CN207248997U - Transformer Bushing Tap Insulation test distributed control device - Google Patents

Transformer Bushing Tap Insulation test distributed control device Download PDF

Info

Publication number
CN207248997U
CN207248997U CN201721143739.3U CN201721143739U CN207248997U CN 207248997 U CN207248997 U CN 207248997U CN 201721143739 U CN201721143739 U CN 201721143739U CN 207248997 U CN207248997 U CN 207248997U
Authority
CN
China
Prior art keywords
transformer
slide unit
driving mechanism
frame
moving contact
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201721143739.3U
Other languages
Chinese (zh)
Other versions
CN207248997U8 (en
Inventor
车凯
周竞
冶善伟
陈成
陆维希
刘庸奇
张永杰
王菲
王�琦
李臻
许可
高明
朱平
凌青
孙海波
陈英传
周源
刘晨
朱健
秦晓东
邹展
滕俊
李炯
朱斌
郭剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou Power Supply Branch Of State Grid Jiangsu Electric Power Co ltd
Shanghai Sichuang Electric Equipment Co Ltd
Original Assignee
SHANGHAI SCEEC ELECTRIC EQUIPMENT CO Ltd
National Power Grid Corp Jiangsu Electric Power Co Yangzhou Power Supply Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SCEEC ELECTRIC EQUIPMENT CO Ltd, National Power Grid Corp Jiangsu Electric Power Co Yangzhou Power Supply Co filed Critical SHANGHAI SCEEC ELECTRIC EQUIPMENT CO Ltd
Priority to CN201721143739.3U priority Critical patent/CN207248997U8/en
Application granted granted Critical
Publication of CN207248997U publication Critical patent/CN207248997U/en
Publication of CN207248997U8 publication Critical patent/CN207248997U8/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Relating To Insulation (AREA)
  • Insulators (AREA)

Abstract

Transformer Bushing Tap Insulation test distributed control device disclosed in the utility model, including transformer sub-control electrode module and insulation resistance meter, transformer sub-control electrode module includes the driving mechanism that frame, some fixed contacts being fixed on frame, sliding configuration slide unit in the frame and a driving slide unit move back and forth, and three moving contacts are provided with slide unit;During test, first moving contact, the 3rd moving contact pass through wired earth, second moving contact is connected with the L binding posts in insulation resistance meter by conducting wire, and the E binding posts in insulation resistance meter are connected by conducting wire with the bottom shielding of bushing in transformer to be tested respectively by wired earth, some fixed contacts;By driving mechanism Mobile Slide during test, make the respectively different fixed contact conductive contact of three moving contacts on slide unit.The utility model can save the conversion time (average each thread-changing spend 10 minutes) of tester, can primary connection realize the insulation resistance test of all bottom shielding of bushing of transformer over the ground.

Description

Transformer Bushing Tap Insulation test distributed control device
Technical field
It the utility model is related to device for testing transformers technical field, more particularly to Transformer Bushing Tap Insulation test point Control device.
Background technology
At present substation field personnel when doing the insulation resistance test of transformer end shield over the ground, it is necessary to climb up transformer handle The p-wire of one of bottom shielding of bushing connects, and remaining bottom shielding of bushing short circuit is grounded, and replaces another bottom shielding of bushing and tries When testing, it is necessary to climb up again transformer replace p-wire, if repetition test want if need repeatedly disconnect line;So test Labor intensity is very big.
Utility model content
The technical problem to be solved by the utility model is to the insulation resistance test for existing transformer end shield over the ground When the problem of needing to disconnect line repeatedly, and provide a kind of Transformer Bushing Tap Insulation test distributed control device, the bushing shell for transformer End shield Insulation test distributed control device can realize that primary connection completes the test job of all bottom shielding of bushing insulation against ground resistance.
Technical problem to be solved in the utility model can be achieved through the following technical solutions:
Transformer Bushing Tap Insulation test distributed control device, including a transformer sub-control electrode module and an insulation resistance Table, the transformer sub-control electrode module includes a frame, fixed some fixed contacts, a sliding configuration on said frame exists The driving mechanism that slide unit in the frame and a driving slide unit move back and forth, three are provided with the slide unit and dynamic is touched Head, is divided into the first moving contact, the second moving contact and the 3rd moving contact;During test, first moving contact, the 3rd moving contact pass through Wired earth, second moving contact are connected with the L binding posts in the insulation resistance meter by conducting wire, the insulation resistance meter In E binding posts be connected respectively by conducting wire with the bottom shielding of bushing in transformer to be tested by wired earth, some fixed contacts; According to test program during test, the slide unit is moved by driving mechanism, makes three moving contacts on the slide unit respectively different Fixed contact conductive contact.
In a preferred embodiment of the utility model, the driving mechanism is feed screw nut's driving mechanism, the silk Screw axis in stem nut driving mechanism are set on said frame, the nut in feed screw nut's driving mechanism and the slide unit Connection.
In a preferred embodiment of the utility model, feed screw nut's driving mechanism further includes the driving silk The motor that bar rotates, the motor installation is on said frame.
As a result of technical solution as above, the conversion time that the utility model can save tester is (average every Secondary thread-changing spends 10 minutes), can primary connection realize the insulation resistance test of all bottom shielding of bushing of transformer over the ground.
Brief description of the drawings
Fig. 1 is the structure of the utility model Transformer Bushing Tap Insulation test distributed control device and the wiring with transformer Schematic diagram.
Embodiment
Referring to Fig. 1, the Transformer Bushing Tap Insulation test distributed control device that is provided in figure, including a transformer sub-control electrode 100 and one insulation resistance meter 200 of module.
Transformer sub-control electrode module 100 include a frame 110, be fixed on frame 110 four fixed contacts 1,2,3, 4th, slide unit 120 and one of the sliding configuration in frame 110 drives the driving mechanism that slide unit 120 moves back and forth.
Driving mechanism is feed screw nut's driving mechanism, and 130 axis of screw in feed screw nut's driving mechanism is located at frame 110 On, the nut (not shown) in feed screw nut's driving mechanism is connected with slide unit 120.Feed screw nut's driving mechanism further includes The motor 140 that one driving screw 130 rotates, motor 140 are installed on frame 110.
Three moving contacts 5,6,7 are provided with slide unit 120.
During test, moving contact 5,7 is by wired earth, and moving contact 6 is with the L binding posts in insulation resistance meter 200 by leading Line connects, and the E binding posts in insulation resistance meter 200 are connected by p-wire respectively by wired earth, four fixed contacts 1,2,3,4 It is connected in 300 three-phase windings of transformer and neutral point (if neutral point has extraction) sleeve A, the end shield of B, C, O.
During test, motor 140 drives screw 130 to rotate, and screw 130 drives slide unit 120 to move, with the shifting of slide unit 120 It is dynamic, moving contact 6 can successively with the contact of fixed contact 1,2,3,4 (i.e. insulation resistance meter L ends be consecutively connected to 3 phases of transformer 300 around In group and the end shield of neutral bushing A, B, C, O, moving contact 5,7 and the contact of other 3 fixed contacts ensure their short circuits ground connection (i.e. Non-measured bottom shielding of bushing ground connection) (such as the moving contact 6 shown in figure is contacted with fixed contact 2, moving contact 5 connects with fixed contact 4,3 Touch, moving contact 7 is contacted with fixed contact 1), primary connection can be achieved by this way and complete all bottom shielding of bushing of transformer over the ground The purpose of insulation resistance test.

Claims (3)

1. Transformer Bushing Tap Insulation test distributed control device, it is characterised in that including a transformer sub-control electrode module and one Insulation resistance meter, the transformer sub-control electrode module include a frame, fixed some fixed contacts, a cunning on said frame The driving mechanism that slide unit and the driving slide unit of the dynamic configuration in the frame move back and forth, is provided with the slide unit Three moving contacts, are divided into the first moving contact, the second moving contact and the 3rd moving contact;During test, first moving contact, the 3rd move Contact is connected by wired earth, second moving contact with the L binding posts in the insulation resistance meter by conducting wire, described exhausted E binding posts in edge ohmmeter pass through the casing in conducting wire and transformer to be tested respectively by wired earth, some fixed contacts End shield connects;According to test program during test, the slide unit is moved by driving mechanism, makes three moving contacts on the slide unit Respectively different fixed contact conductive contact.
2. Transformer Bushing Tap Insulation test distributed control device as claimed in claim 1, it is characterised in that the driving mechanism For feed screw nut's driving mechanism, the screw axis in feed screw nut's driving mechanism are set on said frame, the feed screw nut Nut in driving mechanism is connected with the slide unit.
3. Transformer Bushing Tap Insulation test distributed control device as claimed in claim 2, it is characterised in that the feed screw nut Driving mechanism further includes the motor that the driving screw rotates, and the motor installation is on said frame.
CN201721143739.3U 2017-09-07 2017-09-07 Insulation test sub-control device for transformer bushing end screen Active CN207248997U8 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721143739.3U CN207248997U8 (en) 2017-09-07 2017-09-07 Insulation test sub-control device for transformer bushing end screen

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721143739.3U CN207248997U8 (en) 2017-09-07 2017-09-07 Insulation test sub-control device for transformer bushing end screen

Publications (2)

Publication Number Publication Date
CN207248997U true CN207248997U (en) 2018-04-17
CN207248997U8 CN207248997U8 (en) 2024-01-30

Family

ID=61887471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721143739.3U Active CN207248997U8 (en) 2017-09-07 2017-09-07 Insulation test sub-control device for transformer bushing end screen

Country Status (1)

Country Link
CN (1) CN207248997U8 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107576850A (en) * 2017-09-07 2018-01-12 国家电网公司江苏省电力公司扬州供电公司 Transformer Bushing Tap Insulation test distributed control device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107576850A (en) * 2017-09-07 2018-01-12 国家电网公司江苏省电力公司扬州供电公司 Transformer Bushing Tap Insulation test distributed control device
CN107576850B (en) * 2017-09-07 2024-02-09 国网江苏省电力有限公司扬州供电分公司 Insulation test sub-control device for transformer bushing end screen

Also Published As

Publication number Publication date
CN207248997U8 (en) 2024-01-30

Similar Documents

Publication Publication Date Title
CN201955459U (en) 10kV distribution network line fault simulation test platform
CN109142881B (en) Intelligent switching line device for electric test of power transformer
CN203069753U (en) Final-inspection bench for vacuum circuit breaker
CN103617754A (en) Fault simulation and test simulation system for power cables
WO2023078457A1 (en) Sand table simulation system for intelligent operation and maintenance of power cable, simulation method, device and medium
CN104090216A (en) Device and method for detecting wiring harness high-voltage insulation
CN207248997U (en) Transformer Bushing Tap Insulation test distributed control device
CN203849288U (en) Wiring conversion device for electrical routine tests of transformer
CN107912059A (en) The switching device operating method of switching device, test device and transformer measuring device
CN203365531U (en) Novel alternating-current and direct-current high-voltage electroscope
CN105823969A (en) Apparatus for simulating partial discharge detects of transformer
CN203950007U (en) Portable intelligent correcting line machine
CN205720535U (en) A kind of partial discharge of transformer defects simulation device
CN106771802A (en) DCR of Transformer exception analysis method based on failure dot circuit
CN208126702U (en) A kind of Synthesized Diagnosis On Transformer Faults simulator
CN108037365B (en) Parallel reactor test board
CN206541018U (en) A kind of multipoint grounding seeking instrument of voltage transformer
CN212989429U (en) Power transformer high-voltage lead switching system
CN107576850A (en) Transformer Bushing Tap Insulation test distributed control device
CN205608133U (en) Phase to earth fault auxiliary detection device
CN206002640U (en) A kind of current lifting device
CN205809276U (en) A kind of transformer secondary terminals short-circuit device
CN101661090A (en) Through-flow tester of neutral point current transformer of transformer
CN211505756U (en) Wiring switching device and system for acquiring primary current under single-phase earth fault
CN204065243U (en) The straight resistive of dry-type transformer compares testing auxiliary device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 225009 No. 179, Weiyang Road, Yangzhou, Jiangsu

Patentee after: YANGZHOU POWER SUPPLY BRANCH OF STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd.

Patentee after: SHANGHAI SICHUANG ELECTRIC EQUIPMENT Co.,Ltd.

Address before: No.179, Weiyang Road, Yangzhou City, Jiangsu Province 225000

Patentee before: YANGZHOU POWER SUPPLY COMPANY, STATE GRID JIANGSU ELECTRIC POWER Co.

Patentee before: SHANGHAI SICHUANG ELECTRIC EQUIPMENT Co.,Ltd.

CP03 Change of name, title or address
CU01 Correction of utility model

Correction item: Patentee|Address|Patentee

Correct: State Grid Jiangsu Electric Power Co., Ltd. Yangzhou Power Supply Branch|225009 No. 179, Weiyang Road, Yangzhou, Jiangsu|Shanghai Sichuang Electrical Equipment Co., Ltd.

False: State Grid Corporation of China Jiangsu Electric Power Company Yangzhou Power Supply Company|No.179, Weiyang Road, Yangzhou City, Jiangsu Province 225000|Shanghai Sichuang Electrical Equipment Co., Ltd.

Number: 16-01

Page: The title page

Volume: 34

Correction item: Patentee|Address|Patentee

Correct: State Grid Jiangsu Electric Power Co., Ltd. Yangzhou Power Supply Branch|225009 No. 179, Weiyang Road, Yangzhou, Jiangsu|Shanghai Sichuang Electrical Equipment Co., Ltd.

False: State Grid Corporation of China Jiangsu Electric Power Company Yangzhou Power Supply Company|No.179, Weiyang Road, Yangzhou City, Jiangsu Province 225000|Shanghai Sichuang Electrical Equipment Co., Ltd.

Number: 16-01

Volume: 34

CU01 Correction of utility model
OR01 Other related matters
OR01 Other related matters
AV01 Patent right actively abandoned

Granted publication date: 20180417

Effective date of abandoning: 20240209

AV01 Patent right actively abandoned

Granted publication date: 20180417

Effective date of abandoning: 20240209

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned