CN207120216U - Servicing unit for photovoltaic bracket pile foundation construction - Google Patents
Servicing unit for photovoltaic bracket pile foundation construction Download PDFInfo
- Publication number
- CN207120216U CN207120216U CN201720912483.1U CN201720912483U CN207120216U CN 207120216 U CN207120216 U CN 207120216U CN 201720912483 U CN201720912483 U CN 201720912483U CN 207120216 U CN207120216 U CN 207120216U
- Authority
- CN
- China
- Prior art keywords
- setting
- pile foundation
- photovoltaic bracket
- servicing unit
- foundation construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a kind of servicing unit for photovoltaic bracket pile foundation construction, its drip irrigation device is a kind of servicing unit for photovoltaic bracket pile foundation construction;Including case of constructing, the side for case of constructing is provided with opening, is slid in the opening for case of constructing and is connected with some scribing plates for overturning connection successively, scribing plate is provided with some positioning holes, guide sleeve is fitted with positioning hole;Scribing plate is provided with some deep-slotted chip breakers close to the periphery of guide sleeve;Sliding is connected with setting-out component on each deep-slotted chip breaker, and connection component is provided between each setting-out component of same guide sleeve periphery;Setting-out component includes setting-out axle sleeve, the detail pen being detachably connected with setting-out axle sleeve.Setting-out is positioned using deep-slotted chip breaker, position deviation is smaller;It is more with a band using annular support member, improve setting-out efficiency.
Description
Technical field
It the utility model is related to photovoltaic bracket technical field of construction, the more particularly to auxiliary for photovoltaic bracket pile foundation construction
Device.
Background technology
Solar photovoltaic generation system is the photovoltaic effect using solar cell semi-conducting material, and solar radiation energy is straight
Switch through a kind of new power generating system for being changed to electric energy, have independent operating and the two ways that is incorporated into the power networks, be mainly used in outlying district
With population decentralization area.Wherein solar cell array is supported with photovoltaic bracket, and photovoltaic bracket is supported using concrete suspension column, and
It is connected by screw bolts, the anchor (bolt) hole on photovoltaic bracket has drilled before dispatching from the factory and finished, and job site does not allow reaming.
At present, photovoltaic bracket is after mass customized, and assembling installation, its size are normalized before dispatching from the factory at the scene.It is conventional
Method is to carry out drilling after using setting-out and pour, but the displacement of random direction is easily formed in line drawing process, so as to each pile foundation
Bore position can not well adapt to the installation of each photovoltaic bracket, the foundation construction for photovoltaic bracket causes certain
It is difficult.
Utility model content
The purpose of this utility model is to provide a kind of servicing unit for photovoltaic bracket pile foundation construction, and its advantage is convenient
The setting-out positioning of pile foundation boring position.
Above-mentioned technical purpose of the present utility model technical scheme is that:One kind is used for photovoltaic bracket
The servicing unit of pile foundation construction;
Including case of constructing, the side of case of constructing is provided with opening, slides to be connected with the opening for case of constructing and some overturns successively
The scribing plate of connection, scribing plate are provided with some positioning holes, guide sleeve are fitted with positioning hole;
Scribing plate is provided with some deep-slotted chip breakers close to the periphery of guide sleeve;
Sliding is connected with setting-out component on each deep-slotted chip breaker, is provided between each setting-out component of same guide sleeve periphery
Connection component;
Setting-out component includes setting-out axle sleeve, the detail pen being detachably connected with setting-out axle sleeve.
Pass through above-mentioned technical proposal, pile foundation construction need advance setting-out punching;During construction, the construction case is carried, from construction
Scribing plate is hauled out in the opening of case, each scribing plate forms multiple construction points by that can be laid on the ground after turning unfolding;This
When operate detail pen, state of the flexibility nib in protrusion of detail pen, detail pen carries out the picture that walks using existing deep-slotted chip breaker
Line, it is simple to operate;In addition, detail pen can take out after consume from setting-out axle sleeve, the detail pen more renewed;In setting-out work
After the completion of work, the also desirable rig of operating personnel is pierced in guide sleeve, and on ground, corresponding position is pre-perforated, is easy to the later stage to carry out
The construction working of pile foundation;Wherein structure of the scribing plate as counterweight, it is not easily shifted in line drawing process, so as to setting-out result
It is ideal.
The utility model is further arranged to:Action bars, the picture are rotatably connected at least one setting-out axle sleeve
Line plate is provided with the embedded groove being fitted together to for action bars, and one end of rotation connection position of the embedded groove away from action bars is provided with flank
Groove.
Pass through above-mentioned technical proposal, in non-line drawing process, action bars can be rotated relative to setting-out axle sleeve and be caught in embedded groove,
Being relatively fixed for action bars is realized using embedded groove, reduces the loss of detail pen;And when needing setting-out, it will be grasped using flank groove
Broken out as bar, action bars breaks out rear setting-out axle sleeve and recovers rotational freedom, and the operation of setting-out can be realized by now rotating detail pen.
The utility model is further arranged to:The scribing plate includes train wheel bridge and lower plate, train wheel bridge and lower plate it
Between be provided with separate slot, the connection component is the annular support member around positioning hole, and annular support member is provided with and worn for setting-out axle sleeve
The transfer groove crossed.
Pass through above-mentioned technical proposal, scribing plate are hollow structure;The inside of scribing plate is provided with annular support member, setting-out axle
Interference fit is kept after set insertion annular support member, moving annular support member by the slip band of setting-out axle sleeve rotates, so as to each
Detail pen synchronizing moving, realizes the synchronous setting-out of multiple positions, and required setting-out stroke is only the arc length of deep-slotted chip breaker;Improve
Setting-out efficiency.
The utility model is further arranged to:Each annular support member outer rim in same scribing plate is provided with linkage tooth, respectively
Around equipped with synchronization chain between individual annular support member.
Pass through above-mentioned technical proposal, four annular support members are generally set in scribing plate, led between each annular support member
Synchronization chain synchronous axial system is crossed, it is achieved thereby that the detail pen synchronous axial system setting-out at least on two groups of annular support members, thus enters
One step improves setting-out efficiency;Only need to operate the synchronous picture that dozens of detail pen can be achieved in a detail pen in each setting-out
Line.
The utility model is further arranged to:The synchronization chain in same scribing plate installs around each annular brace successively
Part, the scribing plate are provided with regulating tank, and regulating tank slides along its length is connected with adjustment axis, and tune is arranged with adjustment axis
Gear is saved, adjustment gear engages with the inner side of synchronization chain.
Pass through above-mentioned technical proposal, regulating tank are available for adjustment axis to slide, and drive adjustment gear to promote when adjustment axis slides same
Chain is walked, is adjusted so as to the rate of tension of synchronization chain, improves the degree of engagement of each annular support member first line of a couplet moving teeth.
The utility model is further arranged to:The both sides of the annular support member, which are provided with, to be used to contradict train wheel bridge or lower plate
Movable pulley.
Pass through above-mentioned technical proposal, movable pulley slides between train wheel bridge and lower plate can reduce resistance to sliding, be easy to
The rotation of annular support member, improve the fluent writing degree of detail pen.
The utility model is further arranged to:Some support columns are provided between the train wheel bridge and lower plate.
Pass through above-mentioned technical proposal, multiple support columns are played a supporting role to train wheel bridge and lower plate, thereby reduce ring
The pressure that shape support member is born, the operation resistance of detail pen reduce.
The utility model is further arranged to:The lateral edges of scribing plate are provided with magnetic card frame, and magnetic card frame is provided with and it
By the jamb duster handle of magnetic attracting, bristle is connected with jamb duster handle.
Pass through above-mentioned technical proposal, magnetic card frame are arranged on the outside of scribing plate, and it has certain magnetic action;It has
There are two effects, one is being adsorbed for jamb duster handle, jamb duster handle can carry out sweeping dirt processing in setting-out opening position, reduce ground area
Dirt;The adsorbable a certain amount of screw bolt and nut of other magnetic card frame, it is easy to pick up part during construction.
The utility model is further arranged to:The construction case is provided with the stirring cover for being used for covering its opening, stirring cover
It is provided with the hasp for being used for coordinative construction case closure.
Pass through above-mentioned technical proposal, the stirring cover constructed on case can be closed by rotating, and stirring cover is available after closing to be taken
Button keeps lock-out state, realizes the storage of scribing plate.
The utility model is further arranged to:The both sides of the scribing plate are provided with some pushing wheels, the construction case opening
One be sloped downwardly setting.
Pass through above-mentioned technical proposal, slided during scribing plate is put into construction case using pushing wheel, cunning can be reduced
Dynamic resistance, storage process are more laborsaving.
In summary, the utility model has the advantages that:
1st, setting-out is positioned using deep-slotted chip breaker, position deviation is smaller;
2nd, it is more with a band using annular support member, improve setting-out efficiency;
3rd, using synchronization chain, multiple annular support member synchronous axial systems is further driven to, improve setting-out efficiency.
Brief description of the drawings
Fig. 1 is the structural representation of the present embodiment;
Fig. 2 is the structural representation after the present embodiment scribing plate takes out;
Fig. 3 is the structural representation after the expansion of the present embodiment scribing plate;
Fig. 4 a are the fractionation structural representations of the present embodiment;
Fig. 4 b are enlarged drawings at A in Fig. 4 a;
Fig. 4 c are enlarged drawings at B in Fig. 4 a;
Fig. 5 a are enlarged drawings at C in Fig. 4 a;
Fig. 5 b are enlarged drawings at D in Fig. 4 a;
Fig. 6 is the present embodiment bottom side fractionation structural representation.
Reference:1st, construction case;101st, it is open;102nd, stirring cover;103rd, hasp;104th, handle;2nd, scribing plate;201、
Train wheel bridge;202nd, lower plate;204th, deep-slotted chip breaker;205th, embedded groove;206th, flank groove;207th, regulating tank;208th, support column;209、
Pushing wheel;210th, positioning hole;211st, stopper slot;3rd, guide sleeve;4th, setting-out axle sleeve;401st, detail pen;402nd, action bars;5th, it is annular
Support member;501st, groove is transferred;502nd, link tooth;503rd, synchronization chain;504th, movable pulley;6th, adjustment axis;601st, adjustment gear;
602nd, motion bar;7th, magnetic card frame;8th, jamb duster handle;801st, bristle.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Embodiment:With reference to figure 1 and Fig. 2, a kind of servicing unit for photovoltaic bracket pile foundation construction, the setting-out for pile foundation
Positioning and prebored hole.The device includes construction case 1, and the top side of construction case 1 is provided with handle 104, and the side of construction case 1, which is provided with, opens
Mouth 101, construction case 1 are connected with stirring cover 102 close to the upper of opening 101 along upset, and stirring cover 102 passes through hasp 103 with constructing
Case 1, which coordinates, keeps lock-out state.The opening 101 is built-in with three pieces of scribing plates for overturning connection successively 2, and three pieces of scribing plates 2 can lead to
Cross turning unfolding.When scribing plate 2 collapses stacking, the pushing wheel 209 of its both sides can be slided along the inwall of opening 101 of construction case 1.
With reference to figure 3, three pieces of scribing plates 2 after expansion are long plate shape;Such as Fig. 4 a, Fig. 4 b and Fig. 4 c, scribing plate 2 is provided with four
Individual positioning hole 210, guide sleeve 3 is fitted with each positioning hole 210, guide sleeve 3 is interference fitted with positioning hole 210;Scribing plate 2
Four deep-slotted chip breakers 204 are provided with close to the periphery of guide sleeve 3, four deep-slotted chip breakers 204 cooperatively form the structure of similar annular.Scribing plate
2 include train wheel bridge 201 and lower plate 202, and separate slot is provided between train wheel bridge 201 and lower plate 202, i.e. scribing plate 2 is hollow knot
Structure, while some support columns 208 are provided between train wheel bridge 201 and lower plate 202, play a supporting role.Separate slot is built-in with annular
Support member 5, annular support member 5 are mounted at outside guide sleeve 3 by bearing holder (housing, cover);Annular support member 5 is provided with transfer groove 501, transfer
Setting-out axle sleeve 4 is fitted with groove 501, detail pen 401 is fitted with setting-out axle sleeve 4.When annular support member 5 rotates, setting-out axle
Set 4 arcuately groove 204 will slide, and the nib of detail pen 401 is by the ground setting-out of the bottom of scribing plate 2.In order that obtain setting-out
Pen 401 can be obtained effectively in ground setting-out, and the nib height of detail pen 401 is slightly below the height of the bottom side of scribing plate 2, and setting-out
The nib of pen 401 is soft nib.
In order to increase the rotation fluency of annular support member 5, such as Fig. 4 a and Fig. 4 c, the both sides of annular support member 5 are equipped with
Movable pulley 504, each movable pulley 504 contradict with the inwall of train wheel bridge 201 or the inwall of lower plate 202.
With reference to figure 4b and Fig. 4 c, action bars 402 is rotatably connected on one of setting-out axle sleeve 4, scribing plate 2 is provided with embedding
Enter groove 205;When setting-out axle sleeve 4 rotates corresponding position, action bars 402 can be caught in embedded groove 205, realize annular brace
The rotary spacing of part 5;When needing to release rotary spacing, action bars 402 can be broken using the flank groove 206 of the both sides of embedded groove 205
Go out, the setting-out on ground is now realized using the promotion setting-out of action bars 402 axle sleeve 4.
With reference to figure 4a and Fig. 4 c, the outer rim of annular support member 5 is provided with linkage tooth 502, is installed around between four annular support members 5 same
Walk chain 503;When one of annular support member 5 rotates, you can the synchronous axial system of the other three annular support member 5 is driven, it is real
Existing ground setting-out.
With reference to figure 5a and Fig. 5 b, regulating tank 207 on scribing plate 2, regulating tank 207 slides be connected with regulation along its length
Axle 6, adjustment gear 601 is arranged with adjustment axis 6, adjustment gear 601 engages with the inner side of synchronization chain 503;Turned in adjustment axis 6
Turn to be connected with motion bar 602, scribing plate 2 is provided with stopper slot 211 at three and for motion bar 602 engaged;Can by slidable adjustment axle 6
Adjustment gear 601 is driven to move, adjustment gear 601 can promote synchronization chain 503 to be displaced outwardly when moving, so as to realize synchronous chain
The regulation of the rate of tension of bar 503, the regulative mode are relatively easy.
With reference to figure 6, the outward flange of scribing plate 2 is installed with magnetic card frame 7, and the inwall of magnetic card frame 7 can coated with adhesive increase
Its fix tightly soundness.There is jamb duster handle 8 by magnetic attracting on magnetic card frame 7, bristle 801 is connected with jamb duster handle 8;Drawing
Line plate 2 carries out sweeping dirt before being layed in ground using bristle 801.In addition, according to construction needs, bolt, nut can be adsorbed on
The outer rim of magnetic card frame 7, is easy to photovoltaic bracket to be picked up at any time when constructing.
Use step:
1st, the stirring cover 102 on construction case 1 is opened, takes out three pieces of scribing plates 2 stacked;
2nd, the jamb duster handle 8 on magnetic card frame 7 is removed, dirt is swept to ground;
3rd, deploy three pieces of scribing plates 2, and place to suitable construction location;
4th, the position of adjustment axis 6 is adjusted;
5th, rotating operation bar 402, each setting-out axle sleeve 4 is driven to slide using action bars 402, the setting-out on setting-out axle sleeve 4
Pen 401 is in ground setting-out;
6th, rig is taken to penetrate guide sleeve 3 pre-perforated.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model
Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but
As long as all protected in right of the present utility model by Patent Law.
Claims (10)
- A kind of 1. servicing unit for photovoltaic bracket pile foundation construction, it is characterised in thatIncluding construction case (1), the side of construction case (1) is provided with opening (101), and connection is slid in the opening (101) of construction case (1) There are some scribing plates (2) for overturning connection successively, scribing plate (2) is provided with some positioning holes (210), inserted on positioning hole (210) Equipped with guide sleeve (3);Scribing plate (2) is provided with some deep-slotted chip breakers (204) close to the periphery of guide sleeve (3);Slid on each deep-slotted chip breaker (204) and be connected with setting-out component, between each setting-out component of same guide sleeve (3) periphery Provided with connection component;Setting-out component includes setting-out axle sleeve (4), the detail pen (401) being detachably connected with setting-out axle sleeve (4).
- 2. the servicing unit according to claim 1 for photovoltaic bracket pile foundation construction, it is characterised in that at least one institute State and action bars (402) is rotatably connected on setting-out axle sleeve (4), the scribing plate (2) is embedding provided with being fitted together to for action bars (402) Enter groove (205), one end of rotation connection position of the embedded groove (205) away from action bars (402) is provided with flank groove (206).
- 3. the servicing unit according to claim 1 for photovoltaic bracket pile foundation construction, it is characterised in that the scribing plate (2) include train wheel bridge (201) and lower plate (202), separate slot, the connection are provided between train wheel bridge (201) and lower plate (202) Component is the annular support member (5) around positioning hole (210), and annular support member (5) is provided with the shifting passed through for setting-out axle sleeve (4) Send groove (501).
- 4. the servicing unit according to claim 3 for photovoltaic bracket pile foundation construction, it is characterised in that same scribing plate (2) each annular support member (5) outer rim in is provided with linkage tooth (502), around equipped with synchronous chain between each annular support member (5) Bar (503).
- 5. the servicing unit according to claim 4 for photovoltaic bracket pile foundation construction, it is characterised in that same scribing plate (2) synchronization chain (503) in installs around each annular support member (5) successively, and the scribing plate (2) is provided with regulating tank (207), regulating tank (207) slides be connected with adjustment axis (6) along its length, and adjustment axis is arranged with adjustment gear on (6) (601), adjustment gear (601) engages with the inner side of synchronization chain (503).
- 6. the servicing unit according to claim 5 for photovoltaic bracket pile foundation construction, it is characterised in that the annular branch The both sides of support member (5) are provided with the movable pulley (504) for being used for contradicting train wheel bridge (201) or lower plate (202).
- 7. the servicing unit according to claim 6 for photovoltaic bracket pile foundation construction, it is characterised in that the train wheel bridge (201) some support columns (208) are provided between lower plate (202).
- 8. the servicing unit according to claim 3 for photovoltaic bracket pile foundation construction, it is characterised in that scribing plate (2) Lateral edges be provided with magnetic card frame (7), magnetic card frame (7) is provided with the jamb duster handle (8) with it by magnetic attracting, jamb duster Bristle (801) is connected with handle (8).
- 9. the servicing unit according to claim 1 for photovoltaic bracket pile foundation construction, it is characterised in that the construction case (1) stirring cover (102) for being used for covering its opening (101) is provided with, stirring cover (102), which is provided with, is used for coordinative construction case (1) The hasp (103) of closure.
- 10. the servicing unit according to claim 1 for photovoltaic bracket pile foundation construction, it is characterised in that the setting-out The both sides of plate (2) are provided with some pushing wheels (209), and the one of construction case (1) opening (101) is sloped downwardly setting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720912483.1U CN207120216U (en) | 2017-07-25 | 2017-07-25 | Servicing unit for photovoltaic bracket pile foundation construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720912483.1U CN207120216U (en) | 2017-07-25 | 2017-07-25 | Servicing unit for photovoltaic bracket pile foundation construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207120216U true CN207120216U (en) | 2018-03-20 |
Family
ID=61613183
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720912483.1U Expired - Fee Related CN207120216U (en) | 2017-07-25 | 2017-07-25 | Servicing unit for photovoltaic bracket pile foundation construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207120216U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107263433A (en) * | 2017-07-25 | 2017-10-20 | 江苏信诺新能源有限公司 | Servicing unit for photovoltaic bracket pile foundation construction |
-
2017
- 2017-07-25 CN CN201720912483.1U patent/CN207120216U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107263433A (en) * | 2017-07-25 | 2017-10-20 | 江苏信诺新能源有限公司 | Servicing unit for photovoltaic bracket pile foundation construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202595768U (en) | Self-elevation inspection well lid | |
CN106050142A (en) | Multipurpose device for environment-friendly labor-saving efficient perforation installation | |
CN201794520U (en) | Soil removing device of spiral drill rod | |
US11855457B2 (en) | Modular gravitational energy storage systems | |
CN207120216U (en) | Servicing unit for photovoltaic bracket pile foundation construction | |
CN203050522U (en) | Reamer bit | |
CN108487005A (en) | A kind of road surface tamping unit in the changeable compacting direction of Construction of Civil Engineering | |
CN201263296Y (en) | Portable soil ventilator | |
CN102162349B (en) | The put-on method of a kind of bubble rod row delivery device and bubble rod row | |
CN107263433A (en) | Servicing unit for photovoltaic bracket pile foundation construction | |
CN206302780U (en) | One kind builds sponge city with ecological roof | |
CN107138245A (en) | The overcurrent protection structure of garbage crushing device | |
CN106270645A (en) | A kind of novel wall boring machine | |
CN206958810U (en) | A kind of lowering or hoisting gear for landscape garden illuminating lamp | |
PT106123A (en) | ELECTROMECHANICAL SYSTEM OF GENERATION AND STORAGE OF ELECTRIC ENERGY FROM THE MOVEMENT OF A SURFACE | |
CN211090861U (en) | Suspension type planting system of ecological green building | |
CN201121561Y (en) | Wind power generation plant | |
CN202227346U (en) | Construction device for full casing construction method | |
CN103104190A (en) | Super-large-aperture pile foundation hole drilling machine | |
CN207369565U (en) | A kind of ornamental plant transplants equipment | |
CN201119292Y (en) | Fertilizer applicator | |
CN206987728U (en) | A kind of punching positioner for architectural engineering | |
CN103104191B (en) | Super-large-aperture pile foundation hole drilling machine | |
CN206575822U (en) | The spiral organic fertilizer applicator of Cold region apple jujube garden | |
CN107882314A (en) | Liftable mechanized construction platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180320 Termination date: 20200725 |
|
CF01 | Termination of patent right due to non-payment of annual fee |