A kind of bridge construction scene upending frame Download PDFInfo
- Publication number
- CN207192654U CN207192654U CN201721019271.7U CN201721019271U CN207192654U CN 207192654 U CN207192654 U CN 207192654U CN 201721019271 U CN201721019271 U CN 201721019271U CN 207192654 U CN207192654 U CN 207192654U
- Authority
- CN
- China
- Prior art keywords
- bridge construction
- millet
- connecting plate
- construction scene
- lifting sucker
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a kind of bridge construction scene upending frame, including support frame, perpendicular fine strain of millet is fixedly connected with above support frame as described above, transverse tube is connected with above the perpendicular fine strain of millet, the transverse tube inside left is provided with hydraulic cylinder, crossbeam is connected with the right side of the hydraulic cylinder, the transverse tube is provided with drive mechanism, the drive mechanism side is connected with steel wire rope, and described steel wire rope one end is connected with lifting sucker, and the lifting sucker includes the first connecting plate.Pass through Hydraulic Cylinder crossbeam, steel wire rope is driven to be moved in first pulley and second pulley by drive mechanism, so as to drive rising and falling for lifting sucker, three blocks of electromagnet disposably can more adsorb steel pipe when lifting sucker is fallen, lifting sucker be arranged to 2 groups be can be so that steel pipe be stably lifted by crane, because absorption steel pipe area is smaller when avoiding lifting by crane, absorption shakiness causes steel pipe to be dropped when adsorbing, and the setting of supporting plate and baffle plate is can be transported with the more steel pipe of disposable loading.
Description
Technical field
Upending frame technical field is the utility model is related to, specially a kind of bridge construction scene upending frame.
Background technology
Among the history of the bridging of China, the steel bridge from simple single-plank bridge to today;From single beam bridge to
Pontoon bridge, cable bridge, arch bridge, garden bridge, plank road bridge, track road bridge etc.;The material of bridge construction is from based on timber, to based on building stones, then
To based on steel and armored concrete, this is a very very long evolution.Bridge needs work when building
The steel and reinforcing bar of personnel's carrying small-sized carry out the building operation of bridge, because transport distance and not far, can't typically adopt
With large-scale lifting machine come handling, but artificial carry not only loses time also to expend very much muscle power, is applied so providing a kind of bridge
Work scene, which solves above-mentioned produced problem with upending frame, to be extremely necessary.
Utility model content
The purpose of this utility model is to provide a kind of bridge construction scene upending frame, to solve in above-mentioned background technology
The problem of proposition.
To achieve the above object, the utility model provides following technical scheme:A kind of bridge construction scene upending frame, bag
Support frame is included, perpendicular fine strain of millet is fixedly connected with above support frame as described above, transverse tube, the transverse tube inside left are connected with above the perpendicular fine strain of millet
Provided with hydraulic cylinder, crossbeam is connected with the right side of the hydraulic cylinder, the transverse tube is provided with drive mechanism, and the drive mechanism side connects
Steel wire rope is connected to, described steel wire rope one end is connected with lifting sucker, and the lifting sucker includes the first connecting plate, and described first connects
The second connecting plate is fixedly connected with below fishplate bar, electromagnet is provided between first connecting plate and the second connecting plate, it is described perpendicular
Weight block is provided with the left of fine strain of millet, limiting plate is provided with the left of the weight block, supporting plate, the supporting plate are connected with the right side of the perpendicular fine strain of millet
Right-hand member is connected with baffle plate, and support bar is provided between the perpendicular fine strain of millet and transverse tube.
Preferably, the drive mechanism includes motor and active roller, and first pulley, institute are provided with the right side of the active roller
State crossbeam right-hand member and be provided with second pulley.
Preferably, connecting seat is fixedly connected with above first connecting plate, connecting rod is connected between the connecting seat.
Preferably, the quantity of the lifting sucker is 2 groups.
Preferably, the supporting plate is arc-shaped structure.
Preferably, it is connected with universal wheel below support frame as described above.
Preferably, the quantity of electromagnet is 3 pieces on the lifting sucker, and the electromagnet is round the second connecting plate circumference
Distribution.
Compared with prior art, the beneficial effects of the utility model are:By Hydraulic Cylinder crossbeam, pass through drive mechanism
Drive steel wire rope to move in first pulley and second pulley, so as to drive lifting sucker to rise and fall, lifting sucker fall when
Waiting three blocks of electromagnet disposably can more adsorb steel pipe, lifting sucker be arranged to 2 groups be can be so that steel pipe be stably risen
Hang, because absorption steel pipe area is smaller when avoiding lifting, absorption shakiness causes steel pipe to be dropped when adsorbing, and supporting plate and baffle plate are set
It is that can be transported with the more steel pipe of disposable loading to put, weight block be then can when device lifts by crane stabilising arrangement, dress
After load terminates, staff can carry out the transhipment of steel pipe with pushing meanss.The utility model can effectively be lifted by crane and transported small-sized
Steel pipe, reinforcing bar and other items, at bridge construction scene staff can be helped time saving and energy saving, improve operating efficiency.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is that the utility model lifts by crane sucker side structure schematic view;
Fig. 3 is that the utility model lifts by crane sucker overlooking the structure diagram.
In figure:1 support frame, 2 perpendicular fine strains of millet, 3 housings, 4 crossbeams, 5 weight blocks, 6 limited blocks, 7 supporting plates, 8 baffle plates, 9 support bars,
10 hydraulic cylinders, 11 drive mechanisms, 12 first pulleys, 13 second pulleys, 14 steel wire ropes, 15 lifting suckers, 16 first connecting plates, 17
Second connecting plate, 18 electromagnet, 19 connecting seats, 20 connecting rods, 21 universal wheels.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:A kind of bridge construction scene upending frame, including
Support frame 1, the top of support frame as described above 1 are fixedly connected with perpendicular fine strain of millet 2, and the perpendicular top of fine strain of millet 2 is connected with transverse tube 3, inside the transverse tube 3
Left side is provided with hydraulic cylinder 10, and the right side of hydraulic cylinder 10 is connected with crossbeam 4, and the transverse tube 3 is provided with drive mechanism 11, the drive
The side of motivation structure 11 is connected with steel wire rope 14, and described one end of steel wire rope 14 is connected with lifting sucker 15, and the lifting sucker 15 wraps
Include the first connecting plate 16, the lower section of the first connecting plate 16 is fixedly connected with the second connecting plate 17, first connecting plate 16 with
Electromagnet 18 is provided between second connecting plate 17, the perpendicular left side of fine strain of millet 2 is provided with weight block 5, and the left side of weight block 5 is provided with spacing
Plate 6, the right side of perpendicular fine strain of millet 2 are connected with supporting plate 7, and the right-hand member of supporting plate 7 is connected with baffle plate 8, the perpendicular fine strain of millet 2 and transverse tube 3 it
Between be provided with support bar 9.
Further, the drive mechanism 11 includes motor and active roller, and being provided with first on the right side of the active roller slides
Wheel 12, the right-hand member of crossbeam 4 is provided with second pulley 13.
Further, the top of the first connecting plate 16 is fixedly connected with connecting seat 19, is connected between the connecting seat 19
There is connecting rod 20.
Further, the quantity of the lifting sucker 15 is 2 groups.
Further, the supporting plate 7 is arc-shaped structure.
Further, the lower section of support frame as described above 1 is connected with universal wheel 21.
Further, the quantity of electromagnet 18 is 3 pieces on the lifting sucker 15, and the electromagnet 18 connects round second
The circle distribution of fishplate bar 17.
Operation principle:Crossbeam 4 is promoted by hydraulic cylinder 10, steel wire rope 14 is driven in first pulley 12 by drive mechanism 11
Moved with second pulley 13, so as to drive rising and falling for lifting sucker 15, three blocks of electromagnet 18 when lifting sucker 15 is fallen
It disposably can more adsorb steel pipe, it is that can avoid lifting by crane so that steel pipe is stably lifted by crane that lifting sucker 15, which is arranged to 2 groups,
Shi Yinwei absorption steel pipe areas are smaller, and absorption shakiness causes steel pipe to be dropped when adsorbing, and the setting of supporting plate 7 and baffle plate 8 is can be with
The more steel pipe of disposable loading is transported, weight block be then can when device lifts by crane stabilising arrangement, loading terminate after,
Staff can carry out the transhipment of steel pipe with pushing meanss.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (7)
1. a kind of bridge construction scene upending frame, including support frame (1), it is characterised in that:It is fixed above support frame as described above (1)
Perpendicular fine strain of millet (2) is connected with, transverse tube (3) is connected with above the perpendicular fine strain of millet (2), transverse tube (3) inside left is provided with hydraulic cylinder (10),
Crossbeam (4) is connected with the right side of the hydraulic cylinder (10), the transverse tube (3) is provided with drive mechanism (11), the drive mechanism
(11) side is connected with steel wire rope (14), and described steel wire rope (14) one end is connected with lifting sucker (15), the lifting sucker
(15) include the first connecting plate (16), be fixedly connected with the second connecting plate (17) below first connecting plate (16), described the
Electromagnet (18) is provided between one connecting plate (16) and the second connecting plate (17), weight block (5) is provided with the left of the perpendicular fine strain of millet (2),
Limiting plate (6) is provided with the left of the weight block (5), supporting plate (7) is connected with the right side of the perpendicular fine strain of millet (2), the supporting plate (7) is right
End is connected with baffle plate (8), and support bar (9) is provided between the perpendicular fine strain of millet (2) and transverse tube (3).
A kind of 2. bridge construction scene upending frame according to claim 1, it is characterised in that:The drive mechanism (11)
Including motor and active roller, first pulley (12) is provided with the right side of the active roller, crossbeam (4) right-hand member is provided with second and slided
Take turns (13).
A kind of 3. bridge construction scene upending frame according to claim 1, it is characterised in that:First connecting plate
(16) top is fixedly connected with connecting seat (19), and connecting rod (20) is connected between the connecting seat (19).
A kind of 4. bridge construction scene upending frame according to claim 1, it is characterised in that:The lifting sucker (15)
Quantity be 2 groups.
A kind of 5. bridge construction scene upending frame according to claim 1, it is characterised in that:The supporting plate (7) is
Arc-shaped structure.
A kind of 6. bridge construction scene upending frame according to claim 1, it is characterised in that:Under support frame as described above (1)
Side is connected with universal wheel (21).
A kind of 7. bridge construction scene upending frame according to claim 1, it is characterised in that:The lifting sucker (15)
The quantity of upper electromagnet (18) is 3 pieces, and the electromagnet (18) is round the second connecting plate (17) circle distribution.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721019271.7U CN207192654U (en) | 2017-08-15 | 2017-08-15 | A kind of bridge construction scene upending frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721019271.7U CN207192654U (en) | 2017-08-15 | 2017-08-15 | A kind of bridge construction scene upending frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207192654U true CN207192654U (en) | 2018-04-06 |
Family
ID=61797281
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721019271.7U Expired - Fee Related CN207192654U (en) | 2017-08-15 | 2017-08-15 | A kind of bridge construction scene upending frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207192654U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110526151A (en) * | 2019-09-03 | 2019-12-03 | 惠州市晋锋建筑材料有限公司 | A kind of aluminium sheet crane |
-
2017
- 2017-08-15 CN CN201721019271.7U patent/CN207192654U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110526151A (en) * | 2019-09-03 | 2019-12-03 | 惠州市晋锋建筑材料有限公司 | A kind of aluminium sheet crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205990047U (en) | A kind of palletizing apparatus | |
CN201406270Y (en) | Novel track slab hoisting device | |
CN101435268B (en) | Stretching device of case beam in case | |
CN109665247A (en) | Four-way shuttle | |
CN213651236U (en) | Integrated system for unstacking, stacking and loading | |
CN109879054A (en) | A kind of static pressure cement adobe stacking production line | |
CN108438927A (en) | High-speed packing material stacking machine | |
CN208632019U (en) | A kind of efficient self-unloading carrier | |
CN201284178Y (en) | Hydraulic sling for hoisting bogie | |
CN205087596U (en) | Automatic setting machine layer brick transposition overhead hoist | |
CN201634318U (en) | Large-capacity wood chip orange-peel grab bucket | |
CN207192654U (en) | A kind of bridge construction scene upending frame | |
CN203247031U (en) | Hoisting device for curtain board transporting | |
CN202321480U (en) | Tower crane lifter | |
CN208022601U (en) | A kind of Novel electric block bridge crane | |
CN204844171U (en) | Aluminum alloy ingot casting pile machinery hand | |
CN207748760U (en) | A kind of bridge crane of hoisting large-size drainpipe | |
CN214087406U (en) | Fine quality rod hoisting equipment | |
CN205772938U (en) | A kind of transport, the device of dismounting boiler feed pump | |
CN210479887U (en) | Upper and lower auxiliary device of large-scale special-shaped workpiece | |
CN106744502A (en) | Automatic dress brick machine | |
CN206970053U (en) | Kerbstone handling facilities | |
CN217395281U (en) | Small-size prefabricated component semi-automatization apparatus for producing | |
CN205294593U (en) | Construction is with bearing device | |
CN216272675U (en) | Paving stone hoist and mount handling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180406 Termination date: 20190815 |