CN207130702U - Vertical shaft section penstock elevating construction platform formula inner support - Google Patents

Vertical shaft section penstock elevating construction platform formula inner support Download PDF

Info

Publication number
CN207130702U
CN207130702U CN201720632615.5U CN201720632615U CN207130702U CN 207130702 U CN207130702 U CN 207130702U CN 201720632615 U CN201720632615 U CN 201720632615U CN 207130702 U CN207130702 U CN 207130702U
Authority
CN
China
Prior art keywords
layer
platform
layer platform
support
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720632615.5U
Other languages
Chinese (zh)
Inventor
李建平
谭玉平
杨勇
曾洪富
潘勇
谢守斌
王永华
望永东
孙文
宋慧涛
杨芳
范如谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 7 Co Ltd
Original Assignee
Sinohydro Bureau 7 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 7 Co Ltd filed Critical Sinohydro Bureau 7 Co Ltd
Priority to CN201720632615.5U priority Critical patent/CN207130702U/en
Application granted granted Critical
Publication of CN207130702U publication Critical patent/CN207130702U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of vertical shaft section penstock elevating construction platform formula inner support, including first layer platform, second layer platform, third layer platform, first layer support meanss, second layer support meanss and third layer support meanss, the first layer platform, the second layer platform and the third layer platform are successively set in the penstock from top to bottom, between the first layer platform and the second layer platform, connected between the second layer platform and the third layer platform by interlayer connecting rod, the first layer support meanss, the second layer support meanss and the third layer support meanss are correspondingly arranged at the first layer platform respectively, the outer of the second layer platform and the third layer platform;The utility model vertical shaft section penstock elevating construction platform formula inner support installs telescopic hydraulic pressure support and screw support in the outer of platform by setting three layers of platform, so as to play inner support and the function of operating platform simultaneously.

Description

Vertical shaft section penstock elevating construction platform formula inner support
Technical field
It the utility model is related to Hydropower Station Construction field, more particularly to a kind of vertical shaft section penstock elevating construction platform formula Inner support.
Background technology
Carry out power station vertical shaft section construction when, it is necessary to penstock outer wall casting concrete, it is therefore desirable to Certain support is done in penstock, penstock is avoided and is deformed because of the active force of outside, support dress at this stage Put and only serve simple supporting role, there is still a need for installation platform, less efficient after installation supports.
Utility model content
The purpose of this utility model is that to solve the above problems and provides a kind of vertical shaft section penstock lifting and apply The platform-type inner support of work.
The utility model is achieved through the following technical solutions above-mentioned purpose:
A kind of vertical shaft section penstock elevating construction platform formula inner support, including first layer platform, second layer platform, the 3rd Layer platform, first layer support meanss, second layer support meanss and third layer support meanss, the first layer platform, described second Layer platform and the third layer platform are successively set in the penstock from top to bottom, the first layer platform and described the Connected between two-layer platform, between the second layer platform and the third layer platform by interlayer connecting rod, the first layer branch Support arrangement, the second layer support meanss and the third layer support meanss are correspondingly arranged at the first layer platform, institute respectively State the outer of second layer platform and the third layer platform;
The first layer support meanss include six hydraulic pressure supports and six screw supports, six hydraulic pressure supports and six Individual screw support is spaced the outer for being fixedly installed on the first layer platform successively, and along the radial direction of the first layer platform Set;
The second layer support meanss and the third layer support meanss include 12 screw supports, 12 The screw support is uniformly arranged on the outer of the second layer platform or the third layer platform, and along the second layer platform Or the square setting of radius of the third layer platform.
Specifically, the hydraulic pressure support includes hydraulic jack and hydraulic power unit, the fixing end of the hydraulic jack with it is described First layer platform is fixedly connected, and six hydraulic jacks connect with the hydraulic power unit and can single movement;
The screw support includes operation handle, screw rod and screw jacket, and the screw rod is arranged in the screw jacket, The screw jacket is fixedly connected with the second layer platform or the third layer platform, the rotating shaft of the operation handle with it is described Screw rod is vertically arranged, and is engaged with the inner screw thread of the screw rod.
Further, the inner support also includes roller devices, and the roller devices are fixedly installed on the first layer platform On, and respectively between the screw support and the hydraulic pressure support, the roller devices are fixedly installed on the second layer On platform and the third layer platform, and respectively between two adjacent screw supports, the roller devices and institute State the medial surface fitting of penstock.
Further, the inner support also includes safety steel cable and safety hook, the safety steel cable and the peace Full hook is staggered, and upper end of its both ends respectively with the first layer platform and the penstock is connected.
The beneficial effects of the utility model are:
The utility model vertical shaft section penstock elevating construction platform formula inner support is by setting three layers of platform, and in platform Outer telescopic hydraulic pressure support and screw support are installed, so as to play inner support and the function of operating platform simultaneously.
Brief description of the drawings
Fig. 1 is the structural representation of vertical shaft section penstock elevating construction platform formula inner support described in the utility model;
Fig. 2 is Fig. 1 A-A top views.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings:
As depicted in figs. 1 and 2, a kind of vertical shaft section penstock elevating construction platform formula inner support of the utility model, including First layer platform 4, second layer platform 7, third layer platform 8, first layer support meanss, second layer support meanss and third layer support Device, first layer platform 4, second layer platform 7 and third layer platform 8 are successively set in penstock 13 from top to bottom, and first Connected between layer platform 4 and second layer platform 7, between second layer platform 7 and third layer platform 8 by interlayer connecting rod 6, first layer Support meanss, second layer support meanss and third layer support meanss are correspondingly arranged at first layer platform 4, second layer platform 7 respectively With the outer of third layer platform 8;
First layer platform 4, second layer platform 7, third layer platform 8 are the circular configuration formed by multiple steel pipe weldings, And diamond plate is laid at an upper portion thereof, and first layer platform 4 and second layer platform 7, between second layer platform 7 and third layer platform 8 It is provided with for upper and lower cat ladder 3, interlayer connecting rod 6 is first layer platform 4 and second layer platform 7, second layer platform 7 and third layer Attachment means between platform 8, it is connected to be hinged pattern on three layers of platform.
First layer platform 4 is mainly used in the adjustment and tooled joint, welding of the joint of penstock 13, and as penstock 13 inner support.
Second layer platform 7 is mainly used in the welding of the joint of penstock 13, and the inner support as penstock 13.
Third layer platform 8 is mainly used in placing construction equipment (13 marks in such as cable drum and cable roller, i.e. Fig. 2 Number), due to batching for construction equipment cable, and the inner support as penstock 13.
First layer support meanss include six hydraulic pressure supports 9 and six screw supports 11, six hydraulic pressure supports 9 and six Screw support 11 is spaced the outer for being fixedly installed on first layer platform 4 successively, and is set along the radial direction of first layer platform 4;
Second layer support meanss and third layer support meanss include 12 screw supports, 11,12 screw supports 11 It is uniformly arranged on the outer of second layer platform 7 or third layer platform 8, and along the radius side of second layer platform 7 or third layer platform 8 Shape is set.
Hydraulic pressure support 9 includes hydraulic jack and hydraulic power unit, and the fixing end of hydraulic jack is fixedly connected with first layer platform, Six hydraulic jacks connect with hydraulic power unit and can single movements;
Each hydraulic jack sets a controlled valve, and 6 hydraulic jacks set 6 controlled valve control cylinders to act, Flow speed control valve is set in each controlled valve position simultaneously, the speed that can be acted by flow speed control valve with control cylinder, makes cylinder action Speed control is in 0.2mm/s~5mm/s scopes.
Oil cylinder single movement and responsiveness is adjustable, its main function is when can hold out against tube wall by oil cylinder, according to oil Cylinder stretch pressure size progressively adjusts the circularity of penstock 13.Major advantage is that each hydraulic jack support force is 16 tons, is being pressed It can tightly be adjusted the circularity of penstock 13 in the installation process of power steel pipe 13 instead of hand jack, while can be with by pressure gauge The active force of each stress point is detected, is easy to the adjustment of the installation tooled joint of penstock 13.
Screw support 11 includes operation handle, screw rod and screw jacket, and screw rod is arranged in screw jacket, screw jacket with Second layer platform 7 or third layer platform 8 are fixedly connected, and rotating shaft and the screw rod of operation handle are vertically arranged, and with the inner of screw rod Screw thread engages.
11 manually operated principle of screw support is:Screw support 11 is by operation handle, closure, screw rod, screw jacket four Most of composition, the stroke 300mm of screw rod, manually operation handle, control screw rod are progressively protruding or progressively to inside contracting Enter;
In second layer platform 7, third layer platform 8, each platform is respectively provided with 12 screw supports 11, and screw support 11 is in circle Circumferential direction is evenly arranged, and angle is 30 ° between screw support 11, and screw rod is progressively protruding, screw rod and the inwall of penstock 13 Hold out against, now screw support 11 has the beneficial effect that:Inner support when steel pipe outer concrete pours as penstock 13.
Inner support also includes roller devices 10, and roller devices 10 are fixedly installed on first layer platform 4, and are located at spiral shell respectively Between bar support 11 and hydraulic pressure support 9, roller devices 10 are fixedly installed on second layer platform 7 and third layer platform 8, and point Between two screw supports 11 that Wei Yu be not adjacent, roller devices 10 are bonded with the medial surface of penstock 13.
Roller devices 10 rise in workbench lifting process and are oriented to rolling action, avoid in workbench and penstock 13 The collision and friction of wall.
Inner support also includes safety steel cable 1 and safety hook 5, and safety steel cable 1 and safety hook 5 are staggered, and Upper end of its both ends respectively with first layer platform 4 and penstock 13 is connected.
Safety steel cable 1, safety hook 5 play safeguard protection in workbench working condition.
The technical solution of the utility model is not limited to the limitation of above-mentioned specific embodiment, every according to skill of the present utility model The technology deformation that art scheme is made, each falls within the scope of protection of the utility model.

Claims (4)

  1. A kind of 1. vertical shaft section penstock elevating construction platform formula inner support, it is characterised in that:Including first layer platform, the second layer Platform, third layer platform, first layer support meanss, second layer support meanss and third layer support meanss, the first layer platform, The second layer platform and the third layer platform are successively set in the penstock from top to bottom, the first layer platform Connected between the second layer platform, between the second layer platform and the third layer platform by interlayer connecting rod, it is described First layer support meanss, the second layer support meanss and the third layer support meanss are correspondingly arranged at the first layer respectively The outer of platform, the second layer platform and the third layer platform;
    The first layer support meanss include six hydraulic pressure supports and six screw supports, six hydraulic pressure supports and six spiral shells Interval is fixedly installed on the outer of the first layer platform successively for bar support, and is set along the radial direction of the first layer platform Put;
    The second layer support meanss and the third layer support meanss include 12 screw supports, described in 12 Screw support is uniformly arranged on the outer of the second layer platform or the third layer platform, and along the second layer platform or institute State the square setting of radius of third layer platform.
  2. 2. vertical shaft section penstock elevating construction platform formula inner support according to claim 1, it is characterised in that:The liquid Pressure support includes hydraulic jack and hydraulic power unit, and the fixing end of the hydraulic jack is fixedly connected with the first layer platform, and six The individual hydraulic jack connects with the hydraulic power unit and can single movement;
    The screw support includes operation handle, screw rod and screw jacket, and the screw rod is arranged in the screw jacket, described Screw jacket is fixedly connected with the second layer platform or the third layer platform, the rotating shaft of the operation handle and the screw rod It is vertically arranged, and is engaged with the inner screw thread of the screw rod.
  3. 3. vertical shaft section penstock elevating construction platform formula inner support according to claim 1, it is characterised in that:Also include Roller devices, the roller devices are fixedly installed on the first layer platform, and respectively positioned at the screw support and described Between hydraulic pressure support, the roller devices are fixedly installed on the second layer platform and the third layer platform, and position respectively Between two adjacent screw supports, the roller devices are bonded with the medial surface of the penstock.
  4. 4. vertical shaft section penstock elevating construction platform formula inner support according to claim 1, it is characterised in that:Also include Safety steel cable and safety hook, the safety steel cable and the safety hook are staggered, and its both ends respectively with it is described First layer platform connects with the upper end of the penstock.
CN201720632615.5U 2017-06-02 2017-06-02 Vertical shaft section penstock elevating construction platform formula inner support Active CN207130702U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720632615.5U CN207130702U (en) 2017-06-02 2017-06-02 Vertical shaft section penstock elevating construction platform formula inner support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720632615.5U CN207130702U (en) 2017-06-02 2017-06-02 Vertical shaft section penstock elevating construction platform formula inner support

Publications (1)

Publication Number Publication Date
CN207130702U true CN207130702U (en) 2018-03-23

Family

ID=61631585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720632615.5U Active CN207130702U (en) 2017-06-02 2017-06-02 Vertical shaft section penstock elevating construction platform formula inner support

Country Status (1)

Country Link
CN (1) CN207130702U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107012844A (en) * 2017-06-02 2017-08-04 中国水利水电第七工程局有限公司 Vertical shaft section penstock elevating construction platform formula inner support

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107012844A (en) * 2017-06-02 2017-08-04 中国水利水电第七工程局有限公司 Vertical shaft section penstock elevating construction platform formula inner support

Similar Documents

Publication Publication Date Title
CN104100769B (en) Pipeline sliding auxiliary device
CN206153832U (en) Auxiliary device for pipeline welding
CN105804677A (en) Pipe processing device
CN105108395A (en) Blast furnace shell inner wall welding platform and erecting method thereof
CN207001687U (en) A kind of tube pulling keeps off pipe device
CN207130702U (en) Vertical shaft section penstock elevating construction platform formula inner support
CN107934781B (en) Three-point positioning buffer contact device
CN107237499A (en) A kind of high pressure jet grouting machine
CN103935910B (en) A kind of climbing device for internal-climbing tower crane
CN106287105B (en) A kind of large-scale pipeline internal installation device
CN107012844A (en) Vertical shaft section penstock elevating construction platform formula inner support
CN204954202U (en) Blast furnace stove outer covering inner wall welded platform
CN201906976U (en) Movable tightening nut mounting device
CN102815609A (en) Tank body assembling electric lifting system by flip chip method and hoisting method thereof
CN205927778U (en) Straightening machine roller shell dismouting device
CN105908750B (en) Foundation ditch brace type steel support system
CN203781744U (en) Special steering and hydraulic lifting device for chimney internal steel tube
CN210313411U (en) Automatic combined type lifting device for processing cylinders of various specifications
CN209367731U (en) A kind of portable cord adjustment device for wirerope adjustment mechanism
CN107352464A (en) A kind of hydraulic jacking device being flip-chip mounted for reducer among medium-and-large-sized case tank
CN206842997U (en) A kind of crane steel reinforcement cage lifting device
CN206888983U (en) A kind of penstock installs movable automatic tooled joint car
CN205742959U (en) A kind of lowering or hoisting gear relying on hydraulic lifting scaffold
CN201720286U (en) Pressure steel pipe hydraulic circle regulating frame
CN205966898U (en) Multi -functional portable hydraulic pressure return bend controlling means

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Jianbing

Inventor after: Song Huitao

Inventor after: Zeng Wen

Inventor after: Yang Fang

Inventor after: Fan Rugu

Inventor after: Tan Yuping

Inventor after: Yang Yong

Inventor after: Zeng Hongfu

Inventor after: Pan Yong

Inventor after: Xie Shoubin

Inventor after: Wang Yonghua

Inventor after: Wang Yundong

Inventor after: Sun Wen

Inventor before: Li Jianping

Inventor before: Song Huitao

Inventor before: Yang Fang

Inventor before: Fan Rugu

Inventor before: Tan Yuping

Inventor before: Yang Yong

Inventor before: Zeng Hongfu

Inventor before: Pan Yong

Inventor before: Xie Shoubin

Inventor before: Wang Yonghua

Inventor before: Wang Yongdong

Inventor before: Sun Wen