CN207259965U - Guardrail construction trolley in planer-type - Google Patents

Guardrail construction trolley in planer-type Download PDF

Info

Publication number
CN207259965U
CN207259965U CN201721043743.2U CN201721043743U CN207259965U CN 207259965 U CN207259965 U CN 207259965U CN 201721043743 U CN201721043743 U CN 201721043743U CN 207259965 U CN207259965 U CN 207259965U
Authority
CN
China
Prior art keywords
template
portal frame
planer
guardrail
adjusting mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721043743.2U
Other languages
Chinese (zh)
Inventor
王建博
刘辉
程永志
谢安门
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU
CCCC SHEC Third Highway Engineering Co Ltd
Original Assignee
THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU filed Critical THIRD ENGINEERING Co Ltd OF CCCC SECOND HIGHWAY ENGINEERING BUREAU
Priority to CN201721043743.2U priority Critical patent/CN207259965U/en
Application granted granted Critical
Publication of CN207259965U publication Critical patent/CN207259965U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides guardrail construction trolley in planer-type, including portal frame, adjusting mechanism, template system, walking mechanism, longeron, the portal frame is portal framed structure, it is fixed on by adjusting mechanism on longeron, plays the role of suspention and adjusting template, described adjusting mechanism one end is fixed on portal frame, the other end connects template system, horizontal and high high adjustment can be carried out to template, the template system refers to the interior outboard template of interior guardrail, and the walking mechanism is walked using rubber-tyred.The utility model utilizes removable movement and fixed platform carrier of the portal frame as template, shifted up and down before and after realizing template using adjusting mechanism, realize the integral installation of template and remove work, solves conventional forklift, rack construction needs disassemble the cumbersome process that fritter assembly brings by template, construction safety is efficient, equipment is easy to use, and construction efficiency improves several times compared with traditional approach.

Description

Guardrail construction trolley in planer-type
Technical field
The utility model belongs to Construction of Civil Engineering machinery equipment field, and in particular to guardrail is constructed in a kind of planer-type Trolley.
Background technology
In Construction of Civil Engineering field, the interior guardrail construction of bridge will use model sheetinstallat equipment, traditional construction party Or using the gun carriage of manual mode in method, or carrying out auxiliary installation using fork truck, each installation form is all that monolithic carries out, and is spelled Fill heavy workload, expend it is a large amount of manually and man-hours and precision and adjust cumbersome when installing, when dismounting, similarly want block-by-block decomposition to tear open Remove, construction efficiency is low, there is very big security risk.
The content of the invention
It is above-mentioned in the prior art to solve the purpose of this utility model is to provide guardrail construction trolley in a kind of planer-type The problem of time-consuming, laborious and security risk.
The technical solution of the utility model is:Guardrail construction trolley in planer-type, including portal frame, adjusting mechanism, template System, walking mechanism, longeron, the portal frame are portal framed structure, are fixed on by adjusting mechanism on longeron, play suspention and The effect of adjusting template, described adjusting mechanism one end are fixed on portal frame, the other end connection template system, can to template into Capable horizontal and high high adjustment, the template system refer to the interior outboard template of interior guardrail, and the walking mechanism uses rubber-tyred row Walk, including traveling wheel and drive system.
Further, the portal frame includes two groups of preceding portal frame and back gantry, the guardrail in left and right to scheme.
Further, the walking mechanism can use manually promotion, machinery to pull, in movable motor drive form to scheme One kind is walked.
Scheme further, the adjusting mechanism using hydraulic pressure, screw rod, one kind in jack, come carry out form height and Position is adjusted.
Further, for the template system with steel truss, steel plate is panel to scheme.
Further, the portal frame, longeron are process scheme by shaped steel.
The beneficial effects of the utility model are:Movement and fixation of the utility model by the use of removable portal frame as template Platform carrier, shifts up and down before and after realizing template using adjusting mechanism, realizes the integral installation of template and removes work, due to It is easy to operate efficient using long width holistic Nursing template, it is possible to achieve guardrail template each pours section and disposably moves forward and fix In place, solves conventional forklift, rack construction needs disassemble the cumbersome process that fritter assembly brings, construction safety by template Efficiently, equipment is easy to use, and construction efficiency improves several times compared with traditional approach.
Brief description of the drawings
Fig. 1 is the utility model right view.
Fig. 2 is the utility model front view.
Wherein:1st, adjusting mechanism, 2, portal frame, 21, preceding portal frame, 22, back gantry, 3, template system, 4, hydraulic pressure control Case processed, 5, walking mechanism, 6, longeron.
Embodiment
Clearly complete description is done to the utility model below in conjunction with the accompanying drawings, so that those skilled in the art is being not required Under conditions of making creative work, it can fully implement the utility model.
Embodiment 1:
As shown in Figure 1, 2, guardrail construction trolley in planer-type, including portal frame 2, adjusting mechanism 1, template system 3, walking Mechanism 5, longeron 6, the portal frame 2 are portal framed structure, including 22 two groups of preceding portal frame 21 and back gantry, in left and right Guardrail, is fixed on longeron 6 by adjusting mechanism 1, plays the role of suspention and adjusting template, and the adjusting mechanism 1 is hydraulic pressure Adjusting mechanism, one end are fixed on portal frame 2, and other end connection template system 3, is equipped with hydraulic control box 4 on portal frame 2, Transverse direction and longitudinal direction hydraulic regulator 1 is adjusted by hydraulic action, horizontal and high high adjustment, institute can be carried out to template The interior outboard template that template system 3 refers to interior guardrail is stated, the walking mechanism 5 is walked using rubber-tyred, including traveling wheel and drive Dynamic system, can be using manually promotion, machinery pull, one kind in movable motor drive form is walked.
For template system 3 described in the present embodiment with steel truss, steel plate is panel.
Portal frame 2, longeron 6 described in the present embodiment are process by shaped steel.
The Specific construction step of the present embodiment is:
(1)System is installed:Walking mechanism, adjusting mechanism and template system are installed on portal frame and longeron;
(2)Gantry is in place:Former and later two portal frames rely on the rubber-tyred walking mechanism of itself, are controlled by hydraulic control box Synchronous machine drives portal frame lifting template on former and later two portal frames is in place;
(3)Template is fixed:Using the horizontal and high high adjustment of the adjusting mechanism on trolley by model sheetinstallat in place, and fix tightly Lean on, installation guardrail construction requirement carries out concreting work;
(4)Form removable and displacement:Form removable work, the reverse erector of dismantling step are completed by trolley adjusting mechanism Journey, guardrail template is integrally raised up, and is driven walking mechanism, is moved to next Work sectors;
(5)Above working cycles are repeated, complete next Work sectors construction.
The preferred embodiment to the utility model is described above, it should be pointed out that the utility model not office It is limited to above-mentioned particular implementation, wherein the equipment and structure be not described in detail to the greatest extent are construed as using the common side in this area Formula is practiced;Any those skilled in the art, in the case where not departing from technical solutions of the utility model ambit, foundation The technical essence of the utility model still falls within this to any simple modifications, equivalents, and modifications made for any of the above embodiments In the range of the protection of utility model technical solution.

Claims (6)

1. guardrail construction trolley in planer-type, it is characterised in that including portal frame, adjusting mechanism, template system, walking mechanism, Longeron, the portal frame are portal framed structure, are fixed on by adjusting mechanism on longeron, play the work of suspention and adjusting template With described adjusting mechanism one end is fixed on portal frame, and other end connection template system, can carry out template horizontal and height Adjust, the template system refers to the interior outboard template of interior guardrail, and the walking mechanism is walked using rubber-tyred.
2. guardrail construction trolley in planer-type according to claim 1, it is characterised in that the portal frame includes preceding gantry Two groups of frame and back gantry, the guardrail in left and right.
3. guardrail construction trolley in planer-type according to claim 2, it is characterised in that the walking mechanism includes walking Wheel and drive system, can be using manually promotion, machinery pull, one kind in movable motor drive form is walked.
4. guardrail construction trolley in planer-type according to claim 3, it is characterised in that the adjusting mechanism uses liquid One kind in pressure, screw rod, jack, is adjusted to carry out form height and position.
5. guardrail construction trolley in planer-type according to claim 4, it is characterised in that the template system is with shaped steel purlin Frame, steel plate are panel.
6. guardrail construction trolley in planer-type according to claim 5, it is characterised in that the portal frame, longeron by Shaped steel is process.
CN201721043743.2U 2017-08-21 2017-08-21 Guardrail construction trolley in planer-type Active CN207259965U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721043743.2U CN207259965U (en) 2017-08-21 2017-08-21 Guardrail construction trolley in planer-type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721043743.2U CN207259965U (en) 2017-08-21 2017-08-21 Guardrail construction trolley in planer-type

Publications (1)

Publication Number Publication Date
CN207259965U true CN207259965U (en) 2018-04-20

Family

ID=61925877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721043743.2U Active CN207259965U (en) 2017-08-21 2017-08-21 Guardrail construction trolley in planer-type

Country Status (1)

Country Link
CN (1) CN207259965U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111663454A (en) * 2020-07-06 2020-09-15 中国建筑第四工程局有限公司 Template mobile device is used in bridge construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111663454A (en) * 2020-07-06 2020-09-15 中国建筑第四工程局有限公司 Template mobile device is used in bridge construction

Similar Documents

Publication Publication Date Title
CN207045406U (en) A kind of construction stack pallet for being easy to discharging
CN102230383B (en) All-hydraulic tunnel inverted arch trestle-type moving die frame
CN103016028A (en) Hydraulic self-propelled steel form carrier for tunnel secondary lining operation
CN204457802U (en) Formed by integrally casting formula formwork jumbo
CN104632251A (en) Integrally cast type mould plate trolley and construction method of concrete pouring of underground passage
CN201143722Y (en) Hydraulic integral assembling-disassembling type box beam steel external mold
CN204899941U (en) Whole movable tunnel ditch cable duct formworking jumbo
CN207229120U (en) Tunnel lateral sulcus cable trough hydraulic self-traveling formwork jumbo
CN103982200B (en) Slide rail Mobile steel mould trolley in tunneling boring
CN102418534B (en) Split movable mould frame device for tunnel compartment wall, and construction method for split movable mould frame
CN104533460A (en) Construction method for concrete pouring of support-changing type formwork trolley and underground channel
CN202132052U (en) Fully-hydraulic tunnel inverted arch trestle-type mobile mold frame
CN207259965U (en) Guardrail construction trolley in planer-type
CN101943004A (en) Hydraulic self-running inclined-hole ordinary-state concrete casting trolley
CN103527218A (en) Multifunctional combined type concrete lining trolley
CN202250105U (en) Integral hydraulic steel formwork trolley
CN102322138A (en) The modular sliding formwork
CN201317627Y (en) Double nose girder bridging machine
CN102330559A (en) Integral hydraulic steel formwork jumbo
CN201826855U (en) Integral pouring separating hydraulic lining trolley for large-section tunnel inverted arches
CN208618251U (en) A kind of hydraulic inverted arch trestle in tunnel of constructing tunnel full-automation device
CN204002842U (en) In full section, slide rail moves steel form carrier
CN202073570U (en) Inverted arch movable formwork trolley with crossing running gears
CN201802410U (en) Hydraulic self-traveling normal concrete casting trolley for an inclined tunnel
CN202047828U (en) Movable and light-weight trolley formwork base plate system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant