CN202227346U CN 201120351136 CN201120351136U CN202227346U CN 202227346 U CN202227346 U CN 202227346U CN 201120351136 CN201120351136 CN 201120351136 CN 201120351136 U CN201120351136 U CN 201120351136U CN 202227346 U CN202227346 U CN 202227346U
Authority
CN
China
Prior art keywords
rig
dematron
chassis
full casing
method construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN 201120351136
Other languages
Chinese (zh)
Inventor
梁大云
龚高柏
王龙刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Sany Heavy Machinery Co Ltd
Original Assignee
Beijing Sany Heavy Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Sany Heavy Machinery Co Ltd filed Critical Beijing Sany Heavy Machinery Co Ltd
Priority to CN 201120351136 priority Critical patent/CN202227346U/en
Application granted granted Critical
Publication of CN202227346U publication Critical patent/CN202227346U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model provides a construction device for a full casing construction method. The construction device for the full casing construction method comprises soil taking equipment and a pipe rubbing drill, wherein the pipe rubbing drill is installed on the machine body of the soil taking equipment through a connecting component; and the power source of the pipe rubbing drill is a power element of the soil taking equipment. In the construction device for the full casing construction method, the pipe rubbing drill is adhered to the soil taking equipment and the soil taking equipment serves as the power of the pipe rubbing drill, so that the production cost is reduced; and in the working process, convenient and quick installation and movement can be realized through the hoisting and walking capability of the soil taking equipment, and in combination with the drilling capability of the soil taking equipment, high-efficiency drilling can be realized, so that the construction efficiency is obviously improved.

Description

A kind of full casing worker method construction equipment
Technical field
The utility model relates to engineering machinery field, particularly a kind of full casing worker method construction equipment.
Background technology
The work progress of modern construction engineering generally all begins with pile foundation construction, and therefore, the foundation piling construction seems particularly important.In many foundation piling constructions, full casing construction is to use a kind of comparatively widely important construction.Full casing construction is meant; Casing joint through with a plurality of certain-lengths links together; Be pressed into or be pressed into to stable stratum in the dark scope whole process of whole stake; Thereby cooperate artificial, dash grab bucket, revolve dig, method soil taking hole forming such as Churn drill, the job practices that pore-forming is extracted casing after accomplishing again.Because casing is to the support and the sealing function on stratum; Problems such as the caving in of stake hole, necking down, hole enlargement have been avoided; Come the balance ground water pressure to avoid mud contamination thereby avoid the use of mud, can avoid underground water to get in the casing, simultaneously for pile driving equipment is created good drilling condition; The hole wall that full casing construction forms is rule comparatively, thereby can improve the bearing capacity of pile.
At present, pressing down and rise the following several method that mainly passes through that pulls out casing realizes:
Vibrating hammer; Utilize the exciting force of vibrating hammer, make the liquefaction of soil of casing lower end, realize pressing down of casing through the resistance that reduces between soil and the casing barrel; Rise and to pull out the friction that exciting force that casing utilizes vibrating hammer equally reduces casing barrel and stratum, rise through crane realization casing and pull out.
Rotary drilling rig; Through the casing driver is installed on the unit head of rotary drilling rig, utilize the moment of torsion of unit head and the pressure pull out force that the rotary drilling rig water booster system provides to realize pressing down of casing and pull out.
The full circle swinging rig; Special casing presses down and rises the equipment of pulling out, and holds casing tightly through clamp mechanism and presses down, rises to pull out with rotating mode and realize pressing down, rising and pull out of casing.
Jump bit; Utilize the impact force of gravity to realize pressing down of casing.
Above-mentioned several method all has shortcoming separately, particularly:
The vibrating hammer driving force is less, only is applicable to softer soil property, sandy stratum, owing to have only the active force of vertical direction, can't in hardpans such as rock stratum, use;
The moment of torsion and the downforce of rotary digging drill power head are limited; Be generally tens of tons; But the buried depth of casing is generally tens of rice, and diameter is 0.8m-3.0m, and pressing down and rise the power requirement of pulling out casing is more than hundred tons; So this method is only applicable to the more shallow casing construction of buried depth, or the casing of the initial degree of depth presses down;
The full circle swinging rig utilizes oil cylinder to realize pressing down, rising and pull out casing; The rotation that drives casing with motor realizes the cutting to the stratum; But it can't be realized simultaneously creeping into and fetch earth, and needs to cooperate to dash grab bucket or rotary drilling rig construction, and not only efficiency of construction is lower; And in work progress the full circle swinging rig with creep into borrow equipment and need power be provided separately, make construction cost higher;
Jump bit and only has the ability that presses down casing because its noise only is suitable for and open-air operation, has not had the ability of pulling out casing.
Therefore, develop a kind of casing that is exclusively used in and press down and rise the full casing worker method construction equipment that pulls out, make it have enough downforce and pulling force, and have higher efficiency of construction and lower cost of production, just become the problem that those skilled in the art need solve.
The utility model content
The purpose of the utility model provides a kind of full casing worker method construction equipment, presses down and rise the special equipment that pulls out as casing, and it has enough downforce and pulling force, and has higher efficiency of construction and lower cost of production.
For solving the problems of the technologies described above; The utility model provides a kind of full casing worker method construction equipment; Comprise borrow equipment and dematron rig, said dematron rig is installed on the fuselage of said borrow equipment through link, and the power source of said dematron rig is the dynamical element of said borrow equipment.
Preferably, said link is the interface block of said dematron rig.
Preferably, the chassis of said dematron rig is provided with presents a theatrical performance as the last item on a programme, said interface block comprise be positioned at said present a theatrical performance as the last item on a programme the top and against or away from said briquetting of presenting a theatrical performance as the last item on a programme; Said interface block is fixedly connected with said borrow equipment away from an end of said briquetting, and it is rotationally connected near an end of said briquetting and the chassis of said dematron rig, and swing at vertical direction with respect to said interface block on the chassis of said dematron rig.
Preferably, said interface block is provided with hanging scroll, and said hanging scroll is equipped with the hook that is mounted on said hanging scroll along the horizontally set on the chassis of said dematron rig on the chassis of said dematron rig.
Preferably, said interface block also comprises contiguous block, offers the chute of vertically offering along it on the chassis of said dematron rig, and said contiguous block is slidingly mounted on said chute, and said hook is installed on the end of said contiguous block.
Preferably, offer bar hole on the said contiguous block, said bar hole is vertically offered along the chassis of said dematron rig, and alignment pin is inserted said contiguous block through bar hole.
Preferably, said interface block comprises at least two linking arms, and said linking arm is along the horizontally set on the chassis of said dematron rig, and said interface block is fixedly connected with said borrow equipment through said linking arm.
Preferably, the fixed joint cartoon of said dematron rig is crossed rotating connecting part and is rotated the chassis that is installed on said dematron rig, and the rotating shaft of said rotating connecting part is along the transverse horizontal setting on the chassis of said dematron rig.
Preferably, said rotating connecting part comprises axle bed, and said axle bed is fixed in the chassis of said dematron rig, and said rotating shaft is installed on said axle bed through bearing.
Preferably, said fixed joint card is to hold the arc plate that face is smooth cambered surface tightly, and the outer tip end of said arc plate is equipped with support plate.
Preferably, the reducing moving sets card of said dematron rig is a monolithic construction, and said reducing moving sets card is installed on the moving sets card of said dematron rig removably.
Preferably, said reducing moving sets card is provided with installation shaft, offers installing hole on the said moving sets card, and said installation shaft is inserted in the said installing hole, and said installation shaft radially is fitted with alignment pin.
Preferably, also comprise axle sleeve, said installation shaft radially is plugged in said axle sleeve along said axle sleeve, and said alignment pin is plugged in said axle sleeve coaxially.
Preferably, one in the main card of said dematron rig and the clamping limb is equipped with gag lever post, another person be provided with said gag lever post against or the block that separates.
Preferably, said borrow equipment is rotary drilling rig or grab bucket crane.
The utility model provides a kind of full casing worker method construction equipment; This full casing worker method construction equipment comprises borrow equipment and dematron rig; Said dematron rig is installed on the fuselage of said borrow equipment through link, and the power source of said dematron rig is the dynamical element of said borrow equipment.
When carrying out the construction of full casing, at first to the ground the dematron borer chassis under reinforce, smooth, make the center of creeping into of borrow equipment, the main card and the secondary alignment hole position, center of blocking of dematron rig through the main frame position of adjustment borrow equipment; At first use the workpiece of borrow equipment to creep into proper depth; The elevator lifting casing that utilizes borrow equipment then is in the dematron rig; Connect the casing driver of casing to the unit head of dematron rig; Utilize the power of unit head that casing is pressed into certain depth, then use the dematron rig to carry out dematron and creep into; The revolving to dig with creeping into of dematron rig of borrow equipment hocketed, reach set depth after, hang in reinforcing cage and tremie, concrete perfusion rises simultaneously and pulls out casing, keeps concrete influx height to be higher than the lower end of casing, up to pore-forming.
Like this, the full casing worker of this kind method construction equipment adheres to the dematron rig on borrow equipment, and utilizes the power of borrow equipment as the dematron rig, thereby has reduced cost of production; Simultaneously, in the course of the work, utilize the lifting of borrow equipment and locomotor activity to realize installing easily and moving, cooperate the drilling ability of borrow equipment self to realize efficient drilling and forming hole, significantly improved efficiency of construction.
In a kind of specific embodiment, the link of the full casing worker method construction equipment that the utility model provided is the interface block of dematron rig.The chassis of dematron rig is provided with presents a theatrical performance as the last item on a programme, interface block comprise be positioned at present a theatrical performance as the last item on a programme the top and against or away from the briquetting of presenting a theatrical performance as the last item on a programme; Interface block is fixedly connected with borrow equipment away from an end of briquetting, and it is rotationally connected near an end of briquetting and the chassis of dematron rig, and swing at vertical direction with respect to interface block on the chassis of dematron rig.
When the dematron rig pressed down casing, the pressure of dematron rig was pulled out oil cylinder and is shunk, and the chassis is lifted; Chassis whole rotates with respect to interface block, turn over predetermined angular after, two briquettings of presenting a theatrical performance as the last item on a programme and running into and being resisted against interface block that stretch out at two ends on the chassis; Because interface block is fixedly connected and non-rotatable with borrow equipment, interface block and borrow equipment are connected as a single entity, and suppress the continuation lifting on chassis through the own wt of borrow equipment; Like this, in the drilling process of dematron rig, the reaction force that produces when utilizing the weight of borrow equipment to come balance to press down casing; Indigenous equipment has substituted the counterweight of dematron rig, thereby has further reduced construction cost.
Description of drawings
Fig. 1 is the structural representation of the full casing worker method construction equipment that the utility model provided;
Fig. 2 is the structural representation of dematron rig in the full casing worker method construction equipment that the utility model provided in main apparent direction;
Fig. 3 overlooks the structural representation of direction for dematron rig shown in Figure 2;
Fig. 4 overlooks the structural representation of direction for the chassis of dematron rig shown in Figure 2.
The specific embodiment
The core of the utility model provides a kind of full casing worker method construction equipment, presses down and rise the special equipment that pulls out as casing, and it has enough downforce and pulling force, and has higher efficiency of construction and lower cost of production.
In order to make those skilled in the art person understand the technical scheme of the utility model better, the utility model is done further to specify below in conjunction with the accompanying drawing and the specific embodiment.
Please refer to Fig. 1, Fig. 1 is the structural representation of the full casing worker method construction equipment that the utility model provided.
The utility model provides a kind of full casing worker method construction equipment; This full casing worker method construction equipment comprises borrow equipment 1 and dematron rig 2, and wherein, dematron rig 2 is installed on the fuselage of borrow equipment 1 through link; Apparently; Dematron rig 2 should be installed in the standing part of borrow equipment 1, and this standing part should be static with respect to ground in work progress, and for example dematron rig 2 can be installed on the chassis 22 of borrow equipment 1.The power source of dematron rig 2 is the dynamical element of borrow equipment 1.
It is to be noted; In the full casing works construction equipment that the utility model provided; Dematron rig 2 wherein can be the conventional various dematron rigs that use in this area; Also can be on the basis of original dematron rig, to improve, more to adapt to the dematron rig of full casing worker method, the dematron rig that the utility model provided not only comprises parts related in the literary composition; Also should comprise necessary other component of the process of finishing the work, for example press the pressure of pull out force to pull out oil cylinder, the mistake pipe oil cylinder of power etc. is provided for the rubbing casing for dematron rig 2 provides.The operating principle of dematron rig 2 and traditional dematron rig are basic identical.Particularly, in full casing worker method, the acting as to press down and rise of dematron rig 2 pulled out casing, and action step can be designed as:
The secondary clip of S11 dematron rig 2 is tight;
The main card 26 of S12 dematron rig 2 is opened;
The pressure of S13 dematron rig 2 is pulled out oil cylinder liter (falling) to top dead centre (lower dead center);
S14 main card 26 is held casing tightly;
The secondary card of S15 is opened;
The dematron oil cylinder rubbing of S16 dematron rig 2, pressure is pulled out oil cylinder and is pressed down (rise and pull out) simultaneously; Pressure is pulled out and is stopped to press down (rise and pull out) after oil cylinder arrives lower dead center (top dead centre), and the dematron oil cylinder stops rubbing, beginning step S11; So circulation, reach the upper end (lower end) of casing joint after, (disassembling) casing joint is installed; Continue circulation, up to reaching projected depth (casing all takes out).
When carrying out the construction of full casing, at first to the ground under the chassis 22 of dematron rig 2 reinforce, smooth, make the center of creeping into of borrow equipment 1, the main card 26 of dematron rig 2 and the alignment hole position, center of secondary card through the main frame position of adjustment borrow equipment 1; At first use the workpiece of borrow equipment 1 to creep into proper depth; The elevator lifting casing that utilizes borrow equipment 1 then is in dematron rig 2; Connect the casing driver of casing to the unit head of dematron rig 2; Utilize the power of unit head that casing is pressed into certain depth, then use the dematron rig to carry out dematron and creep into; The revolving to dig with creeping into of dematron rig of borrow equipment hocketed, reach set depth after, hang in reinforcing cage and tremie, concrete perfusion rises simultaneously and pulls out casing, keeps concrete influx height to be higher than the lower end of casing, up to pore-forming.
Like this, the full casing worker of this kind method construction equipment adheres to dematron rig 2 on borrow equipment 1, and utilizes the power of borrow equipment 1 as dematron rig 2, thereby has reduced cost of production; Simultaneously, in the course of the work, utilize lifting and the locomotor activity of borrow equipment 1 to realize installing easily and moving, the drilling ability of cooperation borrow equipment 1 self is realized efficient drilling and forming hole, has significantly improved efficiency of construction.
Please refer to Fig. 2 and Fig. 3, Fig. 2 is the structural representation of dematron rig in the full casing worker method construction equipment that the utility model provided in main apparent direction; Fig. 3 overlooks the structural representation of direction for dematron rig shown in Figure 2.
In a kind of specific embodiment, the full casing worker method construction equipment that the utility model provided, its link can be the interface block 21 of dematron rig 2; Like this, realize connecting, simplified the structure of equipment, further reduced cost of production through the existing structure of dematron rig 2.Apparently, above-mentioned link also is not limited to the interface block 21 of dematron rig 2, also can be connected with the reliable of borrow equipment 1 as long as can realize dematron rig 2 for the structure that designs separately.
Can be provided with on the chassis 22 of above-mentioned dematron rig 2 and present a theatrical performance as the last item on a programme 221, said interface block 21 comprise be positioned at said present a theatrical performance as the last item on a programme 221 tops and against or away from said 221 the briquetting of presenting a theatrical performance as the last item on a programme; Said interface block 21 is fixedly connected with said borrow equipment 1 away from an end of said briquetting, and it is rotationally connected near an end of said briquetting and the chassis 22 of said dematron rig 2, and swing at vertical direction with respect to interface block 21 on the chassis 22 of dematron rig 2.When dematron rig 2 pressed down casing, the pressure of dematron rig 2 was pulled out oil cylinder and is shunk, and chassis 22 is lifted; Chassis 22 integral body are rotated with respect to interface block 21, turn over predetermined angular after, stretch out on the chassis 22 present a theatrical performance as the last item on a programme 221 run into and be resisted against interface block 21 briquetting; Non-rotatable because interface block 21 is fixedly connected with borrow equipment 1, interface block 21 is connected as a single entity with borrow equipment 1, suppresses the continuation lifting on chassis 22 through the own wt of borrow equipment 1; Like this, in the drilling process of dematron rig 2, the reaction force that produces when utilizing the weight of borrow equipment 1 to come balance to press down casing; Indigenous equipment has substituted the counterweight of dematron rig 2, thereby has further reduced construction cost.
Apparently, above-mentioned briquetting should be outwardly directed with respect to interface block 21, and correspondingly, presenting a theatrical performance as the last item on a programme 221 also should be outwardly directed with respect to chassis 22.
221 the quantity of presenting a theatrical performance as the last item on a programme can be two, two present a theatrical performance as the last item on a programme 221 lay respectively at the chassis 22 of dematron rig 2 relative position, correspondingly, the quantity of briquetting also can be two, two briquettings lay respectively at the relative position of interface block 21,221 position is complementary with presenting a theatrical performance as the last item on a programme.Apparently; Present a theatrical performance as the last item on a programme and 221 also be not limited to the quantity of briquetting and be provided with two; Also can be provided with three, four or more a plurality of, a plurality of presenting a theatrical performance as the last item on a programme 221 can be uniformly distributed on the chassis 22 of dematron rig 2, and a plurality of briquettings also can be evenly distributed on the interface block 21.
It is to be noted; Above-mentioned present a theatrical performance as the last item on a programme 221 with briquetting each other against or separate and be meant; In complete first kind of course of work of casing worker method construction equipment, the chassis 22 of dematron rig 2 is with respect to interface block 21 motions, when moving to the precalculated position; Presenting a theatrical performance as the last item on a programme 221 is resisted against on the briquetting, present a theatrical performance as the last item on a programme 221 further motion of briquetting restriction; And when full casing worker method construction equipment carried out second kind of course of work, the chassis 22 of dematron rig 2 was with respect to interface block 21 counter motions, and the 221 disengaging briquettings of presenting a theatrical performance as the last item on a programme are also progressively away from briquetting.
Interface block 21 is fixedly connected with borrow equipment 1 and can realizes that for example both can connect through bolt removably, also can be fixedly connected through modes such as welding through method conventional in this area.
Interface block 21 can be specially with the rotation connection structure on the chassis 22 of dematron rig 2; Interface block 21 is provided with hanging scroll 212; Hanging scroll 212 is equipped with the hook 222 that is mounted on hanging scroll 212 along the horizontally set on the chassis 22 of dematron rig 2 on the chassis 22 of dematron rig 2; When dematron rig 2 pressed down casing, pressure was pulled out oil cylinder and is shunk, and chassis 22 is lifted, and hook 222 rotates around hanging scroll 212, thereby realized chassis 22 integral body with respect to interface block 21 rotations, and the structure that this kind is rotationally connected is comparatively simple, and easy to process, and is safe and reliable.
Interface block 21 also is not limited to above-mentioned hanging scroll 212 and the form of linking up with 222 with being rotationally connected of chassis 22; Also can in this area conventional use other can realize the mode of rotating; For example interface block 21 can directly be articulated on the chassis 22; Jointed shaft is identical with the direction of above-mentioned hanging scroll 212, promptly along the horizontally set on the chassis 22 of dematron rig 2.
Above-mentioned interface block 21 can also comprise contiguous block 213, offers the chute of vertically offering along it on the chassis 22 of dematron rig 2, and contiguous block 213 is slidingly mounted on chute, and hook 222 is installed on the end of contiguous block 213; Like this; Interface block 21 is installed on the chassis 22 through contiguous block 213; Dematron rig 2 has level of freedom in the horizontal direction, and the position of the position of casing and interface block 21 is fixed, can be through the position of adjustment interface block 21 with respect to chassis 22; Regulate the position of casing, thus the positional precision when having guaranteed that casing presses down.
Laterally being meant of the chassis 22 of the dematron rig 2 that it is pointed out that in the literary composition to be mentioned perpendicular to the direction of dematron rig 2 directions of advance, vertically is meant along the direction of dematron rig 2 directions of advance.
Can offer bar hole on the above-mentioned contiguous block 213, this bar hole is vertically offered along the chassis 22 of dematron rig 2, and alignment pin is inserted contiguous block 213 through bar hole; Contiguous block 213 is telescopic to be inserted in the chassis 22 of dematron rig 2; Be fixedly connected through alignment pin; In the time of in working order, alignment pin is inserted in the bar hole, has both guaranteed dematron rig 2 degree of freedom in the horizontal direction; Avoid contiguous block 213 in chute, to come off again, guaranteed the functional reliability of equipment.
On contiguous block 213, can also offer positioning round orifice, alignment pin is selectively inserted in this positioning round orifice.When full casing worker method construction equipment is cut to transportation; From bar hole, extract alignment pin; The chassis of borrow equipment 1 is retreated drive contiguous block 213 and from the chassis 22 of dematron rig 2, is extracted certain distance out; Then alignment pin 2 is inserted in the positioning round orifice, realizes being fixedly connected of chassis 22 of contiguous block 213 and dematron rig 2, thereby realize the displacement of whole dematron rig 2.
Apparently, also can not offer above-mentioned positioning round orifice on the contiguous block 213, when transition, with transportation respectively after dematron rig 2 and borrow equipment 1 fractionation.
Above-mentioned interface block 21 can also comprise at least two linking arms 214; Said linking arm 214 is along the horizontally set on the chassis 22 of dematron rig 2; Interface block 21 is fixedly connected with borrow equipment 1 through linking arm 214, so that realize being fixedly connected of interface block 21 and borrow equipment 1 comparatively easily.
Above-mentioned linking arm 214 can be the bearing pin ways of connecting with being fixedly connected of borrow equipment 1, particularly, can use two row's bearing pins realization multiple spots to fix, so that guarantee connection reliability.
Above-mentioned interface block 21 can be the frame type interface block of U-shaped, and the connecting portion of the connection working portion of dematron rig 2 is positioned at this framework in the horizontal direction; When two dematron oil cylinders of dematron rig 2 alternately stretch the rubbing casing; Dematron rig 2 is at the direction alternatively swinging of link, because interface block 21 is the tower structure of U-shaped, the link of dematron rig 2 alternately hits on interface block 21; And interface block 21 is fixedly connected with the chassis of linking arm 214 with borrow equipment 1 through bearing pin; Be integrally formed on the chassis of horizontal plane inner joint seat 21, thereby realization limits the swing of dematron rig 2, improved the job stability of equipment with borrow equipment 1.
Can also the full casing worker method construction equipment that the utility model provided further be improved.
Please refer to Fig. 4, Fig. 4 overlooks the structural representation of direction for the chassis of dematron rig shown in Figure 2.
In the another kind of specific embodiment; The full casing worker method construction equipment that the utility model provided; The fixed joint card 23 of its dematron rig 2 rotates the chassis 22 that is installed on dematron rig 2 through rotating connecting part, and the rotating shaft of rotating connecting part is along the transverse horizontal setting on the chassis 22 of dematron rig 2; Like this; Fixed joint card 23 remains on the fixing to realize holding firmly casing of horizontal direction; Can realize rotating in vertical direction simultaneously; When pressure was pulled out oil cylinder and pressed down the chassis 22 of mentioning dematron rig 2, fixed joint card 23 was not raised with chassis 22, thereby has avoided the interference between dematron rig 2 and the casing.
Rotating connecting part comprises rotating shaft and axle bed, and axle bed is fixed in the chassis 22 of dematron rig 2, and rotating shaft is installed on axle bed through bearing; When pressure is pulled out the oil cylinder down pressing oil cylinder; The chassis 22 of dematron rig 2 is raised away from an end of borrow equipment 1; Can think fixed owing to the casing insertion is underground; Above-mentioned rotating shaft this moment is rotated in axle bed, rotates on vertical plane thereby drive fixed joint card 23, avoids the chassis 22 of dematron rig 2 and the interference between the casing; The structure of this kind rotating connecting part is comparatively simple, and it is comparatively convenient to process.
