CN207239672U - The assembly tooling of high ferro, bullet train floor - Google Patents
The assembly tooling of high ferro, bullet train floor Download PDFInfo
- Publication number
- CN207239672U CN207239672U CN201721066825.9U CN201721066825U CN207239672U CN 207239672 U CN207239672 U CN 207239672U CN 201721066825 U CN201721066825 U CN 201721066825U CN 207239672 U CN207239672 U CN 207239672U
- Authority
- CN
- China
- Prior art keywords
- floor
- aluminum section
- section bar
- gauge
- activity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Drilling And Boring (AREA)
Abstract
It the utility model is related to the assembly tooling of a kind of high ferro, bullet train floor, the assembly tooling of this kind of high ferro, bullet train floor make use of the high accuracy of aluminium section bar equally to ensure that the running precision of load formula line slideway, so also ensure that required precision of the electric drill during movement with flexibility.Drill type electric drill fixing bracket can allow operative employee drilling, and when tapping and stubborn self threading pin is laborsaving, and hole position is bored inclined when being not in fatigue drilling, improves the efficiency of installation;Due to monoblock splice it is good after floor it is very heavy so support employs unpowered type roller in frock, facilitate upper and lower floor time-frequency it is numerous move floor, save substantial amounts of labour, and save money than automatic manipulator.
Description
Technical field
It the utility model is related to the assembly tooling of a kind of high ferro, bullet train floor.
Background technology
When high ferro currently on the market, bullet train floor assemble, simply frame on floor and floor underframe heap are overlayed
On ground, it is positioned and is postponed with simple limit card board, by people station on floor, hand-held power drill bores at the mount point of floor
Hole, then twist self threading pin.Since floor underframe has used thick iron plate, and in order to ensure the preboring of the fastness self threading pin of installation
The necessary specification less than normal in self threading pin of bore dia, so self threading pin is difficult to tighten.And each piece of splice floor board need to bore 52 holes,
It is extremely inefficient if twisting self threading pin if manpower is drilling, and bits of offset is easily bored, so each piece of floor splicing consumption
What is taken is manually very high, is also difficult to ensure that installation quality.Due to the higher limit card board of no precision, splice the floor after installing
It is also difficult to ensure compliance with the size of design requirement.In addition if can equally solve the automation of such installation requirement using in the market
Mechanical arm cost is sufficiently expensive.
Utility model content
The purpose of this utility model is to be to overcome above-mentioned deficiency, there is provided one kind splicing installation accuracy is high, time saving and energy saving, and
And the assembly tooling of convenient cheap high ferro, bullet train floor.
What the purpose of this utility model was realized in:
The assembly tooling of a kind of high ferro, bullet train floor, it includes aluminum section bar frame, and the aluminum section bar frame is rectangular, aluminium
The opposite sides at the top of section material framework is equipped with load formula line slideway, and a slip is provided with the load formula line slideway
Block, is fixed on the sliding shoe by screw and an electric drill fixing bracket, power drill, hand is housed on the electric drill fixing bracket
The drill bit of drill gun is set straight down, and the aluminum section bar frame is equipped with row's no-power drum, and no-power drum is used for ground
Plate transports backward, and one end of the aluminum section frame top of the trellis is provided with movable thimble limit card board, movable thimble limiting card
Plate can be turned down, and the side of the aluminum section bar frame is provided with fixed limit card board, and aluminum section bar frame is relative to fixed limiting card
The side of plate is provided with the spacing upper snap-gauge of activity and the spacing lower snap-gauge of activity, and the spacing upper snap-gauge of the activity and activity are spacing
Lower snap-gauge can move.
The spacing upper snap-gauge of activity and the spacing lower snap-gauge of activity are promoted by cylinder.
Taken turns equipped with good fortune horse the bottom of the aluminum section bar frame.
The utility model has an advantageous effect in that:
The assembly tooling of this kind of high ferro, bullet train floor make use of the high accuracy of aluminium section bar equally to ensure that load formula straight line
The running precision of guide rail, so also ensures that required precision of the electric drill during movement with flexibility.Drill type electric drill
Fixing bracket can allow operative employee drilling, and when tapping and stubborn self threading pin is laborsaving, and hole position is bored inclined when being not in fatigue drilling,
Improve the efficiency of installation;Floor after being spliced well due to monoblock is very heavy so support employs unpowered type rolling in frock
Cylinder, facilitate upper and lower floor time-frequency it is numerous move floor, save substantial amounts of labour, and save money than automatic manipulator.
Brief description of the drawings
Fig. 1 is the utility model high ferro, the structure diagram of the assembly tooling of bullet train floor.
Wherein:It is aluminum section bar frame 1, good fortune horse wheel 2, load formula line slideway 3, cylinder 4, the spacing upper snap-gauge 5 of activity, unpowered
Roller 6, electric drill fixing bracket 7, fixed limit card board 8, movable thimble limit card board 9, the spacing lower snap-gauge 10 of activity.
Embodiment
Such as Fig. 1, the assembly tooling of a kind of high ferro, bullet train floor is the utility model is related to, it includes aluminum section bar frame 1, institute
State that aluminum section bar frame 1 is rectangular, the bottom of aluminum section bar frame 1 is equipped with good fortune horse wheel 2, the opposite sides at the top of aluminum section bar frame 1
Equipped with load formula line slideway 3, a sliding shoe is provided with the load formula line slideway 3, passes through screw on the sliding shoe
Fixed with an electric drill fixing bracket 7, power drill is housed on the electric drill fixing bracket 7, the drill bit of power drill is set straight down
Put, which moves together with the sliding shoe on load formula line slideway 3, due to the running precision of load formula line slideway 3
Height, so also ensures that precision and flexibility of the electric drill in moving process so that operative employee is in drilling, tapping and twists
Laborsaving during self threading pin, hole position is bored inclined when being not in fatigue drilling, is improved the efficiency of installation, is set on the aluminum section bar frame 1
There is row's no-power drum 6, no-power drum 6 is used to backward transport floor, avoids and frequently move floor, saves big
The labour of amount, the one end at the top of aluminum section bar frame 1 are provided with movable thimble limit card board 9, and movable thimble is spacing
Snap-gauge 9 can be turned down, and spacing for being carried out in floor splicing, the side of the aluminum section bar frame 1 is provided with fixed limiting card
Plate 8, aluminum section bar frame 1 relative to the side of fixed limit card board 8 be provided with the spacing upper snap-gauge 5 of activity and it is movable it is spacing under
Snap-gauge 10, the spacing upper snap-gauge 5 of activity is spacing for being carried out to floor upper ledge frame, and the spacing lower snap-gauge 10 of activity is used for floor lower frame
Frame progress is spacing, and the spacing upper snap-gauge 5 of activity and the spacing lower snap-gauge 10 of activity can move, and all be pushed away by cylinder 4
It is dynamic.
A kind of this high ferro, bullet train floor assembly tooling in use, lower floor frame via being fixed on aluminum section bar frame
No-power drum 6 be pushed into, turn down movable thimble limit card board 9, the cylinder 4 of the spacing lower snap-gauge 10 of opening activity, makes lowerly
Plate framework is fixed, then the upper floor frame that need to splice equally is put into, and the cylinder 4 of the spacing upper snap-gauge 5 of opening activity, makes floor
Frame is fixed, and electric drill fixing bracket 7 is moved to the position for needing to punch after having good positioning, and electricity consumption is drilled on floor and drills, and attacks spiral shell
Line, then tighten self threading pin.
Claims (3)
- A kind of 1. assembly tooling of high ferro, bullet train floor, it is characterised in that:It includes aluminum section bar frame(1), the aluminum section frame Frame(1)It is rectangular, aluminum section bar frame(1)The opposite sides at top be equipped with load formula line slideway(3), which leads Rail(3)On be provided with a sliding shoe, pass through screw and an electric drill fixing bracket on the sliding shoe(7)It is fixed, the electricity Bore fixing bracket(7)Upper that power drill is housed, the drill bit of power drill is set straight down, the aluminum section bar frame(1)It is equipped with one Arrange no-power drum(6), no-power drum(6)For floor to be transported backward, the aluminum section bar frame(1)The one end at top is set It is equipped with movable thimble limit card board(9), movable thimble limit card board(9)It can turn down, the aluminum section bar frame(1)One Side is provided with fixed limit card board(8), aluminum section bar frame(1)Relative to fixed limit card board(8)Side be provided with work Move spacing upper snap-gauge(5)With the spacing lower snap-gauge of activity(10), the spacing upper snap-gauge of activity(5)With the spacing lower snap-gauge of activity(10) It can move.
- A kind of 2. assembly tooling of high ferro, bullet train floor according to claim 1, it is characterised in that:The activity is spacing Upper snap-gauge(5)With the spacing lower snap-gauge of activity(10)Pass through cylinder(4)Promote.
- A kind of 3. assembly tooling of high ferro, bullet train floor according to claim 1, it is characterised in that:The aluminum section frame Frame(1)Bottom equipped with good fortune horse take turns(2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721066825.9U CN207239672U (en) | 2017-08-24 | 2017-08-24 | The assembly tooling of high ferro, bullet train floor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721066825.9U CN207239672U (en) | 2017-08-24 | 2017-08-24 | The assembly tooling of high ferro, bullet train floor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207239672U true CN207239672U (en) | 2018-04-17 |
Family
ID=61882335
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721066825.9U Active CN207239672U (en) | 2017-08-24 | 2017-08-24 | The assembly tooling of high ferro, bullet train floor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207239672U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108907650A (en) * | 2018-08-07 | 2018-11-30 | 浙江建设职业技术学院 | A kind of tempered glass assembling device and its assemble method for Intelligent platform |
-
2017
- 2017-08-24 CN CN201721066825.9U patent/CN207239672U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108907650A (en) * | 2018-08-07 | 2018-11-30 | 浙江建设职业技术学院 | A kind of tempered glass assembling device and its assemble method for Intelligent platform |
CN108907650B (en) * | 2018-08-07 | 2021-07-20 | 浙江建设职业技术学院 | Toughened glass assembling device for intelligent platform and assembling method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203187085U (en) | Sucker mechanism | |
CN204094515U (en) | Boring grab | |
CN202447872U (en) | Magnetic screw taking mechanism | |
CN207239672U (en) | The assembly tooling of high ferro, bullet train floor | |
CN102489991B (en) | Device for assembling handle skeleton and balance weight block of vehicular door automatically | |
CN102554609A (en) | Magnetic suction type screw taking mechanism | |
CN105261990B (en) | Power type cable bending device | |
CN207502332U (en) | A kind of display screen component processing shell rigidity detection device | |
CN204526257U (en) | A kind of full-automatic gluing machine | |
CN207013760U (en) | A kind of steel construction boring grab | |
CN202571113U (en) | Wire feeding transmission mechanism of connecting rod of transmission swinging arm of left side shaft of automatic nail making machine | |
CN103551624A (en) | Drilling device for ladder pipe | |
CN207104443U (en) | Drill clamping device | |
CN206232379U (en) | Cash brick handler | |
CN205652829U (en) | Body material loading plug bush machine steel pipe feed mechanism | |
CN206437801U (en) | A kind of subway construction bogey | |
CN107052385B (en) | A kind of accurate positioning drilling machine | |
CN208879747U (en) | A kind of double-head drilling equipment | |
CN208083104U (en) | A kind of strip metal part coalignment | |
CN203792442U (en) | Wood drilling equipment | |
CN205834677U (en) | A kind of full-automatic circle binding post screw kludge | |
CN202963518U (en) | Drilling equipment with counterweight | |
CN202754408U (en) | Bearing material-conveying anti-blocking mechanism | |
CN102407415A (en) | Clockwork flat welding jig | |
CN206032511U (en) | A receiving roller carries assembly and personally experiences sth. part of body that is used for automatic receipts of LED to expect machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |