CN207174556U - Collapsible building waste collection device - Google Patents

Collapsible building waste collection device Download PDF

Info

Publication number
CN207174556U
CN207174556U CN201720959162.7U CN201720959162U CN207174556U CN 207174556 U CN207174556 U CN 207174556U CN 201720959162 U CN201720959162 U CN 201720959162U CN 207174556 U CN207174556 U CN 207174556U
Authority
CN
China
Prior art keywords
bar
building waste
collection device
support
waste collection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720959162.7U
Other languages
Chinese (zh)
Inventor
连珍
王利雄
陈莹
刘淳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Building Decoration Engineering Group Co Ltd
Original Assignee
Shanghai Building Decoration Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Building Decoration Engineering Group Co Ltd filed Critical Shanghai Building Decoration Engineering Group Co Ltd
Priority to CN201720959162.7U priority Critical patent/CN207174556U/en
Application granted granted Critical
Publication of CN207174556U publication Critical patent/CN207174556U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuse Receptacles (AREA)

Abstract

A kind of collapsible building waste collection device is the utility model is related to, belongs to building waste collection technique field.The collection device includes collecting cart, the collecting cart includes being provided with handrail, support frame, the collecting cart of roller and garbage reclamation bag, support frame as described above includes the first support component and the second support component, fold mechanism is provided between first support component and the second support component, the fold mechanism includes horizontal cross rod member, vertical crossing rod piece and locking mechanism, the first support component and the second support component can be adducted together by fold mechanism, reduce space-consuming, it is convenient for carrying, the collecting cart is suitable for collecting the building waste that metope peels off on scaffold.

Description

Collapsible building waste collection device
Technical field
A kind of collapsible building waste collection device is the utility model is related to, belongs to building waste collection technique field.
Background technology
Traditional metope punching, built-in fitting construction in, it is necessary to operation arrive concrete base layer, especially for mosaic wall surface, always Building renovation metope etc., substantial amounts of peeling building waste can be produced, building waste directly peels off on scaffold or ground floor On, the safety of workmen and neighbouring pedestrian are endangered, while normal pass is also counteracts that, influence duration and operating efficiency.Especially For in scaffold, narrow space causes the collection of building waste to become difficult and poorly efficient.At present, for the building rubbish of peeling Rubbish does not have special collection device, and often building waste is directly peeled off on scaffold or on ground floor, endangers constructor Member's safety, influences workmen and passes through, do not meet safety construction principle.
For peeling off the collection of building waste also only by the side of traditional common refuse collection during practice of construction Method, not effective solution.In this way, with the development of building field, the efficient, light of building waste is had increasing need for Collection device.
Utility model content
Directly peeled off for building waste in the prior art on scaffold or on ground floor, endanger workmen's peace Entirely, the current collection problem for waiting building waste of workmen is influenceed, the utility model discloses a kind of collapsible building waste to receive Acquisition means, including the collecting cart of handrail, support frame, roller and garbage reclamation bag is provided with, support frame as described above includes the first support Component and the second support component, fold mechanism, the folding are provided between first support component and the second support component Folded mechanism includes horizontal cross rod member, vertical crossing rod piece and locking mechanism, can be by the first support component by fold mechanism Adducted together with the second support component, reduce space-consuming, be convenient for carrying, the collecting cart is suitable for collecting on scaffold The building waste that metope peels off.
To solve above technical problem, the utility model includes following technical scheme:
A kind of collapsible building waste collection device, the collection device include collecting cart, and the collecting cart includes:
A pair of armrests;
Support frame, support frame as described above include it is a pair of parallel set and the first support component for being connected respectively with the handrail and Second support component, and the fold mechanism of connection first support component and the second support component;The fold mechanism bag Include vertical crossbar, horizontal cross bar and locking mechanism;The middle part of the horizontal cross bar and vertical crossbar passes through rivet Be hinged, the end of the horizontal cross bar and vertical crossbar passes through described the first of L-type connector and support frame as described above respectively Support component and the be hinged fixation of the second support component;The locking mechanism includes the card article one connected by rotating shaft in end and card Bar two, one end of the rotating shaft is provided with neck in the card article one, the position corresponding with the neck on the card article two Install and be equipped with card column;
Roller, including a pair of the front-wheels and a pair of rear wheels being arranged on support frame;And
Garbage reclamation bag, is fixedly installed on support frame as described above.
Further, first support component and the second support component include:
Arm supports bar, it is fixedly installed respectively with the handrail;
Front wheel supporting bar, one end are fixedly connected with the front-wheel, and the other end passes through U-shaped connector one and the arm supports Bar is be hinged to be fixed;
Rear wheel support bar, one end are fixedly connected with the trailing wheel, and the other end passes through U-shaped connector two and the arm supports Bar is be hinged to be fixed, and limitation front wheel supporting bar is additionally provided with the Rear wheel support bar close to described U-shaped one end of connector two The triangle neck rotated around the arm supports bar;
Horizontal support bar, one end are fixed by the way that U-shaped connector three and the arm supports bar are be hinged, the garbage reclamation bag It is fixed on the horizontal support bar;And
Vertical supporting bar, one end are fixed by the way that U-shaped connector four and the horizontal support bar are be hinged, and the other end passes through U-shaped Connector five and the be hinged fixation of the front wheel supporting bar.
Preferably, the horizontal support bar includes horizon bar and the expansion link being placed in horizon bar.
Preferably, spring is provided with the horizon bar, telescopic open-close button is provided with horizon bar.
Preferably, the end set of the expansion link has fixes the fixture being bonded with building wall.
Preferably, the fixture is provided with bonding structure towards the metope side, and the bonding structure includes as follows At least one:
Two-sided adhesive tape;
Nylon sticking belt;
Vacuum cup.
Preferably, it is additionally provided with becket between the fixture and the expansion link.
Preferably, being provided with the horizontal support bar makes garbage reclamation pocket facing be close to the annular clinching connect.
Preferably, between two arm supports bars and the arm supports bar and the horizontal support bar it Between be provided with enclosing, the enclosing is extended downward into the garbage reclamation bag.
Preferably, on the support frame below the garbage reclamation bag, it is provided with for supporting the garbage reclamation bag Backing plate.
The utility model is allowed to compared with prior art, have the following advantages that and accumulate due to using above technical scheme Pole effect:
(1) the collapsible building waste collection device that the application provides, can by fold mechanism by the first support component and Second support component adducts together, and reduces the space that collecting cart takes;Further, can also be solved by stirring triangle neck Except the limitation to U-shaped connector one, front wheel supporting bar can rotate around arm supports bar, and drive horizontal support bar, vertical supporting Bar rotates, so that each rod member of collecting cart folds, is easy to move collecting cart on scaffold;
(2) the collapsible building waste collection device that the application provides, horizontal support bar include horizon bar and and horizon bar The extension rod being detachably connected, when collecting cart can not be close to metope, it can be easy to peel off by changing the extension rod of appropriate length Building waste fall into garbage reclamation bag;
(3) the collapsible building waste collection device that the application provides, is additionally provided with the fixture being connected with building wall, And two-sided adhesive tape either nylon sticking belt or vacuum cup connection collection device and wall can be selected according to wall space finish material Body, ensure that the collection device in the course of the work fix by position;
(4) the collapsible building waste collection device that the application provides, can also be added between extension rod and fixture Becket, it is allowed to which fixture rotates in small range, the seamless connection of realization device and irregular wall.
Brief description of the drawings
When Fig. 1 is that the collapsible building waste collection device that the embodiment of the utility model one provides is provided with garbage reclamation bag Structural representation;
When Fig. 2 is that the collapsible building waste collection device that the embodiment of the utility model one provides is installed without garbage reclamation bag Structural representation;
Fig. 3 is the support frame explosive view that the embodiment of the utility model one provides;
Fig. 4 is the locking mechanism structural representation that the embodiment of the utility model one provides;
Fig. 5 is to connect between the arm supports bar and front wheel supporting bar, Rear wheel support bar of the offer of the embodiment of the utility model one Connect schematic diagram;
Fig. 5 a, Fig. 5 b are respectively collecting cart triangle groove position schematic diagram in deployed condition and folded state;
Fig. 6 is to connect between the front wheel supporting bar and vertical supporting bar, horizontal cross bar of the offer of the embodiment of the utility model one Connect schematic diagram;
Fig. 7 is connection diagram between the horizontal support bar and vertical supporting bar that the embodiment of the utility model one provides;
Fig. 8 is between the arm supports bar and horizontal support bar, vertical crossbar of the offer of the embodiment of the utility model one Connection diagram;
Fig. 9 is the Rear wheel support bar and horizontal cross bar, vertical crossbar, locking machine that the embodiment of the utility model one provides The connection diagram of structure;
Figure 10 is the folding schematic diagram for the collecting cart that the embodiment of the utility model one provides;
Figure 11 is the structural relation figure of horizontal support bar, becket and fixture that the embodiment of the utility model one provides;
Figure 12 is the enclosing structural representation that one embodiment of the invention provides;
Figure 13 is the stream of the construction method for the collapsible building waste collection device that another embodiment of the utility model provides Cheng Tu.
Label is as follows in figure:
Collecting cart 100;Handrail 110;Support frame 120;Roller 130;Front-wheel 131;Trailing wheel 132;Garbage reclamation bag 140;Pressure Button 141;Enclosing 142;
First support component 201, the second support component 202;Fold mechanism 203;Vertical crossbar 210;L-type connector one 211;Horizontal cross bar 220;L-type connector 2 221;Locking mechanism 230;Card article 1, neck 231a, card article 2 232, card Post 232a, rotating shaft 233;
Arm supports bar 310;Front wheel supporting bar 320;U-shaped connector 1;Rear wheel support bar 330;U-shaped connector two 331;Triangle neck 332;Horizontal support bar 340;U-shaped connector 3 341;Horizontal tube 342;Extension rod 343;Fixture 344;Gold Belong to ring 345;Vertical supporting bar 350;U-shaped connector 4 351;U-shaped connector 5 352.
Embodiment
Collapsible building waste collection device provided by the utility model is made below in conjunction with the drawings and specific embodiments into One step describes in detail.With reference to following explanation and claims, advantages and features of the present utility model will become apparent from.It should be noted It is that accompanying drawing uses using very simplified form and non-accurately ratio, only to convenience, lucidly aids in illustrating this reality With the purpose of new embodiment.
Embodiment one
With reference to shown in Fig. 1 to Fig. 3, collapsible building waste collection device provided by the utility model includes collecting cart 100, Collecting cart 100 includes:A pair of armrests 110, the support frame 120 being connected with handrail 110, the rubbish time being arranged on support frame 120 Closing bag 140 and the roller 130 for being arranged on the bottom of support frame 120.Wherein roller 130 has four, including a pair of front-wheels 131 and a pair Trailing wheel 132.
As shown in figure 3, support frame 120 includes a pair of parallel the first support component for setting and being connected respectively with handrail 110 201 and second support component 202, and fold mechanism 203.Foldable structure 203 includes vertical crossbar 210, horizontal cross bar 220 and locking mechanism 230;The middle part of horizontal cross bar 220 and vertical crossbar 210 is hinged by rivet, horizontal cross bar 220th, the end of vertical crossbar 210 passes through L-type connector 1, L-type connector 2 221 and the first of support frame 120 respectively The support component 202 of support component 201 and second is be hinged to fix.With reference to shown in Fig. 3 and Fig. 4, locking mechanism 230 is included in end and led to The card article 1 and card article 2 232 of the connection of rotating shaft 233 are crossed, one end of rotating shaft 233 is provided with neck in card article 1 231a, neck 231a correspondence positions are provided with card column 232a on card article 2 232.Folding operation is as follows:It is upward along rotating shaft 233 Pull-up locking mechanism 230, card article 1 and card article 2 232 fold, and drive horizontal cross bar 220 and vertical intersection The free end of bar 210 is drawn close, so that the first support component 201 merges with the second support component 202, reduces collecting cart 100 space-consumings, are convenient for carrying.Similarly, deploying operation is:Locking mechanism 230, card column 232a cards are pressed down on along rotating shaft 233 Enter neck 231a, card article 1 and card article 2 232 is formed 180 degree angle, and drive horizontal cross bar 220 and vertical crossbar 210 free end is opened, so that the first support component 201 and the expansion of the second support component 202 are in working condition, places rubbish Rubbish collection bag 140, you can use.Preferably, support frame 120 uses tubular structure, and total quality is slim and graceful, convenient to pack up shape Carried with during state.
As shown in fig.3, the first support component 201 and the second support component 202 include:Helped with what handrail 110 was connected Hand support bar 310, the front wheel supporting bar 320 being fixedly connected with front-wheel 131, the Rear wheel support bar being fixedly connected with trailing wheel 132 330, for supporting the horizontal support bar 340 of garbage reclamation bag 140, and before the active force of horizontal support bar 340 is passed to Take turns the vertical supporting bar 350 of support bar 320.
Fig. 5 to Fig. 9 respectively show arm supports bar 310, front wheel supporting bar 320, Rear wheel support bar 330, horizontal support Specific connection side between bar 340, vertical supporting bar 350, vertical crossbar 210, horizontal cross bar 220, locking mechanism 230 Formula.
As shown in fig.5, one end of front wheel supporting bar 320 is be hinged by U-shaped connector 1 and arm supports bar 310, One end of Rear wheel support bar 330 is be hinged by U-shaped connector 2 331 and arm supports bar 310.Wherein, on Rear wheel support bar 330 Triangle neck 332 is additionally provided with close to one end of U-shaped connector 2 331, and triangle neck 332 is triangular prism structure, Rear wheel support Bar 330 props up U-shaped connector 1 through the side and the relatively corresponding side in the side of triangular prism, triangle neck 332, Front wheel supporting bar 320 can be limited to rotate.In order to further show the operation principle of triangle neck 332, Fig. 5 a and Fig. 5 b are referred to. In 100 deployed condition of collecting cart, the side of triangle neck 332 props up U-shaped connector 1,320 turns of limitation front wheel supporting bar It is dynamic;In 100 collapsed state of collecting cart, Rear wheel support bar 330 is first rotated, triangle neck 332 is unclamped to U-shaped connector one 321 limitation, then make front wheel supporting bar 320 free to rotate.
As shown in fig.6, one end of vertical supporting bar 350 is be hinged by U-shaped connector 5 352 and front wheel supporting bar 320, One end of horizontal cross bar 220 is be hinged by L-type connector 2 221 and front wheel supporting bar 320.
As shown in fig.7, one end of vertical supporting bar 350 is by U-shaped connector 4 351, it is be hinged with horizontal support bar 340 It is fixed.
As shown in fig.8, one end of horizontal support bar 340 is be hinged by U-shaped connector 3 341 and arm supports bar 310 Fixed, vertical crossbar 210 is fixed by the way that L-type connector 1 and arm supports bar 310 are be hinged.
As shown in fig.9, horizontal cross bar 220 is fixed by the way that L-type connector 2 221 and Rear wheel support bar 330 are be hinged, erect Fixed to crossbar 210, locking mechanism 230 by the way that L-type connector 1 and Rear wheel support bar 330 are be hinged.
With reference to Fig. 3 to Fig. 9, collecting cart 100 is folded and spreading principle is further described.When collecting cart 100 deploys, three Angle neck 332 props up U-shaped connector 1, and limitation front wheel supporting bar 320 rotates, now the connecting rod of handrail 110 and front wheel supporting Fixed between bar 320, and rock-steady structure is formed with horizontal support bar 340, vertical supporting bar 350;When collecting cart 100 folds, Triangle neck 332 is rotated, U-shaped connector 1 unclamps limitation, and front wheel supporting bar 320 can rotate around arm supports bar 310, and Horizontal support bar 340, vertical supporting bar 350 is driven to rotate, so that each rod member of collecting cart 100 folds.
The present embodiment has the following advantages that or beneficial effect:, can be by the He of the first support component 201 by fold mechanism 203 Second support component 202 is close together;Pass through triangle neck 332, U-shaped connector 1, U-shaped connector 2 331, U-shaped company Fitting 3 341, U-shaped connector 4 351, U-shaped connector 5 352 can be respectively by the first support component 201 and the second support components 202 further fold, so that collecting cart 100 is in folded state, are easy to move on scaffold.Figure 10 illustrates collecting cart 100 are in the schematic diagram of folded state.
Between scaffold and building wall, it will usually be spaced a distance, the roller 130 of collecting cart 100 can not be forward Continue to move to, horizontal support bar 340 is not against on metope, the building waste for being unfavorable for peeling off falls into garbage reclamation bag 140 In.Preferred embodiment is, as shown in figure 11, horizontal support bar 340 includes horizon bar 342 and removable with horizon bar 342 The extension rod 343 of connection is unloaded, is not suitable for continuing forward region in roller 130, the extension rod 343 of replaceable appropriate length, from And the building waste conveniently peeled off is fallen into garbage reclamation bag 140.The embodiment being more highly preferred to is to be set in horizon bar 342 Spring is equipped with, telescopic open-close button is provided with horizon bar 342.As an example, when collecting cart 100 is located on scaffold, There is one section of space between scaffold and metope, the roller 130 of collecting cart 100 can not continue to move along, and now, start horizon bar Telescopic open-close button on 342, eject spring and promote extension rod 343 to move, extension rod 343 is against on metope.
In order to facilitate the extension rod 343 of selection appropriate length, can configure different lengths, for example, configurable length be 0.4m, The different lengths such as 0.6m, 0.8m.Preferably, horizon bar 342 is threadedly coupled with extension rod 343, and the front end of horizon bar 342 can be set Internal thread, one end that extension rod 343 is attached thereto is supporting to be provided with external screw thread, so as to be convenient for changing extension rod 343, in addition, logical Overwinding is returned stock 343, so as to control the castor for screwing into depth, can suitably adjusting extension rod 343 of extension rod 343 From.Another preferred embodiment is that horizon bar 342 is connected with extension rod 343 by bearing pin, is more convenient for changing extension rod 343.
In order that the end of the extension rod 353 of collecting cart 100 is adjacent to metope, it is preferably, the end set of extension rod 343 has The fixture 344 being bonded is fixed with building wall.Preferably, fixture 344 is provided with bonding structure towards metope side, fitting Structure can be two-sided adhesive tape, nylon sticking belt or vacuum cup.Can be according to the material selection device and metope of metope Connected mode.As an example, when metope is the more smooth facing such as ceramic tile, glass, cleaning treatment is carried out to facing, selected Vacuum cup or two-sided adhesive tape bond;When metope is the more crude facing such as stone material, fragment of brick, polishes, adopt in installation site With glue pre-bonded nylon sticking belt, using nylon adherent buckle band connection.Preferred mode is fixture 344 and extension rod 343 Between be additionally provided with becket 345.As an example, a pair of beckets 345 snapped together, one of becket can be set 345 are fixed on the end of extension rod 343, and another becket 345 is fixed on fixture 344.By setting becket 345, Fixture 344 can be made to rotate within the specific limits, so as to adapt to irregular metope, expand the application of retracting device.
It is fixed on for the ease of garbage reclamation bag 140 on horizontal support bar 340, available iron is clamping fixed, preferred to implement Mode is, as shown in figure 1, be provided with annular clinching 141 on horizontal support bar 340, annular clinching 141 is by garbage reclamation bag 140 are fixed on horizontal support bar 340.When horizon bar is provided with extension rod 343, garbage reclamation bag 140 is settable certain remaining Amount, it is easy to the extension one end distance of extension rod 343.
Building waste to prevent from peeling off pierces through garbage reclamation bag 140 under the impact of gravity, can be in garbage reclamation bag Backing plate is laid on the support frame 120 of 140 lower sections, for supporting garbage reclamation bag 140.
Reclaimed for the ease of the building waste of peeling, as shown in figure 12, two handrail branch above garbage reclamation bag 140 Enclosing 142 is provided between strut 310 and between arm supports bar 310 and horizontal support bar 340, enclosing 142 extends downwardly Into garbage reclamation bag 140.Plastics or cloth material is can be selected in enclosing 142, and support frame 120 is fixed on semicircle clinching 141 On.Three avris are set up to enclosing 142, increases the planar range and whole height of refuse collection, is more beneficial for reclaiming building waste.
Preferably, on the support frame 120 below garbage reclamation bag 140, it is provided with for supporting garbage reclamation bag 140 Backing plate.
Embodiment two
Refering to shown in Figure 13, the utility model additionally provides a kind of building waste collection method, comprises the following steps:
S1. collapsible building waste collection device is deployed, and by the card column on the card article 2 232 of locking mechanism 230 232a is caught in the neck 231a on card article 1, is made by locking mechanism 230, vertical crossbar 210, horizontal cross bar 220 First support component 201 and the second support component 202 keep certain distance to be simultaneously fixed as an overall structure, while by Rear wheel support Triangle neck 332 on bar 330 props up U-shaped connector 1, and collection device is positioned over immediately below metope to be onstructed, and Garbage reclamation bag 140 is fixed on the horizontal support bar 340 of support frame 120 with annular clinching 141.Triangle neck 332 props up U Type connector 1, make arm supports bar 310, front wheel supporting bar 320, horizontal support bar 340, vertical supporting are dry to deploy and locate In a kind of stable state, the first support component 201 and the second support component 202 is set to keep fixing in the case where being acted on by vertical external force Shape.Locking mechanism 230 is deployed and after card column 232a and neck 231a lockings, vertical crossbar 210 and horizontal cross bar 220 are in open configuration and keep solid shape, so that being kept between the first support component 201 and the second support component 202 Fixed range, and collecting cart 100 is kept solid shape.
S2. after to be onstructed, annular clinching 141 is unloaded, removes garbage reclamation bag 140, stirs triangle neck 332, and Rear wheel support bar 330 and front wheel supporting bar 320 are rotated, folds the first support component 201 and the second support component 202, and upwards Locking mechanism 230 is pulled, folds card article 1 and card article 2 232, so that whole support frame 120 is in folded state.Stir Triangle neck 332, unclamp to the spacing of U-shaped connector 1, front wheel support bar 320 makes horizontal support bar 340, vertical Support bar 350 folds, and the first support component 201 and the second support component 202 is in folded state.And then card column 232a is moved Go out neck 231a, unlock, and fold card article 1 and card article 2 232, so as to drive vertical crossbar 210 and level The free end of crossbar 220 is drawn close, so that the first support component 201 and the second support component 202 adduct together, makes collection Car 100 is in folded state.
Foregoing description is only the description to the utility model preferred embodiment, not to any limit of the scope of the utility model Calmly, any change, the modification that the those of ordinary skill in the utility model field does according to the disclosure above content, belonging to right will Seek the protection domain of book.

Claims (10)

1. a kind of collapsible building waste collection device, it is characterised in that the collection device includes collecting cart, the collecting cart bag Include:
A pair of armrests;
Support frame, support frame as described above include a pair of parallel the first support component and second for setting and being connected respectively with the handrail Support component, and the fold mechanism of connection first support component and the second support component;The fold mechanism includes perpendicular To crossbar, horizontal cross bar and locking mechanism;The middle part of the horizontal cross bar and vertical crossbar is hinged by rivet, The end of the horizontal cross bar and vertical crossbar passes through the first support group of L-type connector and support frame as described above respectively Part and the be hinged fixation of the second support component;The locking mechanism includes the card article one and card article two connected by rotating shaft in end, One end of the rotating shaft is provided with neck in the card article one, set on the card article two with the neck correspondence position There is card column;
Roller, including a pair of the front-wheels and a pair of rear wheels being arranged on support frame;And
Garbage reclamation bag, is fixedly installed on support frame as described above.
2. collapsible building waste collection device as claimed in claim 1, it is characterised in that first support component and the Two support components include:
Arm supports bar, it is fixedly installed respectively with the handrail;
Front wheel supporting bar, one end are fixedly connected with the front-wheel, and the other end is cut with scissors by U-shaped connector one and the arm supports bar Connect fixation;
Rear wheel support bar, one end are fixedly connected with the trailing wheel, and the other end is cut with scissors by U-shaped connector two and the arm supports bar Fixation is connect, limitation front wheel supporting bar is additionally provided with the Rear wheel support bar close to described U-shaped one end of connector two and is surrounded The triangle neck that the arm supports bar rotates;
Horizontal support bar, one end are fixed by the way that U-shaped connector three and the arm supports bar are be hinged, and the garbage reclamation bag is fixed On the horizontal support bar;And
Vertical supporting bar, one end are fixed by the way that U-shaped connector four and the horizontal support bar are be hinged, and the other end passes through U-shaped connection Part five and the be hinged fixation of the front wheel supporting bar.
3. collapsible building waste collection device as claimed in claim 2, it is characterised in that the horizontal support bar includes water Flat bar and the extension rod being detachably connected with the horizon bar.
4. collapsible building waste collection device as claimed in claim 3, it is characterised in that the horizon bar and the extension It is threadedly coupled between bar.
5. collapsible building waste collection device as claimed in claim 3, it is characterised in that the end set of the extension rod Have and fix the fixture being bonded with building wall.
6. collapsible building waste collection device as claimed in claim 5, it is characterised in that the fixture is towards the wall Face side is provided with bonding structure, and the bonding structure includes following at least one:
Two-sided adhesive tape;
Nylon sticking belt;
Vacuum cup.
7. collapsible building waste collection device as claimed in claim 5, it is characterised in that the fixture and the extension Becket is additionally provided between bar.
8. collapsible building waste collection device as claimed in claim 2, it is characterised in that set on the horizontal support bar Being equipped with makes garbage reclamation pocket facing be close to the annular clinching connect.
9. collapsible building waste collection device as claimed in claim 2, it is characterised in that in two arm supports bars Between and the arm supports bar and the horizontal support bar between be provided with enclosing, the enclosing extends downward into described In garbage reclamation bag.
10. collapsible building waste collection device as claimed in claim 2, it is characterised in that under the garbage reclamation bag On the support frame of side, the backing plate for supporting the garbage reclamation bag is provided with.
CN201720959162.7U 2017-08-03 2017-08-03 Collapsible building waste collection device Active CN207174556U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720959162.7U CN207174556U (en) 2017-08-03 2017-08-03 Collapsible building waste collection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720959162.7U CN207174556U (en) 2017-08-03 2017-08-03 Collapsible building waste collection device

Publications (1)

Publication Number Publication Date
CN207174556U true CN207174556U (en) 2018-04-03

Family

ID=61744179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720959162.7U Active CN207174556U (en) 2017-08-03 2017-08-03 Collapsible building waste collection device

Country Status (1)

Country Link
CN (1) CN207174556U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107416381A (en) * 2017-08-03 2017-12-01 上海市建筑装饰工程集团有限公司 Collapsible building waste collection device and its collection method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107416381A (en) * 2017-08-03 2017-12-01 上海市建筑装饰工程集团有限公司 Collapsible building waste collection device and its collection method
CN107416381B (en) * 2017-08-03 2023-10-24 上海市建筑装饰工程集团有限公司 Folding building garbage collection device and collection method thereof

Similar Documents

Publication Publication Date Title
CN207174556U (en) Collapsible building waste collection device
CN107416381A (en) Collapsible building waste collection device and its collection method
CN110127157A (en) A kind of device label tears patch integrated device open
CN107352198A (en) Building waste collection device and garbage collection method
CN204866445U (en) Screening sand nets device for construction
CN207174592U (en) Building waste collection device
CN206319259U (en) Suitable for the support system of assembled architecture and bridge construction
CN111891515B (en) Novel cement transportation equipment of environmental protection
CN108035430A (en) A kind of sewage conduit cleaning device
CN206537300U (en) A kind of stroller for being used to place spraying rack
CN209682612U (en) A kind of construction site husky device of shovel
CN209319752U (en) A kind of Moveable foldable tool rack
CN108557328A (en) A kind of office's environmental protection garbage bag fixing device
CN106498859A (en) Be applicable to the support system of assembled architecture and bridge construction
CN107202282A (en) A kind of folding umbrella support of the street lamp with automatic umbrella
CN208502254U (en) A kind of attachment device of roof plate template and wall
CN206769452U (en) Mobile model jumps frame
CN103640822B (en) A kind of public garbage bin
CN206734360U (en) Scrap-iron vehicle
CN219197890U (en) Folding trampoline support frame
CN211870355U (en) Environment-friendly garbage bag with clamping use expansion function
CN218344455U (en) Foldable stone machine of throwing with shock-absorbing function
CN205852389U (en) A kind of novel aluminum bits waggon
CN212815319U (en) Folding chair capable of being used as outdoor sketching knapsack
CN209382954U (en) A kind of construction site brick handling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant