CN207277364U - Soft clay area ancient building ground base enforcement structure - Google Patents

Soft clay area ancient building ground base enforcement structure Download PDF

Info

Publication number
CN207277364U
CN207277364U CN201721003648.XU CN201721003648U CN207277364U CN 207277364 U CN207277364 U CN 207277364U CN 201721003648 U CN201721003648 U CN 201721003648U CN 207277364 U CN207277364 U CN 207277364U
Authority
CN
China
Prior art keywords
soft clay
ancient building
clay area
hole
ground base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721003648.XU
Other languages
Chinese (zh)
Inventor
李茜玲
马云磊
朱彬彬
张宁
吴永强
李江湖
封洪峰
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Gold Mantis Green Landscape Ltd Co
Original Assignee
Suzhou Gold Mantis Green Landscape Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Gold Mantis Green Landscape Ltd Co filed Critical Suzhou Gold Mantis Green Landscape Ltd Co
Priority to CN201721003648.XU priority Critical patent/CN207277364U/en
Application granted granted Critical
Publication of CN207277364U publication Critical patent/CN207277364U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of soft clay area ancient building ground base enforcement structure, original place base, the original basis being arranged on the original place base, the drilling opened up from the original basis to the original place base and cooperation are inserted into the reinforcing pile in the drilling;The reinforcing pile includes cushion cap, casing, through hole, pedestal, multiple grout holes, reinforcing bar and securing plate, and the securing plate bottom surface is connected with multiple T-shaped reinforcement blocks.The soft clay area ancient building ground base enforcement structure of the utility model, sets reinforcing pile, can increase structure total bearing capacity, anti-depression ability, improve integrally-built stability.There is extremely effective consolidation effect for the foundation of soft clay area, foundation depression and displacement can be reduced, effective basis protection can be formed to the ancient building on the foundation of soft clay area.

Description

Soft clay area ancient building ground base enforcement structure
Technical field
Ancient building foundation consolidating technology field is the utility model is related to, more particularly to a kind of soft clay area ancient building ground base Plinth ruggedized construction.
Background technology
For ancient building, since time passage and environmental change, soaking original soil structure can change, foundation bearing Power and compression modulus reduce, and original basis can produce new deformation, when deforming more than specification permissible value, just under load effect It must carry out ground or ground and the reinforcing on basis.And the location of soft clay area has void ratio is big, moisture content is high, sedimentation is big etc. Feature, existing ground base enforcement structure can not solve the ground base of soft clay area ancient building well there are many problems Plinth reinforces problem, protection to ancient building there are it is larger the defects of.So one kind is needed to be used for soft clay area well now The ground base enforcement structure of ancient building, is destroyed with preventing the problems such as ancient building is because of foundation depression.
Utility model content
The technical problem to be solved by the utility model is to for above-mentioned deficiency of the prior art, there is provided a kind of weak soil Regional ancient building ground base enforcement structure.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of soft clay area ancient building ground Foundation reinforcing structure, including:Original place base, the original basis being arranged on the original place base, from the original basis to the original place base The drilling and cooperation that open up are inserted into the reinforcing pile in the drilling;
The reinforcing pile include cushion cap, be fixedly connected on the casing of the cushion cap bottom, be opened in the cushion cap in the middle part of and The through hole that is connected with described sleeve pipe, be connected to the pedestal of described sleeve pipe bottom, the multiple grouting being opened on described sleeve pipe side wall Hole, the reinforcing bar being plugged in described sleeve pipe and one end and the reinforcing bar other end that is rotatably connected are plugged in the grout hole Securing plate, the securing plate bottom surface are connected with multiple T shapes reinforcement blocks.
Preferably, the drilling bottom reaming forms reinforced hole.
Preferably, the grout hole is turned on the reinforced hole.
Preferably, the upper surface of the pedestal is connected with described sleeve pipe sealed bottom, and the bottom surface of the pedestal is arranged to Zigzag is wavy.
Preferably, screw thread is offered on described sleeve pipe outer wall.
Preferably, offered on the side wall of described sleeve pipe upper end and ooze slurry hole.
Preferably, the cushion cap bottom is connected with the mounting blocks of inverted ladder-shaped body shape.
Preferably, the original basis upper surface offers the mounting groove for coordinating with the mounting blocks.
Preferably, it is filled with mixed mud in the reinforced hole, casing and through hole.
The beneficial effects of the utility model are:The soft clay area ancient building ground base enforcement structure of the utility model, if Reinforcing pile is put, structure total bearing capacity, anti-depression ability can be increased, improve integrally-built stability.For soft clay area Foundation there is extremely effective consolidation effect, foundation depression and displacement can be reduced, can be to the ground of soft clay area On the basis of ancient building form effective basis protection.
Brief description of the drawings
Fig. 1 is the structure diagram of the soft clay area ancient building ground base enforcement structure of the utility model;
Fig. 2 is the structure diagram of the reinforcing pile when securing plate of the utility model is in contraction state;
Fig. 3 is the structure diagram of the reinforcing pile when securing plate of the utility model is in unfolded state;
Fig. 4 is the structure diagram of the drilling of the utility model;
Fig. 5 is the structure diagram of the securing plate of the utility model.
Description of reference numerals:
1-reinforcing pile;2-original place base;3-original basis;4-drilling;5-mixed mud;6-deep soil;10-cushion cap; 11-casing;12-through hole;13-pedestal;14-grout hole;15-reinforcing bar;16-securing plate;17-mounting blocks;18-peace Tankage;40-reinforced hole;110-screw thread;111-ooze slurry hole;170-T-shaped reinforcement block.
Embodiment
The utility model is described in further detail with reference to embodiment, to make those skilled in the art's reference say Bright book word can be implemented according to this.
It should be appreciated that such as " having ", "comprising" and " comprising " term used herein do not allot one or more The presence or addition of a other elements or its combination.
As shown in Figs. 1-5, a kind of soft clay area ancient building ground base enforcement structure of the present embodiment, including:Original place base The 2nd, original basis 3 in situ base 2, the drilling 4 opened up from original basis 3 to original place base 2 are set and coordinated and is inserted into drilling 4 Reinforcing pile 1;
Reinforcing pile 1 include cushion cap 10, be fixedly connected on the casing 11 of 10 bottom of cushion cap, be opened in the middle part of cushion cap 10 and with Casing 11 connect through hole 12, be connected to the pedestal 13 of 11 bottom of casing, the multiple grout holes 14 being opened on 11 side wall of casing, The reinforcing bar 15 being plugged in casing 11 and one end and reinforcing bar 15 are rotatably connected the securing plate that the other end is plugged in grout hole 14 16,16 bottom surface of securing plate is connected with multiple T-shaped reinforcement blocks 170.The 4 bottom reamings that drill form reinforced hole 40.Grout hole 14 is with adding Solid hole 40 turns on.The upper surface of pedestal 13 is connected with 11 sealed bottom of casing, and the bottom surface of pedestal 13 is arranged to zigzag or wave Shape.Mixed mud 5 is filled with reinforced hole 40, casing 11 and through hole 12.
Reinforcing bar 15 is connected by hinge or other rotating structural elements with one end of securing plate 16, so that reinforcing bar 15 and hinge Between can mutually rotate.
Wherein, securing plate 16 includes polylith, and before the installation of reinforcing pile 1 is fixed, securing plate 16 is plugged in grout hole 14 One end is not pierced by grout hole 14, its other end is inclined upwardly to be connected with reinforcing bar 15, securing plate 16 adds generally in contraction state Solid plate 16 is completely inside contraction and casing 11;Reinforcing pile 1 inserting to drilling 4 in installed when, pushing reinforcing pile 1 bottom of to, make After grout hole 14 is turned on reinforced hole 40, lower pressing reinforcing 15, moves down with one end of the securing plate 16 of 15 movable connection of reinforcing bar, The other end being plugged in grout hole 14 is pierced by grout hole 14, enters in reinforced hole 40, after reinforcing bar 15 is pressed to bottom, reinforces Plate 16 is fully deployed, and securing plate 16 keeps horizontal, and its one end is in inside casing 11, and the other end is in reinforced hole 40.Then Mixed mud 5 is filled to 11 internal pressure of casing, and is tamped, mixed mud 5 is entered in reinforced hole 40 by grout hole 14, and the filling of mixed mud 5 fills In the full inside of casing 11 and reinforced hole 40 and through hole 12, casing 11, reinforcing bar 15, securing plate 16, pedestal 13 and concrete are formed surely Solid 15 concrete-pile rod structure of reinforcing bar.The size of reinforced hole 40 needs securing plate 16 that at least can be after holding and expanding.
Casing 11, reinforcing bar 15, concrete form the endothecium structure of reinforcing pile 1, and reinforcing bar 15 can increase the rigidity of entirety, casing 11 select steel pipe material, can be used as equivalent reinforcing bar 15, strengthen the intensity of reinforcing pile 1.Securing plate 16 selects stainless steel, reinforces The vertical bearing capacity of reinforcing pile 1 and horizontal anti-excursion capability can be significantly greatly increased in plate 16.Securing plate 16 increase vertical direction by Power area, can prevent reinforcing pile 1 from sinking, so that the anti-depression ability of total is enhanced, the T that 16 bottom of securing plate is set Shape reinforcement block 170 is inserted into the mixed mud 5 being filled in reinforced hole 40, on the one hand can further improve the carrying of vertical direction Power, on the other hand can increase the resistance of 16 horizontal direction of securing plate, prevent the offset in 16 occurred level direction of securing plate, and enhancing adds Gu the stability of stake 1.The bottom surface of pedestal 13 is arranged to zigzag or wavy, can increase the forced area of pedestal 13, increase it The resistance of vertical bearing capacity and horizontal direction, can improve the stability of reinforcing pile 1.
Screw thread 110 is offered on 11 outer wall of casing, the frictional force between casing 11 and original place base 2, original basis 3 can be improved
Offered on 11 upper end side wall of casing and ooze slurry hole 111.Mixed mud 5 penetrates into 11 outer wall of casing by oozing slurry hole 111 In gap between original basis 3, original place base 2, to fill the gap, while increase between casing 11 and original basis 3, original place base 2 Frictional force, prevents 1 occurred level displacement of reinforcing pile, increases the stability of reinforcing pile 1.
10 bottom of cushion cap is connected with the mounting blocks 17 of inverted ladder-shaped body shape.3 upper surface of original basis, which offers, to be used for and mounting blocks 17 mounting grooves 18 coordinated.Mounting blocks 17, which coordinate, to be plugged in mounting groove 18, easy to installation of the cushion cap 10 in original basis 3, again The stability after cushion cap 10 is installed can be strengthened, strengthen overall intensity.
Insertion depth is selected according to actual soil property situation when reinforcing pile 1 inserts, if through original place base 2.
In one embodiment, drilling 4 is drilled into deep soil 6 through original place base 2, and 1 bottom of reinforcing pile is inserted into original place base 2 In the deep soil 6 of lower section, 6 soil property of deep soil therein is hard.
The work progress of the utility model is:
1) drilling 4 downwards in the original basis 3 for needing to be reinforced using 4 equipment of drilling, is drilled into predetermined depth, recycles Broaching equipment carries out reaming to 4 bottoms of drilling, forms reinforced hole 40, and 4 diameters of drilling make choice according to actual needs;
2) reinforcing pile 1 is plugged in drilling 4, coordinates the mounting blocks 17 of 10 bottom of cushion cap and be plugged in mounting groove 18, Reinforcing pile 1 is pushed to bottom, after grout hole 14 is turned on reinforced hole 40, lower pressing reinforcing 15, with adding for 15 movable connection of reinforcing bar One end of solid plate 16 moves down, and the other end being plugged in grout hole 14 is pierced by grout hole 14, enters in reinforced hole 40, by reinforcing bar After 15 press to bottom, securing plate 16 is fully deployed, and securing plate 16 keeps horizontal, and its one end is in inside casing 11, at the other end In in reinforced hole 40;
3) mixed mud 5 is poured into casing 11 using the isobaric equipment that fills of grouting pump, mixed mud 5 is entered by grout hole 14 and added In solid hole 40, while mixed mud 5 is penetrated into the gap between 11 outer wall of casing and original basis 3, original place base 2 by oozing slurry hole 111, Through hole 12 is sealed with mixed mud 5 again, and is tamped, forms casing 11, reinforcing bar 15, securing plate 16, pedestal 13 and concrete firm 15 concrete-pile rod structure of reinforcing bar, complete reinforcing process.Wherein, grouting pressure makes choice according to actual needs;
Original basis 3 and original place base 2 are connected and to form entirety by reinforcing pile 1, can increase the bearing capacity of entirety, anti-depression energy Power, improves integrally-built stability.There is extremely effective consolidation effect for the foundation of soft clay area, can reduce Foundation depression and displacement, can form the ancient building on the foundation of soft clay area effective basis protection.
In the description of the utility model, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " length ", " width Degree ", " thickness ", " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outer ", " suitable The orientation or position relationship of the instruction such as hour hands ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " are based on orientation shown in the drawings Or position relationship, be for only for ease of description the utility model and simplify and describe, rather than instruction or imply signified device or Element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that limit to the utility model System.
Although the embodiment of the utility model is disclosed as above, it is not restricted in specification and embodiment Listed utilization, it can be applied to the field of various suitable the utility model completely, for those skilled in the art, Other modification is easily achieved, therefore under the universal limited without departing substantially from claim and equivalency range, this reality Specific details is not limited to new.

Claims (9)

  1. A kind of 1. soft clay area ancient building ground base enforcement structure, it is characterised in that including:Original place base, be arranged on the original Original basis on ground, the drilling opened up from the original basis to the original place base and cooperation are inserted into the reinforcing in the drilling Stake;
    The reinforcing pile include cushion cap, be fixedly connected on the casing of the cushion cap bottom, be opened in the cushion cap in the middle part of and with institute The through hole of casing connection is stated, the pedestal of described sleeve pipe bottom, the multiple grout holes being opened on described sleeve pipe side wall is connected to, inserts The reinforcing bar being located in described sleeve pipe and one end and the reinforcing bar are rotatably connected the reinforcing that the other end is plugged in the grout hole Plate, the securing plate bottom surface are connected with multiple T-shaped reinforcement blocks.
  2. 2. ancient building ground base enforcement structure in soft clay area according to claim 1, it is characterised in that the drilling bottom Reaming is held to form reinforced hole.
  3. 3. ancient building ground base enforcement structure in soft clay area according to claim 2, it is characterised in that the grout hole Turned on the reinforced hole.
  4. 4. ancient building ground base enforcement structure in soft clay area according to claim 1, it is characterised in that the pedestal Upper surface is connected with described sleeve pipe sealed bottom, and the bottom surface of the pedestal is arranged to zigzag or wavy.
  5. 5. ancient building ground base enforcement structure in soft clay area according to claim 1, it is characterised in that outside described sleeve pipe Screw thread is offered on wall.
  6. 6. ancient building ground base enforcement structure in soft clay area according to claim 1, it is characterised in that in described sleeve pipe Offered on the wall of side and ooze slurry hole.
  7. 7. ancient building ground base enforcement structure in soft clay area according to claim 1, it is characterised in that the cushion cap bottom Portion is connected with the mounting blocks of inverted ladder-shaped body shape.
  8. 8. ancient building ground base enforcement structure in soft clay area according to claim 7, it is characterised in that the original basis Upper surface offers the mounting groove for coordinating with the mounting blocks.
  9. 9. ancient building ground base enforcement structure in soft clay area according to claim 3, it is characterised in that the reinforcing Mixed mud is filled with hole, casing and through hole.
CN201721003648.XU 2017-08-11 2017-08-11 Soft clay area ancient building ground base enforcement structure Active CN207277364U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721003648.XU CN207277364U (en) 2017-08-11 2017-08-11 Soft clay area ancient building ground base enforcement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721003648.XU CN207277364U (en) 2017-08-11 2017-08-11 Soft clay area ancient building ground base enforcement structure

Publications (1)

Publication Number Publication Date
CN207277364U true CN207277364U (en) 2018-04-27

Family

ID=61983326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721003648.XU Active CN207277364U (en) 2017-08-11 2017-08-11 Soft clay area ancient building ground base enforcement structure

Country Status (1)

Country Link
CN (1) CN207277364U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112965378A (en) * 2021-02-05 2021-06-15 中山大学 High-speed railway foundation deformation self-adaptive control system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112965378A (en) * 2021-02-05 2021-06-15 中山大学 High-speed railway foundation deformation self-adaptive control system and method
CN112965378B (en) * 2021-02-05 2022-02-11 中山大学 High-speed railway foundation deformation self-adaptive control system and method

Similar Documents

Publication Publication Date Title
CN101812976B (en) Adjustable multiple coil extruding and expanding drilling tool
CN104074186B (en) The casing device of pore-forming and construction method thereof in a kind of building lot
CN207176673U (en) Suitable for the anti-depression ground base enforcement structure of the small-sized ancient building in soft clay area
CN106192999A (en) The construction method of uplift pile
CN111851479B (en) Method for constructing immersed tube rammed cast-in-place pile in sand layer or gravel layer
CN111794216A (en) Construction method of uplift carrier pile
CN201857606U (en) Novel combined uplift pile
CN201245839Y (en) Composite bearing pile of concrete stirring soil implanted prefabricated reinforced concrete core rod
CN112081157B (en) Construction method for forming reinforced composite pile foundation by high-rise building retreating type grouting
CN207277364U (en) Soft clay area ancient building ground base enforcement structure
CN105297710A (en) High-pressure-jetting cement soil twist drill and reamed reinforced concrete grouting combined pile and manufacturing method
CN102635110A (en) Construction method for concrete pile
CN106677203A (en) Prefabricated anchoring base for frozen soil foundation and installation method
CN101649611A (en) Wing-added hole-expanding pile and wing-added hole expander
CN206752454U (en) One kind perfusion embedded pile
CN203866852U (en) Anti-floating pile structure composited by deep spiral-spraying cement soil plate and anchor rod
KR101031447B1 (en) Protrusion forming machine for ground boring
CN201679450U (en) Bidirectional spiral extruding reaming drill with soil guiding grooves
CN108049401A (en) A kind of screw thread rammed bulb pile and its construction method
CN201650154U (en) Adjustable multi-stage helical extruding type drilling tool
CN209603123U (en) A kind of bottom-enlarging filling pile structure for cutting down negative friction
KR101416865B1 (en) Construction method of screw file
CN101275396A (en) Rotating extrusion concrete filling pile construction method and equipment
CN205857167U (en) A kind of boring extruding reinforcement support disk pile
CN201148617Y (en) Wrapping opening-shaped pile tip

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant