CN207218151U - A kind of suspended cable bridge bracket arm - Google Patents

A kind of suspended cable bridge bracket arm Download PDF

Info

Publication number
CN207218151U
CN207218151U CN201721172010.9U CN201721172010U CN207218151U CN 207218151 U CN207218151 U CN 207218151U CN 201721172010 U CN201721172010 U CN 201721172010U CN 207218151 U CN207218151 U CN 207218151U
Authority
CN
China
Prior art keywords
connecting rod
main body
screw
hole
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721172010.9U
Other languages
Chinese (zh)
Inventor
谢宣誓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Tianxin Electric Co Ltd
Original Assignee
Ningbo Tianxin Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Tianxin Electric Co Ltd filed Critical Ningbo Tianxin Electric Co Ltd
Priority to CN201721172010.9U priority Critical patent/CN207218151U/en
Application granted granted Critical
Publication of CN207218151U publication Critical patent/CN207218151U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of suspended cable bridge bracket arm, for lifting cable testing bridge, it is characterized in:Including fixation kit and suspension assembly, fixation kit includes fixed plate and the connecting portion being connected on the downside of fixed plate, is provided with mounting hole in fixed plate, the lower end of connecting portion is provided with screw;Suspension assembly includes suspension main body and connecting rod, the two bottom sides of suspension main body are respectively arranged with supporting plate, are provided with connecting hole on supporting plate, the vertical central for hanging main body is provided with through hole, the upper end of connecting rod is provided with the bolt supporting with screw, and the lower end of connecting rod is provided with screw and hexagonal afterbody;Connecting rod is through the through hole for hanging main body and is screwed onto in the screw of connecting portion;The lower end of fixation kit is bolted with several suspension main bodys by connecting rod, and cable testing bridge is arranged on supporting plate.The utility model has installation simple, can arbitrarily support the characteristics of lifting multiple cable testing bridges.

Description

A kind of suspended cable bridge bracket arm
Technical field
The utility model belongs to technical field of electric equipment, more particularly, to a kind of suspended cable bridge bracket arm.
Background technology
Trailing arm is the critical piece for supporting cable testing bridge and cable.At present, the quantity of each trailing arm support cable testing bridge All it is fixed, is unfavorable for the upgrading in later stage, and install cumbersome.Therefore, it is necessary to improved.
The content of the invention
The purpose of this utility model is to be directed to above-mentioned the shortcomings of the prior art, there is provided a kind of suspended cable crane span structure support Arm, it has installation simple, can arbitrarily support the characteristics of lifting multiple cable testing bridges.
To achieve these goals, technical scheme is used by the utility model:A kind of suspended cable bridge bracket arm, For lifting cable testing bridge, including fixation kit and suspension assembly, the fixation kit includes fixed plate and is connected to fixed plate The connecting portion of downside, mounting hole is provided with fixed plate, the lower end of connecting portion is provided with screw;The suspension assembly includes suspension Main body and connecting rod, the two bottom sides of the suspension main body are respectively arranged with supporting plate, connecting hole are provided with supporting plate, hangs main body Vertical central be provided with through hole, the upper end of connecting rod is provided with the bolt supporting with screw, and the lower end of connecting rod is provided with spiral shell Hole and hexagonal afterbody;Described connecting rod is through the through hole for hanging main body and is screwed onto in the screw of connecting portion;Fixation kit Lower end is bolted with several suspension main bodys by connecting rod, and cable testing bridge is arranged on supporting plate.
Described suspension main body is made up of insulating materials.
After said structure, the utility model is compared to the prior art advantageously:It is of the present utility model solid Determining component can be easily installed on by the mounting hole in fixed plate on the downside of the top of building, can be spirally connected using connecting rod Multiple suspension main bodys, and then multiple cable testing bridges can be installed, its connection installation is very convenient, and is easy to the later stage to increase cable bridge Frame upgrades.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is use state figure of the present utility model.
Fig. 3 is the trailing arm structure chart for being hung with three suspension main bodys.
Embodiment
As described below is only preferred embodiment of the present utility model, does not therefore limit protection model of the present utility model Enclose, the utility model is further illustrated with reference to the accompanying drawings and examples.
Embodiment, as shown in Fig. 1 to Fig. 3:A kind of suspended cable bridge bracket arm, for lifting cable testing bridge 1, including it is solid Determine component and suspension assembly, the fixation kit includes fixed plate 2 and is connected to the connecting portion 3 of the downside of fixed plate 2, fixed plate 2 On be provided with the mounting hole being easily installed on the downside of top of building(Accompanying drawing is not drawn into), the lower end of connecting portion 3 is provided with screw 4;The suspension assembly includes suspension main body 5 and connecting rod 6, and the two bottom sides of the suspension main body 5 are respectively arranged with supporting plate 7, Connecting hole is provided with supporting plate 7(Accompanying drawing is not drawn into), suspension main body 5 vertical central be provided with through hole, the upper end of connecting rod 6 is set The bolt 8 supporting with screw 4 is equipped with, the lower end of connecting rod 6 is provided with screw 4 and hexagonal afterbody 9, the convenient wrench of hexagonal afterbody 9 Operation;Described connecting rod 6 is through the through hole for hanging main body 5 and is screwed onto in the screw 4 of connecting portion 3;The lower end of fixation kit 1,2,3 or more suspension main bodys 5 are bolted with by connecting rod 6, the cable testing bridge 1 of the suspension double amount of main body 5 is logical Connecting hole is crossed on supporting plate 7.
Preferably, described suspension main body 5 is made up of insulating materials.

Claims (2)

  1. A kind of 1. suspended cable bridge bracket arm, for lifting cable testing bridge(1), it is characterised in that:Including fixation kit and hang Hanging component, the fixation kit include fixed plate(2)And it is connected to fixed plate(2)The connecting portion of downside(3), fixed plate(2)On It is provided with mounting hole, connecting portion(3)Lower end be provided with screw(4);The suspension assembly includes suspension main body(5)And connecting rod (6), the suspension main body(5)Two bottom sides be respectively arranged with supporting plate(7), supporting plate(7)On be provided with connecting hole, hang main body (5)Vertical central be provided with through hole, connecting rod(6)Upper end be provided with and screw(4)Supporting bolt(8), connecting rod(6) Lower end be provided with screw(4)With hexagonal afterbody(9);Described connecting rod(6)Through suspension main body(5)Through hole and be screwed onto Connecting portion(3)Screw(4)In;The lower end of fixation kit passes through connecting rod(6)It is bolted with several suspension main bodys(5), cable Crane span structure(1)Installed in supporting plate(7)On.
  2. A kind of 2. suspended cable bridge bracket arm according to claim 1, it is characterised in that:Described suspension main body(5) It is made up of insulating materials.
CN201721172010.9U 2017-09-13 2017-09-13 A kind of suspended cable bridge bracket arm Expired - Fee Related CN207218151U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721172010.9U CN207218151U (en) 2017-09-13 2017-09-13 A kind of suspended cable bridge bracket arm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721172010.9U CN207218151U (en) 2017-09-13 2017-09-13 A kind of suspended cable bridge bracket arm

Publications (1)

Publication Number Publication Date
CN207218151U true CN207218151U (en) 2018-04-10

Family

ID=61824771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721172010.9U Expired - Fee Related CN207218151U (en) 2017-09-13 2017-09-13 A kind of suspended cable bridge bracket arm

Country Status (1)

Country Link
CN (1) CN207218151U (en)

Similar Documents

Publication Publication Date Title
CN207700751U (en) A kind of prefabrication supporting member
CN208474666U (en) A kind of suspension and support being easily installed
CN202963967U (en) Hydraulic screw nut installing device for rudder horn
CN207218151U (en) A kind of suspended cable bridge bracket arm
CN203690795U (en) Carriage used for overhaul of insulator chain
CN203022198U (en) Suspended ceiling structure
CN203250600U (en) Suspension type insulator arrester
CN205399783U (en) Mineral wool board ceiling hanging strengthens device in middle part
CN202513536U (en) Cable support for power tunnel
CN204835446U (en) Do style of calligraphy iron tower wire jumper and prevent wind inclined to one side fixing device
CN209427981U (en) A kind of clamping device for electromechanical equipment maintenance installation
CN103452371B (en) Integral sleeve suspension chimney
CN205102073U (en) A device that is used for support of column pipe intracavity to fix a position
CN206051215U (en) Compensated chain hangs suspension ring
CN207218124U (en) A kind of insulator replacement equipment
CN202769052U (en) Pipeline movable cradle
CN208659136U (en) Platform with glass is auxiliary hangs conversion equipment
CN207588375U (en) A kind of detachable branched cable hanging head hook structure
CN205713154U (en) A kind of interior wall transverse squeezing device
CN205429615U (en) Hoist and mount type cable crane span structure
CN205973583U (en) Flip -chip of assembled steel board cabin is with hoist and mount subassembly
CN203430135U (en) Sleeve integrally-suspended type chimney
CN207645500U (en) A kind of cable conduction mechanism
CN204901274U (en) Installing support of electrical apparatus
CN204103403U (en) Bus duct suspension bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180410

Termination date: 20200913