CN207296150U - A kind of prefabricated component tackling system - Google Patents

A kind of prefabricated component tackling system Download PDF

Info

Publication number
CN207296150U
CN207296150U CN201721282395.4U CN201721282395U CN207296150U CN 207296150 U CN207296150 U CN 207296150U CN 201721282395 U CN201721282395 U CN 201721282395U CN 207296150 U CN207296150 U CN 207296150U
Authority
CN
China
Prior art keywords
prefabricated component
axis pin
lifting
rod piece
pin rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721282395.4U
Other languages
Chinese (zh)
Inventor
周智勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Shengyu Drainage Systems Co Ltd
Original Assignee
Wuhan Shengyu Drainage Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Shengyu Drainage Systems Co Ltd filed Critical Wuhan Shengyu Drainage Systems Co Ltd
Priority to CN201721282395.4U priority Critical patent/CN207296150U/en
Application granted granted Critical
Publication of CN207296150U publication Critical patent/CN207296150U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a kind of prefabricated component tackling system, it is used to lift by crane prefabricated component, it includes pre-manufactured hole, lifting attachment device and boom hoisting;The pre-manufactured hole is opened on the prefabricated component, the lifting attachment device includes axis pin rod piece and lifting part, the lifting part is connected to the axis pin rod piece end, and the axis pin rod piece is inserted into the pre-manufactured hole, and the boom hoisting is connected with the lifting part.Prefabricated component tackling system provided by the utility model, can keep prefabricated component monnolithic case structure constant, avoid the damage to prefabricated component, extend the service life of prefabricated component, reduce economic loss.

Description

A kind of prefabricated component tackling system
Technical field
It the utility model is related to hoisting technology field, and in particular to a kind of prefabricated component tackling system.
Background technology
At present, prefabricated component is widely used in various fields of recent life, and size, the weight of prefabricated component are different.The prior art In, reserved suspension hook is lifted usually on prefabricated component, and suspension hook lifting is convenient, durable, but this mode lifting method Mainly there is following drawback:
(1), it is necessary to which mounted suspension hook is cut off after in prefabricated component, installation is complete, to ensure flatness, can so damage Hinder prefabricated component, reduce its service life, cause economic loss.
(2) after cutting off, maintenance of the prefabricated component in the later stage can not be lifted by crane again in replacing, and can not be reused, be caused The wasting of resources.
Utility model content
For defect existing in the prior art, the purpose of this utility model is to provide a kind of prefabricated component tackling system, Keep prefabricated component monnolithic case structure constant, realize the Fast Installation of prefabricated component.
To achieve the above objectives, the technical scheme adopted by the utility model is that:A kind of prefabricated component tackling system, it has been used for Prefabricated component is hung, it includes:
The pre-manufactured hole being opened on the prefabricated component;
Attachment device is lifted by crane, the lifting attachment device includes axis pin rod piece and lifting part, the lifting part connection In the axis pin rod piece end, the axis pin rod piece is inserted into the pre-manufactured hole;
Boom hoisting, the boom hoisting are connected with the lifting part.
Further, the prefabricated component includes top plate and the side plate extended downwardly by the top plate both ends, the pre-manufactured hole It is opened in the top plate and runs through the top plate;Meanwhile
The axis pin rod piece is inserted into the pre-manufactured hole and is fixed on the top plate, and the lifting part is attached at the top Plate.
Further, the axis pin rod piece includes screw rod and nut;The lifting part is connected to described screw rod one end, institute State screw rod and be mounted on the one end of the screw rod away from the lifting part through the pre-manufactured hole and the nut.
Further, the lifting part is hanging ring or suspension hook.
Further, when the lifting part is hanging ring, the hanging ring is in D shape and has a tabular wall, described Tabular wall face paste is arranged on the top plate.
Further, the axis pin rod piece further includes gasket, two wall of gasket respectively with the nut and the top Plate contacts.
Further, the prefabricated component includes mainboard and the side plate for being connected to the mainboard both sides, and the pre-manufactured hole opens up In the side plate;Meanwhile
The axis pin rod piece is embedded at the pre-manufactured hole and is fixed on the side plate, and the lifting part be connected to it is described The one end of axis pin rod piece away from the side plate.
Further, the axis pin rod piece includes hanging sled and is connected to the described hanging part for hanging sled one end Part, the sled that hangs are embedded at the pre-manufactured hole.
Further, the lifting part prizes the annular stop protrusion that radially projection forms for described hang, and There is gap between the limit protrusion and the side plate;Or the lifting part for it is described hang prize on radially projection form Spaced two annular stop protrusions, and be bonded close to the limit protrusion of the side plate with side plate this described.
Further, the axis pin rod piece further includes embedded steel tube, and the embedded steel tube is embedded at the pre-manufactured hole and institute State lifting hang sled be embedded at the embedded steel tube.
Compared with prior art, the utility model has the advantage of:
(1) prefabricated component tackling system provided by the utility model, can keep prefabricated component monnolithic case structure constant, avoid Damage to prefabricated component, extends the service life of prefabricated component, reduces economic loss.
(2) tackling system is simple in structure, of low cost, Hoisting Security, realizes the Fast Installation of prefabricated component, is arranged at Lifting attachment device thereon can not have to remove, and can also continue to use when needing replacing in the later stage so that replace and safeguard more What is added is time saving and energy saving.
Brief description of the drawings
Fig. 1 provides lifting attachment device structure diagram for the utility model first embodiment;
Fig. 2 provides lifting attachment device structure diagram for the utility model second embodiment;
Fig. 3 is that sled structure diagram is hung in the lifting that the utility model embodiment provides.
In figure, 1- prefabricated components, 10- pre-manufactured holes, 11- top plates, 12- side plates, 13- mainboards, 2- lifting attachment devices, 20- pins Axis bar, 200- screw rods, 201- nuts, 202- gaskets, 203- hang sled, 204- limit protrusions, 205- embedded steel tubes, 21- Lifting part, 210- tabular walls.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and embodiments.
Shown in Figure 1, the utility model embodiment provides a kind of prefabricated component tackling system, it is used to lift by crane prefabricated component 1, It includes pre-manufactured hole 10, lifting attachment device 2 and boom hoisting (not shown);The pre-manufactured hole 10 is opened in described prefabricated On part 1, the lifting attachment device 2 includes axis pin rod piece 20 and lifting part 21, and the lifting part 21 is connected to the pin 20 end of axis bar, the axis pin rod piece 20 are inserted into the pre-manufactured hole 10, and the boom hoisting connects with the lifting part 21 Connect.
The coupling part of the prefabricated component 1 is tongue and groove shape, so when connection, can preferably be coordinated, and It is also prevented from effluent seepage after the completion of assembly.
Common various parts when the prefabricated component 1 is constructs, while the boom hoisting is the sheet such as loop wheel machine or hoist engine The device that field notes, details are not described herein.
Tackling system provided by the utility model, its lifting attachment device are not fixed on prefabricated using modes such as welding On part, it need not be cut after the completion of construction, therefore, damage of the wall to prefabricated component, maintains prefabricated component monnolithic case structure It is constant, the service life of prefabricated component is extended, reduces economic loss, the tackling system is simple in structure, and lifting attachment device is adopted With common simple part, of low cost, Hoisting Security realizes the quick installation of prefabricated component, and the lifting being arranged on connects Connection device can not have to remove, and can also continue to use when needing replacing in the later stage so that and it is more time saving and energy saving that replacement is safeguarded, The lifting attachment device preferably use stainless steel, prevents corrosion, accordingly even when being damaged using prefabricated component after for many years, occurs Situation, can also be hung out by the lifting attachment device, be also convenient for repairing, time saving and energy saving.
Shown in Figure 1, further, the prefabricated component 1 includes top plate 11 and is extended downwardly by 11 both ends of top plate Side plate 12, the pre-manufactured hole 10 is opened in the top plate 11 and runs through the top plate 11, and the pre-manufactured hole 10 is preferably using perpendicular Directly run through the structure of the upper and lower ends face of the top plate 11;Meanwhile the axis pin rod piece 20 is inserted into the pre-manufactured hole 10 and fixes In the top plate 11, and the lifting part 21 is attached at the top plate 11.
As a kind of structure of the prefabricated component 1, the prefabricated component 1 has the top plate 11, therefore can be directly in institute State and the pre-manufactured hole 10 is opened up on top plate 11, topple in order to prevent, the pre-manufactured hole 10 at least sets 2, is symmetricly set on institute State on top plate 11, it is ensured that the stress balance during lifting, the axis pin rod piece 20 is fastened wherein, the lifting rope of lifting is connected to It in the lifting part 21, easily can quickly be lifted, the lifting part 21 is attached at the top plate 11, really Connection fastening is protected, prevents from rocking during lifting.
Shown in Figure 1, further, the axis pin rod piece 20 includes screw rod 200 and nut 201;The lifting part 21 are connected to described 200 one end of screw rod, and the screw rod 200 is mounted on the spiral shell through the pre-manufactured hole 10 and the nut 201 The one end of bar 200 away from the lifting part 21.The length of the screw rod 200 is more than the length of the pre-manufactured hole 10, it is ensured that institute State screw rod 200 through end after the pre-manufactured hole 10 can also group set the nut 201.When in use, the screw rod 200 is worn The nut 201 is tightened after crossing the pre-manufactured hole 10, the lifting part 21 is contacted with the top plate 11, prevents from lifting by crane During the prefabricated component 1 rock.
Shown in Figure 1, further, the lifting part 21 is hanging ring or suspension hook, facilitates the suspension of lifting rope.
Shown in Figure 1, further, when the lifting part 21 is hanging ring, the hanging ring is in D shape and with one Tabular wall 210, the tabular wall 210 are attached at the top plate 11.When tightening the nut 201, the tabular wall 210 contact with 11 face of top plate, and the hanging ring is caused to damage or become to the top plate 11 when preventing from tightening the nut 201 Shape.The hanging ring is contacted with the top plate 11.On the one hand prevent that the prefabricated component 1 rocks during lifting, the screw rod 200 The top plate 11 is caused to damage, it is on the other hand also more steady during lifting, prevent unexpected generation.
Shown in Figure 1, further, the axis pin rod piece 20 further includes gasket 202, described 202 liang of walls of gasket point Do not contacted with the nut 201 and the top plate 11.The gasket 202 is set, prevents from tightening the nut during nut 201 201 pairs of top plates 11 cause to damage, and the gasket 202 can use stainless steel material or wear resistant plastic material to make.
Shown in Figure 2, further, the prefabricated component 1 includes mainboard 13 and is connected to the side of 13 both sides of mainboard Plate 12, the pre-manufactured hole 10 are opened in the side plate 12;Meanwhile the axis pin rod piece 20 embedded at the pre-manufactured hole 10 and is fixed In the side plate 12, and the lifting part 21 is connected to the one end of the axis pin rod piece 20 away from the side plate 12.
As another structure of the prefabricated component 1, the prefabricated component 1 is because without the top plate 11, therefore described in it The pre-manufactured hole 10 is opened up on side plate 12, when opening up, the position for opening up the pre-manufactured hole 10 on best two side plate 12 It is identical, ensure held stationary during lifting, prevent from damaging, the lifting rope of lifting is connected in the lifting part 21, can be very convenient Quickly lifted.
Shown in Figure 2, further, the axis pin rod piece 20 hangs sled 203 including lifting and is connected to described hang The lifting part 21 of 203 one end is prized, the sled 203 that hangs is embedded at the pre-manufactured hole 10.
Referring to shown in Fig. 2 and Fig. 3, further, the lifting part 21 hangs radially projection on sled 203 to be described The annular stop protrusion 204 formed, and have gap between the limit protrusion 204 and the side plate 12;Or the lifting part 21 hang spaced two annular stop protrusions 204 that radially projection forms on sled 203 to be described, and close to described The limit protrusion 204 of side plate 12 is bonded with side plate this described 12.
When the lifting part 21 is a limit protrusion 204, lifting rope can be arranged on the limit protrusion 204 and place side described between side plate 12, prize 203 radiuses since 204 radius of limit protrusion is more than described hang, because This, the limit protrusion 204 can prevent lifting rope from moving and come off axially outward along the sled 203 that hangs, and cause lifting to lose Lose.And when the lifting part 21 is two limit protrusions 204, even if the sled 203 that hangs is during lifting Tendency is skidded off by the upward active force of lifting rope, due to described in the limit protrusion 204 close to the side plate 12 and the side Side plate 12 is bonded, and prevents it outwards to skid off, it is ensured that lifts by crane the security of process.In addition, the limit protrusion 204 can be It is continuous continual or be made of multiple convex block intervals.
Shown in Figure 2, further, the axis pin rod piece 20 further includes embedded steel tube 205, the embedded steel tube 205 The embedded steel tube 205 is embedded at embedded at the pre-manufactured hole 10 and the sled 203 that hangs.205 outside diameter of embedded steel tube Not less than 10 internal diameter of pre-manufactured hole, 203 outside diameters of sled that hang are not less than 205 outside diameter of embedded steel tube, such ability Ensure to set more firm between three, and set the embedded steel tube 205 to be lifted by crane to avoid the sled 203 that hangs During damage to the prefabricated component 1.
Shown in Figure 2, further, the pre-manufactured hole 10 is blind hole.Blind hole is set to, can not only meet to lift by crane need Ask, the damage to the side plate 12 can also be reduced.
The utility model is not limited to the above embodiment, for those skilled in the art, not On the premise of departing from the utility model principle, some improvements and modifications can also be made, these improvements and modifications are also considered as this reality Within new protection domain.The content not being described in detail in this specification belongs to known to professional and technical personnel in the field The prior art.

Claims (10)

1. a kind of prefabricated component tackling system, it is used to lift by crane prefabricated component (1), it is characterised in that it includes:
The pre-manufactured hole (10) being opened on the prefabricated component (1);
Attachment device (2) is lifted by crane, the lifting attachment device (2) includes axis pin rod piece (20) and lifting part (21), described Hanging part part (21) is connected to axis pin rod piece (20) end, and the axis pin rod piece (20) is inserted into the pre-manufactured hole (10);
Boom hoisting (3), the boom hoisting (3) are connected with the lifting part (21).
A kind of 2. prefabricated component tackling system as claimed in claim 1, it is characterised in that:
The prefabricated component (1) includes top plate (11) and the side plate (12) extended downwardly by the top plate (11) both ends, described prefabricated Hole (10) is opened in the top plate (11) and runs through the top plate (11);Meanwhile
The axis pin rod piece (20) is inserted into the pre-manufactured hole (10) and is fixed on the top plate (11), and the lifting part (21) It is attached at the top plate (11).
A kind of 3. prefabricated component tackling system as claimed in claim 2, it is characterised in that:
The axis pin rod piece (20) includes screw rod (200) and nut (201);The lifting part (21) is connected to the screw rod (200) one end, the screw rod (200) are mounted on the screw rod (200) far through the pre-manufactured hole (10) and the nut (201) From one end of the lifting part (21).
A kind of 4. prefabricated component tackling system as claimed in claim 2 or claim 3, it is characterised in that:The lifting part (21) is to hang Ring or suspension hook.
A kind of 5. prefabricated component tackling system as claimed in claim 4, it is characterised in that:When the lifting part (21) is hanging ring When, the hanging ring is in D shape and has a tabular wall (210), and the tabular wall (210) is attached at the top plate (11).
A kind of 6. prefabricated component tackling system as claimed in claim 3, it is characterised in that:The axis pin rod piece (20) further includes pad Piece (202), (202) two wall of gasket are contacted with the nut (201) and the top plate (11) respectively.
A kind of 7. prefabricated component tackling system as claimed in claim 1, it is characterised in that:
The prefabricated component (1) includes mainboard (13) and the side plate (12) for being connected to the mainboard (13) both sides, the pre-manufactured hole (10) it is opened in the side plate (12);Meanwhile
The axis pin rod piece (20) is embedded at the pre-manufactured hole (10) and is fixed on the side plate (12), and the lifting part (21) it is connected to the one end of the axis pin rod piece (20) away from the side plate (12).
A kind of 8. prefabricated component tackling system as claimed in claim 7, it is characterised in that:
The axis pin rod piece (20) hangs sled (203) including lifting and is connected to the lifting for hanging sled (203) one end Component (21), the sled (203) that hangs are embedded at the pre-manufactured hole (10).
A kind of 9. prefabricated component tackling system as claimed in claim 8, it is characterised in that:The lifting part (21) is risen to be described It is raised (204) to hang the annular stop that radially projection forms on sled (203), and the limit protrusion (204) and the side plate (12) there is gap between;Or the lifting part (21) is hung the interval that radially projection forms on sled (203) and is set to be described The two annular stop protrusions (204) put, and the limit protrusion (204) close to the side plate (12) and the side plate (12) it is bonded.
A kind of 10. prefabricated component tackling system as claimed in claim 8 or 9, it is characterised in that:The axis pin rod piece (20) is also wrapped Embedded steel tube (205) is included, the embedded steel tube (205) is set embedded at the pre-manufactured hole (10) and the sled (203) that hangs In the embedded steel tube (205).
CN201721282395.4U 2017-09-30 2017-09-30 A kind of prefabricated component tackling system Expired - Fee Related CN207296150U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721282395.4U CN207296150U (en) 2017-09-30 2017-09-30 A kind of prefabricated component tackling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721282395.4U CN207296150U (en) 2017-09-30 2017-09-30 A kind of prefabricated component tackling system

Publications (1)

Publication Number Publication Date
CN207296150U true CN207296150U (en) 2018-05-01

Family

ID=62440669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721282395.4U Expired - Fee Related CN207296150U (en) 2017-09-30 2017-09-30 A kind of prefabricated component tackling system

Country Status (1)

Country Link
CN (1) CN207296150U (en)

Similar Documents

Publication Publication Date Title
CN206156567U (en) Thin cylinder body hoist
CN207566717U (en) A kind of I-shaped floor steel beam lifting structure
CN207296150U (en) A kind of prefabricated component tackling system
CN203452013U (en) Integrated unloading device for cantilever casting cradle template
CN201501730U (en) Special hanger for blade of large-scale wind generator
CN102050377B (en) Method for installing combined hoist and oil production platform drilling equipment
CN202016797U (en) Hoisting device of foundation base of wind power generation tower
CN201232652Y (en) Invalidation preventing structure of vertical diagonal flow pump sleeve coupler and detaching device thereof
CN204689354U (en) A kind of external board-like hanger Lift-on/Lift-off System protecting steel wire cable
CN208869182U (en) It is a kind of for thin-walled pipeline or the hanging apparatus of thin-walled line equipment
CN207330115U (en) Clamping device for petroleum pipeline lifting
CN209923970U (en) Bailey beam fixing device for suspension pipeline
CN209443487U (en) A kind of diversion works prefabricated open caisson installation equipment
CN202499643U (en) Special lifting head
CN208948679U (en) Assembled hanger
CN208218181U (en) A kind of ESR ingot special hanger
CN212687323U (en) Hoisting system for hoisting converter vaporization cooling system equipment
CN202379580U (en) Pipeline horizontal lifting appliance with automatic hook
CN207276043U (en) A kind of large component lifts positioning auxiliary device
CN216235557U (en) Tower crane mark festival hoist of convenient operation formula
CN103950821A (en) Pipeline hoisting rigging
CN206842829U (en) A kind of deslagging device for crane of slagging tap
CN204873459U (en) A deep -well pump hoisting accessory for infusing production line
CN202561404U (en) Hoisting device
CN212024527U (en) Fire-fighting pipe lifting appliance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180501

CF01 Termination of patent right due to non-payment of annual fee