CN201901538U - Self-lifting fan-mounted crane and marine fan transporting and mounting equipment - Google Patents

Self-lifting fan-mounted crane and marine fan transporting and mounting equipment Download PDF

Info

Publication number
CN201901538U
CN201901538U CN2010206756611U CN201020675661U CN201901538U CN 201901538 U CN201901538 U CN 201901538U CN 2010206756611 U CN2010206756611 U CN 2010206756611U CN 201020675661 U CN201020675661 U CN 201020675661U CN 201901538 U CN201901538 U CN 201901538U
Authority
CN
China
Prior art keywords
crane
jacking
blower fan
girder
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206756611U
Other languages
Chinese (zh)
Inventor
任自放
黄文俊
薛烨军
葛绍群
徐成伟
陈建兵
徐晨飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010206756611U priority Critical patent/CN201901538U/en
Application granted granted Critical
Publication of CN201901538U publication Critical patent/CN201901538U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model discloses a self-lifting fan-mounted crane and marine fan transporting and mounting equipment. The self-lifting fan-mounted crane comprises a synchronous jacking mechanism, a hoisting platform and a generator get, wherein the synchronous jacking mechanism comprises a plurality of synchronous jacking stocks and multiple sets of standard knobs; the synchronous jacking stocks are connected with pre-embedded bolts on a bearing platform; the multiple sets of standard knobs are matched with the synchronous jacking stocks; each set of standard knots is provided with multiple knobs; the jacking or descending of the synchronous jacking mechanism can be realized by the synchronous jacking or descending of the multiple sets of standard knobs; the hoisting platform comprises a main beam, a jacking buttress, a first crane, a second crane and a standard knob hoisting crane; the jacking buttress is arranged on the main beam and is used for fixing a fan on the main beam; the first crane is arranged on the main beam and is used for hoisting a main frame; the second hoisting crane is embedded into the main beam; the standard knob hoisting crane is arranged on the main beam and is used for hoisting the standard knobs into the synchronous jacking stocks; and the generator set is used for supplying power to the synchronous jacking mechanism and the hoisting platform. By using the self-lifting fan-mounted crane, the input of the marine fan mounting equipment can be reduced and the all-weather work can be realized.

Description

Jack up blower fan erecting crane and offshore wind turbine transportation erecting equipment
Technical field
The utility model relates to a kind of blower fan erecting crane and blower fan transportation erecting equipment, particularly relates to a kind of jack up blower fan erecting crane and offshore wind turbine transportation erecting equipment that is suitable for the intertidal zone of the more difficult operation of marine vessel.
Background technology
Offshore wind farm installation at present is at the early-stage, and existing large-scale lift-on and lift-off ship all absorbs water darker, can't carry out lifting operation in the beach between tide.The self-lifting hoister ship of part enterprise exploitation can fix in the shoal and lift by crane, but the equipment input is very big, place in operation on a large scale, and inefficiency will restrict the fast development of offshore wind farm project.
The utility model content
The purpose of this utility model is to provide a kind of can reduce offshore wind turbine erecting equipment input, reduce installation difficulty, improve the wind-powered electricity generation installation effectiveness and make wind-powered electricity generation that the influence of avoiding fluctuation tide in beach between tide fully is installed, the jack up blower fan erecting crane of all weather operation and offshore wind turbine transportation erecting equipment.
In order to achieve the above object, the utility model proposes a kind of jack up blower fan erecting crane, can be on the blower fan cushion cap each component part of blower fan be installed as blower fan integral body, the component part of described blower fan comprises more piece tower tube, main frame, three fan blades and wheel hub, this jack up blower fan erecting crane comprises: synchronization of jacking up mechanism, comprise: a plurality of synchronization of jacking up stocks, with bolted connection pre-buried on the described cushion cap; And overlap standard knot more, and cooperating with described synchronization of jacking up stock, every cover standard knot has more piece, can be by the synchronization of jacking up of described many cover standard knots or the jacking or the decline of the realization synchronization of jacking up mechanism that descends; Hoisting platform is installed on described synchronization of jacking up mechanism top, and described hoisting platform comprises: girder; The jacking buttress is located on the described girder, is used for the main frame of described blower fan is fixed in girder; The first heavy-duty machine is located on the described girder, is used for the described main frame of lifting; Second hoisting crane is embedded in described girder, is used for lifting and assembly unit tower tube, and is used to lift by crane the 3rd fan blade of described three fan blades and docks with wheel hub; And standard knot plays hanging, is located on the described girder, is used for standard knot risen winching in the described synchronization of jacking up stock; And generator set, be used to supply the electric power of described synchronization of jacking up mechanism and hoisting platform.
Jack up blower fan erecting crane described in the utility model, wherein said synchronization of jacking up stock and standard knot are 4 covers, and every cover standard knot comprises 3 joint standard knots.
Jack up blower fan erecting crane described in the utility model, wherein said girder comprises first girder and second girder, has linking beam between this two girder.
Jack up blower fan erecting crane described in the utility model, wherein said the first heavy-duty machine are 180 tons of hoisting cranes.
Jack up blower fan erecting crane described in the utility model, wherein said second hoisting crane are 60 tons of hoisting cranes.
Jack up blower fan erecting crane described in the utility model, wherein said standard knot are H205B type standard knot.
The utility model has also proposed a kind of offshore wind turbine transportation erecting equipment, comprises above-mentioned erecting equipment, and this offshore wind turbine transportation and erecting equipment also comprise: carrier is used to transport each component part and the described erecting equipment of offshore wind turbine to be installed; And crane ship, be used for each component part of described offshore wind turbine and the assembling and the unloading process of erecting equipment are winched to described cushion cap or winch to carrier from cushion cap from carrier, and lift by crane first fan blade, second fan blade and wheel hub and dock with main frame.
By the technique scheme the beneficial effects of the utility model be: gross weight of equipment is about 450t, and total cost is no more than 1,000 ten thousand, and than present various lift-on and lift-off ship, equipment manufacturing cost has only 1/10th.Transfer crane is installed in safety on the blower foundation, reliable.Equipment availability is not subjected to tidal effect.Can be in the sky all weather operations of non-typhoon.Equipment is installed, blower fan is installed and equipment is removed, and whole process can be finished in 20 effective working days, and speed is fast.
Description of drawings
Fig. 1 is the structural representation of the utility model offshore wind turbine transportation erecting equipment;
Fig. 2 is the scheme drawing of the utility model installation code stock;
Fig. 3 installs the scheme drawing of girder for the utility model;
Fig. 4 installs the scheme drawing of contact beam, 180T hoisting crane, 60T hoisting crane for the utility model;
Fig. 5 is the scheme drawing of the utility model jacking standard stock 2 joints;
Fig. 6 is the scheme drawing of the utility model lifting first segment tower tube;
Fig. 7 is the scheme drawing of the utility model lifting main frame;
Fig. 8 is the descend scheme drawing of the accurate sections of 2 feast-brand marks of the utility model;
Fig. 9 installs the scheme drawing of main frame buttress, dismounting 180T hoisting crane for the utility model;
Figure 10 falls within the scheme drawing of buttress for hoist jacking, main frame of the utility model;
Figure 11 A and Figure 11 B are the scheme drawing that the utility model is installed two fan blades;
Figure 12 A and Figure 12 B are the scheme drawing that the utility model is installed remaining tower tube;
Figure 13 A and Figure 13 B are the scheme drawing of the utility model main frame contraposition;
Figure 14 A and Figure 14 B are the scheme drawing that the utility model lifts by crane the 3rd fan blade and docks with wheel hub;
Figure 15 A and Figure 15 B play the scheme drawing that hanging cooperates jack-up system decline erecting equipment for the utility model standard knot.
The specific embodiment
To describe specific embodiment of the utility model in detail below.Should be noted that the embodiments described herein only is used for casehistory, is not limited to the utility model.
Please refer to Fig. 1, the utility model is a kind of jack up blower fan erecting crane, can be on blower fan cushion cap 3 each component part of blower fan be installed as blower fan integral body, the component part of described blower fan comprises more piece tower tube 61, main frame 62, three fan blades 63 and wheel hubs, this blower fan erecting equipment comprises: synchronization of jacking up mechanism, it comprises: a plurality of synchronization of jacking up stocks 41, with bolted connection pre-buried on the described cushion cap; And overlap standard knot 42 more, and cooperating with described synchronization of jacking up stock, every cover standard knot has more piece, can be by the synchronization of jacking up of described many cover standard knots or the jacking or the decline of the realization synchronization of jacking up mechanism that descends; Hoisting platform is installed on described synchronization of jacking up mechanism top, and described hoisting platform comprises: girder 51; Jacking buttress 54 is located on the described girder, is used for the main frame of described blower fan is fixed in girder; The first heavy-duty machine 52 is located on the described girder, is used for the described main frame of lifting; Second hoisting crane 53 is embedded in described girder, is used for lifting and assembly unit tower tube, and is used to lift by crane the 3rd fan blade of described three fan blades and docks with wheel hub; And standard knot plays hanging 55, is located on the described girder, is used for standard knot risen winching in the described synchronization of jacking up stock; And generator set, be used to supply the electric power of described synchronization of jacking up mechanism and hoisting platform.
Wherein said synchronization of jacking up stock and standard knot are 4 covers, and every cover standard knot comprises 3 joint H205B type standard knots.Described girder comprises first girder and second girder, has linking beam between this two girder.Described the first heavy-duty machine is 180 tons of hoisting cranes.Described second hoisting crane is 60 tons of hoisting cranes.
Referring again to Fig. 1, the utility model has also proposed a kind of offshore wind turbine transportation erecting equipment, comprise above-mentioned jack up blower fan erecting crane, this offshore wind turbine transportation erecting equipment also comprises: carrier 1 is used to transport each component part and the described erecting equipment of offshore wind turbine to be installed; And crane ship 2, be used for each component part of described offshore wind turbine and the assembling and the unloading process of erecting equipment are winched to described cushion cap or winch to carrier from cushion cap from carrier, and lift by crane first fan blade, second fan blade and wheel hub and dock with main frame.
As shown in Figure 2, be the scheme drawing of the utility model installation code sections.Crane ship stopped be anchored in cushion cap 3 limits, barge rests against the crane ship opposite side, 4 standard stocks is installed is connected (each standard cover comprises: fixing feet, 3 saves standard knots, stock, flange frame) with pre-embedded bolt on the cushion cap.
The scheme drawing of girder is installed for the utility model as shown in Figure 3.2 sections girders (comprising standard knot lifting dolly) are installed;
The scheme drawing of contact beam, 180T hoisting crane, 60T hoisting crane is installed for the utility model as shown in Figure 4.Linking beam (comprising the 60t hoisting crane) is installed, 180t hoisting hook (comprising crane girder, winch, suspender) is installed;
As Fig. 5~shown in Figure 10, be respectively the scheme drawing of the utility model jacking standard stock 2 joints, the scheme drawing of lifting first segment tower tube, the scheme drawing of lifting main frame, the scheme drawing of the accurate sections of 2 feast-brand marks descends, the scheme drawing of main frame buttress, dismounting 180T hoisting crane is installed, and the jacking that hoists, main frame fall within the scheme drawing of buttress.Promptly begin to start synchronization of jacking up after the installation of standard sections, the accurate sections of 2 feast-brand marks that hoists begins to install main frame afterwards, and step is as follows: first segment tower tube is transported to the cushion cap limit, uses the 180t crane loading, be installed on the cushion cap, tie bolt is fixed.The main frame carrier is rested against the cushion cap limit, use the 180t crane loading, be fixed on the first segment tower tube.Start synchronization of jacking up decline 2 joint standard knots, utilize crane ship that the main frame carriage is installed, remove the 180t hoisting crane simultaneously.Start synchronization of jacking up, main frame is ejected the tower tube, fall within on the main frame buttress, and carry out the fixing of main frame and buttress, buttress and girder are fixed.
Shown in Figure 11 A and Figure 11 B, the scheme drawing of two fan blades is installed for the utility model.Promptly utilize crane ship that 2 fan blades and wheel hub lifting are docked with main frame after main frame is fixing.
Shown in Figure 12 A and Figure 12 B, the scheme drawing of remaining tower tube is installed for the utility model.The synchronization of jacking up that hoists is with platform and main frame that has fixed and fan blade jacking simultaneously.And constantly lift by crane standard knot, mechanism is constantly risen, reach the proper height that blower fan tower barrel installs after, begin to utilize the 60t hoisting crane that remaining tower tube is installed.
Shown in Figure 13 A and Figure 13 B, be the scheme drawing of the utility model main frame contraposition.After the whole installations of tower tube, the decline platform makes main frame and the contraposition of tower tube, is connected firmly.
Shown in Figure 14 A and Figure 14 B, the scheme drawing that lifts by crane the 3rd fan blade and dock for the utility model with wheel hub.Utilize the 60t hoisting crane that the 3rd blower fan lifted by crane, when reaching most significant bit, dock, utilize electric block that fan blade is docked with wheel hub again with electric block on being fixed in girder.
Shown in Figure 15 A and Figure 15 B, for the utility model standard knot plays the scheme drawing that hanging cooperates jack-up system decline erecting equipment.Constantly the decline synchronous device is removed the standard sections.Equipment is dropped to the standard facility section, utilize crawler crane afterwards, remove the main frame carriage, remove the 60t hoisting crane, remove the girder linking beam, remove girder, remove the standard stock.Finish whole blower fan erection work.
Though described the utility model with reference to above-mentioned exemplary embodiments, should be appreciated that used term is explanation and exemplary and nonrestrictive term.The spirit or the essence that do not break away from utility model because the utility model can specifically be implemented in a variety of forms, so be to be understood that, the foregoing description is not limited to any aforesaid details, and should be in the spirit and scope that claim limited of enclosing explain widely, therefore fall into whole variations in claim or its equivalent scope and remodeling and all should be the claim of enclosing and contain.

Claims (7)

1. jack up blower fan erecting crane, can be on the blower fan cushion cap each component part of blower fan be installed as blower fan integral body, the component part of described blower fan comprises more piece tower tube, main frame, three fan blades and wheel hub, it is characterized in that this jack up blower fan erecting crane comprises:
Synchronization of jacking up mechanism, it comprises:
A plurality of synchronization of jacking up stocks are with bolted connection pre-buried on the described cushion cap; And
Many cover standard knots cooperate with described synchronization of jacking up stock, and every cover standard knot has more piece, can realize the jacking or the decline of synchronization of jacking up mechanism by the synchronization of jacking up or the decline of described many cover standard knots; Hoisting platform is installed on described synchronization of jacking up mechanism top, and described hoisting platform comprises:
Girder;
The jacking buttress is located on the described girder, is used for the main frame of described blower fan is fixed in girder;
The first heavy-duty machine is located on the described girder, is used for the described main frame of lifting;
Second hoisting crane is embedded in described girder, is used for lifting and assembly unit tower tube, and is used to lift by crane the 3rd fan blade of described three fan blades and docks with wheel hub; And
Standard knot plays hanging, is located on the described girder, is used for standard knot risen winching in the described synchronization of jacking up stock; And
Generator set is used to supply the electric power of described synchronization of jacking up mechanism and hoisting platform.
2. jack up blower fan erecting crane as claimed in claim 1 is characterized in that, described synchronization of jacking up stock and standard knot are 4 covers, and every cover standard knot comprises 3 joint standard knots.
3. jack up blower fan erecting crane as claimed in claim 1 is characterized in that described girder comprises first girder and second girder, has linking beam between this two girder.
4. jack up blower fan erecting crane as claimed in claim 1 is characterized in that, described the first heavy-duty machine is 180 tons of hoisting cranes.
5. jack up blower fan erecting crane as claimed in claim 1 is characterized in that, described second hoisting crane is 60 tons of hoisting cranes.
6. offshore wind turbine erecting equipment as claimed in claim 1 is characterized in that, described standard knot is a H205B type standard knot.
7. an offshore wind turbine transportation erecting equipment comprises each described jack up blower fan erecting crane among the claim 1-6, it is characterized in that, this offshore wind turbine transportation erecting equipment also comprises:
Carrier is used to transport each component part and the described erecting equipment of offshore wind turbine to be installed; And
Crane ship is used for each component part of described offshore wind turbine and the assembling and the unloading process of erecting equipment are winched to described cushion cap or winch to carrier from cushion cap from carrier, and lifts by crane first fan blade, second fan blade and wheel hub and dock with main frame.
CN2010206756611U 2010-12-22 2010-12-22 Self-lifting fan-mounted crane and marine fan transporting and mounting equipment Expired - Fee Related CN201901538U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206756611U CN201901538U (en) 2010-12-22 2010-12-22 Self-lifting fan-mounted crane and marine fan transporting and mounting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206756611U CN201901538U (en) 2010-12-22 2010-12-22 Self-lifting fan-mounted crane and marine fan transporting and mounting equipment

Publications (1)

Publication Number Publication Date
CN201901538U true CN201901538U (en) 2011-07-20

Family

ID=44272137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206756611U Expired - Fee Related CN201901538U (en) 2010-12-22 2010-12-22 Self-lifting fan-mounted crane and marine fan transporting and mounting equipment

Country Status (1)

Country Link
CN (1) CN201901538U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103557126A (en) * 2013-10-23 2014-02-05 中国中铁航空港建设集团有限公司 Installation device and installation method for wind power generation device
CN110944928A (en) * 2017-07-27 2020-03-31 Sl接入系统公司 Lifting assembly for lifting a component to a wind turbine and method of using the same
CN111039191A (en) * 2019-12-30 2020-04-21 扬州中远海运重工有限公司 High-precision control building method and device for large ship

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103557126A (en) * 2013-10-23 2014-02-05 中国中铁航空港建设集团有限公司 Installation device and installation method for wind power generation device
CN103557126B (en) * 2013-10-23 2016-05-04 中国中铁航空港建设集团有限公司 The erecting device of wind power plant and installation method
CN110944928A (en) * 2017-07-27 2020-03-31 Sl接入系统公司 Lifting assembly for lifting a component to a wind turbine and method of using the same
CN110944928B (en) * 2017-07-27 2021-06-29 Sl接入系统公司 Lifting assembly for lifting a component to a wind turbine and method of using the same
CN111039191A (en) * 2019-12-30 2020-04-21 扬州中远海运重工有限公司 High-precision control building method and device for large ship

Similar Documents

Publication Publication Date Title
CA2777282C (en) Vessel and method for transporting and hoisting the offshore wind turbine generator system
CN103939299B (en) The split type mounting process of a kind of offshore wind turbine
CN100406721C (en) Wind turbine and method of mounting the same
US20060120809A1 (en) Method and crane for installing, maintaining and decommissioning wind turbines
CN106014874B (en) How to install offshore wind turbines
CN102079477A (en) Fan holding and lifting device and mobile overwater operation platform
RU2744782C1 (en) Lifting system for installing a wind turbine and method for lifting operations (options)
KR20100055053A (en) (method of establishing sea wind power generator and apparatus thereof
CN101786494A (en) Mounting ship of offshore wind turbine and construction method thereof
CN103693170A (en) Floating type offshore wind power assembly platform and method using floating type offshore wind power assembly platform for assembly offshore wind turbine
CN108443079A (en) Method for transporting and installing blades of offshore wind generating set
CN213566364U (en) Single-column mast type device for transporting and installing multiple offshore wind turbine complete machines
CN201901538U (en) Self-lifting fan-mounted crane and marine fan transporting and mounting equipment
CN102400862A (en) Method for assembling impeller of wind power generator unit
CN203753364U (en) Self-elevating offshore wind turbine mounting ship
CN102562489A (en) Method for mounting offshore wind turbine
CN206108749U (en) Professional equipment is maintained in marine wind power hoist and mount
CN117846884A (en) Efficient offshore wind turbine integrated installation method and device
KR101297669B1 (en) Installation method using vessel for installing sea wind power generator
CN206608280U (en) Fan part is had bad luck, assembled, lifting integral type wind turbine installation vessel
CN202529738U (en) Special lifting machine for wind power
CN203822558U (en) Horizontal-assembly integral-turnover vertical installation system of offshore wind power generator unit
CN203822557U (en) Inhaul cable jack hoisting installation device of offshore wind power generator unit
CN203684191U (en) Fan construction system of offshore intertidal zone
CN102444139A (en) Construction method for installing offshore wind power generation fan

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Beijing Baishan Heavy Industry Co., Ltd.

Assignor: Ren Wei|Wang Xiaojing| Xue Yejun|Huang Wenjun|Wang Zhong

Contract record no.: 2011110000164

Denomination of utility model: Self-lifting fan-mounted crane and marine fan transporting and mounting equipment

Granted publication date: 20110720

License type: Exclusive License

Record date: 20110915

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110720

Termination date: 20131222