CN109113938A CN201811178357.3A CN201811178357A CN109113938A CN 109113938 A CN109113938 A CN 109113938A CN 201811178357 A CN201811178357 A CN 201811178357A CN 109113938 A CN109113938 A CN 109113938A
Authority
CN
China
Prior art keywords
hanging basket
pitch variable
variable bearings
flange
cushion block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811178357.3A
Other languages
Chinese (zh)
Other versions
CN109113938B (en
Inventor
彭国勋
王锌
陈平
代勋伟
赵辉
薛振峰
郭涛
梁善伦
苏联发
刘冰鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MingYang Smart Energy Group Co Ltd
Original Assignee
MingYang Smart Energy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MingYang Smart Energy Group Co Ltd filed Critical MingYang Smart Energy Group Co Ltd
Priority to CN201811178357.3A priority Critical patent/CN109113938B/en
Publication of CN109113938A publication Critical patent/CN109113938A/en
Application granted granted Critical
Publication of CN109113938B publication Critical patent/CN109113938B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D80/00Details, components or accessories not provided for in groups F03D1/00 - F03D17/00
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/10Assembly of wind motors; Arrangements for erecting wind motors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Wind Motors (AREA)

Abstract

The invention discloses a kind of segmented pitch variable bearings of Wind turbines to reinforce flange and its aerial installation method, the pitch variable bearings are reinforced flange and are made of two flange sections and cushion block, two flange sections are arc section, sliceable is a whole coil structures, the both ends of two flange sections sink to having the thickness sinking position consistent with cushion block, after two flange section splicings, its respective sinking position can combine the accommodating space for being configured to accommodating cushion block, the shape size of accommodating space matches with cushion block, bolt hole is provided on two flange sections and cushion block, and the pitch variable bearings bolt hole of bolt hole and Wind turbines, blade bolt hole is concentric and diameter is identical.Disassembly pitch variable bearings and blade are not required to using structure of the invention and method, can be installed in high-altitude, using the cantilever crane and hanging basket of nacelle top, be not required to large-scale crane, reinforce flange in high-altitude, that is, mountable pitch variable bearings, expense is low.

Description

The segmented pitch variable bearings of Wind turbines reinforce flange and its aerial installation method
Technical field
The present invention relates to the technical field of Wind turbines, the segmented pitch variable bearings for referring in particular to a kind of Wind turbines add Strong flange and its aerial installation method.
Background technique
Known in the industry, wind generating set pitch control bearing outer ring is connect with blade, and pitch variable bearings inner ring is connect with wheel hub, is The fatigue behaviour for improving blade root bolt needs to install pitch variable bearings in pitch variable bearings outer rings and reinforces flange.General reinforcement Orchid is whole coil structures, and installation pitch variable bearings, which reinforce flange, to dismantle blade and pitch variable bearings, since installation site is higher, needs benefit Blade is hung down with large-scale crane, it is costly.
Summary of the invention
The purpose of the present invention is to overcome the shortcomings of the existing technology and deficiency, proposes a kind of segmented of Wind turbines Pitch variable bearings reinforce flange and its aerial installation method, are not required to disassembly pitch variable bearings and blade, can install in high-altitude, utilize machine Cantilever crane and hanging basket at the top of cabin, are not required to large-scale crane, reinforce flange in high-altitude, that is, mountable pitch variable bearings, expense is low.
To achieve the above object, technical solution provided by the present invention is as follows:
The segmented pitch variable bearings of Wind turbines reinforce flange, by first flange section, second flange section, the first cushion block and Second cushion block composition, wherein the first flange section and second flange section are arc section, they can be spliced into a whole circle Structure, while the first sinking position that one end sinking of the first flange section has depth consistent with the first pad thickness, it is another One end of the second sinking position that one end sinking has depth consistent with the second pad thickness, the second flange section sinks to having depth The third sinking position consistent with the first pad thickness, other end sinking have fourth consistent with the second pad thickness of depth After sinking position, the first flange section and second flange section are spliced into whole circle, the first sinking position and third sinking position being capable of groups The accommodating space constituted for accommodating the first cushion block is closed, the second sinking position and the 4th sinking position can combine composition for accommodating The accommodating space of second cushion block, and the shape size of the accommodating space matches with respective cushion block;The first flange section, Bolt hole, and the pitch variable bearings spiral shell of the bolt hole and Wind turbines are provided on two flange sections, the first cushion block and the second cushion block Keyhole, blade bolt hole is concentric and diameter is identical.
Further, first cushion block and the second cushion block are arc section.
The segmented pitch variable bearings of above-mentioned Wind turbines reinforce the aerial installation method of flange, specific as follows:
This method needs to use the cantilever crane and hanging basket of the nacelle top of Wind turbines, wherein the cantilever crane is solid It is scheduled on the platform of nacelle top, hanging basket can be moved to safely to nacelle top and pitch variable bearings reinforce the installation site of flange; Maintenance personnel can dismantle installation pitch variable bearings in hanging basket and connect studs with blade, and can fill by the way that hanging basket is fixed It sets and is connected and fixed with pitch variable bearings;
The aerial installation method, comprising the following steps:
1) adjustment blade is in state downwards: wheel rotation to blade being in state downwards and locks impeller;
2) pitch variable bearings reinforce flange and material lifting: pitch variable bearings being reinforced flange, tool and supplies and is put into and hangs Basket, promoting cantilever crane makes lifting of hanging basket to cabin altitude;
3) maintenance personnel enters hanging basket: continuing to lift up above hanging basket to engineroom flat, the cabin that hanging basket is reliably fixed is put down On platform, maintenance personnel enters hanging basket, and hanging basket is adjusted to pitch variable bearings the installation site for reinforcing flange by adjustment cantilever crane;
4) dismantle a part of studs that original pitch variable bearings are connect with blade: installation hanging basket fixing device makes hanging basket It is reliably fixed with pitch variable bearings, fixed point is connect by bolt with pitch variable bearings, dismantles one that pitch variable bearings are connect with blade Divide studs;
5) first flange section is installed: the bolt hole of first flange section is directed at pitch variable bearings outer ring bolt hole, it will be original short Studs change long studs into, fastening nut installs hanging basket fixing device again, keeps hanging basket reliable with pitch variable bearings Fixed, fixed point is connect by bolt with first flange section, and hanging basket fixing device is dismantled after the completion of all bolt fastenings;
6) install second flange section: adjustment cantilever crane hanging basket is adjusted to the installation site of the impeller other side, using with The same method of step 5) installs second flange section;
7) the first and second cushion block is installed: after the first and second flange section is installed, installing the first and second cushion block respectively, and Two-stage method orchid section is connected and fixed by bolt afterwards;
8) tool material hangs lower Wind turbines: after entire pitch variable bearings reinforcement flange is installed, hanging basket is moved to cabin Top is fixed, and maintenance personnel is from hanging basket safety moving to nacelle top;Old studs, tool are hung to tower using hanging basket Base.
Compared with prior art, the present invention have the following advantages that with the utility model has the advantages that
It is not required to disassembly pitch variable bearings and blade, pitch variable bearings can be installed in high-altitude and reinforce flange, utilize nacelle top Cantilever crane and hanging basket are not required to large-scale crane, and expense is low, and small-sized crane is easy for installation.
Detailed description of the invention
Fig. 1 is that pitch variable bearings of the invention reinforce flange installation diagram.
Fig. 2 is that pitch variable bearings of the invention reinforce flange exploded view.
Fig. 3 is the structural schematic diagram of wherein one-stage process orchid section.
Fig. 4 is the structural schematic diagram of one of cushion block.
Fig. 5 is that pitch variable bearings of the invention reinforce flange scheme of installation.
Fig. 6 is the scheme of installation of cantilever crane, hanging basket and pitch variable bearings.
Fig. 7 is the schematic diagram of hanging basket fixing device.
Specific embodiment
The present invention is further explained in the light of specific embodiments.
As shown in Figures 1 to 5, the segmented pitch variable bearings of Wind turbines provided by the present embodiment reinforce flange, by First flange section 1, second flange section 2, the first cushion block 3 and the second cushion block 4 composition, wherein the first flange section and the second method Blue section is arc section, they can be spliced into a whole coil structures, while one end of the first flange section 1 sinks to having depth The first sinking position 5 consistent with 3 thickness of the first cushion block, other end sinking have depth consistent with 4 thickness of the second cushion block Second sinking position 6, the third sinking position that one end sinking of the second flange section 2 has depth consistent with 3 thickness of the first cushion block 7, the 4th sinking position 8 that other end sinking has depth consistent with 4 thickness of the second cushion block, the first flange section 1 and second After flange section 2 is spliced into whole circle, the first sinking position 5 and third sinking position 7 can combine the appearance for being configured to the first cushion block 3 of accommodating Between emptying, the second sinking position 6 and the 4th sinking position 8 can combine the accommodating space for being configured to the second cushion block 4 of accommodating, and described The shape size of accommodating space matches with respective cushion block, it is described first pad, 3 and second cushion block 4 also be arc section;In addition, institute State and be provided with bolt hole 9 on first flange section 1, second flange section 2, the first cushion block 3 and the second cushion block 4, and the bolt hole 9 with 10 bolt hole of pitch variable bearings of Wind turbines, blade bolt hole is concentric and diameter is identical.
Reinforce the aerial installation method of flange for the above-mentioned segmented pitch variable bearings of the present embodiment below, concrete condition is as follows:
This method needs to use the cantilever crane 11 and hanging basket 12 of the nacelle top of Wind turbines, wherein the cantilever crane Machine 11 is fixed on the platform of nacelle top, 12 safety of hanging basket can be moved to nacelle top and pitch variable bearings reinforce the peace of flange Holding position (as shown in Figure 6);The shape of hanging basket 12 is semicircle, and maintenance personnel can dismantle 1/2 circle variable pitch of installation in hanging basket 12 Bearing 10 connect studs with blade, and can be connect by hanging basket fixing device 13 (as shown in Figure 7) with pitch variable bearings 10 It is fixed.
It is as follows that the step of pitch variable bearings reinforce flange, is installed in high-altitude:
1) adjustment blade is in state downwards: wheel rotation to blade being in state downwards and locks impeller;
2) pitch variable bearings reinforce flange and material lifting: pitch variable bearings being reinforced flange, tool and supplies and is put into and hangs Basket, promoting cantilever crane makes lifting of hanging basket to cabin altitude;
3) maintenance personnel enters hanging basket: continuing to lift up above hanging basket to engineroom flat, the cabin that hanging basket is reliably fixed is put down On platform, maintenance personnel enters hanging basket, and hanging basket is adjusted to pitch variable bearings the installation site for reinforcing flange, such as schemed by adjustment cantilever crane Shown in 6;
4) dismantle the 1/2 circle studs that original pitch variable bearings are connect with blade: installation hanging basket fixing device makes hanging basket It is reliably fixed with pitch variable bearings, fixed point is connect by bolt with pitch variable bearings, dismantles one that pitch variable bearings are connect with blade Divide studs;
5) first flange section is installed: the bolt hole of first flange section is directed at pitch variable bearings outer ring bolt hole, it will be original short Studs change long studs into, fastening nut installs hanging basket fixing device again, keeps hanging basket reliable with pitch variable bearings Fixed, fixed point is connect by bolt with first flange section, and hanging basket fixing device is dismantled after the completion of all bolt fastenings;
6) install second flange section: adjustment cantilever crane hanging basket is adjusted to the installation site of the impeller other side, using with The same method of step 5) installs second flange section;
7) the first and second cushion block is installed: after the first and second flange section is installed, installing the first and second cushion block respectively, and Two-stage method orchid section is connected and fixed by bolt afterwards;
8) tool material hangs lower Wind turbines: after entire pitch variable bearings reinforcement flange is installed, hanging basket is moved to cabin Top is fixed, and maintenance personnel is from hanging basket safety moving to nacelle top;The materials such as old studs, tool are hung using hanging basket To column foot.
Embodiment described above is only the preferred embodiments of the invention, and but not intended to limit the scope of the present invention, therefore All shapes according to the present invention change made by principle, should all be included within the scope of protection of the present invention.

Claims (3)

1. the segmented pitch variable bearings of Wind turbines reinforce flange, it is characterised in that: by first flange section, second flange section, First cushion block and the second cushion block composition, wherein the first flange section and second flange section are arc section, they can splice For a whole coil structures, while one end of the first flange section sinks under have depth consistent with the first pad thickness first Heavy position, the second sinking position that other end sinking has depth consistent with the second pad thickness, one end of the second flange section Sink the third sinking position for having depth consistent with the first pad thickness, and other end sinking has depth and the second pad thickness phase After consistent 4th sinking position, the first flange section and second flange section are spliced into whole circle, under the first sinking position and third Heavy position can combine the accommodating space constituted for accommodating the first cushion block, and the second sinking position and the 4th sinking position can combine structure At the accommodating space for accommodating the second cushion block, and the shape size of the accommodating space matches with respective cushion block;Described It is provided with bolt hole on one flange section, second flange section, the first cushion block and the second cushion block, and the bolt hole and Wind turbines Pitch variable bearings bolt hole, blade bolt hole is concentric and diameter is identical.
2. a kind of segmented pitch variable bearings of Wind turbines according to claim 1 reinforce flange, it is characterised in that: institute Stating the first cushion block and the second cushion block is arc section.
3. a kind of segmented pitch variable bearings of Wind turbines as claimed in claim 1 or 2 reinforce the aerial installation method of flange, Be characterized in that: this method needs to use the cantilever crane and hanging basket of the nacelle top of Wind turbines, wherein the cantilever crane is solid It is scheduled on the platform of nacelle top, hanging basket can be moved to safely to nacelle top and pitch variable bearings reinforce the installation site of flange; Maintenance personnel can dismantle installation pitch variable bearings in hanging basket and connect studs with blade, and can fill by the way that hanging basket is fixed It sets and is connected and fixed with pitch variable bearings;
The aerial installation method, comprising the following steps:
1) adjustment blade is in state downwards: wheel rotation to blade being in state downwards and locks impeller;
2) pitch variable bearings reinforce flange and material lifting: pitch variable bearings being reinforced flange, tool and supplies and are put into hanging basket, are mentioned Rising cantilever crane makes lifting of hanging basket to cabin altitude;
3) maintenance personnel enters hanging basket: it continues to lift up above hanging basket to engineroom flat, on the engineroom flat that hanging basket is reliably fixed, Maintenance personnel enters hanging basket, and hanging basket is adjusted to pitch variable bearings the installation site for reinforcing flange by adjustment cantilever crane;
4) dismantle a part of studs that original pitch variable bearings are connect with blade: installation hanging basket fixing device makes hanging basket and becomes Paddle shaft, which is held, to be reliably fixed, and fixed point is connect by bolt with pitch variable bearings, and disassembly pitch variable bearings are connect a part of double with blade Header stud;
5) first flange section is installed: the bolt hole of first flange section is directed at pitch variable bearings outer ring bolt hole, by original short pair Header stud changes long studs into, and fastening nut installs hanging basket fixing device again, keeps hanging basket and pitch variable bearings reliably solid Fixed, fixed point is connect by bolt with first flange section, and hanging basket fixing device is dismantled after the completion of all bolt fastenings;
6) install second flange section: adjustment cantilever crane adjusts hanging basket to the installation site of the impeller other side, use and step 5) same method installs second flange section;
7) the first and second cushion block is installed: after the first and second flange section is installed, installing the first and second cushion block respectively, then leads to Bolt is crossed to be connected and fixed two-stage method orchid section;
8) tool material hangs lower Wind turbines: after entire pitch variable bearings reinforcement flange is installed, hanging basket is moved to nacelle top Fixed, maintenance personnel is from hanging basket safety moving to nacelle top;Old studs, tool are hung to column foot using hanging basket.
CN201811178357.3A 2018-10-10 2018-10-10 Segmented variable-pitch bearing reinforcing flange for wind turbine generator and air installation method of segmented variable-pitch bearing reinforcing flange Active CN109113938B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811178357.3A CN109113938B (en) 2018-10-10 2018-10-10 Segmented variable-pitch bearing reinforcing flange for wind turbine generator and air installation method of segmented variable-pitch bearing reinforcing flange

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811178357.3A CN109113938B (en) 2018-10-10 2018-10-10 Segmented variable-pitch bearing reinforcing flange for wind turbine generator and air installation method of segmented variable-pitch bearing reinforcing flange

Publications (2)

Publication Number Publication Date
CN109113938A true CN109113938A (en) 2019-01-01
CN109113938B CN109113938B (en) 2024-03-15

Family

ID=64857879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811178357.3A Active CN109113938B (en) 2018-10-10 2018-10-10 Segmented variable-pitch bearing reinforcing flange for wind turbine generator and air installation method of segmented variable-pitch bearing reinforcing flange

Country Status (1)

Country Link
CN (1) CN109113938B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109854462A (en) * 2019-03-11 2019-06-07 中国船舶重工集团海装风电股份有限公司 A kind of wind-driven generator and its blade pitch device
CN113931802A (en) * 2021-09-24 2022-01-14 广东水电二局股份有限公司 High-altitude fan blade replacement method based on cooperation of double cranes

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007008166A1 (en) * 2007-02-14 2008-08-21 Nordex Energy Gmbh Wind energy plant with a pitch turning connection
CN103161662A (en) * 2011-12-13 2013-06-19 新疆金风科技股份有限公司 Variable pitch limit structure of wind turbine blade
CN209041031U (en) * 2018-10-10 2019-06-28 明阳智慧能源集团股份公司 A kind of segmented pitch variable bearings reinforcement flange for Wind turbines

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007008166A1 (en) * 2007-02-14 2008-08-21 Nordex Energy Gmbh Wind energy plant with a pitch turning connection
CN103161662A (en) * 2011-12-13 2013-06-19 新疆金风科技股份有限公司 Variable pitch limit structure of wind turbine blade
CN209041031U (en) * 2018-10-10 2019-06-28 明阳智慧能源集团股份公司 A kind of segmented pitch variable bearings reinforcement flange for Wind turbines

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109854462A (en) * 2019-03-11 2019-06-07 中国船舶重工集团海装风电股份有限公司 A kind of wind-driven generator and its blade pitch device
CN113931802A (en) * 2021-09-24 2022-01-14 广东水电二局股份有限公司 High-altitude fan blade replacement method based on cooperation of double cranes

Also Published As

Publication number Publication date
CN109113938B (en) 2024-03-15

Similar Documents

Publication Publication Date Title
US10865077B2 (en) System for assembling/disassembling windmills
EP3019433B1 (en) Assembly and method for lifting loads
TWI576510B (en) Method of and apparatus for fitting a rotor of a wind power installation
US9821417B2 (en) System and method for replacing a pitch bearing
CN108700024B (en) Method for mounting or dismounting wind turbine components of a multi-rotor wind turbine
CN103443450B (en) Wind turbine blade bearing detaching device and method
EP3394427B1 (en) Methods for mounting or dismounting a wind turbine component of a multirotor wind turbine
CN102192111B (en) Installation method of blades of offshore wind turbine
WO2016007241A1 (en) Tall wind turbine tower erection with climbing crane
EP3091223B1 (en) Up-tower suspension system for a wind turbine rotor blade
CN106586811B (en) Lifting equipment for supporting patient with burn and lifting turn-over method for concrete tower
US9909561B2 (en) Rotor assembly for a wind turbine and method for mounting a blade to the rotor assembly
CN109113938A (en) The segmented pitch variable bearings of Wind turbines reinforce flange and its aerial installation method
CN209041031U (en) A kind of segmented pitch variable bearings reinforcement flange for Wind turbines
BR102017003456A2 (en) CONCRETE TOWER MANUFACTURING PROCESS FOR WIND TURBINES AND CONCRETE TOWER FOR WIND TURBINES
CN103726992B (en) The firm blade draw piece of tower crane type Large Efficient wind-driven generator and installation method
EP3167186A1 (en) Tall wind turbine tower erection with climbing crane
CN207229306U (en) The dual-purpose tower of one frame
CN205973583U (en) Flip -chip of assembled steel board cabin is with hoist and mount subassembly
CN205916899U (en) Take suspender tightening mechanism's fan blade hoist support
CN220415584U (en) Wind driven generator base
CN214092144U (en) Impeller assembling and fixing device of wind generating set
CN209469537U (en) The anchoring tower segments and concrete tower of concrete tower

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant