CN207160533U - 一种建筑施工用的脚手架延长架 - Google Patents

一种建筑施工用的脚手架延长架 Download PDF

Info

Publication number
CN207160533U
CN207160533U CN201720773255.0U CN201720773255U CN207160533U CN 207160533 U CN207160533 U CN 207160533U CN 201720773255 U CN201720773255 U CN 201720773255U CN 207160533 U CN207160533 U CN 207160533U
Authority
CN
China
Prior art keywords
scaffold
set portion
connector
motion bar
extends frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720773255.0U
Other languages
English (en)
Inventor
林少忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Putuo Construction Engineering Co ltd
Original Assignee
Huian County Crystal Eagle Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huian County Crystal Eagle Building Materials Co Ltd filed Critical Huian County Crystal Eagle Building Materials Co Ltd
Priority to CN201720773255.0U priority Critical patent/CN207160533U/zh
Application granted granted Critical
Publication of CN207160533U publication Critical patent/CN207160533U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

本实用新型公开了一种建筑施工用的脚手架延长架,包括四个呈矩形排布的延长组件,及配合在两个纵向设置的所述延长组件之间的第一连接件,及配合在两个对角设置的所述延长组件之间的第二连接件,所述延长组件包括套部,在所述套部的底部设置有安插在脚手架顶部用的插杆,所述套部的顶部设置有插孔,在所述套部的顶部设置有插管,所述插管的底部设置有活动杆,所述活动杆安插在所述套部内,所述套部的外壁处设置有固定所述活动杆用的螺丝,所述第一连接件和所述第二连接件均与所述套部之间焊接固定;本装置可以连接在两个相互堆叠的脚手架之间,可以实现上方的脚手架调平,确保支撑可靠性。

Description

一种建筑施工用的脚手架延长架
技术领域
本实用新型涉及一种建筑施工用的脚手架延长架。
背景技术
脚手架是一种常用的建筑施工装置,通过多个脚手架的堆叠可以实现高处的施工,但是地面通常不平整,因此位于最下方的脚手架摆放不平稳,当多个脚手架堆叠时,极易发生倒塌,现有的处理办法是在最下方的脚手架的底部垫东西来调整水平度,但是垫的东西在重压的作用下极易发生形变,支撑较为不可靠,存在安全隐患。
基于上述问题,需要提供一种可以连接在两个相互堆叠的脚手架之间,可以实现上方的脚手架调平,确保支撑可靠性的建筑施工用的脚手架延长架。
实用新型内容
本实用新型所要解决的技术问题是提供一种可以连接在两个相互堆叠的脚手架之间,可以实现上方的脚手架调平,确保支撑可靠性的建筑施工用的脚手架延长架。
本实用新型是通过以下技术方案来实现的:
一种建筑施工用的脚手架延长架,包括四个呈矩形排布的延长组件,及配合在两个纵向设置的所述延长组件之间的第一连接件,及配合在两个对角设置的所述延长组件之间的第二连接件,所述延长组件包括套部,在所述套部的底部设置有安插在脚手架顶部用的插杆,所述套部的顶部设置有插孔,在所述套部的顶部设置有插管,所述插管的底部设置有活动杆,所述活动杆安插在所述套部内,所述套部的外壁处设置有固定所述活动杆用的螺丝,所述第一连接件和所述第二连接件均与所述套部之间焊接固定。
优选地,所述插杆与所述套部为一体式结构。
优选地,在所述插杆的杆身上配合有一减震套,所述减震套为橡胶材质,所述减震套的厚度为2mm-5mm,通过设置减震套,当插杆插入下方的脚手架的顶部时,通过减震套可以支撑在脚手架与套部之间,减少配合间隙,避免发生震动。
优选地,在所述活动杆的杆身上设置有缓冲弹簧,通过设置缓冲弹簧,当螺丝固定失效时,插管迅速下落,通过缓冲弹簧可以缓冲下坠力,避免下坠力过大而导致整个脚手架倒塌。
优选地,所述第一连接件为空心钢制杆件,第一连接件为主要连接支撑。
优选地,所述第二连接件为实心钢制杆件,所述第二连接件空间交叉设置有两根。
本实用新型的有益效果是:本装置被连接在两个堆叠的脚手架之间,即使下方的脚手架摆放存在角度倾斜,也可以通过本装置进行调平,使得上方的脚手架获得水平支撑,便于施工,调平时,只需要调节插管的高度即可,本装置的结构较为简单,支撑较为稳定,成本较为低廉,适合推广使用。
附图说明
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1为本实用新型的主视图;
图2为套部分别与第一连接件和第二连接件的配合示意图。
具体实施方式
本说明书中公开的所有特征,或公开的所有方法或过程中的步骤,除了互相排斥的特征和/或步骤以外,均可以以任何方式组合。
本说明书(包括任何附加权利要求、摘要和附图)中公开的任一特征,除非特别叙述,均可被其他等效或具有类似目的的替代特征加以替换。即,除非特别叙述,每个特征只是一系列等效或类似特征中的一个例子而已。
如图1和图2所示的一种建筑施工用的脚手架延长架,包括四个呈矩形排布的延长组件1,及配合在两个纵向设置的所述延长组件1之间的第一连接件2,及配合在两个对角设置的所述延长组件1之间的第二连接件3,所述延长组件1包括套部101,在所述套部101的底部设置有安插在脚手架顶部用的插杆102,在装配时,插杆插入下方的脚手架内,所述套部101的顶部设置有插孔(未图示),在所述套部101的顶部设置有插管103,所述插管103的底部设置有活动杆104,所述活动杆104安插在所述套部101内,所述套部101的外壁处设置有固定所述活动杆104用的螺丝105,所述第一连接件2和所述第二连接件3均与所述套部101之间焊接固定。
本实用新型中一个较佳的实施例,所述插杆102与所述套部101为一体式结构。
本实用新型中一个较佳的实施例,在所述插杆102的杆身上配合有一减震套122,所述减震套122为橡胶材质,所述减震套122的厚度为3mm,通过设置减震套,当插杆插入下方的脚手架的顶部时,通过减震套可以支撑在脚手架与套部之间,减少配合间隙,避免发生震动。
本实用新型中一个较佳的实施例,在所述活动杆104的杆身上设置有缓冲弹簧144,通过设置缓冲弹簧,当螺丝固定失效时,插管迅速下落,通过缓冲弹簧可以缓冲下坠力,避免下坠力过大而导致整个脚手架倒塌。
本实用新型中一个较佳的实施例,所述第一连接件2为空心钢制杆件,第一连接件为主要连接支撑。
本实用新型中一个较佳的实施例,所述第二连接件3为实心钢制杆件,所述第二连接件空间交叉设置有两根。
本实用新型的有益效果是:本装置被连接在两个堆叠的脚手架之间,即使下方的脚手架摆放存在角度倾斜,也可以通过本装置进行调平,使得上方的脚手架获得水平支撑,便于施工,调平时,只需要调节插管的高度即可,本装置的结构较为简单,支撑较为稳定,成本较为低廉,适合推广使用。
以上所述,仅为本实用新型的具体实施方式,但本实用新型的保护范围并不局限于此,任何不经过创造性劳动想到的变化或替换,都应涵盖在本实用新型的保护范围之内。因此,本实用新型的保护范围应该以权利要求书所限定的保护范围为准。

Claims (6)

1.一种建筑施工用的脚手架延长架,其特征在于:包括四个呈矩形排布的延长组件,及配合在两个纵向设置的所述延长组件之间的第一连接件,及配合在两个对角设置的所述延长组件之间的第二连接件,所述延长组件包括套部,在所述套部的底部设置有安插在脚手架顶部用的插杆,所述套部的顶部设置有插孔,在所述套部的顶部设置有插管,所述插管的底部设置有活动杆,所述活动杆安插在所述套部内,所述套部的外壁处设置有固定所述活动杆用的螺丝,所述第一连接件和所述第二连接件均与所述套部之间焊接固定。
2.根据权利要求1所述的建筑施工用的脚手架延长架,其特征在于:所述插杆与所述套部为一体式结构。
3.根据权利要求1所述的建筑施工用的脚手架延长架,其特征在于:在所述插杆的杆身上配合有一减震套,所述减震套为橡胶材质,所述减震套的厚度为2mm-5mm。
4.根据权利要求1所述的建筑施工用的脚手架延长架,其特征在于:在所述活动杆的杆身上设置有缓冲弹簧。
5.根据权利要求1所述的建筑施工用的脚手架延长架,其特征在于:所述第一连接件为空心钢制杆件。
6.根据权利要求1所述的建筑施工用的脚手架延长架,其特征在于:所述第二连接件为实心钢制杆件,所述第二连接件空间交叉设置有两根。
CN201720773255.0U 2017-06-29 2017-06-29 一种建筑施工用的脚手架延长架 Expired - Fee Related CN207160533U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720773255.0U CN207160533U (zh) 2017-06-29 2017-06-29 一种建筑施工用的脚手架延长架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720773255.0U CN207160533U (zh) 2017-06-29 2017-06-29 一种建筑施工用的脚手架延长架

Publications (1)

Publication Number Publication Date
CN207160533U true CN207160533U (zh) 2018-03-30

Family

ID=61711935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720773255.0U Expired - Fee Related CN207160533U (zh) 2017-06-29 2017-06-29 一种建筑施工用的脚手架延长架

Country Status (1)

Country Link
CN (1) CN207160533U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853992A (zh) * 2018-12-27 2019-06-07 苏州交通工程集团有限公司 高度可随意调节式梯笼

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853992A (zh) * 2018-12-27 2019-06-07 苏州交通工程集团有限公司 高度可随意调节式梯笼

Similar Documents

Publication Publication Date Title
CN205153136U (zh) 一种竖向隔震支座
CN205859533U (zh) 一种纺织机械支撑装置
CN207160533U (zh) 一种建筑施工用的脚手架延长架
CN206754275U (zh) 用于机械设备减振的力变向传递传动机构
CN202273110U (zh) 自动调整底脚及使用该自动调整底脚的洗衣机
CN206578969U (zh) 一种减震型搅拌机
CN204098484U (zh) 可调节楼板支撑架体
CN206754276U (zh) 一种机械设备减振装置
CN210364955U (zh) 一种装配式建筑支撑座
CN207620337U (zh) 一种带微调结构的脚手架
CN210643344U (zh) 一种矿山工程使用的斜面减震座椅
CN203374294U (zh) 一种大倾角液压支架的安全行走梯
CN209991159U (zh) 一种矿山机械作业支撑平台
CN203139592U (zh) 一种台球桌
CN214739810U (zh) 一种用于脚手架的抗震结构
CN215212209U (zh) 一种便于调节高度的施工平台架
CN207812975U (zh) 一种新型人字梯
CN216243318U (zh) 一种建筑工地用带有防护结构的水平仪
CN210860078U (zh) 一种混凝土泵管固定支架
CN106400977B (zh) 一种木质滑移隔震支座
CN207498979U (zh) 一种抗震建筑桩
CN210827836U (zh) 一种防尘通风型钢结构
CN211446865U (zh) 一种建筑规划工程用地基规划装置
CN207063365U (zh) 一种建筑用的楼梯板
CN211342724U (zh) 一种综合性城市用安全用便携梯

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Lin Shaozhong

Inventor after: Zhang Zhijie

Inventor before: Lin Shaozhong

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20181115

Address after: 2nd Floor, Building No. 8, 3299 South Shenjiang Road, Pudong New Area, Shanghai, 200120

Patentee after: SHANGHAI PUTUO CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 362000 Quanzhou, Huian, Fujian province Tu Zhai Town, Huang Qi Yu Wen Xin Ting school 70 meters Northwest

Patentee before: HUI'AN JINGYING BUILDING MATERIALS CO.,LTD.

TR01 Transfer of patent right
CP02 Change in the address of a patent holder

Address after: 200120 Shanghai Pudong New Area Shenjiang South Road (Metro Line 16 Dishuihu Direction 2 Station to Zhoupudong Station 1 Exit 226 m Walk to Zhoukang 4 Lujiazhai Direction 7 Station to Zhouzhu Highway Shenjiang South Road Station 828 m Walk) 3299 Building 8, 2nd Floor

Patentee after: SHANGHAI PUTUO CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 2nd Floor, Building No. 8, 3299 South Shenjiang Road, Pudong New Area, Shanghai, 200120

Patentee before: SHANGHAI PUTUO CONSTRUCTION ENGINEERING Co.,Ltd.

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 200120 Shanghai Pudong New Area Shenjiang South Road (Metro Line 16 Dishuihu Direction 2 Station to Zhoupudong Station 1 Exit 226 m Walk to Zhoukang 4 Lujiazhai Direction 7 Station to Zhouzhu Highway Shenjiang South Road Station 828 m Walk) 3299 Building 8, 2nd Floor

Patentee after: SHANGHAI PUTUO CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 200120 Shanghai Pudong New Area Shanghai Pudong New Area Shenjiang South Road (Metro Line 16 Dishuihu Direction 2 Station to Zhoupudong Station 1 Exit 226 m Walk to Zhoukang Road 4 Lujiazhai Direction 7 Station to Zhouzhu Road Shenjiang South Road Station 828 m Walk) 32998 Building 2

Patentee before: SHANGHAI PUTUO CONSTRUCTION ENGINEERING Co.,Ltd.

CP02 Change in the address of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180330

CF01 Termination of patent right due to non-payment of annual fee