CN207154642U - Base mould with handle flanged ball valve valve body forging - Google Patents

Base mould with handle flanged ball valve valve body forging Download PDF

Info

Publication number
CN207154642U
CN207154642U CN201720947385.1U CN201720947385U CN207154642U CN 207154642 U CN207154642 U CN 207154642U CN 201720947385 U CN201720947385 U CN 201720947385U CN 207154642 U CN207154642 U CN 207154642U
Authority
CN
China
Prior art keywords
die
base
cylinder
cavity
lower portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720947385.1U
Other languages
Chinese (zh)
Inventor
吴克成
周亚夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Katz Industrial Group Co Ltd
Original Assignee
Sichuan Katz Industrial Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Katz Industrial Group Co Ltd filed Critical Sichuan Katz Industrial Group Co Ltd
Priority to CN201720947385.1U priority Critical patent/CN207154642U/en
Application granted granted Critical
Publication of CN207154642U publication Critical patent/CN207154642U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forging (AREA)

Abstract

The utility model discloses a kind of base mould with handle flanged ball valve valve body forging, including base upper male mould, base lower cavity die, ejector beam and backing plate;Base upper male mould includes mounting of roof plate plate, intermediolateral column and conical lower portion, and intermediolateral column includes cylinder and the pillar extended laterally in cylindrical outer wall, and cylinder flushes with the bottom surface of pillar;The inner chamber of base lower cavity die is divided into die cavity top and die cavity bottom, die cavity top section matches with the bottom surface of intermediolateral column, the height on die cavity top is more than the height of conical lower portion, die cavity bottom is cylindrical hole, and cylinder, conical lower portion, cylindrical hole are coaxially disposed, cylinder, cylindrical hole, conical lower portion, the cross-sectional area of pillar successively decrease successively;Backing plate is located at the intracavity bottom of base lower cavity die, and ejector beam is against on backing plate through lower cavity die from bottom to top.Base mould combination finisher, for band handle flanged ball valve valve body forging forming technique in, with reduce process, improve part stock utilization and production efficiency, reduce manufacturing cost.

Description

Base mould with handle flanged ball valve valve body forging
Technical field
It the utility model is related to the metal forming technique in materials processing technology field, and in particular to a kind of band handle method The base mould of blue ball valve body forging.
Background technology
Band handle flanged ball valve valve body forging with reference to shown in Fig. 1, Fig. 2, mainly by left flange a, right flange b, osculant Chamber c and handle flange d compositions.Intermediate cavity c abuts left flange a, and handle flange d is located at intermediate cavity c surface.Due to passing The forging method of system, it is impossible to forge intermediate cavity c, be cost-effective, such valve body blank, substantially made using casting method Make.
Band handle flanged ball valve valve body, if using traditional forging and molding, its technological process is:Blanking → heating → system Base (sub-material) → upset right flange → blocking (preform) → finish-forging shaping → trimming, totally 7 procedure.Its existing subject matter It is:
(1) intermediate cavity can not be forged, it is necessary to be machined to complete, and manufacturing cost is high;
(2) forged using open type, blank has overlap, it is necessary to trimming;
(3) waste of material is serious, by being machined the intermediate cavity shaped and the overlap cut away into waste material;
Utility model content
The utility model is improved for above-mentioned technical problem, there is provided a kind of system with handle flanged ball valve valve body forging Mold, for band handle flanged ball valve valve body forging forming technique in, with reduce process, improve part stock utilization and life Produce efficiency, reduce manufacturing cost.
Therefore, a kind of base mould with handle flanged ball valve valve body forging provided by the utility model, including base are convex Mould, base lower cavity die, ejector beam and backing plate;The base upper male mould includes mounting of roof plate plate, intermediolateral column and conical lower portion, described Intermediolateral column includes cylinder and the pillar extended laterally in cylindrical outer wall, and cylinder flushes with the bottom surface of pillar;The base is recessed The inner chamber of mould is divided into die cavity top and die cavity bottom, and die cavity top section matches with the bottom surface of intermediolateral column, die cavity top Highly it is more than the height of conical lower portion, die cavity bottom is cylindrical hole, and cylinder, conical lower portion, cylindrical hole are coaxially disposed, cylinder, Cylindrical hole, conical lower portion, the cross-sectional area of pillar successively decrease successively;The backing plate is located at the intracavity bottom of base lower cavity die, liftout Bar is against on backing plate through lower cavity die from bottom to top, base upper male mould towards base lower cavity die move, until intermediolateral column bottom surface with The inner chamber top surface of base lower cavity die, which flushes, realizes matched moulds, and after component shaping, base upper male mould moves upwards, and ejector beam promotes backing plate And drive workpiece to move upwards, realize the demoulding.
The beneficial effects of the utility model:Base mould combination finisher, applied to band handle flanged ball valve valve body forging into In shape technique, intermediate cavity is directly forged, processed without subsequent mechanical;Finisher uses closed molds, and non-trimming produces;With Exemplified by Fig. 1 products, the cutting stock weight of traditional forging forming method is used as 8.9Kg, and the cutting stock weight of this method is 6.01Kg, phase Than under, the material of this method saving is up to 32.4% compared with conventional method, and reduces process, reduces manufacturing cost, improves Production efficiency.
Brief description of the drawings
Fig. 1 is the structural representation with handle flanged ball valve valve body.
Fig. 2 is Fig. 1 A-A sectional views.
Fig. 3 is the state before the utility model matched moulds.
Fig. 4 is the state of the utility model matched moulds postforming workpiece.
Fig. 5 is the state before the finisher matched moulds coordinated with the utility model.
Fig. 6 is the left half module of finisher and right half module close up after state.
Fig. 7 is the state of finisher Forming Workpiece.
Fig. 8 is the process chart with handle flanged ball valve valve body forging forming.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples:
Band handle flanged ball valve valve body forging with reference to shown in Fig. 1, Fig. 2, mainly by left flange a, right flange b, osculant Chamber c and handle flange d compositions.Intermediate cavity c abuts left flange a, and handle flange d is located at intermediate cavity c surface, the forging Intermediate cavity need completed in forging and molding.
Firstly the need of making base mould and finisher.
As shown in Figure 3, Figure 4, base mould is mainly made up of base upper male mould 1, base lower cavity die 2, ejector beam 3 and backing plate 4.
Base upper male mould 1 includes mounting of roof plate plate 1a, intermediolateral column and conical lower portion 1c compositions, three in one shaping, top plate Installing plate 1a is used to be connected with power section, and power section drives base upper male mould 1 to move up and down.Intermediolateral column include cylinder 1b and In the pillar 1d that cylinder 1b outer walls extend laterally, and cylinder 1b flushes with pillar 1d bottom surface.Cylinder 1b and pillar 1d bottom surface Matched with the upper surface of preformed workpiece, preformed workpiece carries the blank of handle flange.Conical lower portion 1c is used for preform work The intermediate cavity of part.
The inner chamber of base lower cavity die 2 is divided into die cavity top 2a and die cavity bottom 2b, die cavity top 2a sections and intermediolateral column Bottom surface is matched, and the workpiece of handle flange blank is carried for preform.Die cavity top 2a height is more than conical lower portion 1c height Degree, die cavity bottom 2b is cylindrical hole, and cylinder 1b, conical lower portion 1c, cylindrical hole are coaxially disposed, cylinder 1b, cylindrical hole, conical bottom Portion 1c, pillar 1d cross-sectional area successively decrease successively.Backing plate 4 is located at the intracavity bottom of base lower cavity die 2, and ejector beam 3 is from bottom to top It is against through lower cavity die 2 on backing plate 4, base upper male mould 1 moves towards base lower cavity die 2, until under the bottom surface and base of intermediolateral column The inner chamber top surface of cavity plate 2, which flushes, realizes matched moulds, and after component shaping, base upper male mould 1 moves upwards, and ejector beam 3 promotes backing plate 4 simultaneously Drive workpiece to move upwards, realize the demoulding.
As shown in Fig. 5-Fig. 7, finisher is mainly by finish-forging upper male mould 5, finish-forging lower punch 6, die holder 7, left half module 8 and the right side Half module 9, finisher is integrally symmetrical.Finish-forging lower punch 6 is in shaft-like, stretches into left half module 8 and right half through die holder 7 from bottom to top In the cavity that mould 9 surrounds.After left half module 8 closes up with the right move toward one another of half module 9, while finish-forging upper male mould 5 moves downward, finish-forging Lower punch 6 moves upwards, final forming belt handle flanged ball valve valve body forging.
Left flange a is shaped by finish-forging upper male mould 5, left half module 8 and right half module 9, and right flange b, handle flange d are by left half module 8 Shaped with right half module 9, intermediate cavity c is shaped by finish-forging lower punch 6, and after component shaping, finish-forging upper male mould 5, finish-forging lower punch 6 are same When return to initial position after, left half module 8 and right half module 9 return to initial position.
Preferably, the top of die holder 7 of finisher is additionally provided with cushion block 10.
As shown in figure 8, a kind of forging forming method with handle flanged ball valve valve body forging, is comprised the following steps that:
The first step:Make mould, including base mould and finisher.
Second step:Blanking, by blanking dividers lattice.
3rd step:Heating, will be put into heating furnace by bar good under specification, is come out of the stove after being heated to initial forging temperature.
4th step:Base, the bar come out of the stove is put into the base lower cavity die 2 of base mould, base upper male mould 1 is towards under base Cavity plate 2 is moved, until the bottom surface of intermediolateral column flushes with the inner chamber top surface of base lower cavity die 2 and realizes matched moulds, bar is pressed into base After expecting shape, base upper male mould 1 moves upwards, returns to initial position, and ejector beam 3 moves upwards, promotes backing plate 4 and band is started building Part is moved upwards, and workpiece is ejected into lower cavity die, takes out workpiece, completes a working cycles.
5th step:Sub-material, also known as have a waistline, the workpiece of base will be made, be put into axis horizontal in two halves circle clamp, work Part rotate, complete sub-material, i.e., had a waistline in workpiece loins position, make the material of workpiece left-right parts evenly distributed, be easy to finish-forging into Material can be full of whole die cavity during shape.It is the process often having in forging forming to have a waistline, and be will not be repeated here, in conventional belt handle method Also there is the step in the forging and forming technology of blue ball valve body forging.
6th step:Finish-forging shapes, and the workpiece that sub-material is completed is put on the finish-forging lower punch 6 of finisher, stamp forging hydraulic press Left and right die cylinder to intermediary movements, drive left half module 8 to close up with the right move toward one another of half module 9, left half module after closing up, right half Mould is locked.Afterwards, while stamp forging hydraulic press master cylinder drive finish-forging upper male mould 5 moves downward, oil cylinder under stamp forging hydraulic press Drive finish-forging lower punch 6 to move upwards, final forming belt handle flanged ball valve valve body forging, left flange a by finish-forging upper male mould 5, Left half module 8 and right half module 9 are shaped, and right flange b, handle flange d are shaped by left half module 8 and right half module 9, and intermediate cavity c is by finish-forging Lower punch 6 shapes, and after component shaping, first returns to initial position simultaneously by finish-forging upper male mould 5, finish-forging lower punch 6, then by left half Mould 8 and right half module 9 return to initial position, finally take out workpiece, complete a working cycles.

Claims (1)

1. a kind of base mould with handle flanged ball valve valve body forging, including base upper male mould (1), base lower cavity die (2), liftout Bar (3) and backing plate (4);The base upper male mould (1) includes mounting of roof plate plate (1a), intermediolateral column and conical lower portion (1c), described Intermediolateral column includes cylinder (1b) and the pillar (1d) extended laterally in cylinder (1b) outer wall, and the bottom of cylinder (1b) and pillar (1d) Face flushes;The inner chamber of the base lower cavity die (2) is divided into die cavity top (2a) and die cavity bottom (2b), the die cavity top (2a) Section matches with the bottom surface of intermediolateral column, and the height of die cavity top (2a) is more than the height of conical lower portion (1c), die cavity bottom (2b) For cylindrical hole, and cylinder (1b), conical lower portion (1c), cylindrical hole are coaxially disposed, cylinder (1b), cylindrical hole, conical lower portion (1c), The cross-sectional area of pillar (1d) successively decreases successively;The backing plate (4) is located at the intracavity bottom of base lower cavity die (2), ejector beam (3) by Under be upward through lower cavity die (2) and be against on backing plate (4), base upper male mould (1) moves towards base lower cavity die (2), until intermediolateral column Bottom surface flushed with the inner chamber top surface of base lower cavity die (2) and realize matched moulds, after component shaping, base upper male mould (1) moves upwards, Ejector beam (3) promotes backing plate (4) and drives workpiece to move upwards, realizes the demoulding.
CN201720947385.1U 2017-07-31 2017-07-31 Base mould with handle flanged ball valve valve body forging Active CN207154642U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720947385.1U CN207154642U (en) 2017-07-31 2017-07-31 Base mould with handle flanged ball valve valve body forging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720947385.1U CN207154642U (en) 2017-07-31 2017-07-31 Base mould with handle flanged ball valve valve body forging

Publications (1)

Publication Number Publication Date
CN207154642U true CN207154642U (en) 2018-03-30

Family

ID=61714714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720947385.1U Active CN207154642U (en) 2017-07-31 2017-07-31 Base mould with handle flanged ball valve valve body forging

Country Status (1)

Country Link
CN (1) CN207154642U (en)

Similar Documents

Publication Publication Date Title
CN107598064B (en) Forging and forming technology with handle flanged ball valve valve body
CN110842128A (en) Hub direct forging die and forging process thereof
CN102699094B (en) Die used in extrusion moulding of high-precision complex copper alloy thrust bearing seat
CN207154643U (en) A kind of forging and molding module with handle flanged ball valve valve body forging
CN101376141A (en) Press forming method of automobile hub and matched forming mold thereof
CN110976733A (en) Hub direct forging die and forging process thereof
CN104493061A (en) Cold-forging technology for safety belt transmission shaft and die structure of molded transmission patterned tooth
CN103419002A (en) Temperature cooling precision forming method of big modulus high boss bevel gear
CN211413524U (en) Hub direct forging die
CN105921671B (en) The backward extrusion method and mould of a kind of ladder hollow shaft like members
CN107363205A (en) Forging and molding module with handle flanged ball valve valve body forging
CN211194826U (en) Front mold structure for injection molding of automobile ornaments
CN100411770C (en) Generator magnetic pole precision forging method
CN211413523U (en) Hub direct forging die
CN207154642U (en) Base mould with handle flanged ball valve valve body forging
CN107671217A (en) A kind of flanged ball valve valve body forging forming method and its base mould of use
CN205614005U (en) Duplex position forward finishing mould
CN207154644U (en) Finisher with handle flanged ball valve valve body forging
TWI647048B (en) Method for forming a spanner
CN106694792A (en) Cold heading device and process for specially-shaped torsion rod
CN203711731U (en) Closed extrusion finish forging forming die for cam shaft
CN102658304A (en) Closed-extrusion and molding method of flange
CN111558683A (en) Large-scale tooth block forging forming die and forming method
CN207668416U (en) A kind of external screw thread double bond slot forging piece molding die
CN211164936U (en) Heat preservation pouring material design mould

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant