CN207228694U - A kind of hydraulic gate headstock gear - Google Patents
A kind of hydraulic gate headstock gear Download PDFInfo
- Publication number
- CN207228694U CN207228694U CN201721229214.1U CN201721229214U CN207228694U CN 207228694 U CN207228694 U CN 207228694U CN 201721229214 U CN201721229214 U CN 201721229214U CN 207228694 U CN207228694 U CN 207228694U
- Authority
- CN
- China
- Prior art keywords
- framed
- bent
- elements
- space grid
- roof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of hydraulic gate headstock gear, including framed bent, being built between adjacent bent columns has filling wall, further include Elements of Space Grid Truss, the roof formed using panel splicing that two power bars are assembled into truss structure, at the top of Elements of Space Grid Truss, the Elements of Space Grid Truss is fixed at the top of bent columns the roofing by bearing;In Elements of Space Grid Truss side, surrounding is surrounded equipped with framed side wallboard, and the framed side wallboard is fixed on framed bent, and framed side wallboard is sealed with the junction on framed bent and roof.The utility model is since Elements of Space Grid Truss and roof panels component complete in factory, and construction site is substantially carried out assembly working, and speed of application is fast, short time limit.Moreover, the construction on roof does not have to set up full hall scaffold and various templates, headstock gear installation is disturbed small.Meanwhile whole shape is also more beautiful.Suitable for the hydroelectric project that the construction period is tight, appearance requirement is higher.
Description
Technical field
The utility model belongs to construction of hydropower plant field, and in particular to a kind of hydraulic gate headstock gear.
Background technology
In the prior art, the headstock gear size of hydraulic gate is big, for installing the headstock gear of headstock gear in construction
Generally first main body construction is finished, roof is left and does not construct, then headstock gear lifting is entered in computer room, finally makes roof
(Otherwise, if first carrying out roof, headstock gear can not be transported in computer room).
After headstock gear lifting is entered in computer room, it is also necessary to follow-up installation is carried out to headstock gear.The room of headstock gear
Top generally uses cast in situ reinforced concrete beam and floor structure, its general construction procedure is:Full hall scaffold is set up, for installing, admittedly
Solid plate, then binding structure reinforcing bar, then pour roof beam board concrete, needed after concreting maintenance, etc. it is strong,
Reach form removal and scaffold after regulation age, then construction waterproof layer, insulating layer on it again.Whole work progress process
More, the cycle, length was, it is necessary to install a large amount of templates.
The construction on roof sets up a series of constructions such as full hall scaffold due to needing, it is contemplated that space is limited and construction safety
Etc. factor, it is impossible to and the follow-up installation of headstock gear is carried out at the same time.After often first having carried out roof at present, it could be opened and closed
The subsequent installation construction of machine, causes the whole duration to be elongated.
Utility model content
In view of the above-mentioned problems, the utility model aims to provide a kind of short hydraulic gate headstock gear of construction period, it is applied
Work can be carried out at the same time roof and make and headstock gear installation.
The technical solution that the utility model solves the problems, such as is:A kind of hydraulic gate headstock gear, including framed bent, adjacent framed bent
Being built between column has filling wall, further includes Elements of Space Grid Truss, the roof formed using panel splicing that two power bars are assembled into truss structure, institute
Roofing is stated at the top of Elements of Space Grid Truss, the Elements of Space Grid Truss is fixed at the top of bent columns by bearing;
In Elements of Space Grid Truss side, surrounding is surrounded equipped with framed side wallboard, and the framed side wallboard is fixed on framed bent, and framed side wallboard and framed bent
Sealed with the junction on roof.
Framed bent is building structure commonly used in the prior art, generally comprises a series of bent columns and collar tie beam.
Further, the bearing includes upper bracket plate, the base being fixed at the top of framed bent, and the base is equipped with recessed
Groove, upper bracket plate leave gap, and upper bracket plate can be in groove in base groove between upper bracket plate and groove inner wall
Horizontal direction moves freely, with deformation caused by adaptive temperature, load.
Further, there is a face framed side wallboard overhanging in the four sides framed side wallboard of Elements of Space Grid Truss outside framed bent, its excess-three face is stood on
At the top of framed bent;
The framed side wallboard at the top of framed bent and the junction at the top of framed bent is stood on to seal using flashing plate;
The framed side wallboard of overhanging is connected by overhanging arm with framed bent side.
Further, the roof is slope, and the slope foot of slope is disposed in proximity to the side wall Board position of overhanging, on slope
Gutter is equipped with foot.
Preferably, the panel is sandwich structure, including including upper plate, lower plate and is arranged between upper and lower plates
Adiabator layer, plays heat-insulated, insulation;
The framed side wallboard is double-decker, including inner panel, outside plate, is voided layer between inner and outer plates.
The remarkable result of the utility model is:
Since Elements of Space Grid Truss and roof panels component complete in factory, construction site is substantially carried out assembly working, applies
Work speed is fast, short time limit.Moreover, the construction on roof does not have to set up full hall scaffold and various templates, to headstock gear installation
Disturb small.Meanwhile whole shape is also more beautiful.Suitable for the hydroelectric project that the construction period is tight, appearance requirement is higher.
Brief description of the drawings
The utility model is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is the utility model structure of hoist room profile.
Fig. 2 is the partial enlarged view in Fig. 1.
Fig. 3 is in Fig. 1 I enlarged drawing.
Fig. 4 is bearing schematic diagram.
In figure:1- framed bents, 2- Elements of Space Grid Truss, 3- roofs, 4- bearings, 5- inner panels, 6- outside plates, 7- gutters, 8- framed side wallboards, 9-
Flashing plate, 10- overhanging arms, 11- bases, 12- upper bracket plates.
Embodiment
As shown in Figures 1 to 3, a kind of hydraulic gate headstock gear, including framed bent 1, building between adjacent bent columns has filling wall.
Further include Elements of Space Grid Truss 2, the roof 3 formed using panel splicing that two power bars are assembled into truss structure, the roof 3
The top of Elements of Space Grid Truss 2 is layed in, the Elements of Space Grid Truss 2 is fixed at the top of bent columns by bearing 4.
The bearing 4 includes upper bracket plate 12, is fixed on the base 11 at the top of framed bent 1.The base 11 is equipped with groove,
Upper bracket plate 12 leaves gap in 11 groove of base between upper bracket plate 12 and groove inner wall, and upper bracket plate 12 can be
Horizontal direction moves freely in groove.
Surround in 2 side surrounding of Elements of Space Grid Truss and be fixed on equipped with framed side wallboard 8, the framed side wallboard 8 on framed bent 1.The four of Elements of Space Grid Truss 2
There is a face framed side wallboard 8 to overhang outside framed bent in surface side wallboard 8, the top of framed bent 1 is stood in its excess-three face.Stand on the top of framed bent 1
Framed side wallboard 8 and the junction at the top of framed bent 1 are sealed using flashing plate 9.The framed side wallboard 8 of overhanging is by overhanging arm 10 and 1 side of framed bent
Face connects.
The roof 3 is slope, and the slope foot of slope is disposed in proximity to 8 position of framed side wallboard of overhanging, set at slope foot
There is gutter 7.
The panel is sandwich structure, including upper plate, lower plate and the adiabator layer being arranged between upper and lower plates.
The framed side wallboard 8 is double-decker, including inner panel 5, outside plate 6, is voided layer between inner and outer plates.
Construction procedure is:
(a)Framed bent concrete is first poured(Buried including built-in fitting), steel mesh frame member and roof panels(Piecemeal)In work
Factory completes and is transported to building-site.
(b)Complete Elements of Space Grid Truss list Pin assembling and bearing 4 installed, using crane by the single Pin Elements of Space Grid Truss 2 being completed carry to
Headstock gear framed bent top is in place, and docked with bearing 4, completes the installation of whole Elements of Space Grid Truss 2 like this.
(c)By panel(Piecemeal)Roof is hung to, and completes overall splicing.
Claims (5)
1. a kind of hydraulic gate headstock gear, including framed bent(1), building between adjacent bent columns has filling wall, it is characterised in that:Also
The Elements of Space Grid Truss of truss structure is assembled into including two power bars(2), the roof that is formed using panel splicing(3), the roof(3)It is laid with
In Elements of Space Grid Truss(2)Top, the Elements of Space Grid Truss(2)Pass through bearing(4)It is fixed at the top of bent columns;
In Elements of Space Grid Truss(2)Side surrounding is surrounded equipped with framed side wallboard(8), the framed side wallboard(8)It is fixed on framed bent(1)On, and side wall
Plate(8)With framed bent(1)Sealed with the junction on roof.
2. hydraulic gate headstock gear according to claim 1, it is characterised in that:The bearing(4)Including upper bracket plate
(12), be fixed on framed bent(1)The base at top(11), the base(11)It is equipped with groove, upper bracket plate(12)Embedded in base
(11)In groove, upper bracket plate(12)Gap, and upper bracket plate are left between groove inner wall(12)Can in groove horizontal direction
Move freely.
3. hydraulic gate headstock gear according to claim 1, it is characterised in that:Elements of Space Grid Truss(2)Four sides framed side wallboard(8)
In have a face framed side wallboard(8)Overhang outside framed bent, framed bent is stood in its excess-three face(1)Top;
Stand on framed bent(1)The framed side wallboard at top(8)With framed bent(1)The junction at top uses flashing plate(9)Sealing;
The framed side wallboard of overhanging(8)By overhanging arm(10)With framed bent(1)Side connects.
4. hydraulic gate headstock gear according to claim 3, it is characterised in that:The roof(3)For slope, slope
The slope foot in face is disposed in proximity to the framed side wallboard of overhanging(8)Position, is equipped with gutter at slope foot(7).
5. hydraulic gate headstock gear according to claim 1, it is characterised in that:The panel is sandwich structure, bag
Include upper plate, lower plate and the adiabator layer being arranged between upper and lower plates;
The framed side wallboard(8)For double-decker, including inner panel(5), outside plate(6), it is voided layer between inner and outer plates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721229214.1U CN207228694U (en) | 2017-09-25 | 2017-09-25 | A kind of hydraulic gate headstock gear |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721229214.1U CN207228694U (en) | 2017-09-25 | 2017-09-25 | A kind of hydraulic gate headstock gear |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207228694U true CN207228694U (en) | 2018-04-13 |
Family
ID=61863940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721229214.1U Active CN207228694U (en) | 2017-09-25 | 2017-09-25 | A kind of hydraulic gate headstock gear |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207228694U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109469021A (en) * | 2018-12-27 | 2019-03-15 | 中国电建集团成都勘测设计研究院有限公司 | Structure for drain hole port strobe opening and closing device mounting platform |
-
2017
- 2017-09-25 CN CN201721229214.1U patent/CN207228694U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109469021A (en) * | 2018-12-27 | 2019-03-15 | 中国电建集团成都勘测设计研究院有限公司 | Structure for drain hole port strobe opening and closing device mounting platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203049832U (en) | Assembling type shear wall structure | |
CN106436893A (en) | Fully-prefabricated structure and construction method thereof | |
CN107143034A (en) | A kind of assembly concrete frame structure beam column rigid connection node | |
CN107558626A (en) | A kind of prefabricated assembled wall structure and the method using this structure building house | |
CN203924471U (en) | Precast concrete external wall panel | |
CN105089178B (en) | A kind of pre-splicing Standard formula building of prefabricated steel reinforced concrete shear walls | |
CN206903022U (en) | A kind of steel bar truss floor support plate | |
CN103352569A (en) | Construction method of integrally-poured architecture building | |
CN108005286A (en) | A kind of construction method of the unidirectional overlapping floorboard of assembled architecture | |
CN103452350B (en) | Assembling electronic workshop and construction method thereof | |
CN105908965A (en) | Assembly type concrete wall board, assembly type building and assembly method | |
CN108532796A (en) | Assembly concrete shear wall and face inner beam rigid connection node and construction method | |
CN107338907A (en) | A kind of cross lowly reinforced external wrapping concrete shaped steel Special-Shaped Column | |
CN106351358A (en) | Method for manufacturing and mounting fabricated steel structure house sandwich thermal insulation concrete external wall panel | |
CN108005264A (en) | A kind of steel framework constraint precast reinforced concrete shear wall structure and preparation and installation method | |
CN205475851U (en) | Energy -conserving walling system of modularization detaching -free formwork | |
CN103362307B (en) | Construction method for modularizing insulation wall boards and pouring integrated house building | |
CN103362235B (en) | Integrally-poured building house with wallboards integrating thermal insulating and templates | |
CN207228694U (en) | A kind of hydraulic gate headstock gear | |
CN108756038A (en) | Assembly concrete shear wall and floor support plate rigid connection node and construction method | |
CN208899692U (en) | Beam rigid connection node outside assembly concrete shear wall and face | |
CN210178013U (en) | Fully-prefabricated assembled house | |
CN203412312U (en) | Thermal-insulating integrated template wallboard construction building | |
CN203412143U (en) | Wall body structure of integrally poured building house | |
CN110409492A (en) | The combination assembled piping lane of one kind more structures containing superposed member and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |