CN207177731U - A kind of vertical engineering investigation car - Google Patents

A kind of vertical engineering investigation car Download PDF

Info

Publication number
CN207177731U
CN207177731U CN201721191609.7U CN201721191609U CN207177731U CN 207177731 U CN207177731 U CN 207177731U CN 201721191609 U CN201721191609 U CN 201721191609U CN 207177731 U CN207177731 U CN 207177731U
Authority
CN
China
Prior art keywords
mobile platform
mobile
platform
drilling
engineering investigation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201721191609.7U
Other languages
Chinese (zh)
Inventor
黎志中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Yongji Construction Foundation Co ltd
Original Assignee
Guangdong Yongji Building Foundation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Yongji Building Foundation Co Ltd filed Critical Guangdong Yongji Building Foundation Co Ltd
Priority to CN201721191609.7U priority Critical patent/CN207177731U/en
Application granted granted Critical
Publication of CN207177731U publication Critical patent/CN207177731U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of vertical engineering investigation car, including creeper undercarriage, mobile platform, actuating unit, drilling machine and boring tower, the chassis of drilling machine is raised, the torsion bar arrangement that drilling rod can be made to rotate is also set up on drilling machine, there is the drilling tool that can accommodate drilling tool vertical display to put area on mobile platform, drilling tool vertical display, reduce drill bit level run duration, reduce the labor intensity of operating personnel, have can accommodate that drilling rod passes through to pass through hole on mobile platform, mobile platform has effectively obstructed slime water, keep the tidiness of operating personnel's working environment, simultaneously, the mud pit of mud can be stored by being also set up on mobile platform, reduce digging in-situ guide channel, the flow chart of mud pit, improve operating efficiency.The utility model additionally provides a kind of vertical engineering investigation operational method, compared with existing level formula engineering investigation operational method, solves the problems, such as that operating personnel's labor intensity is big, operating environment is poor.

Description

A kind of vertical engineering investigation car
Technical field
Engineering investigation field is the utility model is related to, more particularly to a kind of vertical engineering investigation car.
Background technology
Construction project prospecting refers to meet the need of the planning of engineering construction, design, construction, operation and the comprehensive regulation etc. Will, the situations such as landform, geology and the hydrology are surveyed and drawn, explore test, and the activity of corresponding achievement and data, ground work are provided Exploration, design, processing, monitoring activity in journey also belong to engineering investigation category.Study and find out the ground quality in engineering construction place Manage environmental characteristic, and its comprehensive applied science related to engineering construction.For urban construction, industry and civil buildings, iron Road, road, coastal waters harbour, transmission of electricity and pipe engineering, water conservancy and waterwork, mining and the inferior engineering in ground planning, design, apply Work, operation and the comprehensive regulation, engineering investigation are commented by the mapping to key elements such as landform, geology and the hydrology, exploration, test and synthesis It is fixed, there is provided feasibility assessment is with building required basic data.It is the primary link of capital construction.Do engineering investigation well, it is special It is not prospecting early stage, detailed demonstration can be made to building place, ensure the reasonable progress of engineering, promote engineering to obtain most preferably Economic, society and environmental benefit.
Rig is in exploration or exploitation of mineral resources, drives drilling tool to be crept into underground, obtains the machine of geologic information in kind Tool equipment, also known as drilling machine, main function are to drive drilling tool to crush bottom hole rock, the drilling tool of tripping in or proposition in hole, can be used In drilling through rock core, the ore deposit heart, landwaste, gaseous state sample, liquid-like etc., situations such as to verify subsurface geology and mineral resources.At present, no matter Industry and the engineering investigation of civil buildings, or all kinds of engineering investigations of highway, railway, harbour bridge, are all to use rig pair Operation after quasi- hole position, all kinds of drill bits, drilling tool are put using plane in operation, and to use, this method can be described as horizontal Engineering investigation operational method.Wet operation is used because rig is most, slime water splashes often, makes operating worker shoes, clothes Slime water is often stained with even, labor intensity is big, and operating environment is poor, causes many young workers to be reluctant into hilllock, and on duty is equal For more than 40 years old worker, labour's wretched insufficiency.
Therefore, how to improve in the prior art, the present situation that engineering investigation intensity of workers is big, operating environment is poor, It is those skilled in the art's urgent problem to be solved.
Utility model content
The purpose of this utility model is to provide a kind of vertical engineering investigation car, to solve to ask existing for above-mentioned prior art Topic, is effectively improved prospecting operating environment, reduces the labor intensity of operating personnel.
To achieve the above object, the utility model provides following scheme:The utility model provides a kind of vertical engineering and surveyed Examine car, including creeper undercarriage, mobile platform, actuating unit, drilling machine and boring tower, the mobile platform and the crawler belt row Mechanism is walked to be connected, the transmission of the creeper undercarriage and the actuating unit is connected, the actuating unit, the drilling machine and The boring tower is set in turn on the mobile platform, and the torsion bar arrangement that drilling rod can be made to rotate is also set up on the drilling machine, There is the drilling tool that can accommodate drilling tool vertical display to put area, the drilling tool puts area and the drilling machine on the mobile platform Be respectively arranged at the both sides of the boring tower, have on the mobile platform can accommodate that drilling rod passes through by hole, it is described to pass through Hole is arranged at the bottom of the unit head of the drilling machine, and the mud pit that can store mud is also set up on the mobile platform.
Preferably, vertical engineering investigation car also includes operating platform and auxiliary stairs, and the operating platform is arranged at the movement Platform upper, the operating platform be arranged in parallel with the mobile platform, and the operating platform is arranged at the drilling tool and puts area Top, the breach that drilling tool passes through can be accommodated by having on the operating platform, and the auxiliary stairs connects the mobile platform and institute State operating platform.
Preferably, the mud pit is arranged at the bottom of the mobile platform, and the mud pit is V-shaped mud pit, institute The height for stating the height creeper undercarriage of mud pit is short.
Preferably, the boring tower also sets up support bar, and the support bar connects the boring tower and the mobile platform, described One end of support bar is hinged with the boring tower, and the other end of the support bar is detachably connected with the mobile platform.
Preferably, vertical engineering investigation car also includes supporting leg, and the supporting leg is telescopic legs, and the mobile platform is square Shape platform, four supporting legs are arranged at the bottom of the corner of the mobile platform.
Preferably, the torsion bar arrangement includes two mobile cylinder decks and at least two fixed cylinder decks, described solid Determine the axis circumferentially shape setting of the unit head of cylinder deck and the mobile cylinder deck around the drilling machine, the mobile circle Post deck can move back and forth along two lines for moving cylinder deck.
Preferably, the torsion bar arrangement also includes movable plate, Mobile base and drive cylinder, two mobile cylinder decks It is arranged on the movable plate, there is sliding groove on the Mobile base, the movable plate is slidably disposed in the sliding groove Interior, the drive cylinder is connected with the movable plate.
Preferably, the mobile cylinder deck and the fixed cylinder deck be cylindric, the sliding groove it is transversal Face is convex shape, and the width of the sliding panel is big compared with the basal diameter of the mobile cylinder deck.
The utility model also provides a kind of vertical engineering investigation operational method, comprises the following steps:
Step 1: the drilling rod for reconnoitring operation is vertically placed on into drilling tool puts area, mud is injected into mud pit, is driven Creeper undercarriage is travelled to prospecting destination;
Step 2: operating personnel is on a mobile platform, prospecting is docked with by drilling machine with drilling rod by boring tower, drilling rod passes through Being stretched out by hole on mobile platform, contacted with prospecting ground, the water pump with seasonal drilling machine is connected with mud pit, implements to bore Visit operation;
After step 3, probing and the sampling end of job, operating personnel dismantled drilling tool by torsion bar arrangement, and will be unloaded Drilling rod is placed on drilling tool and puts area vertically, and prospecting operation is completed.
The utility model achieves following technique effect relative to prior art:Vertical engineering investigation of the present utility model Car, including creeper undercarriage, mobile platform, actuating unit, drilling machine and boring tower, mobile platform are connected with creeper undercarriage Connecing, creeper undercarriage is connected with actuating unit transmission, and actuating unit, drilling machine and boring tower are set in turn on mobile platform, The chassis of drilling machine is raised, the torsion bar arrangement that drilling rod can be made to rotate is also set up on drilling machine, having on mobile platform can The drilling tool for accommodating drilling tool vertical display puts area, drilling tool vertical display, reduces drill bit level run duration, reduces operation people The labor intensity of member, drilling tool puts area and drilling machine is respectively arranged at the both sides of boring tower, and brill can be accommodated by having on mobile platform Bar pass through by hole, the bottom of the unit head of drilling machine is arranged at by hole, mobile platform has effectively obstructed slime water, keeps The tidiness of operating personnel's working environment, meanwhile, the mud pit that can store mud is also set up on mobile platform, reduces scene Guide channel, the flow chart of mud pit are excavated, improves operating efficiency.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art In the required accompanying drawing used be briefly described, it should be apparent that, drawings in the following description are only of the present utility model Some embodiments, for those of ordinary skill in the art, without having to pay creative labor, can also basis These accompanying drawings obtain other accompanying drawings.
Fig. 1 is the main structure diagram of vertical engineering investigation car of the present utility model;
Fig. 2 is the overlooking the structure diagram of vertical engineering investigation car of the present utility model;
Fig. 3 is the overlooking the structure diagram of the torsion bar arrangement of vertical engineering investigation car of the present utility model;
Fig. 4 is the positive structure diagram of the torsion bar arrangement of vertical engineering investigation car of the present utility model;
Wherein, 1 is creeper undercarriage, and 2 be mobile platform, and 3 be actuating unit, and 4 be drilling machine, and 5 be boring tower, and 501 are Support bar, 6 be torsion bar arrangement, and 601 be mobile cylinder deck, and 602 be fixed cylinder deck, and 603 be movable plate, and 604 be movement Seat, 605 be drive cylinder, and 7 be that drilling tool puts area, and 8 be mud pit, and 9 be operating platform, and 10 be auxiliary stairs, and 11 be supporting leg.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
The purpose of this utility model is to provide a kind of vertical engineering investigation car, to solve to ask existing for above-mentioned prior art Topic, is effectively improved prospecting operating environment, reduces the labor intensity of operating personnel.
To enable above-mentioned purpose of the present utility model, feature and advantage more obvious understandable, below in conjunction with the accompanying drawings and tool Body embodiment is described in further detail to the utility model.
Fig. 1 to Fig. 4 is refer to, Fig. 1 is the main structure diagram of vertical engineering investigation car of the present utility model, and Fig. 2 is The overlooking the structure diagram of vertical engineering investigation car of the present utility model, Fig. 3 are vertical engineering investigation car of the present utility model The overlooking the structure diagram of torsion bar arrangement, Fig. 4 are the facing structure of the torsion bar arrangement of vertical engineering investigation car of the present utility model Schematic diagram.
The utility model provides a kind of vertical engineering investigation car, including creeper undercarriage 1, mobile platform 2, actuating unit 3rd, drilling machine 4 and boring tower 5, mobile platform 2 are connected with creeper undercarriage 1, band of the mobile platform 2 in creeper undercarriage 1 Dynamic lower reach reconnoitres destination, and creeper undercarriage 1 is connected with the transmission of actuating unit 3, and dynamic structure 3 is creeper undercarriage 1 Power is provided, actuating unit 3, drilling machine 4 and boring tower 5 are set in turn on mobile platform 1, and mobile platform 2 improves drilling machine Chassis position, the torsion bar arrangement 6 that drilling rod can be made to rotate is also set up on drilling machine 4, will can be arranged on by torsion bar arrangement 6 Drilling rod on drilling machine 4 is unscrewed and then dismantled.
There is the drilling tool that can accommodate drilling tool vertical display to put area 7, drilling tool puts area 7 and drilling machine 4 on mobile platform 2 The both sides of boring tower 5 are respectively arranged at, drilling tool vertical display is put in area in drilling tool, facilitates boring tower 5 to sling drilling tool installed in brill Prospecting operation is carried out on spy machine 4, while drilling tool vertical display reduces drill bit level traveling time, reduces operating personnel's work Intensity.Have on mobile platform 2 can accommodate that drilling rod passes through by hole, be arranged at by hole under the unit head of drilling machine 4 Portion, drilling tool can be stretched out from by hole, and prospecting bottom surface is punched, the operation such as samples, mobile platform 2 has obstructed the mud to splash Pulp-water;The mud pit 8 of mud can be stored by being also set up on mobile platform 2, and the water pump of drilling machine 4 is in operation process by mud pit Mud in 8 extracts, and for the retaining wall of drilling, mobile platform 2 improves the chassis of drilling machine 4, and it is empty to provide installation for mud pit 8 Between, the process of reduction digging in-situ mud pit.
Specifically, vertical engineering investigation car also includes operating platform 9 and auxiliary stairs 10, and operating platform 9 is arranged at mobile platform 2 Top, operating platform 9 be arranged in parallel with mobile platform 2, and operating platform 9 is arranged at the top that drilling tool puts area 7, operating platform 9 The breach that drilling tool passes through can be accommodated by above having, and auxiliary stairs 10 connects mobile platform 2 and operating platform 9.In the prior art, dismantle , it is necessary to which two operating personnels are simultaneously in ground dismounting drilling rod during drilling rod, then the hoist engine of one man operation drilling machine 4 puts drilling rod Under, another people, which will coordinate, draws forward drilling rod, drilling rod is kept flat on the ground.Torsion bar is used in the utility model, during dismounting drilling rod Device 6 back-outs drilling rod, and two operating personnels are respectively on mobile platform 2 and operating platform 9, i.e., two people one on the other, match somebody with somebody Drilling rod is pulled down in conjunction, then drilling rod vertical shift to drilling tool is put area 7 by the people on superposed operating platform 9, is reduced and is bored The bar horizontal movement time, operating personnel's labor intensity is reduced, improve operating efficiency.
More specifically, mud pit 8 is arranged at the bottom of mobile platform 2, mud pit 8 is V-shaped mud pit, avoids mud pit 8 during Prospecting vehicle traveling because encountering barrier, and cause Prospecting vehicle " being lifted ", can not advance, the height of mud pit 8 compared with The height of creeper undercarriage 1 is short, and the innermost terrain clearance of mud pit 8 must be maintained in certain zone of reasonableness, it is ensured that no The normally travel of Prospecting vehicle can be influenceed, and terrain clearance is unsuitable excessive, causes operating personnel to move up and down the inconvenience of platform 2.
In addition, boring tower 5 also sets up support bar 501, support bar 501 connects boring tower 5 and mobile platform 2, the one of support bar 501 End is be hinged with boring tower 5, and the other end and the mobile platform 2 of support bar 501 are detachably connected.In this embodiment, boring tower 5 It is be hinged with mobile platform 2, for the ease of the windage during mobile Prospecting vehicle or reduction traveling, boring tower 5 can be fallen, be flat on On mobile platform 2, in use, jacked up boring tower 5 using support bar 501, after jacking up boring tower 5, support bar 501 and mobile platform 2 It is flexibly connected, support bar 501, which is obliquely installed, to be played a part of supporting boring tower 5.
Further, vertical engineering investigation car also includes supporting leg 11, and supporting leg 11 is Collapsible structure, and mobile platform 2 is square Shape platform, four supporting legs 11 are arranged at the bottom of the corner of mobile platform.When reaching specified prospecting place, supporting leg 11 can be used for Fixed, support Prospecting vehicle, stable working environment is provided for prospecting operation, while supporting leg 11 is scalable, when walking, supporting leg 11 Shrink, do not interfere with the normally travel of Prospecting vehicle, when running into complicated landform, four supporting legs 11 of adjustment support, balance Prospecting vehicle, Improve the adaptability of Prospecting vehicle.
Further, torsion bar arrangement 6 includes two mobile cylinder decks 601 and at least two fixed cylinder decks 602, In this embodiment, the quantity of fixed cylinder deck 602 is five, fixed cylinder deck 602 and mobile cylinder deck 601 around the unit head of drilling machine axis circumferentially shape set.Mobile cylinder deck 601 can move cylinder deck along two 601 line moves back and forth, it is necessary to illustrate, the action of two mobile cylinder decks 601 needs to be consistent, i.e., two shiftings The relative position of dynamic cylinder deck 601 is fixed, and two mobile cylinder decks 601 can be fixed using connector, or by two Mobile cylinder deck 601 is fixedly installed on the first-class operation of same parts, to realize the mobile side of two mobile cylinder decks 601 It is consistent to speed.
In this embodiment, torsion bar arrangement 6 also includes movable plate 603, Mobile base 604 and drive cylinder 605, and two Individual mobile cylinder deck 601 is arranged on movable plate 603, has sliding groove on Mobile base 604, and movable plate 603 is slideably set It is placed in sliding groove, drive cylinder 605 is connected with movable plate 603.
When needing dismounting drilling rod, in use, wherein one blocks lower drilling rod bayonet socket spanner, pinch bar is stuck in two of which Room between fixed cylinder deck 602;Another that spanner is blocked upper drilling rod bayonet socket, pinch bar is stuck in mobile cylinder deck Room between 601;The pushing piston-rod of drive cylinder 605 is operated, moves movable plate 603, the mobile cylinder on movable plate 603 Deck 601 is rotated with wrench, and upper drilling rod is back-outed;Spanner above is taken out afterwards, and the personnel of operating platform 9 are i.e. detachable to bore Bar.
Mobile cylinder deck 601 and fixed cylinder deck 602 are cylindric, and the cross section of sliding groove is convex shape, on Narrow lower width, avoids spanner to take sliding panel 603 from sliding groove out of, and the width of sliding panel 603 relatively moves the bottom of cylinder deck 601 Face diameter is big.
Vertical engineering investigation car of the present utility model, drilling machine 4 is arranged on mobile platform 2, by creeper undercarriage 1 Driving, during operation, drilling tool vertical display puts area 7 in drilling tool, and operating platform 9, two operating personnels are set on mobile platform 2 It can coordinate dismounting drilling tool up and down respectively on mobile platform 2 and operating platform 9, carry out prospecting operation, reduce drill bit level Traveling time, improve operating efficiency.Meanwhile mud pit 8 is provided with Prospecting vehicle, by the water pump of of drilling machine 4 itself from mud pit 8 Interior extraction mud, without digging in-situ guide channel and mud pit, mobile platform 2 can also avoid the mud in operation process from splashing, Improve the working environment of operating personnel.In addition, torsion bar arrangement 6 of the present utility model is using mobile cylinder deck 601 and fixes Cylinder deck 602 coordinates spanner to complete drilling rod dismounting.
The utility model also provides a kind of vertical engineering investigation operational method, comprises the following steps:
Step 1: the drilling rod for reconnoitring operation is vertically placed on into drilling tool puts area 7, mud is injected into mud pit 8, is driven The dynamic traveling of creeper undercarriage 1 extremely prospecting destination;
Step 2: prospecting is docked with drilling machine 4, drilling rod by operating personnel on mobile platform 2, by boring tower 5 with drilling rod By being stretched out by hole on mobile platform 2, contacted with prospecting ground, the water pump with seasonal drilling machine 4 is connected with mud pit 8 It is logical, implement drilling operation;
After step 3, probing and the sampling end of job, operating personnel is dismantled drilling tool by torsion bar arrangement 6, and will be unloaded Drilling rod be placed on drilling tool vertically and put area 7, prospecting operation is completed.
Apply specific case in the utility model to be set forth principle of the present utility model and embodiment, the above The explanation of embodiment is only intended to help and understands method and its core concept of the present utility model;Meanwhile for the one of this area As technical staff, according to thought of the present utility model, there will be changes in specific embodiments and applications.To sum up Described, this specification content should not be construed as to limitation of the present utility model.

Claims (8)

  1. A kind of 1. vertical engineering investigation car, it is characterised in that:Including creeper undercarriage, mobile platform, actuating unit, drilling machine And boring tower, the mobile platform are connected with the creeper undercarriage, the creeper undercarriage passes with the actuating unit Dynamic to be connected, the actuating unit, the drilling machine and the boring tower are set in turn on the mobile platform, on the drilling machine The torsion bar arrangement that drilling rod can be made to rotate is also set up, there is the drilling tool pendulum that can accommodate drilling tool vertical display on the mobile platform Area is put, the drilling tool puts area and the drilling machine is respectively arranged at the both sides of the boring tower, has energy on the mobile platform Enough accommodate drilling rod pass through by hole, the bottom of the unit head that the drilling machine is arranged at by hole, the mobile platform On also set up the mud pit that can store mud.
  2. 2. vertical engineering investigation car according to claim 1, it is characterised in that:Also include operating platform and auxiliary stairs, it is described Operating platform is arranged at the mobile platform top, and the operating platform be arranged in parallel with the mobile platform, and the operation is flat Platform is arranged at the top that the drilling tool puts area, and the breach that drilling tool passes through can be accommodated by having on the operating platform, it is described just Ladder connects the mobile platform and the operating platform.
  3. 3. vertical engineering investigation car according to claim 1, it is characterised in that:The mud pit is arranged at the movement and put down The bottom of platform, the mud pit are V-shaped mud pit, and the height of the height creeper undercarriage of the mud pit is short.
  4. 4. vertical engineering investigation car according to claim 1, it is characterised in that:The boring tower also sets up support bar, described Support bar connects the boring tower and the mobile platform, one end of the support bar are hinged with the boring tower, the support bar The other end is detachably connected with the mobile platform.
  5. 5. vertical engineering investigation car according to claim 1, it is characterised in that:Also include supporting leg, the supporting leg is to stretch Contracting supporting leg, the mobile platform are rectangular platform, and four supporting legs are arranged at the bottom of the corner of the mobile platform.
  6. 6. vertical engineering investigation car according to claim 1, it is characterised in that:The torsion bar arrangement includes two mobile circles Post deck and at least two fixed cylinder decks, the fixed cylinder deck and the mobile cylinder deck are around the drilling machine Circumferentially shape is set the axis of unit head, and the mobile cylinder deck can come along two lines for moving cylinder deck Return is dynamic.
  7. 7. vertical engineering investigation car according to claim 6, it is characterised in that:The torsion bar arrangement also include movable plate, Mobile base and drive cylinder, two mobile cylinder decks are arranged on the movable plate, are had on the Mobile base and are slided Groove, the movable plate are slidably disposed in the sliding groove, and the drive cylinder is connected with the movable plate.
  8. 8. vertical engineering investigation car according to claim 7, it is characterised in that:The mobile cylinder deck and the fixation Cylinder deck is cylindric, and the cross section of the sliding groove is convex shape, the width mobile cylinder of the sliding panel The basal diameter of deck is big.
CN201721191609.7U 2017-09-15 2017-09-15 A kind of vertical engineering investigation car Withdrawn - After Issue CN207177731U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721191609.7U CN207177731U (en) 2017-09-15 2017-09-15 A kind of vertical engineering investigation car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721191609.7U CN207177731U (en) 2017-09-15 2017-09-15 A kind of vertical engineering investigation car

Publications (1)

Publication Number Publication Date
CN207177731U true CN207177731U (en) 2018-04-03

Family

ID=61746612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721191609.7U Withdrawn - After Issue CN207177731U (en) 2017-09-15 2017-09-15 A kind of vertical engineering investigation car

Country Status (1)

Country Link
CN (1) CN207177731U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107701104A (en) * 2017-09-15 2018-02-16 广东永基建筑基础有限公司 A kind of vertical engineering investigation car and operational method
CN111720066A (en) * 2019-03-20 2020-09-29 周兆弟 Pile machine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107701104A (en) * 2017-09-15 2018-02-16 广东永基建筑基础有限公司 A kind of vertical engineering investigation car and operational method
CN107701104B (en) * 2017-09-15 2023-10-20 广东永基建筑基础股份有限公司 Vertical engineering investigation vehicle and operation method
CN111720066A (en) * 2019-03-20 2020-09-29 周兆弟 Pile machine
CN111720066B (en) * 2019-03-20 2023-11-03 周兆弟 Pile machine

Similar Documents

Publication Publication Date Title
Standing et al. Unexpected tunnelling volume losses in the Westminster area, London
CN103758453B (en) Intelligent microdrill
CN103993879B (en) Boom-type roadheader is airborne with pick anchor drilling integrated rig
Guan et al. Theory and technology of drilling engineering
CN108130904A (en) A kind of construction method of the composite bushing drill-pouring pilework of neighbouring existing subway
CN107701104A (en) A kind of vertical engineering investigation car and operational method
Foster et al. Structure and fabric
CN103643669B (en) For the Apparatus and method for of survey soft soil area on-site sampling
CN207177731U (en) A kind of vertical engineering investigation car
CN203066913U (en) Hole drilling construction equipment of reverse circulation drill
CN203584301U (en) Hole guide equipment
CN203891877U (en) Cantilever excavator-mounted digging, anchoring and drilling integrated drilling machine
CN209025600U (en) A kind of crawler-type engineering drilling machine
Geist et al. A method for installing piezometers in large cobble bed rivers
CN206256893U (en) Short space internal drilling pile-forming apparatus
CN107964940A (en) A kind of construction method of continuous wall trench underground
CN204782997U (en) Impacted style soil layer sample rig
CN203701954U (en) Down-the-hole drill
Bayer HDD practice handbook
CN102003141B (en) Monitoring walking drilling equipment
CN103614999B (en) A kind of method of clump of piles deep hole construction under complex geological condition
CN210264510U (en) Novel vehicle-mounted rotary drilling rig for railway track with power
CN210858601U (en) Multi-angle full-hydraulic portable drilling machine for railway engineering investigation
CN202990854U (en) Oil hydraulic system for crawler-type full-hydraulic underground drill rig
CN113107368A (en) Full-casing geological exploration construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 528000 Honggang Community Resident Committee, Daliang Street Office, Shunde District, Foshan City, Guangdong Province

Patentee after: GUANGDONG YONGJI CONSTRUCTION FOUNDATION CO.,LTD.

Address before: 528000 Honggang Community Resident Committee, Daliang Street Office, Shunde District, Foshan City, Guangdong Province

Patentee before: GUANGDONG YONGJI BUILDING FOUNDATION Co.,Ltd.

CP01 Change in the name or title of a patent holder
AV01 Patent right actively abandoned

Granted publication date: 20180403

Effective date of abandoning: 20231020

AV01 Patent right actively abandoned

Granted publication date: 20180403

Effective date of abandoning: 20231020

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned