CN207244959U - A kind of lightweight steel construction assembles the floor plates of decoration integrated building - Google Patents
A kind of lightweight steel construction assembles the floor plates of decoration integrated building Download PDFInfo
- Publication number
- CN207244959U CN207244959U CN201721226349.2U CN201721226349U CN207244959U CN 207244959 U CN207244959 U CN 207244959U CN 201721226349 U CN201721226349 U CN 201721226349U CN 207244959 U CN207244959 U CN 207244959U
- Authority
- CN
- China
- Prior art keywords
- floor
- layer
- steel construction
- abutted against
- assembles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
Landscapes
- Building Environments (AREA)
Abstract
The utility model belongs to the integrally-built technical field of building, more particularly to a kind of lightweight steel construction assembles the floor plates of decoration integrated building, it is by floor ground layer, floor ceiling floor and intermediate course compoboard are formed, intermediate course compoboard includes earth's surface heating layer, extrusion molding flaggy, heat preservation sandwich layer, cement pressure plate layer, steel construction supporting course, fire protection flame retarding filled layer, this fire protection flame retarding filled layer are mutually abutted against with floor ceiling floor, floor ground layer is timber floor, wood composite board or floor ceramic tile, and floor ceiling floor is pad pasting wood-plastic board;Earth's surface heating layer is Electric radiant Heating Film geothermal heating system or hot-water line heating system;Steel construction supporting course is using H profile steel as the force structure of girder, cellular board as secondary beam;The utility model is produced using factory modularization, and standardization connection, floor plates junction gap is small, and efficient and light weight, sound-insulating and heat-insulating, fire protection flame retarding, construction procedure is few, and the construction period is short, and suitable large area is mated formation, and should more be widelyd popularize.
Description
Technical field
The utility model belongs to the integrally-built technical field of building, more particularly to a kind of lightweight steel construction assembling decorating integrative
Change the floor plates of building.
Background technology
Traditional architecture flooring can be divided into reinforced concrete floor plate or steel structure floor plate, all be to need formwork in advance
Plate, then concrete perfusion, or directly make steel plate flooring, its shortcoming is as follows:1)Need live support template increase template
And supporting expense;2)Cast in situs flooring construction site is dirty and messy, and concrete setting length curing cycle, influences the duration, be not suitable for big
Area flooring is constructed;3)Conventional steel sound isolation of floor flameproof effect is undesirable, and 4)Architectural surface and geothermal system need secondary
Finishing, consumes great amount of cost.
The content of the invention
The purpose of this utility model is to provide the floor plates that a kind of lightweight steel construction assembles decoration integrated building, using car
Between it is prefabricated, efficient and light weight, sound-insulating and heat-insulating, fire protection flame retarding, construction procedure is few, and the construction period is short.
What the purpose of this utility model was realized in.
A kind of assembled architecture floor plates of the utility model, by floor ground plate, floor ceiling floor and positioned at this floor
Intermediate course compoboard between ground floor and floor ceiling floor is formed, and the intermediate course compoboard is included with floor
The earth's surface heating layer that surface layer is mutually abutted against, the extrusion molding flaggy being mutually abutted against with this earth's surface heating layer, the guarantor being mutually abutted against with this extrusion molding flaggy
Warm interlayer, the cement pressure plate layer being mutually abutted against with this heat preservation sandwich layer, the steel construction supporting course being mutually abutted against with this cement pressure plate layer,
The fire protection flame retarding filled layer being filled in steel construction supporting course, this fire protection flame retarding filled layer are mutually leaned on the floor ceiling floor
Connect.
The floor ground layer is timber floor, wood composite board or floor ceramic tile, and the floor ceiling floor is patch
Film wood-plastic board.
The earth's surface heating layer is Electric radiant Heating Film geothermal heating system or hot-water line heating system.
The steel construction supporting course is using H profile steel as the force structure of girder, cellular board as secondary beam.
The heat preservation sandwich layer is the vacuum aluminum-coated laminated polyester film not less than 0.2mm thickness, the extrusion molding flaggy
Thickness is 15mm -25mm, and the fire protection flame retarding filled layer is the glass silk flosssilk wadding layer not less than 100mm.
The utility model has the advantages that:
1)The utility model is produced using factory modularization, and standardization connection, floor plates junction gap is small, and lightweight is high
Effect, sound-insulating and heat-insulating, fire protection flame retarding, surface layer can be customized according to user, and construction procedure is few, and the construction period is short, be adapted to big face
Product is mated formation;
2)The utility model instead of the construction method of traditional type floor, and new floor system uses finished product pad pasting wood-plastic board
As lower template, not only unnecessary waste was caused from dismounting template, but also can regard pad pasting wood-plastic board as next layer of ceiling
Decorative panel, kills two birds with one stone;
3)The utility model employs the force structure that H profile steel girder adds cellular board secondary beam, adds beam stress area again
Reduce the usage amount of steel, mitigate dead weight, the security and overall stability of the structure greatly increased;In floor plates system,
Using filling fire line glass silk flosssilk wadding, can effective sound insulation and noise reduction, increase the fire protecting performance of its own;In addition the vacuum added
Aluminized mylar and extruded sheet increase structure thermal property as gas partiting dampproof layer.
Brief description of the drawings
Fig. 1 uses diagrammatic cross-section during wood floors for the floor ground plate of the utility model.
Fig. 2 uses diagrammatic cross-section during floor ceramic tile for the floor ground plate of the utility model.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in Figure 1, a kind of lightweight steel construction of the utility model assembles the floor plates of decoration integrated building, by floor
Surface layer, floor ceiling floor 9 and the intermediate course compoboard between this floor ground plate and floor ceiling floor are formed, described
The intermediate course compoboard earth's surface that includes mutually being abutted against with floor ground plate heat layer 3, squeezed with what this earth's surface heating layer was mutually abutted against
Mould plate layer 4, the heat preservation sandwich layer 5 being mutually abutted against with this extrusion molding flaggy, the cement pressure plate layer 6 being mutually abutted against with this heat preservation sandwich layer, with this
The steel construction supporting course 8 that cement pressure plate layer is mutually abutted against, the fire protection flame retarding filled layer 7 being filled in steel construction supporting course, this is anti-
Fiery flame resistant filler layer 7 is abutted against with 9 phase of floor ceiling floor.Above-mentioned all flaggy structures factory floor process and according to
It is secondary to be closely abutted against or be bonded, overall floor is formed, realizes that factory modularization produces;Then connecting node and another piece are being passed through
Floor or wallboard are fixedly connected, and realize standardization connection;Small, the efficient and light weight with floor plates junction gap, sound-insulating and heat-insulating, prevents
The features such as fire is fire-retardant, and construction procedure is few, and the construction period is short, and suitable large area is mated formation.
As shown in Fig. 2, the floor ground layer is timber floor, wood composite board 1 or floor ceramic tile 2, ground floor
Surface layer can customize selection installation according to user, with cementitious when using floor ceramic tile 2.The floor ceiling floor 9 is
Pad pasting wood-plastic board, this pad pasting wood-plastic board also as the lower template of overall floor plates, both caused unnecessary wave from dismounting template
Take, and can kill two birds with one stone using pad pasting wood-plastic board as next layer of top decoration board.
The earth's surface heating layer is Electric radiant Heating Film geothermal heating system or hot-water line heating system, this structure is embedded in entirety
In floor plates, jointing is left in junction, convenient and fast connection.
The steel construction supporting course, as the force structure of girder, cellular board as secondary beam, adds beam using H profile steel
Forced area reduces the usage amount of steel again, mitigates dead weight, considerably increases integrally-built security and overall stability,
Other shaped steel can also be used as girder.
The heat preservation sandwich layer is the vacuum aluminum-coated laminated polyester film not less than 0.2mm thickness, the extrusion molding flaggy
Thickness is 15mm -25mm, has gas partiting dampproof, increases structure thermal property;The fire protection flame retarding filled layer be not less than
The glass silk flosssilk wadding layer of 100mm, can effective sound insulation and noise reduction, increase the fire protecting performance of its own.
Claims (5)
1. a kind of lightweight steel construction assembles the floor plates of decoration integrated building, it is characterised in that:By floor ground layer, floor ceiling
Plate and the intermediate course compoboard between this floor ground layer and floor ceiling floor are formed, intermediate course combination
Plate includes the earth's surface heating layer being mutually abutted against with floor ground layer, the extrusion molding flaggy being mutually abutted against with this earth's surface heating layer, with this extrusion molding
The heat preservation sandwich layer that flaggy is mutually abutted against, the cement pressure plate layer being mutually abutted against with this heat preservation sandwich layer, is mutually abutted against with this cement pressure plate layer
Steel construction supporting course, the fire protection flame retarding filled layer being filled in steel construction supporting course, this fire protection flame retarding filled layer with it is described
Floor ceiling floor is mutually abutted against.
2. a kind of lightweight steel construction according to claim 1 assembles the floor plates of decoration integrated building, it is characterised in that:Institute
The floor ground layer stated is timber floor, wood composite board or floor ceramic tile, and the floor ceiling floor is pad pasting wood-plastic board.
3. a kind of lightweight steel construction according to claim 1 assembles the floor plates of decoration integrated building, it is characterised in that:Institute
The earth's surface heating layer stated is Electric radiant Heating Film geothermal heating system or hot-water line heating system.
4. a kind of lightweight steel construction according to claim 1 assembles the floor plates of decoration integrated building, it is characterised in that:Institute
The steel construction supporting course stated is using H profile steel as the force structure of girder, cellular board as secondary beam.
5. a kind of lightweight steel construction according to claim 1 assembles the floor plates of decoration integrated building, it is characterised in that:Institute
The heat preservation sandwich layer stated is the vacuum aluminum-coated laminated polyester film not less than 0.2mm thickness, and the thickness of the extrusion molding flaggy is 15mm-
25mm, the fire protection flame retarding filled layer are the glass silk flosssilk wadding layer not less than 100mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721226349.2U CN207244959U (en) | 2017-09-23 | 2017-09-23 | A kind of lightweight steel construction assembles the floor plates of decoration integrated building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721226349.2U CN207244959U (en) | 2017-09-23 | 2017-09-23 | A kind of lightweight steel construction assembles the floor plates of decoration integrated building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207244959U true CN207244959U (en) | 2018-04-17 |
Family
ID=61886736
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721226349.2U Active CN207244959U (en) | 2017-09-23 | 2017-09-23 | A kind of lightweight steel construction assembles the floor plates of decoration integrated building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207244959U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109505373A (en) * | 2018-09-03 | 2019-03-22 | 安徽安保新型节能建材科技有限公司 | Prefabricated float builds floor heat-preservation sound-insulation board and its laying method |
CN109853803A (en) * | 2019-01-31 | 2019-06-07 | 河南聚誉帆工程技术咨询有限公司 | Assembled integral floor and fabrication and installation method |
CN112197324A (en) * | 2020-11-10 | 2021-01-08 | 吉林省新生建筑工程公司 | Indoor overhead hot-water heating heat supply temperature regulating system based on building dismounting-free template |
-
2017
- 2017-09-23 CN CN201721226349.2U patent/CN207244959U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109505373A (en) * | 2018-09-03 | 2019-03-22 | 安徽安保新型节能建材科技有限公司 | Prefabricated float builds floor heat-preservation sound-insulation board and its laying method |
CN109853803A (en) * | 2019-01-31 | 2019-06-07 | 河南聚誉帆工程技术咨询有限公司 | Assembled integral floor and fabrication and installation method |
CN109853803B (en) * | 2019-01-31 | 2024-06-04 | 河南聚誉帆工程技术咨询有限公司 | Assembled integral floor slab and manufacturing and installing method |
CN112197324A (en) * | 2020-11-10 | 2021-01-08 | 吉林省新生建筑工程公司 | Indoor overhead hot-water heating heat supply temperature regulating system based on building dismounting-free template |
CN112197324B (en) * | 2020-11-10 | 2024-02-23 | 吉林省新生建筑工程公司 | Indoor upper water heating and heat supply temperature regulating system based on building dismantling-free template |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9840851B2 (en) | Building panels and method of forming building panels | |
CN202017277U (en) | Wall structure for light steel villa | |
CN207244959U (en) | A kind of lightweight steel construction assembles the floor plates of decoration integrated building | |
KR200479903Y1 (en) | Assembled steel structure hollow building | |
CN104695662B (en) | Stone facing prefabricated outer wall panel and its production method and external wall system | |
CN205777066U (en) | A kind of wallboard being easily installed | |
CN1765624A (en) | Polyurethane hard foam plastic composite board with elastic bonding transition layer and production method thereof | |
CN204491984U (en) | Stone facing precast wall panel and external wall system | |
US20130326986A1 (en) | System and Method for Light Steel Frame Construction | |
CN104420549A (en) | Prefabricated heat insulation board | |
CN104727481A (en) | Efficient energy-saving building wall for industrialized production and fabrication method of efficient energy-saving building wall | |
CN105155730A (en) | Outer wall building module and application thereof | |
CN112092468A (en) | Preparation process of recycled decorative concrete wallboard | |
CN202658753U (en) | Composite external-wall insulation board | |
CN104420556A (en) | Assembly type energy-saving wall | |
WO2022205508A1 (en) | Enhanced thermal insulation decorative board based on inorganic lightweight aggregate, and preparation method therefor | |
CN102352678B (en) | Four-step energy-saving cold-bridge-free heat insulation plate for dwelling house | |
CN205476047U (en) | A assembled EPS module with filling heat preservation composite wall panel for steel construction wall body | |
CN201172911Y (en) | Thermal insulation concrete sandwich wallboard | |
CN211949118U (en) | Prefabricated floor slab | |
CN210152052U (en) | Compound heat preservation side fascia of assembled frame construction | |
CN202324463U (en) | Cold-bridge-free insulation board for four-step energy-saving house | |
CN202899427U (en) | Ultra high toughness cementitious composites-based sandwich thermal-insulating wall body and wallboard | |
CN204876099U (en) | Novel building outer wall composite waterproof heated board | |
CN216360836U (en) | Assembled polymerization adjustable wallboard and wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |