CN207229306U - The dual-purpose tower of one frame - Google Patents
The dual-purpose tower of one frame Download PDFInfo
- Publication number
- CN207229306U CN207229306U CN201721137281.0U CN201721137281U CN207229306U CN 207229306 U CN207229306 U CN 207229306U CN 201721137281 U CN201721137281 U CN 201721137281U CN 207229306 U CN207229306 U CN 207229306U
- Authority
- CN
- China
- Prior art keywords
- tower
- pylon
- center
- dual
- hanger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Abstract
The utility model discloses a kind of dual-purpose tower of a frame, tower includes:Tower body, the tower body include multiple tower segments sequentially connected from down to up;Center pylon, the center pylon are located at the center of the tower body, are being equipped with construction platform described in the construction time of the tower on the pylon of center, are equipped with maintenance lift appliance described in the validity period in the tower on the pylon of center.Thus, after construction terminates, rationally to utilize center pylon, without removing, center pylon can continue to run with center pylon tower may as a part for tower, so as to reduce difficulty of construction, accelerate speed of application, save cost.And the center pylon retained can strengthen the stability and bearing capacity of tower at least to some extent.
Description
Technical field
It the utility model is related to concrete tower the realm of building construction, more particularly to the tower that an a kind of frame is dual-purpose.
Background technology
With the increase of wind turbine power generation efficiency, the length of blade of wind-driven generator is increasingly longer, matching
The height and sectional dimension of blower fan tower barrel are also continuously increased.Wherein, steel construction tower is since cost is higher, transport difficult,
It is difficult to the construction requirement for meeting the high tower in heavy in section.And concrete tower can economically build Large-scale Wind Turbines, because
This obtains extensive concern.Since traffic condition and processing conditions limit, heavy in section tower is using cast-in-place form than prefabricated processing tool
There are the advantages such as the economy of higher and faster speed of application.
In the construction of cast-in-place concrete tower, setting center pylon in meeting tower, for transporting building materials and construction personnel, is applied
Removed after the completion of work, construction is complicated, and economy is low.
Utility model content
The utility model is intended at least solve one of technical problem existing in the prior art.For this reason, the utility model carries
Go out a kind of dual-purpose tower of a frame, which can retain center pylon after construction, can so as to reduce difficulty of construction
To improve speed of application.
The dual-purpose tower of a frame according to the present utility model, including:Tower body, the tower body are included from down to up
Sequentially connected multiple tower segments;Center pylon, the center pylon is located at the center of the tower body, in the tower
Construction time described in center pylon be equipped with construction platform, described in the validity period in the tower on the pylon of center be equipped with maintenance electricity
Ladder device.
The dual-purpose tower of a frame according to the present utility model, after construction terminates, wind-driven generator can be utilized rationally
Center pylon, without removing, center pylon can be continued to run with, applied so as to reduce center pylon as a part for tower
Work difficulty, accelerates speed of application, saves cost.And the center pylon retained can strengthen the steady of tower at least to some extent
Qualitative and bearing capacity.
In some examples of the utility model, the construction platform includes:Multiple radiation beams, the multiple radiation beam ring
Set around the central tower frame, radiation the inner of beam is connected with the center pylon, and the outer end for radiating beam is from described
The tower body is stretched out in the top of tower body.
In some examples of the utility model, the construction platform includes:Interior hanger and pylon, the interior hanger and
The pylon is both connected on the radiation beam, and the interior hanger and the pylon are respectively positioned at the interior of the tower body
Outer both sides.
In some examples of the utility model, the interior hanger and the pylon be it is multiple, it is two neighboring described
Interior connecting plate is equipped between interior hanger, outer connecting plate is equipped between the two neighboring pylon.
In some examples of the utility model, the pylon to be multiple, the interior hanger be it is multiple, it is multiple described outer
Hanger and multiple interior hangers correspond.
In some examples of the utility model, each mutually interlocked between the pylon and the corresponding interior hanger
Gu.
In some examples of the utility model, the construction platform includes:The radial direction hanger being located on the radiation beam,
The radial direction hanger is located between the interior hanger and the center pylon.
In some examples of the utility model, passage connecting plate is equipped between the radial direction hanger and the interior hanger.
In some examples of the utility model, transport electricity is being equipped with described in the construction time of the tower on the pylon of center
Ladder.
In some examples of the utility model, the maximum horizontal extent size of the transportation elevator is less than or equal to the tower
The internal diameter of tower segments described in the top of cylinder body.
Brief description of the drawings
The above-mentioned and/or additional aspect and advantage of the utility model will in the description from combination accompanying drawings below to embodiment
Become obvious and be readily appreciated that, wherein:
Fig. 1 be according to the dual-purpose tower of a frame of the utility model embodiment when top is constructed schematic diagram;
Fig. 2 be according to the dual-purpose tower of a frame of the utility model embodiment when bottom is constructed schematic diagram;
Fig. 3 is the sectional view according to the dual-purpose tower of a frame of the utility model embodiment.
Reference numeral:
Tower 100;
Tower body 10;Tower segments 11;
Center pylon 20;
Construction platform 30;Radiate beam 31;Interior hanger 32;Pylon 33;Interior connecting plate 34;Outer connecting plate 35;Radial direction hanger 36;It is logical
Road connecting plate 37;
Transportation elevator 40.
Embodiment
The embodiment of the utility model is described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning
Same or similar element is represented to same or similar label eventually or there is same or like element.Below by ginseng
The embodiment for examining attached drawing description is exemplary, and is only used for explaining the utility model, and it is not intended that to the utility model
Limitation.
Described in detail below with reference to Fig. 1-Fig. 3 according to the dual-purpose tower 100 of a frame of the utility model embodiment, this
Tower 100 can be used for wind-power electricity generation (such as atop a tower installation wind wheel) in utility model embodiment, and tower 100 can also be used
In thermal power generation (such as tower is cooling tower), tower 100 can be also used for chemical field (such as reaction tower) etc., not make here
Limitation.Hereafter only illustrated so that tower 100 is the tower of wind-driven generator as an example.
As depicted in figs. 1 and 2, can be included according to the dual-purpose tower 100 of a frame of the utility model embodiment:Tower sheet
Body 10 and center pylon 20, tower body 10 include multiple tower segments 11 sequentially connected from down to up.
Center pylon 20 is located at the center of tower body 10, is equipped with and applies on the construction time center pylon 20 of tower 100
Work platform 30, such staff can construct in construction platform 30, thereby may be ensured that the security and height of construction
Effect property.Specifically, center pylon 20 is truss structure, and such 20 rigidity of structure of center pylon is high, reliable and stable.
Installation and maintenance needs due to tower wind power generating set, tower using when need to set some to be easy to work people
The facility that member creeps up and down, such as need to set cat ladder in tower, or the device such as extra installation elevator, cause cost to increase
Add.Itd is proposed for this in the utility model, after the completion of tower 100, when wind-driven generator comes into operation, center that when construction builds
Pylon 20 can retain, and so overhaul lift appliance and may be mounted on center pylon 20, the setting for overhauling lift appliance can be with
Personnel's periodic inspection wind-driven generator convenient to overhaul.
Thus, in wind-driven generator, center pylon 20 can have two effects, and an effect is construction platform 30
Installation, thereby may be ensured that being normally carried out for construction, another effect is to overhaul the installation of lift appliance, so retains central tower
Frame 20, and detection lift appliance can effectively be worked by center pylon 20.That is, after construction terminates, wind-force
Generator can rationally utilize center pylon 20, and for center pylon 20 without removing, center pylon 20 can be as the one of tower 100
Part continues to run with, and so as to reduce difficulty of construction, accelerates speed of application, saves cost.And the center pylon 20 retained
It can strengthen the stability and bearing capacity of tower 100 at least to some extent.
In some embodiments of the utility model, as depicted in figs. 1 and 2, construction platform 30 includes:Multiple radiation beams
31, multiple radiation beams 31 are set around center pylon 20, and the inner of radiation beam 31 is connected with center pylon 20, radiate the outer of beam 31
Hold from the top of tower body 10 and stretch out tower body 10.It is understood that construction personnel needs to pour in construction platform 30
Concrete is built to form tower segments 11, radiation beam 31 can be conducive to construction personnel can build in the circumferential direction of center pylon 20
Tower segments 11 are made, thereby may be ensured that the normal construction of tower segments 11 is built.
Further, as shown in Fig. 2, construction platform 30 can include:Interior hanger 32 and pylon 33, interior hanger 32 and outer
Hanger 33 is both connected on radiation beam 31, and interior hanger 32 and pylon 33 are respectively inside and outside tower body 10.Interior extension
The setting of frame 32 and pylon 33 can facilitate the placement of construction personnel and raw material of constructing, and can be in order to which construction personnel is in tower
The inner side and outer side of cylinder section 11 carries out the installing of template, concrete is poured, safeguarded, thereby may be ensured that tower body 10
Normal construction is built.
Specifically, as shown in figure 3, interior hanger 32 and pylon 33 are multiple, it is equipped between two neighboring interior hanger 32
Interior connecting plate 34, is equipped with outer connecting plate 35 between two neighboring pylon 33.
The interior hanger 32 being formed by connecting forms interior construction platform, and the pylon 33 being formed by connecting forms outer construction platform.It is interior
Connecting plate 34 can walk about in order to construction personnel between two adjacent interior hangers 32, and outer connecting plate 35 can exist in order to construction personnel
Walk about between two adjacent pylons 33, so as to construct easy to construction personnel around the circumferential direction of tower segments 11, into
And difficulty of construction can be reduced, and construction efficiency can be improved.
Alternatively, as shown in Figures 2 and 3, pylon 33 is multiple, and interior hanger 32 is multiple, multiple pylons 33 and more
A interior hanger 32 corresponds.Thus, when carrying out pouring tower segments 11, construction personnel can be with corresponding pylon 33 and interior extension
Poured at frame 32, thereby may be ensured that pouring at this is normally carried out.
Here since pylon 33 and interior hanger 32 are each provided on radiation beam 31, will, multiple pylons 33 and multiple
Interior hanger 32, which corresponds, to be set, and installation is also easier to.
In addition, each mutually lock between pylon 33 and corresponding interior hanger 32.The pylon 33 that mutually locks and interior
Hanger 32 can cause pylon 33 and 32 position of interior hanger to fix, and thereby may be ensured that the security of construction personnel, but also
The construction of tower segments 11 can be influenced to avoid pylon 33 and interior hanger 32, so can ensure safety that tower 100 constructs into
OK.
Further, as shown in figure 3, construction platform 30 includes:The radial direction hanger 36 being located on radiation beam 31, radial direction hanger
36 radially arrange, radial direction hanger 36 is located between interior hanger 32 and center pylon 20.Radial direction hanger 36 can be conducive to
Construction personnel moves between interior hanger 32 and center pylon 20, and the material that can be conducive to construct is at interior hanger 32 and center
Conveyed between pylon 20, so as to improve the construction efficiency of tower 100.
Specifically, as shown in figure 3, being equipped with passage connecting plate 37 between radial direction hanger 36 and interior hanger 32.Passage connecting plate 37 can
In order to facilitate construction personnel to walk about, and it can thereby may be ensured that being smoothed out for construction in order to the conveying for material of constructing.
In addition, as depicted in figs. 1 and 2, in the construction time of tower 100, center pylon 20 is equipped with transportation elevator 40.Transport
Elevator 40 can be used for transporting construction personnel and construction material.The setting of transportation elevator 40 can largely improve construction effect
Rate, and can ensure the security of construction personnel.
In the example of fig. 1, transportation elevator 40 is two framves, opposite the two of two frame transportation elevators, 40 centrally disposed pylon 20
Side.
Specifically, the internal diameter of multiple tower segments 11 can be sequentially reduced on direction from bottom to top.
More specifically, as shown in Figure 1, the maximum horizontal extent size of transportation elevator 40 is less than or equal to tower body 10 most
The internal diameter of top tower segments 11.Thus, even if tower body 10 has been constructed to top, the tower at such transportation elevator 40 and top
Cylinder section 11 is also non-interference, thereby may be ensured that the normal transport of construction personnel and material of constructing, and can ensure top
The normal construction of tower segments 11.
There is also the need to explanation, tower is in the construction stage since transportation elevator 40 needs to transport construction equipment, construction
Building materials etc., therefore the load of transportation elevator 40 is big, takes up area and is also required to suitably amplify.And when tower comes into operation, center
Pylon 20 needs the weight of the service personnel that transports and equipment to mitigate significantly, therefore the transportation elevator 40 that uses of construction stage and throws
The maintenance elevator that the production stage uses is not same elevator.
In the utility model embodiment, center pylon 20 can be as the load of permanent maintenance elevator after the completion of construction
Body, can install the wind-powered electricity generation component such as cable on center pylon 20.It is integrally-built can to increase tower 100 for center pylon 20 at the same time
Stability and bearing capacity.
Specifically, to ensure the rigidity of structure of center pylon 20, the periphery of center pylon 20 can set connector, central tower
Frame 20 is connected by connector with tower body 10.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " illustrative examples ",
The description of " example ", " specific example " or " some examples " etc. means to combine specific features, the knot that the embodiment or example describe
Structure, material or feature are contained at least one embodiment or example of the utility model.In the present specification, to above-mentioned art
The schematic representation of language may not refer to the same embodiment or example.Moreover, description specific features, structure, material or
Person's feature can combine in an appropriate manner in any one or more embodiments or example.
While there has been shown and described that the embodiment of the utility model, it will be understood by those skilled in the art that:
These embodiments can be carried out with a variety of changes, modification in the case where not departing from the principle and objective of the utility model, replaced
And modification, the scope of the utility model are limited by claim and its equivalent.
Claims (10)
- A kind of 1. dual-purpose tower of a frame, it is characterised in that including:Tower body, the tower body include multiple tower segments sequentially connected from down to up;Center pylon, the center pylon is located at the center of the tower body, at center described in the construction time of the tower Pylon is equipped with construction platform, is equipped with maintenance lift appliance described in the validity period in the tower on the pylon of center.
- 2. the dual-purpose tower of a frame according to claim 1, it is characterised in that the construction platform includes:Multiple radiation Beam, the multiple radiation beam are set around the central tower frame, and radiation the inner of beam is connected with the center pylon, described The tower body is stretched out in the outer end for radiating beam from the top of the tower body.
- 3. the dual-purpose tower of a frame according to claim 2, it is characterised in that the construction platform includes:Interior hanger and Pylon, the interior hanger and the pylon are both connected on the radiation beam, the interior hanger and pylon difference Inside and outside the tower body.
- 4. the dual-purpose tower of a frame according to claim 3, it is characterised in that the interior hanger and the pylon are It is multiple, interior connecting plate is equipped between the two neighboring interior hanger, outer connecting plate is equipped between the two neighboring pylon.
- 5. the dual-purpose tower of a frame according to claim 3, it is characterised in that the pylon is multiple, the interior extension Frame is multiple, and multiple pylons and multiple interior hangers correspond.
- 6. the dual-purpose tower of a frame according to claim 3, it is characterised in that each pylon with it is corresponding described Mutually lock between interior hanger.
- 7. the dual-purpose tower of a frame according to claim 3, it is characterised in that the construction platform includes:It is located at described The radial direction hanger on beam is radiated, the radial direction hanger is located between the interior hanger and the center pylon.
- 8. the dual-purpose tower of a frame according to claim 7, it is characterised in that the radial direction hanger and the interior hanger it Between be equipped with passage connecting plate.
- 9. the dual-purpose tower of a frame according to any one of claim 1-8, it is characterised in that in the construction of the tower Center pylon described in phase is equipped with transportation elevator.
- 10. the dual-purpose tower of a frame according to claim 9, it is characterised in that the maximum horizontal of the transportation elevator is wide Spend the internal diameter that size is less than or equal to tower segments described in the top of the tower body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721137281.0U CN207229306U (en) | 2017-09-01 | 2017-09-01 | The dual-purpose tower of one frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721137281.0U CN207229306U (en) | 2017-09-01 | 2017-09-01 | The dual-purpose tower of one frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207229306U true CN207229306U (en) | 2018-04-13 |
Family
ID=61860761
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721137281.0U Active CN207229306U (en) | 2017-09-01 | 2017-09-01 | The dual-purpose tower of one frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207229306U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111350639A (en) * | 2018-12-21 | 2020-06-30 | 西门子歌美飒可再生能源公司 | Platform positioning system, method of operating a platform positioning system and wind turbine |
-
2017
- 2017-09-01 CN CN201721137281.0U patent/CN207229306U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111350639A (en) * | 2018-12-21 | 2020-06-30 | 西门子歌美飒可再生能源公司 | Platform positioning system, method of operating a platform positioning system and wind turbine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9068555B2 (en) | Element for lifting the blade and method followed | |
AU2009244469B2 (en) | Erection method for solar receiver and support tower | |
CN103939299B (en) | The split type mounting process of a kind of offshore wind turbine | |
CN202558552U (en) | Self-propelled lifting working platform | |
US20110142660A1 (en) | Wind turbine blade with integrated handling mechanism attachment bores | |
CN102996370A (en) | Tower base section of a wind turbine, a wind turbine and a system for mounting a tower | |
JP5719975B2 (en) | Wind energy turbine shell station | |
CN106586846B (en) | The hanging device and its construction method of a kind of wind power generating set | |
US20120152651A1 (en) | Heli-hoist platform | |
CN102650261A (en) | Segmental lifting method for impeller of high-power wind driven generator | |
CN106481060A (en) | Operating platform for tower and hanging method | |
EP3115601B1 (en) | Connection between lattice tower and gondola | |
CN207229306U (en) | The dual-purpose tower of one frame | |
CN202001212U (en) | Tower frame for wind generating set | |
CN201647834U (en) | Device for mounting tower equipment in narrow spaces | |
CN103511179A (en) | Wind wheel structure of vertical axis wind turbine and installation method thereof | |
CN103122828A (en) | Wind turbine generator group | |
CN203513223U (en) | High-altitude operating platform | |
CN109424506A (en) | The dual-purpose tower of one frame | |
CN211691444U (en) | Wind power generator tower template | |
CN109113938A (en) | The segmented pitch variable bearings of Wind turbines reinforce flange and its aerial installation method | |
CN201901538U (en) | Self-lifting fan-mounted crane and marine fan transporting and mounting equipment | |
CN106662076A (en) | Tall wind turbine tower erection with climbing crane | |
CN209041031U (en) | A kind of segmented pitch variable bearings reinforcement flange for Wind turbines | |
CN201343379Y (en) | Crane used for maintenance of large-size wind power equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |