CN207177281U - A kind of fibre cement formwork system - Google Patents

A kind of fibre cement formwork system Download PDF

Info

Publication number
CN207177281U
CN207177281U CN201720720139.2U CN201720720139U CN207177281U CN 207177281 U CN207177281 U CN 207177281U CN 201720720139 U CN201720720139 U CN 201720720139U CN 207177281 U CN207177281 U CN 207177281U
Authority
CN
China
Prior art keywords
fibre cement
cement formwork
support bar
fixed
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720720139.2U
Other languages
Chinese (zh)
Inventor
左小鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720720139.2U priority Critical patent/CN207177281U/en
Application granted granted Critical
Publication of CN207177281U publication Critical patent/CN207177281U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of fibre cement formwork system,Including fibre cement formwork,Fibre cement formwork is screwed on horizontal support bar,Horizontal support bar is fixed on vertical support bar,Vertical support bar bottom is fixed on built-in fitting,Built-in fitting is embedded on reinforced concrete floor,The knighthead top of adjustable in length is fixed on vertical support bar,The knighthead bottom of adjustable in length is fixed on built-in fitting,There are Y type alkali-resistant glass fibre fag ends the side of fibre cement formwork towards shear force wall reinforcing steel bar,The side of fibre cement formwork towards shear force wall reinforcing steel bar is embedded with cordage handle,During formwork,The adjustable support system of fibre cement formwork behind can ensure the flatness and perpendicularity of formwork metope,After having poured shear wall concrete,After intensity to be achieved,Shear wall concrete turns into an entirety with fibre cement formwork,The support system rod member of behind need to only be removed,Metope need not paint,Eliminate hollowing and the common quality defect of cracking one kind.

Description

A kind of fibre cement formwork system
Technical field
Building template support system field is the utility model is related to, specially a kind of fibre cement formwork system.
Background technology
Building template typically uses wooden splint at present, and turnover is scrapped afterwards several times, is a kind of waste to material;Interior wall mould During plate form removal, large area template transports difficulty by door-window opening;Traditional wall plaster uses thermal insulation mortar or light water Cement mortar, it is also easy to produce the common quality defects such as hollowing cracking.
The content of the invention
The purpose of this utility model is to provide a kind of fibre cement formwork system, after shear wall concreting, fiber Cement formwork is integrally formed with walls concrete, instead of traditional wall plaster layer, during form removal, as long as the turn of the screw and bolt, The support system at the fibre cement formwork back side is removed, support system is made up of rod member, rod member and easily by door and window hole Mouth transport.
To achieve the above object, the utility model provides following technical scheme:A kind of fibre cement formwork system, including fibre Cement formwork is tieed up, fibre cement formwork is screwed on horizontal support bar, and horizontal support bar is fixed on vertical support bar, Vertical support bar bottom is fixed on built-in fitting, and built-in fitting is embedded on reinforced concrete floor, on the knighthead of adjustable in length Portion is fixed on vertical support bar, and the knighthead bottom of adjustable in length is fixed on built-in fitting, fibre cement formwork towards There are Y type alkali-resistant glass fibre fag ends the side of shear force wall reinforcing steel bar, and the side of fibre cement formwork towards shear force wall reinforcing steel bar is embedded with Cordage handle.
Preferably, the fibre cement formwork can be according to the design requirement of wall plastering layer, using thermal insulation mortar Or the cement mortar incorporation reinforcing material such as fiber, prefabricated in advance and conserve, high-strength light, processing characteristics is good, can saw that can follow closely can Drilling, is not likely to produce warpage and crackle, and back side flatness is high, is not required to paint again, can will be size normalised according to building module, The fibre cement formwork of modular size need to be only screwed when formwork is installed on support system, corner location size is not Enough can saw fibre cement formwork is short.
Preferably, there are Y type alkali-resistant glass fibre fag ends the side of fibre cement formwork towards the shear wall, pours shearing After wall concrete, in Y type alkali-resistant glass fibres fag end embedment shear wall concrete, shear wall concrete and dimension cement mould are enhanced The attachment force of shell, it is not likely to produce metope hollowing.
Preferably, the fibre cement formwork is screwed on horizontal support bar, during form removal, as long as screw is torn open Remove, formwork is that disengaging contacts with support system.
Preferably, vertical support bar, the knighthead of adjustable in length and the reinforced concrete floor form one it is stable Triangular support system, is fixed on reinforced concrete floor by built-in fitting, will not be sent out when pouring shear wall concrete because of vibration Raw displacement, can adjust the perpendicularity of vertical support bar by adjusting the length of knighthead.
Compared with prior art, the beneficial effects of the utility model are as follows:
1st, fibre cement formwork architecture is simple used by the utility model, easy to operate, can save plank sheathing Deng material, it is possible to reduce form removal workload.
2nd, fibre cement formwork system used by the utility model, after pouring shear wall concrete, fibre cement formwork Turn into an entirety with shear wall concrete, metope is not likely to produce hollowing and the common quality defect of cracking one kind.
3rd, the utility model the flatness at the control cement formwork back side, passes through stabilization by prefibers cement formwork Formwork support system, the perpendicularity and flatness of metope are controlled, metope does not have to paint after completion, can save the construction period.
Brief description of the drawings
Fig. 1 is the utility model side elevation schematic diagram;
Fig. 2 is the positive elevational schematic view of the utility model;
Fig. 3 is fibre cement formwork detail drawing;
In figure:It is 1 fibre cement formwork, 2 horizontal support bars, 3 vertical support bars, the knighthead of 4 adjustable in length, 5 pre- Embedded part, 6 shear force wall reinforcing steel bars, 7 reinforced concrete floors, 11Y type alkali-resistant glass fibres fag end, 12 cordage handles, 21 screws.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Refer to Fig. 1-3, a kind of fibre cement formwork system, including fibre cement formwork, fibre cement formwork screw It is fixed on horizontal support bar, horizontal support bar is fixed on vertical support bar, and vertical support bar bottom is fixed on built-in fitting, Built-in fitting is embedded on reinforced concrete floor, the knighthead top of adjustable in length is fixed on vertical support bar, adjustable length The knighthead bottom of section is fixed on built-in fitting, and there are Y type alkali-proof glasses the side of fibre cement formwork towards shear force wall reinforcing steel bar Fiber fag end, the side of fibre cement formwork towards shear force wall reinforcing steel bar are embedded with cordage handle, during formwork, fibre cement formwork The adjustable support system of behind can ensure the flatness and perpendicularity of formwork metope, after having poured shear wall concrete, treat After reaching intensity, shear wall concrete turns into an entirety with fibre cement formwork, need to only remove the support system rod member of behind.
In summary:The fibre cement formwork system, traditional plank sheathing is substituted by using prefibers cement formwork, After pouring shear wall concrete, fibre cement formwork turns into an entirety without removing with shear wall concrete, as long as tearing open It is easily operated except the support system rod member of behind.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of fibre cement formwork system, including fibre cement formwork(1), fibre cement formwork(1)Use screw(21)It is fixed In horizontal support bar(2)On, horizontal support bar(2)It is fixed on vertical support bar(3)On, vertical support bar(3)Bottom is fixed on On built-in fitting (5), built-in fitting (5) is embedded on reinforced concrete floor (7), the knighthead of adjustable in length(4)Top is fixed on Vertical support bar(3)On, the knighthead of adjustable in length(4)Bottom is fixed on built-in fitting(5)On, fibre cement formwork(1) Towards shear force wall reinforcing steel bar(6)Side have Y type alkali-resistant glass fibre fag ends(11), fibre cement formwork(1)Towards shear wall steel Muscle(6)Side be embedded with cordage handle(12).
A kind of 2. fibre cement formwork system according to claim 1, it is characterised in that:The fibre cement formwork(1) It is prefabricated in advance and conserve.
A kind of 3. fibre cement formwork system according to claim 1, it is characterised in that:The fibre cement formwork(1) Towards shear force wall reinforcing steel bar(6)Side have Y type alkali-resistant glass fibre fag ends(11), after pouring shear wall concrete, the alkaline-resisting glass of Y types Glass fiber fag end(11)In Transducers Embedded in Concrete.
A kind of 4. fibre cement formwork system according to claim 1, it is characterised in that:The fibre cement formwork(1) Use screw(21)It is fixed on horizontal support bar(2)On.
A kind of 5. fibre cement formwork system according to claim 1, it is characterised in that:The vertical support bar(3), it is long Spend adjustable knighthead(4)A stable triangular support system is formed with reinforced concrete floor (7), passes through built-in fitting (5) it is fixed on reinforced concrete floor (7).
A kind of 6. fibre cement formwork system according to claim 1, it is characterised in that:The vertical support bar(3), it is long Spend adjustable knighthead(4)A vertical support bar is formed with reinforced concrete floor (7)(3)Perpendicular to the stabilization of horizontal plane Triangular support system.
CN201720720139.2U 2017-06-20 2017-06-20 A kind of fibre cement formwork system Active CN207177281U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720720139.2U CN207177281U (en) 2017-06-20 2017-06-20 A kind of fibre cement formwork system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720720139.2U CN207177281U (en) 2017-06-20 2017-06-20 A kind of fibre cement formwork system

Publications (1)

Publication Number Publication Date
CN207177281U true CN207177281U (en) 2018-04-03

Family

ID=61735202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720720139.2U Active CN207177281U (en) 2017-06-20 2017-06-20 A kind of fibre cement formwork system

Country Status (1)

Country Link
CN (1) CN207177281U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116927382A (en) * 2023-09-05 2023-10-24 海南威特建设科技有限公司 Membrane shell shear wall structure and preparation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116927382A (en) * 2023-09-05 2023-10-24 海南威特建设科技有限公司 Membrane shell shear wall structure and preparation method thereof

Similar Documents

Publication Publication Date Title
CN101858119A (en) Reinforced concrete hollow floor slab and construction method
CN102433958A (en) Prefabricated wall board construction member
CN104563282B (en) Integral constructing method of house body structure and wall structure and house
CN101487293A (en) Concreting method with different intensity grades for beam column nodes
CN108301618A (en) A kind of steel and wood composite construction column template and its construction method
CN108071230A (en) A kind of construction method of door-window opening
CN102094525A (en) Method for constructing reinforced concrete lintel
CN204098486U (en) The concrete of building basement roof ater-casting hangs mould
CN207177281U (en) A kind of fibre cement formwork system
CN114704080A (en) Aluminum template and PC (polycarbonate) component combined mold hanging system and construction method
CN201495664U (en) Novel hollow floor slab with precast prestress
CN206319620U (en) A kind of floor concrete casting controls scale
CN112112419A (en) Construction method of cast-in-situ overhanging floating window plate
CN107143146A (en) Secondary structure exempts from template and exempts from plastering construction device
CN106760487B (en) A kind of cast-in-place concrete exterior wall crack resistence Slate hanging construction method
CN205875714U (en) A consolidate fixture for retainer plate beam mold board
CN206205455U (en) A kind of construction centre mounted type pours leveling unit
CN206503365U (en) A kind of shear wall and filling wall junction aluminum alloy pattern plate erecting device
CN203373872U (en) Cast-in-place concrete self-warm-keeping wall with dismounting-free outer formworks
CN210767837U (en) Cross constructional column cement template group
CN211172565U (en) A ram for argil brick facade
CN210152282U (en) Device for controlling thickness of cast-in-situ reinforced concrete floor
CN207934255U (en) A kind of prefabricated composite wallboard for exempting from formwork
CN206971474U (en) A kind of integral corner structure of assembled wall
CN206554239U (en) A kind of gate stack for the prefabricated installation of shear wall side door-window opening

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant