CN207259973U - A kind of wet seam construction Hanging Basket of bridge floor - Google Patents
A kind of wet seam construction Hanging Basket of bridge floor Download PDFInfo
- Publication number
- CN207259973U CN207259973U CN201721217448.4U CN201721217448U CN207259973U CN 207259973 U CN207259973 U CN 207259973U CN 201721217448 U CN201721217448 U CN 201721217448U CN 207259973 U CN207259973 U CN 207259973U
- Authority
- CN
- China
- Prior art keywords
- supporting rod
- rod
- bridge floor
- wet seam
- hanging basket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of wet seam construction Hanging Basket of bridge floor, including the first support column, connecting rod, pull rod, hanging rod, web plate, second support bar, the 3rd supporting rod, the 4th supporting rod;Advantage; wet seam is carried out to bridge floor with Hanging Basket auxiliary using the wet seam construction of bridge floor provided by the utility model; hanging rod is suspended on bridge floor; wet seam worker stands in Hanging Basket; connecting rod and pull rod on first support column, second support bar, the 3rd supporting rod and the 4th supporting rod, safeguard protection is carried out to the staff in Hanging Basket, avoids the wet seam staff of bridge floor when carrying out wet seam to bridge floor; fall from Hanging Basket, cause security incident.The wet seam construction cradle structure of bridge floor provided by the utility model is simple, removes and installs conveniently, uses manpower and material resources sparingly.
Description
Technical field
The utility model belongs to field of bridge construction, and in particular to a kind of wet seam construction Hanging Basket of bridge floor.
Background technology
In bridge construction, it usually needs using Hanging Basket as auxiliary tool, aid in the wet seam of bridge floor to construct, it is existing
Cradle structure it is complicated, installation and removal are required to using instrument auxiliary installation, installation inconvenience.It is steady after existing Hanging Basket installation
Qualitative not high, staff easily occurs security incident, influences the construction of bridge when using Hanging Basket.Existing Hanging Basket
Need dismounting to preserve after the completion of use, do not dismantle preservation and take up a large area, move inconvenience, wasting space resource, it has not been convenient to
Promoted in bridge construction process.
Utility model content
In view of the above-mentioned problems of the prior art, the utility model provides a kind of simple in structure, bridge floor easy to use
Wet seam construction Hanging Basket.
Its technical solution is:
A kind of wet seam construction Hanging Basket of bridge floor, including the first support column, connecting rod, pull rod, hanging rod, web plate, the second support
Bar, the 3rd supporting rod, the 4th supporting rod;
First support column, second support bar, the 3rd supporting rod and the 4th supporting rod are parallel to each other and surround one jointly
Cuboid, the connecting rod are two groups, and two groups of connecting rods are arranged in parallel, and one group of connecting rod is perpendicular to the first support column and second support bar two
End is fixedly connected with the first support column and second support bar respectively, and another group of connecting rod is perpendicular to the 3rd supporting rod and the 4th supporting rod
Both ends are fixedly connected with the 3rd supporting rod and the 4th supporting rod respectively, and connecting rod on the supporting rod of supporting rod junction with being provided with card
Mouthful, the connecting rod two end is arranged in bayonet, and the pull rod is two groups, and two groups of pull rods are arranged in parallel, one group of pull rod both ends difference
It is connected with the first support column and the 4th supporting rod, another group of pull rod both ends are connected with second support bar and the 3rd supporting rod respectively,
First support column, second support bar, the 3rd supporting rod and the 4th supporting rod one end are fixedly connected with web plate, the first support
Column, second support bar, the 3rd supporting rod and the 4th supporting rod other end are connected with hanging rod.
Wet seam is carried out to bridge floor with Hanging Basket auxiliary using the wet seam construction of bridge floor provided by the utility model, hanging rod is hanged
Hang on bridge floor, wet seam worker stands in Hanging Basket, the first support column, second support bar, the 3rd supporting rod and the 4th support
Connecting rod and pull rod on bar, carry out safeguard protection to the staff in Hanging Basket, avoid the wet seam staff of bridge floor to bridge
When face carries out wet seam, fall from Hanging Basket, cause security incident.The wet seam construction Hanging Basket knot of bridge floor provided by the utility model
Structure is simple, removes and installs conveniently, uses manpower and material resources sparingly.
Further, first support column, second support bar, the 3rd supporting rod and the 4th supporting rod are divided into two-stage up and down,
Higher level supports shank diameter to be more than subordinate's support shank diameter, and subordinate's supporting rod can freely stretch in higher level's supporting rod, the higher level
Through hole is provided with first support column of supporting rod and subordinate's supporting rod, second support bar, the 3rd supporting rod and the 4th supporting rod.
Coordinated using the higher level's support and subordinate's supporting rod of minor diameter of major diameter, connecting rod two end is extend on supporting rod
Through hole in, the supporting rod of upper and lower two-stage can be relatively fixed, realize the flexible of construction hanging basket, construction hanging basket can be effectively improved
Service efficiency.
Further, the pull rod passes through fulcrum and the first support column, second support bar, the 3rd supporting rod and the 4th supporting rod
Connection mode be it is hinged, the fixed pivot be arranged on the first support column, second support bar, the 3rd supporting rod and the 4th support
On bar.
Pull rod is hinged with the first support column, second support bar, the 3rd supporting rod and the 4th supporting rod, the wet seam construction of bridge floor
Used with Hanging Basket after completing, the distance between the first support column of pulling, the 3rd supporting rod and second support bar, the 4th supporting rod,
The wet seam construction of bridge floor quickly can be subjected to contraction storage with Hanging Basket, it is easy to operate, save and hang the wet seam construction of bridge floor
Floor space when basket is stored, it is easy to operate, the cost of the wet seam of bridge floor is saved, improves the work efficiency of the wet seam of bridge floor.
Further, it is provided with bracing piece on the web plate.
Bracing piece is avoided that operator station when on web plate, and web plate is extended the service life of web plate, saved by gravity deformation
The about cost of the wet seam construction Hanging Basket of bridge floor, improves the work efficiency of the wet seam of bridge floor.
Further, the hanging rod is hinged with connecting plate one end, and the connecting plate other end is hinged on support by hanging rod hinged block
On bar, the supporting bar top is provided with leg.
The setting of leg enables the wet seam construction of bridge floor to be used by the use of Hanging Basket as Hanging Basket the wet seam of bridge floor progress, at the same time
The wet seam construction of bridge floor can also be used by the use of Hanging Basket as ladder while can not find suitable mount point, improve that bridge floor is wet connects
The service efficiency of construction Hanging Basket is stitched, saves the cost of the wet seam of bridge floor, improves the work efficiency of the wet seam of bridge floor.
Further, the hanging rod is two.
Using two hanging rods so that the wet seam construction of bridge floor is more stable after being installed with Hanging Basket, avoids producing security incident, carries
The work efficiency of the high wet seam of bridge floor.
Beneficial effect:
1st, wet seam is carried out to bridge floor with Hanging Basket auxiliary using the wet seam construction of bridge floor provided by the utility model, by hanging rod
It is suspended on bridge floor, wet seam worker stands in Hanging Basket, the first support column, second support bar, the 3rd supporting rod and the 4th
Connecting rod and pull rod on strut, carry out safeguard protection to the staff in Hanging Basket, avoid the wet seam staff of bridge floor right
When bridge floor carries out wet seam, fall from Hanging Basket, cause security incident.The wet seam construction Hanging Basket of bridge floor provided by the utility model
It is simple in structure, remove and install conveniently, use manpower and material resources sparingly.
2nd, coordinated using the higher level's support and subordinate's supporting rod of minor diameter of major diameter, connecting rod two end is extend into supporting rod
On through hole in, the supporting rod of upper and lower two-stage can be relatively fixed, realize the flexible of construction hanging basket, construction hanging basket can be effectively improved
Service efficiency.
3rd, pull rod is hinged with the first support column, second support bar, the 3rd supporting rod and the 4th supporting rod, and the wet seam of bridge floor is applied
Work with Hanging Basket using completing after, pull between the first support column, the 3rd supporting rod and second support bar, the 4th supporting rod away from
From, the wet seam construction of bridge floor quickly can be subjected to contraction storage with Hanging Basket, it is easy to operate, save and use the wet seam construction of bridge floor
Floor space when Hanging Basket is stored, it is easy to operate, the cost of the wet seam of bridge floor is saved, improves the work efficiency of the wet seam of bridge floor.
4th, bracing piece is avoided that operator station when on web plate, and web plate is extended the service life of web plate by gravity deformation,
The cost of the wet seam construction Hanging Basket of bridge floor is saved, improves the work efficiency of the wet seam of bridge floor.
5th, the setting of leg enables the wet seam construction of bridge floor to carry out wet seam to bridge floor as Hanging Basket by the use of Hanging Basket and uses, together
When the wet seam construction of bridge floor can also be used by the use of Hanging Basket as ladder while can not find suitable mount point, improve bridge floor it is wet
The service efficiency of seam construction Hanging Basket, saves the cost of the wet seam of bridge floor, improves the work efficiency of the wet seam of bridge floor.
6th, using two hanging rods so that the wet seam construction of bridge floor is more stable after being installed with Hanging Basket, avoids producing security incident,
Improve the work efficiency of the wet seam of bridge floor.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Figure 1A direction views when Fig. 2 collapses for Hanging Basket;
Fig. 3 is Fig. 2A-A to sectional view;
Fig. 4 is mesh-plate structure schematic diagram;
Fig. 5 is supporting bar structure schematic diagram;Wherein, the first support columns of 1-, 2- connecting rods, 3- fulcrums, 4- pull rods, 5- hanging rods
Hinged block, 6- hanging rods, 7- web plates, 8- bracing pieces, 9- connecting plates, 10- legs, 11- bayonets, 12- second support bars, 13- the 3rd
Supporting rod, the 4th supporting rods of 14-.
Embodiment
As shown in Figs 1-4, the wet seam construction Hanging Basket of a kind of bridge floor, including the first support column 1, connecting rod 2, pull rod 4, hanging rod
6th, web plate 7, second support bar 12, the 3rd supporting rod 13, the 4th supporting rod 14;
First support column 1, second support bar 12, the 3rd supporting rod 13 and the 4th supporting rod 14 are parallel to each other and enclose jointly
Into a cuboid, the connecting rod 2 is two groups, and two groups of connecting rods 2 are arranged in parallel, and one group of connecting rod 2 is perpendicular to the first support column 1 and the
Two supporting rods, 12 both ends are fixedly connected with the first support column 1 and second support bar 12 respectively, and another group of connecting rod 2 is perpendicular to the 3rd
Strut 13 and 14 both ends of the 4th supporting rod are fixedly connected with the 3rd supporting rod 13 and the 4th supporting rod 14 respectively, connecting rod 2 and support
Bayonet 11 is provided with the supporting rod of bar junction, 2 both ends of connecting rod are arranged in bayonet 11, the pull rod 4 be two groups, two
Group pull rod 4 is arranged in parallel, and one group of 4 both ends of pull rod is connected with the first support column 1 and the 4th supporting rod 14 respectively, another group of pull rod 4
Both ends are connected with 12 and the 3rd supporting rod 13 of second support bar respectively, first support column 1, second support bar 12, the 3rd
Strut 13 and 14 one end of the 4th supporting rod are fixedly connected with web plate 7, the first support column 1, second support bar 12, the 3rd supporting rod 13
It is connected with 14 other end of the 4th supporting rod with hanging rod 6.
Further, first support column 1, second support bar 12, the 3rd supporting rod 13 and the 4th supporting rod 14 divide to be upper
Lower two-stage, higher level support shank diameter to be more than subordinate's support shank diameter, and subordinate's supporting rod can freely stretch in higher level's supporting rod, institute
State the first support column 1, second support bar 12, the 3rd supporting rod 13 and the 4th supporting rod of higher level's supporting rod and subordinate's supporting rod
Through hole is provided with 14.
Further, the pull rod 4 passes through 3 and first support column 1 of fulcrum, second support bar 12, the 3rd supporting rod 13 and
The connection mode of four supporting rods 14 be it is hinged, the fulcrum 3 be fixed at the first support column 1, second support bar 12, the 3rd
On 13 and the 4th supporting rod 14 of strut.
Further, it is provided with bracing piece 8 on the web plate 7.
Further, the hanging rod 6 is hinged with 9 one end of connecting plate, and 9 other end of connecting plate is hinged on by hanging rod hinged block 5
On supporting rod, the supporting bar top is provided with leg 10.
Further, the hanging rod 6 is two.
Wet seam is carried out to bridge floor with Hanging Basket auxiliary using the wet seam construction of bridge floor provided by the utility model, hanging rod is hanged
Hang on bridge floor, wet seam worker stands in Hanging Basket, the first support column 1, second support bar 12, the 3rd supporting rod 13 and the 4th
Connecting rod 2 and pull rod 3 on supporting rod 14, safeguard protection is carried out to the staff in Hanging Basket, avoids the wet seam work people of bridge floor
Member falls from Hanging Basket when carrying out wet seam to bridge floor, causes security incident.The wet seam construction of bridge floor provided by the utility model
It is simple with cradle structure, remove and install conveniently, use manpower and material resources sparingly.
Claims (6)
- A kind of 1. wet seam construction Hanging Basket of bridge floor, it is characterised in that including the first support column (1), connecting rod (2), pull rod (4), Hanging rod (6), web plate (7), second support bar (12), the 3rd supporting rod (13), the 4th supporting rod (14);First support column (1), second support bar (12), the 3rd supporting rod (13) and the 4th supporting rod (14) are parallel to each other altogether With a cuboid is surrounded, the connecting rod (2) is two groups, and two groups of connecting rods (2) are arranged in parallel, and one group of connecting rod (2) is perpendicular to first Support column (1) and second support bar (12) both ends are fixedly connected with the first support column (1) and second support bar (12) respectively, another Group connecting rod (2) perpendicular to the 3rd supporting rod (13) and the 4th supporting rod (14) both ends respectively with the 3rd supporting rod (13) and the 4th Strut (14) is fixedly connected, and connecting rod (2) on the supporting rod of supporting rod junction with being provided with bayonet (11), the connecting rod (2) two End is arranged in bayonet (11), and the pull rod (4) is two groups, and two groups of pull rods (4) are arranged in parallel, one group of pull rod (4) both ends difference Be connected with the first support column (1) and the 4th supporting rod (14), another group of pull rod (4) both ends respectively with second support bar (12) and Three supporting rods (13) connect, first support column (1), second support bar (12), the 3rd supporting rod (13) and the 4th supporting rod (14) one end is fixedly connected with web plate (7), the first support column (1), second support bar (12), the 3rd supporting rod (13) and the 4th Strut (14) other end is connected with hanging rod (6).
- A kind of 2. wet seam construction Hanging Basket of bridge floor according to claim 1, it is characterised in that first support column (1), second support bar (12), the 3rd supporting rod (13) and the 4th supporting rod (14) are divided into two-stage up and down, and higher level supports shank diameter Shank diameter is supported more than subordinate, subordinate's supporting rod can freely stretch in higher level's supporting rod, higher level's supporting rod and subordinate's branch It is provided with the first support column (1) of strut, second support bar (12), the 3rd supporting rod (13) and the 4th supporting rod (14) logical Hole.
- 3. the wet seam construction Hanging Basket of a kind of bridge floor according to claim 1, it is characterised in that the pull rod (4) passes through The connection side of fulcrum (3) and the first support column (1), second support bar (12), the 3rd supporting rod (13) and the 4th supporting rod (14) Formula is hinged, and the fulcrum (3) is fixed at the first support column (1), second support bar (12), the 3rd supporting rod (13) and On four supporting rods (14).
- 4. the wet seam construction Hanging Basket of a kind of bridge floor according to claim 1, it is characterised in that set on the web plate (7) It is equipped with bracing piece (8).
- 5. the wet seam construction Hanging Basket of a kind of bridge floor according to claim 1, it is characterised in that the hanging rod (6) is with connecting Fishplate bar (9) one end is hinged, and connecting plate (9) other end is hinged on supporting rod by hanging rod hinged block (5), the supporting bar top It is provided with leg (10).
- 6. the wet seam construction Hanging Basket of a kind of bridge floor according to claim 1, it is characterised in that the hanging rod (6) is two Root.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721217448.4U CN207259973U (en) | 2017-09-21 | 2017-09-21 | A kind of wet seam construction Hanging Basket of bridge floor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721217448.4U CN207259973U (en) | 2017-09-21 | 2017-09-21 | A kind of wet seam construction Hanging Basket of bridge floor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207259973U true CN207259973U (en) | 2018-04-20 |
Family
ID=61918646
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721217448.4U Active CN207259973U (en) | 2017-09-21 | 2017-09-21 | A kind of wet seam construction Hanging Basket of bridge floor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207259973U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108589552A (en) * | 2018-06-11 | 2018-09-28 | 交通运输部科学研究院 | A kind of collapsible suspension apparatus |
-
2017
- 2017-09-21 CN CN201721217448.4U patent/CN207259973U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108589552A (en) * | 2018-06-11 | 2018-09-28 | 交通运输部科学研究院 | A kind of collapsible suspension apparatus |
CN108589552B (en) * | 2018-06-11 | 2023-07-21 | 交通运输部科学研究院 | Folding suspension device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207259973U (en) | A kind of wet seam construction Hanging Basket of bridge floor | |
CN201793330U (en) | Gantry hanger frame device | |
CN203257123U (en) | Building supporting frame convenient to fold | |
CN209457508U (en) | A kind of bridge construction protective fence | |
CN205132955U (en) | Hoist and mount operation of electric power industry low latitude is with hoist and mount frame | |
CN208039790U (en) | A kind of movable type scaffold bracket for overhead construction of building engineering | |
CN207453461U (en) | Supporting frame | |
CN215167811U (en) | Multifunctional scaffold for constructional engineering | |
CN202550348U (en) | Folding multifunctional overhauling frame for overhauling isolating switch | |
CN204895808U (en) | L type hangs foot hand support | |
CN201198659Y (en) | Formwork support system of prilling tower hanging structure | |
CN205446933U (en) | Novel tuber pipe gallows | |
CN210508296U (en) | Fixing support for house building engineering | |
CN201358764Y (en) | Balance weight structure of vertical oil extractor | |
CN207749810U (en) | A kind of Novel moveable scaffold | |
CN202544376U (en) | Telescopic disc supporting system | |
CN203062760U (en) | Assembled steel bar processing platform | |
CN206313117U (en) | A kind of manual pulley support | |
CN207069964U (en) | Photovoltaic panel installing support | |
CN221372852U (en) | Hanging basket device arranged on steel beam | |
CN215523805U (en) | Solar cell panel mounting rack convenient to dismantle | |
CN213297110U (en) | Scaffold connecting device convenient to detach for construction | |
CN211714549U (en) | Hanging flower basket structure for urban construction | |
CN219158338U (en) | Anti-falling device for road and bridge construction | |
CN210690509U (en) | Air quality detector |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |