CN207228623U - Assembled aluminum shear force of frame wall column formwork structure - Google Patents

Assembled aluminum shear force of frame wall column formwork structure Download PDF

Info

Publication number
CN207228623U
CN207228623U CN201721072877.7U CN201721072877U CN207228623U CN 207228623 U CN207228623 U CN 207228623U CN 201721072877 U CN201721072877 U CN 201721072877U CN 207228623 U CN207228623 U CN 207228623U
Authority
CN
China
Prior art keywords
frame
aluminium chassis
wall column
template
shear force
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721072877.7U
Other languages
Chinese (zh)
Inventor
李奕俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangmen Friend Building Formwork Co Ltd
Original Assignee
Jiangmen Friend Building Formwork Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangmen Friend Building Formwork Co Ltd filed Critical Jiangmen Friend Building Formwork Co Ltd
Priority to CN201721072877.7U priority Critical patent/CN207228623U/en
Application granted granted Critical
Publication of CN207228623U publication Critical patent/CN207228623U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses assembled aluminum shear force of frame wall column formwork structure, including some pieces of aluminium chassis templates, the connector in aluminium chassis template, it is connected with each other between the aluminium chassis template by connector, the frame face of the aluminium chassis template be equipped with it is a plurality of be used to adjust frame face of the connector in frame face Chuan Jie positions, the frame of the aluminium chassis template is while lateral opening equipped with the frame that connects is worn when being used for connector in frame.The utility model carries out sliceable assembling using light aluminium chassis template, can not only reuse, and can quickly control the cast of shearing wall column;It is fastenedly connected between aluminium chassis template using connector to realize, efficiency of assembling is high;Aluminium chassis template is equipped with multiple frame faces, is applicable to various various sizes of shearing wall columns and is flexibly used, which improves versatility and utilization rate.

Description

Assembled aluminum shear force of frame wall column formwork structure
Technical field
The utility model belongs to construction engineering technical field, is specifically related to assembled aluminum shear force of frame wall column formwork knot Structure.
Background technology
In assembled architecture shears wall column work progress, it is usually to make that conventional template, which makes, using panel, wood Side, frame pipe are combined into conventional template, and template is disperseed, and frame pipe is pressurized, and are only supported by flitch.But traditional plank sheathing is easily lost, no But it is poor for applicability, and inconvenience splicing, also it is difficult to dismantle, causes efficiency of assembling low, can not meets that modern construction engineering is efficient Rate, high turnover, low cost, the construction demand of green building.
Utility model content
For overcome the deficiencies in the prior art, the purpose of this utility model is to provide a kind of simple and efficient, solid and reliable, dress With efficient, versatile, repeatable utilization, energy-saving and environment-friendly assembled aluminum shear force of frame wall column formwork structure.
The utility model is that technical solution is used by solving the problems, such as it:
Assembled aluminum shear force of frame wall column formwork structure, including some pieces of aluminium chassis templates, in aluminium chassis template Connector, be connected with each other by connector between the aluminium chassis template, the frame face of the aluminium chassis template is equipped with a plurality of For adjusting frame face of the connector in frame face Chuan Jie positions, the frame of the aluminium chassis template is while equipped with connector is used in frame It is lateral opening to wear the frame connect.
Further, the connector with the selling sheet being fastened on pin, to pull rod and is socketed in pull rod including pin On rotating handles.
Further, when being connected in the same direction between the aluminium chassis template, with pin by between adjacent two pieces of aluminium chassis templates Frame it is lateral opening wear be connected together after be inserted into selling sheet locking.
Further, between the aluminium chassis template during vertical connection, with pin by the frame of any one piece of aluminium chassis template The frame face of lateral opening and another piece of aluminium chassis template adjacent thereto is worn be connected together after be inserted into selling sheet locking.
Further, aluminum corner brace is further included, the aluminum corner brace is installed on the corner between two pieces of L-types connection aluminium chassis templates, With pin by aluminum corner brace and frame it is lateral opening wear be connected together after be inserted into selling sheet lock.
Further, the gasket for strengthening mechanical seal is provided between the aluminum corner brace and pin.
Further, described worn to pull rod is connected on the frame face of two pieces of opposite installation aluminium chassis templates, the rotation handle Hand will be to draw lever locking on frame face.
Further, the frame face has five, and five frame faces are placed equidistant with aluminium chassis template.
Further, the frame face middle of the aluminium chassis template is provided with vertical ribs.
Further, the aluminium chassis template surface is glued protects thin plate equipped with one layer of outsourcing, and the outsourcing protection thin plate is Veneer Coil Coating Products, sheet metal, aluminium sheet or hot-melt plastic plated film.
The beneficial effects of the utility model are:The assembled aluminum shear force of frame wall column formwork structure that the utility model uses, Sliceable assembling is carried out using light aluminium chassis template, can not only be reused, and can quickly control shearing wall column Cast;It is fastenedly connected between aluminium chassis template using connector to realize, efficiency of assembling is high;Aluminium chassis template is equipped with multiple Frame face, is applicable to various various sizes of shearing wall columns and is flexibly used, which improves versatility and utilization rate.
Brief description of the drawings
Fig. 1 be between the utility model aluminium chassis template in the same direction connection when structure diagram;
Structure diagram when Fig. 2 is vertical connection between four pieces of aluminium chassis templates of the utility model (is suitable for shear wall Column 450mm*450mm);
Structure diagram when Fig. 3 is vertical connection between four pieces of aluminium chassis templates of the utility model (is suitable for shear wall Column 500mm*500mm);
Fig. 4 is that structure diagram when L-type connects between four pieces of aluminium chassis templates of the utility model (is suitable for shearing wall column 600mm*600mm);
Fig. 5 is structure diagram when two pieces of aluminium chassis templates of the utility model are installed in opposite directions;
Figure label:1- aluminium chassis templates;2- pins;3- selling sheets;4- frame faces;5- frames are lateral opening;6- aluminum corner braces; 7- gaskets;8- ribs;9- is to pull rod;10- rotating handleses.
Embodiment
The utility model is described in further detail with example below in conjunction with the accompanying drawings.
As shown in Figs. 1-5, the utility model provides assembled aluminum shear force of frame wall column formwork structure, including some blocks of aluminium Framework template 1, the connector in aluminium chassis template 1, are connected with each other by connector between the aluminium chassis template 1, The frame face of the aluminium chassis template 1 is equipped with a plurality of for adjusting frame face 4 of the connector in frame face Chuan Jie positions, the aluminium frame The frame of frame template 1 wears the frame lateral opening 5 connect while equipped with for connector in frame.Using light aluminium chassis template 1 can spell Tipping is matched somebody with somebody, and can not only be reused, and can quickly control the cast of shearing wall column;Using company between aluminium chassis template 1 Fitting is fastenedly connected to realize, efficiency of assembling is high;Aluminium chassis template 1 is equipped with multiple frame faces 4, is applicable to various sizes of Shearing wall column is flexibly used, and which improves versatility and utilization rate.
In the present embodiment, connector with the selling sheet 3 being fastened on pin 2, to pull rod 9 and is socketed in drawing including pin 2 Rotating handles 10 on bar 9.
When connection in the same direction between aluminium chassis template 1, with pin 2 by the frame lateral opening 5 between adjacent two pieces of aluminium chassis templates 1 Wear and be connected together, be inserted into selling sheet 3 and lock.
When vertical connection between aluminium chassis template 1, with pin 2 by the frame of any one piece of aluminium chassis template 1 lateral opening 5 and separately The frame face 4 of one piece of aluminium chassis template 1 adjacent thereto, which is worn, to be connected together, and is inserted into selling sheet 3 and locks.
1 length of aluminium chassis template is 600 millimeters.When two pieces of aluminium chassis templates 1 need vertically to connect for 600 millimeters with extreme length Connect, i.e., when L-type connects, using aluminum corner brace 6 both can be aided in be attached, aluminum corner brace 6 is installed between two pieces of aluminium chassis templates 1 Corner, aluminum corner brace 6 and frame lateral opening 5 is worn be connected together with pin 2, is inserted into selling sheet 3 and is locked.And in order to strengthen mechanical seal, Gasket 7 can also be set between aluminum corner brace 6 and pin 2.
When two pieces of aluminium chassis templates 1 are installed in opposite directions, pull rod 9 is worn and is connected on frame face 4, then will be right with rotating handles 10 Pull rod 9 is locked on frame face 4.Since rotating handles 10 is screwed in on pull rod 9, no matter tightening and dismounting is quite convenient to.
Every piece of aluminium chassis template 1 is equipped with five frame faces 4, and five 4 equidistant arrangements of frame face are set.So every four blocks of aluminium Framework template 1 enclose together cast shearing wall column, be applicable to 600*600,600*450,500*400,500*500, The various sizes of shearing wall column such as 450*450,400*400,350*350,300*300 (millimeter) is flexibly used.
In order to lift the performance that aluminium chassis template 1 bears pressure, the frame face middle of aluminium chassis template 1 is provided with vertical Ribs 8.
1 surface of aluminium chassis template is glued protects thin plate equipped with one layer of outsourcing, and outsourcing protection thin plate is veneer Coil Coating Products, Bao Gang Plate, aluminium sheet or hot-melt plastic plated film.It can so protect aluminium chassis template 1 to avoid being combined with extraneous various media, improve weight Multiple access times.
The preferred embodiment of the above, simply the utility model, the utility model are not limited to above-mentioned implementation Mode, as long as it reaches the technique effect of the utility model with identical means, should all belong to the scope of protection of the utility model.

Claims (10)

1. assembled aluminum shear force of frame wall column formwork structure, it is characterised in that:Including some pieces of aluminium chassis templates, installed in aluminium frame Connector in frame template, is connected with each other between the aluminium chassis template, the frame face of the aluminium chassis template is set by connector Have it is a plurality of be used to adjust frame face of the connector in frame face Chuan Jie positions, the frame side of the aluminium chassis template, which is equipped with, to be used to connect It is lateral opening that part wears the frame connect on frame side.
2. assembled aluminum shear force of frame wall column formwork structure according to claim 1, it is characterised in that:The connector bag Include pin and be fastened on pin selling sheet, to pull rod and be socketed in the rotating handles on pull rod.
3. assembled aluminum shear force of frame wall column formwork structure according to claim 2, it is characterised in that:The aluminium chassis mould Between plate in the same direction connection when, with pin by the frame between adjacent two pieces of aluminium chassis templates it is lateral opening wear be connected together after be inserted into selling sheet lock Tightly.
4. assembled aluminum shear force of frame wall column formwork structure according to claim 2, it is characterised in that:The aluminium chassis mould Between plate during vertical connection, with pin by lateral opening and another piece of aluminium chassis template adjacent thereto of the frame of any one piece of aluminium chassis template Frame face wear be connected together after be inserted into selling sheet locking.
5. assembled aluminum shear force of frame wall column formwork structure according to claim 2, it is characterised in that:Further include aluminum corner brace, The aluminum corner brace is installed on the corner between two pieces of L-types connection aluminium chassis templates, and lateral opening wear of aluminum corner brace and frame is connected on one with pin Selling sheet locking is inserted into after rising.
6. assembled aluminum shear force of frame wall column formwork structure according to claim 5, it is characterised in that:The aluminum corner brace and pin The gasket for strengthening mechanical seal is provided between nail.
7. assembled aluminum shear force of frame wall column formwork structure according to claim 2, it is characterised in that:It is described that pull rod is worn It is connected on the frame face of two pieces of opposite installation aluminium chassis templates, the rotating handles will be to draw lever locking on frame face.
8. assembled aluminum shear force of frame wall column formwork structure according to claim 1, it is characterised in that:The frame face has Five, five frame faces are placed equidistant with aluminium chassis template.
9. assembled aluminum shear force of frame wall column formwork structure according to claim 1, it is characterised in that:The aluminium chassis mould The frame face middle of plate is provided with vertical ribs.
10. assembled aluminum shear force of frame wall column formwork structure according to claim 1, it is characterised in that:The aluminium chassis Template surface is glued protects thin plate equipped with one layer of outsourcing, and the outsourcing protection thin plate is veneer Coil Coating Products, sheet metal, aluminium sheet or hot melt Property film coated plastic.
CN201721072877.7U 2017-08-25 2017-08-25 Assembled aluminum shear force of frame wall column formwork structure Expired - Fee Related CN207228623U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721072877.7U CN207228623U (en) 2017-08-25 2017-08-25 Assembled aluminum shear force of frame wall column formwork structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721072877.7U CN207228623U (en) 2017-08-25 2017-08-25 Assembled aluminum shear force of frame wall column formwork structure

Publications (1)

Publication Number Publication Date
CN207228623U true CN207228623U (en) 2018-04-13

Family

ID=61857852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721072877.7U Expired - Fee Related CN207228623U (en) 2017-08-25 2017-08-25 Assembled aluminum shear force of frame wall column formwork structure

Country Status (1)

Country Link
CN (1) CN207228623U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386639A (en) * 2017-08-25 2017-11-24 江门友建建筑模板有限公司 Assembled aluminum shear force of frame wall column formwork structure
CN113882557A (en) * 2021-11-22 2022-01-04 浙江易家建筑工程有限公司 High-strength steel plate shear wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386639A (en) * 2017-08-25 2017-11-24 江门友建建筑模板有限公司 Assembled aluminum shear force of frame wall column formwork structure
CN113882557A (en) * 2021-11-22 2022-01-04 浙江易家建筑工程有限公司 High-strength steel plate shear wall

Similar Documents

Publication Publication Date Title
CN107386639A (en) Assembled aluminum shear force of frame wall column formwork structure
CN207228623U (en) Assembled aluminum shear force of frame wall column formwork structure
CN104032948A (en) Steel-wood combined formwork and construction method
CN107386629A (en) Build aluminum alloy mould plate combining structure
CN105155836A (en) Aluminum alloy formwork for buildings and method for applying aluminum alloy formwork
CN206110650U (en) Assembled aluminum alloy compound template
CN205875689U (en) Template for construction
CN206309019U (en) One kind is used for heavy in section frame column gang form bracing means
CN203947767U (en) Quick pouring wall form
CN104047421B (en) Finished product assembly type plastic composition turnover mould board construction method
CN206495497U (en) Build aluminum alloy mould plate crossbeam and floor combining structure
CN207499439U (en) Build aluminum alloy mould plate door and window indent composite structure
CN207048314U (en) A kind of shaping type stair wooden model board component
CN206397121U (en) Build the outer crossbeam of aluminum alloy mould plate and floor combining structure
CN206397129U (en) Build aluminum alloy mould plate corner upright and wall panel assemblies structure
CN204715738U (en) A kind of corner for building template
CN202627485U (en) Aluminum-alloy-framed building formwork
CN211775787U (en) Non-standard layer aluminum mould and wood pattern combined node structure
CN211622604U (en) Building template device with corner
CN209556351U (en) A kind of readily removable section construction aluminum alloy pattern plate
CN103122690A (en) Splicing building board for rapid modeling and template rib, template and template structure
CN207362876U (en) Build aluminum alloy mould plate piping lane corner combined structure
CN207829451U (en) Build aluminum alloy mould plate composite structure
CN207032853U (en) The hollow building form of double-layer coextrusion
CN204609286U (en) A kind of aluminium wood is in conjunction with template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180413

Termination date: 20190825

CF01 Termination of patent right due to non-payment of annual fee