CN207176637U - A kind of blocking dam for mud-rock flow - Google Patents

A kind of blocking dam for mud-rock flow Download PDF

Info

Publication number
CN207176637U
CN207176637U CN201721064103.XU CN201721064103U CN207176637U CN 207176637 U CN207176637 U CN 207176637U CN 201721064103 U CN201721064103 U CN 201721064103U CN 207176637 U CN207176637 U CN 207176637U
Authority
CN
China
Prior art keywords
dam
mud
rock flow
blocking
height
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721064103.XU
Other languages
Chinese (zh)
Inventor
徐心远
焦鹏飞
姬晓飞
陈涵思
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
THREE TEAMS COALFIELD GEOLOGY BUREAU OF HENAN PROVINCE
Original Assignee
THREE TEAMS COALFIELD GEOLOGY BUREAU OF HENAN PROVINCE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by THREE TEAMS COALFIELD GEOLOGY BUREAU OF HENAN PROVINCE filed Critical THREE TEAMS COALFIELD GEOLOGY BUREAU OF HENAN PROVINCE
Priority to CN201721064103.XU priority Critical patent/CN207176637U/en
Application granted granted Critical
Publication of CN207176637U publication Critical patent/CN207176637U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model belongs to mountain torrents debris flow technical field,More particularly to a kind of blocking dam for mud-rock flow,Including dam body and dam foundation plinth,Shi Zhen is provided with front of described dam body,Post of blocking is provided between Shi Zhen and dam body,The bottom of dam body is provided with culvert,Overflow segment is provided with the top of dam body,The centre of overflow segment is provided with spacer,First that dog arrangement is additionally provided with overflow segment stops body,The height of spacer and height of the height more than the first obstruction body for reinforcing section,The both sides of overflow segment are provided with reinforcing section,The rear of dam body is provided with guiding gutter,Second that dog arrangement is provided with guiding gutter stops body,Guiding gutter connection second stops one end of body,The both sides of guiding gutter are provided with splitter box,Tap hole is provided between splitter box and guiding gutter,The utility model can deal with the mud-rock flow of different scales,Slow down mud-rock flow to destroy by rush of water to dam body,Reduce the impulsive force and flow velocity of mud-rock flow,So as to protect the life of people and property.

Description

A kind of blocking dam for mud-rock flow
Technical field
The utility model belongs to mountain torrents debris flow technical field, and in particular to a kind of blocking dam for mud-rock flow.
Background technology
The landform quacification complexity mud-rock flow in our mountain areas is the main address for threatening the mountain area people normally to produce, live One of disaster.Influenceed by factors such as earthquake, extreme weather conditions, the frequency more and more higher of mountain area debris flow, it is frequently living The dynamic substantial amounts of solid matter of mud-rock flow downstream transport, property and safety to people cause great infringement.
At present, the Main Means for preventing and treating mud-rock flow are to establish mud-rock flow blocking dam, and the method for intercepting mud-rock flow mainly has two Kind, one kind is to stop mud-rock flow completely using debris dam storehouse, and a kind of is the impulsive force for being buffered using splitter box mud-rock flow, so And due to sudden and mud-rock flow grade the certainty that mud-rock flow occurs, single debris flow means are difficult to meet not Debris flow with degree is administered, and mud-rock flow is mingled with substantial amounts of stone and trees in motion process, it is easy to conventional The dredging pipeline of mud-rock flow blocking dam block, cause the heap of mud-rock flow, make mudstone when dam body is destroyed by rush of water by mud-rock flow The energy moment increase of stream, increase the destruction ability of mud-rock flow, so that mud-rock flow blocking dam turns into the accomplice of mud-stone flow disaster, Therefore, existing mud-rock flow blocking dam can not meet the needs that debris flow is administered.
Utility model content
The purpose of this utility model is overcome the deficiencies in the prior art, and a kind of of offer is used for blocking for mud-rock flow Dam.
What the utility model was realized in:A kind of blocking dam for mud-rock flow, including dam body and dam foundation plinth, it is special Sign is:Shi Zhen is provided with front of described dam body, post of blocking is provided between Shi Zhen and dam body, the bottom of dam body is provided with Culvert, overflow segment is provided with the top of dam body, the centre of overflow segment is provided with spacer, and dog arrangement is additionally provided with overflow segment First stop body, the both sides of overflow segment are provided with reinforcing section, and the rear of dam body is provided with guiding gutter, dog is provided with guiding gutter The second of dentition formula arrangement stops body, and guiding gutter connection second stops one end of body, and the both sides of guiding gutter are provided with splitter box, shunt Tap hole is provided between groove and guiding gutter.
Described post of blocking is blocked post for circle, and described stone battle array is marble stone battle array.
Described stone battle array and post of blocking is cast on the basis of dam by cement.
The distance between described stone battle array and dam body are 100 meters ~ 150 meters, described block the distance between post and dam body It it is ~ 100 meters for 60 meters.
The height of described spacer and height of the height more than the first obstruction body for reinforcing section.
The height of described stone battle array and the first height for stopping body are more than the height of culvert.
Described second stops height of the height more than tap hole of body.
Described tap hole is higher than culvert and is less than overflow segment.
Compared with prior art, the beneficial effects of the utility model are:Mud-rock flow can be slowed down to dam body by stone battle array Impact velocity, the extent of damage of dam body, Shi Zhen and the stone and trees that post can stop that volume is larger in mud-rock flow of blocking are reduced, Mud-rock flow is just blocked in the front of dam body, while reduce the risk that culvert is blocked on dam body, increase dam body is to small-sized mud The interdiction capability and dredging ability, overflow segment of rock glacier can make macrosolifluction have enough spaces to circulate, and reduce mud-rock flow Infringement to dam body, the first obstruction body in overflow segment can reduce the flow velocity of mud-rock flow, while reduce mud-rock flow from dam body stream Can be disperseed by the flow direction of mud-rock flow, drop the impulsive force of mud-rock flow, the utility model for second impact for stopping body, splitter box when lower It is vdiverse in function, different brackets and the mud-rock flow of scale can be dealt with, use range is wide, prevents the significant effect of mud-rock flow.
Brief description of the drawings
Fig. 1 is a kind of structural representation of blocking dam for mud-rock flow
In figure:1- dam foundation plinth, 2- stone battle arrays, 3- block post, 4- spacers, and 5- first stops body, 6- guiding gutters, 7- tap holes, 8- splitter boxs, 9- second stop body, and 10- reinforces section, 11- culverts, 12- overflow segments.
Embodiment
Embodiment 1, as shown in Fig. 1 structures, a kind of blocking dam for mud-rock flow, including dam body and dam foundation plinth 1, dam body Front is provided with Shi Zhen 2, and Shi Zhen 2 is marble stone battle array 2, and post 3 of blocking is provided between Shi Zhen 2 and dam body, and post 3 of blocking is circle Block post 3, Shi Zhen 2 and post 3 of blocking are cast on dam foundation plinth 1 by cement, the distance between Shi Zhen 2 and dam body for 100 meters ~ 150 meters, it is ~ 100 meters that block the distance between post 3 and dam body, which are 60 meters, and the height of Shi Zhen 2 height and the first obstruction body 5 is big In the height of culvert 11, Shi Zhen 2 and post 3 of blocking can reduce impact dynamics of the mud-rock flow to dam body, while can be mud-rock flow In the volume that is mingled with stopped compared with ratchel and trees, reduce the blocked risk of dam body culvert 11, strengthen the excretion of dam body Ability, the stone retained by stone battle array 2 and post 3 of blocking can be formed with trees together with stop barrier, follow-up mud-rock flow is carried out Stop, the bottom of dam body is provided with culvert 11, and culvert 11 can meet the dredging of small-scale mud-rock flow, slow down the flow velocity of mud-rock flow And impulsive force, overflow segment 12 is provided with the top of dam body, and overflow segment 12 has broad dredging volume, is easy to large-scale mud-rock flow Roamed from the top of dam body, avoid mud-rock flow from heaping and cause saving bit by bit for energy to cause damage dam body, the centre of overflow segment 12 is set Spacer 4 is equipped with, the first of dog arrangement is additionally provided with overflow segment 12 and stops body 5, the first obstruction body 5 can increase mud-rock flow The stroke of sinuous movement, slow down the speed of mud-rock flow, reduce the impact that mud-rock flow stops dam body downstream second body 9, spacer 4 The height of height and reinforcing section 10 is more than the first height for stopping body 5, can so ensure that mud-rock flow will not be from the both sides of dam body Sprawling, damage of the mud-rock flow to dam body is reduced, the both sides of overflow segment 12, which are provided with, reinforces section 10, and the rear of dam body is provided with water conservancy diversion Groove 6, guiding gutter 6 can make mud-rock flow flow direction to people's life and property without the place threatened, while avoid the climing of mud-rock flow Prolonging, the second of dog arrangement is provided with guiding gutter 6 and stops body 9, the second obstruction body 9 can reduce the flow velocity of mud-rock flow, from And mud-rock flow destroying by rush of water to guiding gutter 6 is reduced, the second height for stopping body 9 is more than the height of tap hole 7, the connection of guiding gutter 6 the Two stop one end of body 9, and the both sides of guiding gutter 6 are provided with splitter box 8, tap hole 7 is provided between splitter box 8 and guiding gutter 6, Tap hole 7 is higher than culvert 11 and is less than overflow segment 12, debris flow scale hour, and the second obstruction body 9 can meet subtracting for mud-rock flow Speed and refluence, when debris flow scale is big, a part of mud-rock flow is flowed away from tap hole 7 through splitter box 8, and the energy of mud-rock flow is divided Dissipate, reduce the damage capability of mud-rock flow.
During utility model works, the larger stone of trees and volume in mud-rock flow is retained by stone battle array 2 and post 3 of blocking, Debris flow velocity reduces, and subsequent mud-rock flow flows to guiding gutter 6 from the culvert 11 and overflow segment 12 of dam body, and mud-rock flow is in guiding gutter 6 During interior traveling, a part of mudstone flows through tap hole 7 and flowed away out of splitter box 8.
Preferred embodiment of the present utility model is the foregoing is only, not to limit the utility model, for this area Technical staff for, the utility model can have various modifications and variations, all within the spirit and principles of the utility model, Any modification, equivalent substitution and improvements made etc., should be included within the scope of protection of the utility model.

Claims (8)

1. a kind of blocking dam for mud-rock flow, including dam body and dam foundation plinth, it is characterised in that:The front of described dam body is set There is Shi Zhen, post of blocking is provided between Shi Zhen and dam body, the bottom of dam body is provided with culvert, overflow is provided with the top of dam body Section, the centre of overflow segment are provided with spacer, and first that dog arrangement is additionally provided with overflow segment stops body, the both sides of overflow segment Reinforcing section is provided with, the rear of dam body is provided with guiding gutter, and second that dog arrangement is provided with guiding gutter stops body, water conservancy diversion Groove connection second stops one end of body, and the both sides of guiding gutter are provided with splitter box, shunting is provided between splitter box and guiding gutter Hole.
A kind of 2. blocking dam for mud-rock flow according to claim 1, it is characterised in that:Described post of blocking is circle Block post, described stone battle array is marble stone battle array.
A kind of 3. blocking dam for mud-rock flow according to claim 1, it is characterised in that:Described stone battle array and post of blocking It is cast in by cement on the basis of dam.
A kind of 4. blocking dam for mud-rock flow according to claim 1, it is characterised in that:Described stone battle array and dam body it Between distance be 100 meters ~ 150 meters, it is ~ 100 meters that described block the distance between post and dam body, which are 60 meters,.
A kind of 5. blocking dam for mud-rock flow according to claim 1, it is characterised in that:The height of described spacer and The height for reinforcing section is more than the first height for stopping body.
A kind of 6. blocking dam for mud-rock flow according to claim 1, it is characterised in that:The height of described stone battle array and First height for stopping body is more than the height of culvert.
A kind of 7. blocking dam for mud-rock flow according to claim 1, it is characterised in that:Described second stops body Highly it is more than the height of tap hole.
A kind of 8. blocking dam for mud-rock flow according to claim 1, it is characterised in that:Described tap hole is higher than culvert Hole is simultaneously less than overflow segment.
CN201721064103.XU 2017-08-24 2017-08-24 A kind of blocking dam for mud-rock flow Expired - Fee Related CN207176637U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721064103.XU CN207176637U (en) 2017-08-24 2017-08-24 A kind of blocking dam for mud-rock flow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721064103.XU CN207176637U (en) 2017-08-24 2017-08-24 A kind of blocking dam for mud-rock flow

Publications (1)

Publication Number Publication Date
CN207176637U true CN207176637U (en) 2018-04-03

Family

ID=61737858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721064103.XU Expired - Fee Related CN207176637U (en) 2017-08-24 2017-08-24 A kind of blocking dam for mud-rock flow

Country Status (1)

Country Link
CN (1) CN207176637U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113029A (en) * 2018-09-14 2019-01-01 四川省交通运输厅交通勘察设计研究院 Terrace with edge stake and shuttle table type stake woods dam
CN109717086A (en) * 2019-03-12 2019-05-07 卜欢 A kind of herding canopy of anti-mud-rock flow
CN110541388A (en) * 2019-08-29 2019-12-06 新疆维吾尔自治区交通规划勘察设计研究院 Large debris flow comprehensive prevention and control method based on multi-stage flow distribution drainage
CN110965526A (en) * 2019-12-23 2020-04-07 太原理工大学 Be adapted to assembled retaining structure that small-size mud-rock flow ditch was administered
CN111254882A (en) * 2020-03-09 2020-06-09 华北水利水电大学 Hedging energy dissipation type debris flow diversion system
CN111270652A (en) * 2020-03-09 2020-06-12 华北水利水电大学 Compound mud-rock flow system of blocking
CN111335260A (en) * 2020-05-06 2020-06-26 段刚强 Movable type flow dividing and blocking system for debris flow prevention and control
CN112813921A (en) * 2021-01-06 2021-05-18 西南科技大学 Mud-rock flow water-stone separation and storage system
CN112813922A (en) * 2021-01-06 2021-05-18 西南科技大学 Active-passive debris flow water-stone separation-energy dissipation disaster reduction device

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113029A (en) * 2018-09-14 2019-01-01 四川省交通运输厅交通勘察设计研究院 Terrace with edge stake and shuttle table type stake woods dam
CN109717086A (en) * 2019-03-12 2019-05-07 卜欢 A kind of herding canopy of anti-mud-rock flow
CN109717086B (en) * 2019-03-12 2021-05-07 卜欢 Prevent poultry canopy of mud-rock flow
CN110541388A (en) * 2019-08-29 2019-12-06 新疆维吾尔自治区交通规划勘察设计研究院 Large debris flow comprehensive prevention and control method based on multi-stage flow distribution drainage
CN110965526B (en) * 2019-12-23 2021-06-15 太原理工大学 Be adapted to assembled retaining structure that small-size mud-rock flow ditch was administered
CN110965526A (en) * 2019-12-23 2020-04-07 太原理工大学 Be adapted to assembled retaining structure that small-size mud-rock flow ditch was administered
CN111254882A (en) * 2020-03-09 2020-06-09 华北水利水电大学 Hedging energy dissipation type debris flow diversion system
CN111270652A (en) * 2020-03-09 2020-06-12 华北水利水电大学 Compound mud-rock flow system of blocking
CN111254882B (en) * 2020-03-09 2021-07-30 华北水利水电大学 Hedging energy dissipation type debris flow diversion system
CN111335260A (en) * 2020-05-06 2020-06-26 段刚强 Movable type flow dividing and blocking system for debris flow prevention and control
CN111335260B (en) * 2020-05-06 2023-12-29 盐城荣泰石油机械有限公司 Movable diversion blocking system for debris flow prevention and treatment
CN112813922A (en) * 2021-01-06 2021-05-18 西南科技大学 Active-passive debris flow water-stone separation-energy dissipation disaster reduction device
CN112813921A (en) * 2021-01-06 2021-05-18 西南科技大学 Mud-rock flow water-stone separation and storage system
CN112813922B (en) * 2021-01-06 2022-05-17 西南科技大学 Active-passive debris flow water-stone separation-energy dissipation disaster reduction device

Similar Documents

Publication Publication Date Title
CN207176637U (en) A kind of blocking dam for mud-rock flow
CN204370384U (en) A kind of mud-rock flow classified energy-dissipation exhaust system
CN101215830A (en) Vertical shaft rotational flow flood discharging tunnel and emptying tunnel or diversion tunnel square crossing arrangement hydraulic form
CN105735208B (en) Dykes and dams super standard flood flood diversion siphon pipe band group
CN106801403A (en) A kind of method for preventing mud-stone flow disaster and mudstone apoblema to recycle
CN215168679U (en) Sand barrier for preventing sand from overflowing
CN106759066A (en) A kind of method of mountain area side slope water conservancy diversion energy dissipating prevention and control geological disaster
CN204590069U (en) A kind of retaining wall for hydraulic engineering
CN107386136A (en) Utilize the method for portable plate sand stop wall protection dust storm
CN105625446B (en) A kind of construction method of tunnel undercrossing tunnel
CN206706699U (en) Ramp type sand surfing structure
CN108547258A (en) A kind of ecological protection slope of the hydraulic engineering based on multi-protective device
CN206971357U (en) A kind of anti-ponding well lid of municipal administration
CN102002927B (en) Compound mud-rock flow discharge and guide trough
CN105040795A (en) Drop well having scouring alleviation function
CN203129121U (en) Windproof sand resistance sand barrier
CN209011260U (en) A kind of sinking garden rain sewerage system with underground garage
CN205100180U (en) Groove section bend structure is let out to spillway
CN207193911U (en) A kind of stage beam pattern debris flow drainage groove
CN207109997U (en) Tunneled central gutter nondestructive inspection (NDI) construction
CN206346219U (en) A kind of retaining wall for hydraulic engineering
CN205046656U (en) Slow down and erode drop well
CN107326864A (en) A kind of protector of hydraulic engineering bank protection
CN103614986A (en) Free surface flow water inflow method suitable for draining off floodwaters of tailing pond
KR20150031002A (en) Debris barrier with fish habitat

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180403

Termination date: 20210824

CF01 Termination of patent right due to non-payment of annual fee