CN207244570U - A kind of erosion control promotees shield beach structure of becoming silted up - Google Patents

A kind of erosion control promotees shield beach structure of becoming silted up Download PDF

Info

Publication number
CN207244570U
CN207244570U CN201721168975.0U CN201721168975U CN207244570U CN 207244570 U CN207244570 U CN 207244570U CN 201721168975 U CN201721168975 U CN 201721168975U CN 207244570 U CN207244570 U CN 207244570U
Authority
CN
China
Prior art keywords
tying
bar
base
geotechnique
longitudinal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721168975.0U
Other languages
Chinese (zh)
Inventor
刘鹏飞
王宁
张明进
刘万利
朱玉德
李华国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Research Institute for Water Transport Engineering MOT
Original Assignee
Tianjin Research Institute for Water Transport Engineering MOT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Research Institute for Water Transport Engineering MOT filed Critical Tianjin Research Institute for Water Transport Engineering MOT
Priority to CN201721168975.0U priority Critical patent/CN207244570U/en
Application granted granted Critical
Publication of CN207244570U publication Critical patent/CN207244570U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of erosion control to promote shield beach structure of becoming silted up, it is paved into using tying concrete block soft raft, tying concrete block soft raft arranges pad and concrete ballast body including geotechnique, geotechnique is arranged pad and is formed using polypropylene woven cloth sewing reinforcement, along row's cross direction a longitudinal sinew adding strip is equipped with every a setpoint distance, along platoon leader direction a transversal reinforcement bar is equipped with every a setpoint distance, tying bar I is sewed between longitudinal sinew adding strip and arrangement, the length of longitudinal sinew adding strip is identical with platoon leader, and the length of transversal reinforcement bar is identical with row's width;Concrete ballast body includes base and the multiple cylinders being arranged on base, all cylinders are arranged on base in plum blossom pile-type, and tying bar II is embedded with base;I system of tying bar that the tying bar II of concrete ballast body and geotechnique arrange pad connects.The utility model can be effectively increased bed resistance, reduce flow rate of water flow, promote channel aggradation.

Description

A kind of erosion control promotees shield beach structure of becoming silted up
Technical field
A kind of shield beach structure is the utility model is related to, particularly a kind of erosion control promotees shield beach structure of becoming silted up.
Background technology
The isostere structure that riverbed point bar, riparian protection engineering use at present mainly has tying concrete block soft raft, hinge concrete block Soft raft, concrete interlocking block soft mattress, unit row etc..The ballast carrier that isostere uses is mainly rectangle concrete block, king's font concrete block Deng, there are the problem of be concrete block surfacing, be similar to plane configuration, it is smaller to the resistance of water flow mud-sand, though after engineering construction Beach face can be so protected, but flow rate of water flow cannot be effectively reduced, promoting point bar to deposit, effect is not notable, and shoal protection works is easily larger Flow velocity current scour destroys, and the engineering service life is shorter.
The content of the invention
The utility model provides a kind of erosion control rush silt shield beach structure to solve technical problem present in known technology, should The erosion control that structure can strengthen shoal protection works promotees silt effect, and can improve shoal protection works stability in itself and durability.
The utility model is adopted the technical scheme that to solve technical problem present in known technology:A kind of erosion control promotees Shield of becoming silted up beach structure, is paved into, the tying concrete block soft raft arranges pad and coagulation including geotechnique using tying concrete block soft raft Soil pressure carrier, the geotechnique is arranged pad and is formed using polypropylene woven cloth sewing reinforcement, along row's cross direction every a setting Distance is equipped with a longitudinal sinew adding strip, and a transversal reinforcement bar is equipped with every a setpoint distance along platoon leader direction, in longitudinal reinforcement Tying bar I is sewed between bar and arrangement, the length of the longitudinal direction sinew adding strip is identical with platoon leader, the length of the transversal reinforcement bar It is identical with row's width;The concrete ballast body includes base and the multiple cylinders being arranged on the base, all cylinders It is arranged in plum blossom pile-type on the base, tying bar II is embedded with the base;The tying of the concrete ballast body I system of tying bar that bar II and the geotechnique arrange pad connects.
The upper surface of the base is rectangle, and a column is respectively provided with four corners of the base upper surface and center Body, the cylinder use four-prism structure.
The utility model has the advantages and positive effects of:
1) plum blossom pile-type concrete block structure is stable, form resistance is big, by using being the ballast arrangement that connects plum blossom pile-type concrete block, Soft raft can increase resistance to water-flow, can effectively reduce the flow rate of water flow for guarding region, promote sediment siltation, protect and guarded beach Body or the stabilization on riverbank.
2) the nearly bottom flow rate of water flow in riverbed can be greatly reduced, the destruction of current to engineering in itself can be reduced, improves shield beach Engineering service life.
3) silt can be promoted to fall to become silted up, silt falls to become silted up on plum blossom pile-type concrete ballast carrier, the 3 D stereo of plum blossom pile-type Structure can reduce the starting and passage of silt, start to fix the sand and protect husky effect, and then can further enhance shield beach structure itself Stability and durability.
In conclusion the utility model can be effectively increased bed resistance, reduce flow rate of water flow, promote channel aggradation, energy Enough realize guards good riverbed effect, the siltation of promotion beach body, enhancement engineering stabilization and the target for extending engineering service life.
Brief description of the drawings
Fig. 1 is the plan of the utility model;
Fig. 2 is the concrete ballast body top view of the utility model.
In figure:1st, geotechnique arranges pad;1-1, longitudinal sinew adding strip, 1-2, transversal reinforcement bar, 2, concrete ballast body;2-1, bottom Seat;2-2, cylinder;2-3, tying bar II.
Embodiment
For that can further appreciate that the invention, features and effects of the utility model, the following examples are hereby given, and coordinates Attached drawing describes in detail as follows:
Please refer to Fig.1 and Fig. 2, a kind of erosion control are promoted shield beach structure of becoming silted up, be paved into using tying concrete block soft raft, the system Knot concrete block soft raft arranges pad 1 and concrete ballast body 2 including geotechnique, and it is to use polypropylene woven cloth that the geotechnique, which arranges pad 1, Sewing reinforcement forms, and a longitudinal sinew adding strip 1-1 is equipped with every a setpoint distance along row's cross direction, for fixing I He of tying bar Increase row's pad tensile strength.Along platoon leader direction a transversal reinforcement bar 1-2 is equipped with every a setpoint distance.In longitudinal sinew adding strip Tying bar I is sewed between 1-1 and arrangement, the length of the longitudinal direction sinew adding strip 1-1 is identical with platoon leader, the transversal reinforcement bar 1- 2 length is identical with row's width;The concrete ballast body 2 includes base 2-1 and the multiple cylinders being arranged on the base 2-1 2-2, all cylinder 2-2 are arranged on the base 2-1 in plum blossom pile-type, and tying bar is embedded with the base 2-1 Ⅱ2-3;I system of tying bar that II 2-3 of tying bar of the concrete ballast body 2 and the geotechnique arrange pad 1 connects.
In the present embodiment, the upper surface of the base 2-1 is rectangle, in four corners of the base 2-1 upper surfaces And center is respectively provided with a cylinder 2-2, the cylinder 2-2 uses four-prism structure.More specifically, base 2-1's is upper Surface size is 60cm × 60cm × 10cm, and the size of cylinder is 15cm × 15cm × 20cm, pre- along its length in base The woven tying bar II of long filament of two 1.2cm × 105cm is buried, for being connect with I system of tying bar on row's pad.The geotechnique arranges pad 1 is equipped with a longitudinal sinew adding strip 1-1 along row's cross direction every 100cm, sets transversal reinforcement bar 1-2 every 2m along platoon leader direction, longitudinal direction Every two one group of the woven tying bar II of 80cm long filaments is sewed between sinew adding strip 1-1 and arrangement, for tying concrete ballast body 2, the distance between group and group are 60cm, two root system knot bar interval 30cm in every group.
During construction, isostere sinking is constructed using special mattress ship.Pre-processed arrangement is involved in reel first, is arranged Head is fixed, and arrangement is gradually laid on mattress ship workbench, concrete ballast body is tied in arrangement on platform, twist Working Ships, allow isostere to sink to river bed, have the overlap joint of some scale between every two rows, isostere sinking is repeated, until completing Mattress sinking works.
Although the preferred embodiment of the utility model is described above in conjunction with attached drawing, the utility model is not Above-mentioned embodiment is confined to, above-mentioned embodiment is only schematical, is not restricted, ability The those of ordinary skill in domain is not departing from the utility model aims and claimed under the enlightenment of the utility model In the case of scope, many forms can also be made, these are belonged within the scope of protection of the utility model.

Claims (2)

1. a kind of erosion control promotees shield beach structure of becoming silted up, it is paved into using tying concrete block soft raft, the tying concrete block soft raft includes Geotechnique arranges pad and concrete ballast body, it is characterised in that it is using polypropylene woven cloth sewing reinforcement that the geotechnique, which arranges pad, Form, be equipped with a longitudinal sinew adding strip every a setpoint distance along row's cross direction, be equipped with along platoon leader direction every a setpoint distance One transversal reinforcement bar, is sewed with tying bar I, the length of the longitudinal direction sinew adding strip and row between longitudinal sinew adding strip and arrangement Length is identical, and the length of the transversal reinforcement bar is identical with row's width;The concrete ballast body includes base and is arranged on the bottom Multiple cylinders on seat, all cylinders are arranged on the base in plum blossom pile-type, and tying is embedded with the base Bar II;I system of tying bar that the tying bar II of the concrete ballast body and the geotechnique arrange pad connects.
2. erosion control according to claim 1 promotees shield beach structure of becoming silted up, it is characterised in that the upper surface of the base is rectangle, A cylinder is respectively provided with four corners of the base upper surface and center, the cylinder uses four-prism structure.
CN201721168975.0U 2017-09-13 2017-09-13 A kind of erosion control promotees shield beach structure of becoming silted up Expired - Fee Related CN207244570U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721168975.0U CN207244570U (en) 2017-09-13 2017-09-13 A kind of erosion control promotees shield beach structure of becoming silted up

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721168975.0U CN207244570U (en) 2017-09-13 2017-09-13 A kind of erosion control promotees shield beach structure of becoming silted up

Publications (1)

Publication Number Publication Date
CN207244570U true CN207244570U (en) 2018-04-17

Family

ID=61888308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721168975.0U Expired - Fee Related CN207244570U (en) 2017-09-13 2017-09-13 A kind of erosion control promotees shield beach structure of becoming silted up

Country Status (1)

Country Link
CN (1) CN207244570U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111423173A (en) * 2020-01-13 2020-07-17 武汉长江航道救助打捞局 D-shaped soft raft of recycled concrete unit blocks and manufacturing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111423173A (en) * 2020-01-13 2020-07-17 武汉长江航道救助打捞局 D-shaped soft raft of recycled concrete unit blocks and manufacturing method thereof
CN111423173B (en) * 2020-01-13 2021-11-26 武汉长江航道救助打捞局 Method for manufacturing D-shaped soft raft of recycled concrete unit block

Similar Documents

Publication Publication Date Title
CN2863884Y (en) Thread connecting precast block soft row
CN104594290B (en) A kind of soft raft mattress sinking constructional method
CN207244570U (en) A kind of erosion control promotees shield beach structure of becoming silted up
CN207032201U (en) Steel plastic geogrid
CN206189344U (en) Existing stereoplasm shore protection ecological landscape ization transformation structure
CN104452665B (en) Abyssal region seawall sand quilt laying method
CN106836118A (en) A kind of staged plant wave attenuating device for littoral zone protection
CN204326031U (en) Concrete adds the flexible apron structure of rough pier
CN208136929U (en) A kind of Bridge Pier bifurcation structure
CN207295627U (en) A kind of Novel water conservancy protective slope structure
CN204690683U (en) A kind of ecology type of choking water protects beach structure
CN206570760U (en) A kind of assembled erosion control chokes water bed protection structure
CN104594291B (en) A kind of soft raft mattress sinking construction method that can improve mattress sinking smooth degree
CN109235385A (en) A kind of apron
CN104612106B (en) A kind of permeable geotechnique soft raft structure
CN104264626A (en) Structure for controlling and guiding river regime and stabilizing river mainstream
CN208586559U (en) Artificial fish nest near-nature forest protects beach structure
CN204690685U (en) A kind of ecological environment-friendly type protects beach structure
CN208055980U (en) A kind of permeable erosion control wall construction of hydraulic engineering
CN208105183U (en) A kind of soft fascine mattress bank protection structure
CN106498899A (en) A kind of compound ground sills for mountain stream curved road type Shoal Regulation
CN203834427U (en) Combined shore protection building block
CN113006005A (en) Dam structure suitable for hydraulic and hydroelectric engineering
CN209339092U (en) A kind of waveform ecology shield beach structure
CN207193903U (en) A kind of inland river ecology shield beach body and the shield beach structure using the shield beach body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180417