CN207210895U - A kind of superlastic weeping plastic track - Google Patents
A kind of superlastic weeping plastic track Download PDFInfo
- Publication number
- CN207210895U CN207210895U CN201721039757.7U CN201721039757U CN207210895U CN 207210895 U CN207210895 U CN 207210895U CN 201721039757 U CN201721039757 U CN 201721039757U CN 207210895 U CN207210895 U CN 207210895U
- Authority
- CN
- China
- Prior art keywords
- coat
- screed
- superlastic
- arc
- plastic track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of superlastic weeping plastic track, including setting bottom on the ground, the upper surface of the bottom is sequentially provided with screed-coat and surface layer, the bottom is stacked by elastoplast particle and formed, the screed-coat includes upper screed-coat and lower screed-coat, the upper surface of the upper screed-coat is in contact with the surface layer, its bottom surface is provided with an arc-shaped concave, the lower surface of the lower screed-coat is in contact with the bottom, its upper surface is provided with an arc convex, the arc-shaped concave and the arc convex form a cavity, rigid particles are filled with the cavity, and it is additionally provided with multiple through holes on the upper screed-coat and lower screed-coat, the axis of the through hole and horizontal plane are perpendicular.The utility model effectively increases the overall elasticity of runway, while improves the infiltration efficiency of runway.
Description
Technical field
It the utility model is related to runway technology field, more particularly to a kind of superlastic weeping plastic track.
Background technology
At present, most of plastic cement race track poor flexibility, impact absorbing is few, is easily damaged to sportsman joint, and runway
Surface permeability performance is poor, phenomena such as runway ponding easily occurs.
Utility model content
The utility model is mainly to solve the technical problem in the presence of prior art, good, no so as to provide a kind of elasticity
The superlastic weeping plastic track of easy ponding.
Above-mentioned technical problem of the present utility model is mainly what is be addressed by following technical proposals:
Superlastic weeping plastic track provided by the utility model, including bottom on the ground is set, the bottom
Upper surface is sequentially provided with screed-coat and surface layer, and the bottom is stacked by elastoplast particle and formed, and the screed-coat includes above looking for
Flat bed and lower screed-coat, the upper surface of the upper screed-coat are in contact with the surface layer, and its bottom surface is provided with an arc-shaped concave, described
The lower surface of lower screed-coat is in contact with the bottom, and its upper surface is provided with an arc convex, the arc-shaped concave and the arc
Shape convex surface forms a cavity, is filled with rigid particles in the cavity, and be additionally provided with the upper screed-coat and lower screed-coat more
Individual through hole, the axis and horizontal plane of the through hole are perpendicular.
Further, the both ends of the cavity are connected with a conduit respectively, and the conduit is connected with drainpipe, described
Drainpipe is connected with the water pump of outside.
Further, a screen pack is additionally provided between the surface layer and the upper screed-coat, the screen pack is completely covered
All through holes.
Further, the surface layer is mixed by polyurethane particles and quartz sand particle.
Further, a diameter of 3-7mm of the elastoplast particle.
The beneficial effects of the utility model are:Formed by the way that bottom is stacked using elastoplast particle, it effectively increases
Add the overall elasticity of runway, meanwhile, pass through the sky for forming the arc convex of the arc-shaped concave of upper screed-coat and lower screed-coat
Chamber, and in cavity the stability of filling increase structure rigid particles, and open up on upper screed-coat and lower screed-coat more
Individual through hole, when rainy after, rainwater, which can not only directly be infiltrated into elastoplast particle by surface layer, through hole and stack, forms bottom, adds
The rain penetration of fast runway surface, moreover, rainwater can also flow to the arc convex of lower screed-coat through cavity, it is then convex along arc
Drained towards the both sides of runway, this further improves the infiltration efficiency of runway.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only
It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work
Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of superlastic weeping plastic track of the present utility model;
Fig. 2 is the top view of superlastic weeping plastic track of the present utility model.
Embodiment
Preferred embodiment of the present utility model is described in detail below in conjunction with the accompanying drawings, so that the advantages of the utility model
It can be easier to be readily appreciated by one skilled in the art with feature, it is apparent clear and definite so as to be made to the scope of protection of the utility model
Define.
Refering to shown in Fig. 1-2, superlastic weeping plastic track of the present utility model, including bottom 1 on the ground is set,
The upper surface of bottom 1 is sequentially provided with screed-coat 2 and surface layer 3, and bottom 1 is stacked by elastoplast particle and formed, and screed-coat 2 includes upper
Screed-coat 21 and lower screed-coat 22, the upper surface of upper screed-coat 21 are in contact with surface layer 3, and its bottom surface is provided with an arc-shaped concave 23,
The lower surface of lower screed-coat 22 is in contact with bottom 1, and its upper surface is provided with an arc convex 24, arc-shaped concave 23 and arc convex
24 form a cavity, are filled with rigid particles 25 in cavity, and be additionally provided with multiple through holes on upper screed-coat 21 and lower screed-coat 22
4, the axis and horizontal plane of through hole 4 are perpendicular.
The utility model is formed by the way that bottom 1 is stacked using elastoplast particle, and it effectively increases runway entirety
Elasticity, meanwhile, by the cavity for forming the arc convex 24 of the arc-shaped concave 23 of upper screed-coat 21 and lower screed-coat 22, and
The rigid particles 25 of the stability of filling increase structure in cavity, and open up on upper screed-coat 21 and lower screed-coat 22 multiple
Through hole 4, when rainy after, rainwater, which can not only directly be infiltrated into elastoplast particle by surface layer 3, through hole 4 and stack, forms bottom 1,
Accelerate the rain penetration of runway surface, moreover, rainwater can also flow to the arc convex 24 of lower screed-coat 22 through cavity, then along
Arc convex 24 drains to the both sides of runway, and this further improves the infiltration efficiency of runway.
Specifically, in order to further speed up the flowing of rainwater, the both ends of cavity are connected with a conduit 5 respectively, conduit 5 with
Drainpipe 6 is connected, and drainpipe 6 is connected with the water pump 7 of outside.It is preferred that surface layer 3 is by polyurethane particles and quartz sand particle
Mix.In other embodiments, surface layer 3 can also have other materials making.And lead in order to avoid the particle of surface layer 3 blocks
Hole 4, is additionally provided with a screen pack 8 between surface layer 3 and upper screed-coat 21, all through holes 4 are completely covered in screen pack 8.
In the utility model, a diameter of 3-7mm of elastoplast particle.Certainly, under different use occasions, elasticity modeling
The diameter for expecting particle can also be other appropriate values.
It is described above, only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to
In this, any change or replacement expected without creative work, should all cover within the scope of protection of the utility model.
Therefore, the scope of protection of the utility model should be determined by the scope of protection defined in the claims.
Claims (5)
1. a kind of superlastic weeping plastic track, including bottom on the ground is set, it is characterised in that the upper table of the bottom
Face is sequentially provided with screed-coat and surface layer, and the bottom is stacked by elastoplast particle and formed, and the screed-coat includes upper screed-coat
With lower screed-coat, the upper surface of the upper screed-coat is in contact with the surface layer, and its bottom surface is provided with an arc-shaped concave, is looked under described
The lower surface of flat bed is in contact with the bottom, and its upper surface is provided with an arc convex, and the arc-shaped concave and the arc are convex
Face forms a cavity, and rigid particles are filled with the cavity, and is additionally provided with the upper screed-coat and lower screed-coat multiple logical
Hole, the axis and horizontal plane of the through hole are perpendicular.
2. superlastic weeping plastic track as claimed in claim 1, it is characterised in that led respectively with one at the both ends of the cavity
Pipe is connected, and the conduit is connected with drainpipe, and the drainpipe is connected with the water pump of outside.
3. superlastic weeping plastic track as claimed in claim 2, it is characterised in that the surface layer and the upper screed-coat it
Between be additionally provided with a screen pack, all through holes are completely covered in the screen pack.
4. the superlastic weeping plastic track as described in claim any one of 1-3, it is characterised in that the surface layer is by polyurethane
Particle and quartz sand particle mix.
5. superlastic weeping plastic track as claimed in claim 1, it is characterised in that the elastoplast particle it is a diameter of
3-7mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721039757.7U CN207210895U (en) | 2017-08-18 | 2017-08-18 | A kind of superlastic weeping plastic track |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721039757.7U CN207210895U (en) | 2017-08-18 | 2017-08-18 | A kind of superlastic weeping plastic track |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207210895U true CN207210895U (en) | 2018-04-10 |
Family
ID=61815787
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721039757.7U Active CN207210895U (en) | 2017-08-18 | 2017-08-18 | A kind of superlastic weeping plastic track |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207210895U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109554977A (en) * | 2018-11-26 | 2019-04-02 | 李谦 | A kind of ground structure of rapid infiltrated runway |
-
2017
- 2017-08-18 CN CN201721039757.7U patent/CN207210895U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109554977A (en) * | 2018-11-26 | 2019-04-02 | 李谦 | A kind of ground structure of rapid infiltrated runway |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207210895U (en) | A kind of superlastic weeping plastic track | |
CN203795375U (en) | Mutual-nesting type ecological building block | |
CN103603411B (en) | Desert composite anti-penetrating water impoundment method | |
CN205604000U (en) | Novel permeable pavement brick | |
CN205062609U (en) | Sponge aggregate and brick of making that permeates water thereof | |
CN205152742U (en) | Light type city ceramic tile that permeates water | |
CN206428546U (en) | A kind of new gangue water-permeable brick | |
CN206815129U (en) | A kind of permeable terrace | |
CN207210882U (en) | One kind filtering absorption water-permeable brick | |
CN207685622U (en) | It is a kind of to can be used for the permeable floor tile in part | |
CN204443435U (en) | A kind of tree nest being applicable to arid and semi-arid desert tree planting keep-alive restoration of the ecosystem | |
CN205105787U (en) | Concrete heat preservation plant case | |
CN206858991U (en) | A kind of high-performance composite water permeable brick | |
CN205151910U (en) | Bed is floated in formula of stopping ecological scrubbing in river course | |
CN207812399U (en) | A kind of anchoring type revetment brick suitable for rock side slope | |
CN207828733U (en) | A kind of novel water permeable concrete road | |
CN207176416U (en) | A kind of ecological sand base sponge urban water-through brick | |
CN206396581U (en) | A kind of regeneration aggregate brickmaking recycled for lawn water resource | |
CN207073962U (en) | A kind of automatic water pot decoupler | |
CN106868976B (en) | It is originated from a kind ofly and so removes haze ecological recycle system | |
CN107288000A (en) | A kind of method for storing seepage brick cavity formation pipe network system and infiltration soil moisture conservation water drainage | |
CN206319224U (en) | A kind of ecological, environmental protective water-permeable brick | |
CN207727373U (en) | A kind of concrete block for road construction | |
CN203625963U (en) | Desert combined seepage prevention impounding reservoir | |
CN206052491U (en) | Ground water permeable device based on sponge urban construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Super elastic water permeable plastic runway Effective date of registration: 20220228 Granted publication date: 20180410 Pledgee: Bank of China Limited by Share Ltd. Guangzhou Panyu branch Pledgor: GUANGZHOU XIULIN SPORTS EQUIPMENT CO.,LTD. Registration number: Y2022980001958 |