowel is also provided with left and right sides of wallboard, for by wall Plate links together.During construction, the dowel in the dowel and mounting groove of wallboard is linked together, and by adjacent wallboard Dowel link together, afterwards in junction formwork supporting plate, between wallboard and connecting portion casting concrete, be poured into wall When at the top of plate, setting groove reserved in panel tops, afterwards by the connecting pole alignment indentation on roof, pass through hanging on roof Roof is lifted on wallboard by dress ring, and finally, connecting pole is fixed on wallboard by bolt.
Generally, the utility model has the advantages that with sound construction, speed of application is fast, easy to lifting construction.

Claims (5)

1. a kind of full prefabricated buildings of PC components, including basis, wallboard, roof, it is characterised in that:It is provided with the basis of described Mounting groove, is provided with dowel in the mounting groove, and the wallboard is arranged in mounting groove, and the wallboard is double P plates, The wallboard lower part sets dowel, and the wallboard top sets groove, and the roof is arranged at the top of wallboard, institute The lower part on the roof stated sets connecting pole, and the connecting pole is installed in groove.
A kind of 2. full prefabricated buildings of PC components according to claim 1, it is characterised in that:The groove and connecting pole Between be bolted.
A kind of 3. full prefabricated buildings of PC components according to claim 1, it is characterised in that:The roof is prefabricated mixed Solidifying earth house top, and the ridge both ends on roof respectively set a hoisting ring.
A kind of 4. full prefabricated buildings of PC components according to claim 1, it is characterised in that:The left and right two of the wallboard Side is also provided with dowel.
A kind of 5. full prefabricated buildings of PC components according to claim 1, it is characterised in that:The depth of the mounting groove For 20 ~ 30 ㎝.
CN201721198047.9U 2017-09-19 2017-09-19 A kind of full prefabricated buildings of PC components Expired - Fee Related CN207314540U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721198047.9U CN207314540U (en) 2017-09-19 2017-09-19 A kind of full prefabricated buildings of PC components

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721198047.9U CN207314540U (en) 2017-09-19 2017-09-19 A kind of full prefabricated buildings of PC components

Publications (1)

Publication Number Publication Date
CN207314540U true CN207314540U (en) 2018-05-04

Family

ID=62383084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721198047.9U Expired - Fee Related CN207314540U (en) 2017-09-19 2017-09-19 A kind of full prefabricated buildings of PC components

Country Status (1)

Country Link
CN (1) CN207314540U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729542A (en) * 2018-07-18 2018-11-02 北京玖新创世科技有限公司 A kind of prefabrication main body and construction method
CN110318457A (en) * 2019-06-25 2019-10-11 山西诚达筑鑫科技有限公司 The construction method of light section steel structure prefabricated house
CN112282365A (en) * 2020-11-24 2021-01-29 河南超诚建材科技有限公司 Construction process of single heat-insulation wall body in indoor skiing hall
CN113833103A (en) * 2021-09-30 2021-12-24 赵传辉 Design and construction method of prefabricated house building

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729542A (en) * 2018-07-18 2018-11-02 北京玖新创世科技有限公司 A kind of prefabrication main body and construction method
CN110318457A (en) * 2019-06-25 2019-10-11 山西诚达筑鑫科技有限公司 The construction method of light section steel structure prefabricated house
CN112282365A (en) * 2020-11-24 2021-01-29 河南超诚建材科技有限公司 Construction process of single heat-insulation wall body in indoor skiing hall
CN113833103A (en) * 2021-09-30 2021-12-24 赵传辉 Design and construction method of prefabricated house building

Similar Documents

Publication Publication Date Title
CN207314540U (en) A kind of full prefabricated buildings of PC components
CN203834739U (en) End steel board connection, positioning and assembly type shear wall structure
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
WO2016062224A1 (en) Integrated column-equipped heat insulation wallboard, manufacturing and building processes and corollary equipment thereof
CN103669905A (en) Lightweight composite prefabricated panel combined type house and building method thereof
CN206467827U (en) A kind of assembly concrete shear wall
CN107989238A (en) A kind of cast-in-place sandwiched heat-preservation shear wall structure, assembled architecture and engineering method
CN114197715B (en) Prefabricated wallboard of assembled, floor and connection structure thereof
CN2931627Y (en) Frame and wall plate combined building
CN111236416A (en) Prefabricated reinforced concrete structure house and installation method thereof
CN113737936B (en) Connection structure of prefabricated combined duplex balcony and construction method
CN103993672A (en) Tenon type connecting joint structure of low-rise fabricated composite wall house
CN108756038A (en) Assembly concrete shear wall and floor support plate rigid connection node and construction method
CN207110035U (en) Assembled steel tendon concrete frame structure based on steel plate connection joint
CN206636034U (en) A kind of high intensity Hollow blockses
CN201649291U (en) Box house
CN207597652U (en) A kind of cast-in-place sandwiched heat-preservation shear wall structure and assembled architecture
CN210369491U (en) Floor board of integrated house
CN211229781U (en) Novel prefabricated hollow enclosure
CN204282824U (en) Prefabricated setting prop rises beam composite frame structure
CN209011400U (en) Assembly concrete shear wall and floor support plate rigid connection node
CN208502345U (en) A kind of full-prefabricated assembled concrete wallboard communications equipment room
CN207032474U (en) A kind of assembly concrete frame structure beam column rigid connection node
CN207988157U (en) Prefabricated partition wall connecting node
CN207453130U (en) The T-shaped crossbeam connector in steel reinforced concrete house

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180504

Termination date: 20180919