Rotating connecting part also is not limited to the form that above-mentioned rotating shaft is rotated in axle bed; As long as can realize chassis 22 the swing on vertical plane of fixed joint card 23 with respect to dematron rig 2; Rotating connecting part can have various ways, for example makes the chassis 22 of fixed joint card 23 and dematron rig 2 hinged etc.
The number of above-mentioned rotating shaft can be two, and two rotating shafts are arranged at the two-end-point of fixed joint card 23 respectively.
Fixed joint card 23 can be for holding the arc plate that face is smooth cambered surface tightly, and the outer tip end of arc plate is equipped with support plate; Smooth cambered surface can reduce teaching and administrative staff's difficulty, simultaneously, at the support plate that the outer tip end of arc plate is provided with, can avoid when fixed joint card 23 is held casing tightly, and whole shearing forces is born in rotating shaft, has reduced the force request of rotating shaft.
The reducing moving sets card of the dematron rig 2 that the utility model provided can be monolithic construction, and reducing moving sets card is installed on the moving sets card 25 of dematron rig 2 removably.Particularly, reducing moving sets card is provided with installation shaft, offers installing hole on the moving sets card 25, and installation shaft is inserted in the said installing hole, and said installation shaft radially is fitted with alignment pin; Like this, when the size of casing changes, reducing moving sets card is pulled down, changed the reducing moving sets card that meets dimensional requirement simultaneously, this kind structure makes that the process of changing reducing moving sets card is comparatively convenient, has improved the applicability of equipment.
Above-mentioned dematron rig 2 can also comprise axle sleeve, and installation shaft radially is plugged in axle sleeve along axle sleeve, and alignment pin is plugged in axle sleeve coaxially, so that improve the installation reliability of installation shaft.
The main card 26 of above-mentioned dematron rig 2 and clamping limb 27 one among both are equipped with gag lever post 29, another person be provided with said gag lever post 29 against or the block 210 that separates; When clamping oil cylinder pulling clamping limb 27 is opened main card 26; Clamping limb 27 rotates around it axle when turning to a certain degree; Above-mentioned gag lever post 29 blocks clamping limb 27, thereby clamping limb 27 continues to open and promotes gag lever post 29 motions, and then the rule that promotes whole main card 26 is opened; Make that opening of main card 26 is regular more, guaranteed the reliability that main card 26 is opened.
Apparently, block 210 can be realized for the existing structure of clamping limb or through the groove that is opened on the clamping limb 27, also can be the element that is provided with in addition.
The full casing worker method construction equipment that the utility model provided, its borrow equipment 1 is rotary drilling rig or grab bucket crane, also can be for other can provide power, and the engineering machinery of the bore operation of can realizing fetching earth.
More than a kind of full casing worker method construction equipment that the utility model provided has been carried out detailed introduction.Used concrete example among this paper the principle and the embodiment of the utility model are set forth, the explanation of above embodiment just is used to help to understand the method and the core concept thereof of the utility model.Should be understood that; For those skilled in the art; Under the prerequisite that does not break away from the utility model principle, can also carry out some improvement and modification to the utility model, these improvement and modification also fall in the protection domain of the utility model claim.

Claims (15)

1. full casing worker method construction equipment; It is characterized in that; Comprise borrow equipment (1) and dematron rig (2), said dematron rig (2) is installed on the fuselage of said borrow equipment (1) through link, and the power source of said dematron rig (2) is the dynamical element of said borrow equipment (1).
2. full casing worker method construction equipment according to claim 1 is characterized in that said link is the interface block (21) of said dematron rig (2).
3. full casing worker method construction equipment according to claim 2; It is characterized in that; The chassis (22) of said dematron rig (2) is provided with present a theatrical performance as the last item on a programme (221), said interface block (21) comprise be positioned at said presenting a theatrical performance as the last item on a programme (221) top and against or away from the briquetting of said presenting a theatrical performance as the last item on a programme (221); Said interface block (21) is fixedly connected with said borrow equipment (1) away from an end of said briquetting; It is rotationally connected near an end of said briquetting and the chassis (22) of said dematron rig (2), and swing at vertical direction with respect to said interface block (21) on the chassis (22) of said dematron rig (2).
4. full casing worker method construction equipment according to claim 3; It is characterized in that; Said interface block (21) is provided with hanging scroll (212); Said hanging scroll (212) is equipped with the hook (222) that is mounted on said hanging scroll (212) along the horizontally set on the chassis (22) of said dematron rig (2) on the chassis (22) of said dematron rig (2).
5. full casing worker method construction equipment according to claim 4; It is characterized in that; Said interface block (21) also comprises contiguous block (213); Offer the chute of vertically offering along it on the chassis (22) of said dematron rig (2), said contiguous block (213) is slidingly mounted on said chute, and said hook (222) is installed on the end of said contiguous block (213).
6. full casing worker method construction equipment according to claim 5; It is characterized in that; Said contiguous block offers bar hole on (213), and said bar hole is vertically offered along the chassis (22) of said dematron rig (2), and alignment pin is inserted said contiguous block (213) through bar hole.
7. full casing worker method construction equipment according to claim 3; It is characterized in that; Said interface block (21) comprises at least two linking arms (214); Said linking arm is along the horizontally set on the chassis (22) of said dematron rig (2), and said interface block (21) is fixedly connected with said borrow equipment (1) through said linking arm.
8. full casing worker method construction equipment according to claim 1; It is characterized in that; The fixed joint card (23) of said dematron rig (2) rotates the chassis (22) that is installed on said dematron rig (2) through rotating connecting part, and the rotating shaft of said rotating connecting part is along the transverse horizontal setting on the chassis (22) of said dematron rig (2).
9. full casing worker method construction equipment according to claim 8 is characterized in that said rotating connecting part comprises axle bed, and said axle bed is fixed in the chassis (22) of said dematron rig (2), and said rotating shaft is installed on said axle bed through bearing.
10. full casing worker method construction equipment according to claim 9 is characterized in that for to hold the arc plate that face is smooth cambered surface tightly, the outer tip end of said arc plate is equipped with support plate to said fixed joint card (23).
11. full casing worker method construction equipment according to claim 1 is characterized in that the reducing moving sets card of said dematron rig (2) is a monolithic construction, said reducing moving sets card is installed on the moving sets card (25) of said dematron rig (2) removably.
12. full casing worker method construction equipment according to claim 11; It is characterized in that said reducing moving sets card is provided with installation shaft, offers installing hole on the said moving sets card (25); Said installation shaft is inserted in the said installing hole, and said installation shaft radially is fitted with alignment pin.
13. full casing worker method construction equipment according to claim 12 is characterized in that, also comprises axle sleeve, said installation shaft radially is plugged in said axle sleeve along said axle sleeve, and said alignment pin is plugged in said axle sleeve coaxially.
14. full casing worker method construction equipment according to claim 1; It is characterized in that; The main card (26) of said dematron rig (2) and clamping limb (27) one among both are equipped with gag lever post (29), another person be provided with said gag lever post (29) against or the block (210) that separates.
15., it is characterized in that said borrow equipment (1) is rotary drilling rig or grab bucket crane according to each described full casing worker method construction equipment of claim 1 to 13.
CN 201120351136 2011-09-19 2011-09-19 Construction device for full casing construction method Withdrawn - After Issue CN202227346U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120351136 CN202227346U (en) 2011-09-19 2011-09-19 Construction device for full casing construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120351136 CN202227346U (en) 2011-09-19 2011-09-19 Construction device for full casing construction method

Publications (1)

Publication Number Publication Date
CN202227346U true CN202227346U (en) 2012-05-23

Family

ID=46077936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120351136 Withdrawn - After Issue CN202227346U (en) 2011-09-19 2011-09-19 Construction device for full casing construction method

Country Status (1)

Country Link
CN (1) CN202227346U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102304922A (en) * 2011-09-19 2012-01-04 北京市三一重机有限公司 Full-pile casing construction device
CN104314083A (en) * 2014-09-18 2015-01-28 中国水利水电第十三工程局有限公司 Novel power-traction soil-taking system and using method thereof
CN104452750A (en) * 2014-11-17 2015-03-25 李春江 Self-propelled automatic-lifting and full-rotation integrated building machine
CN111535308A (en) * 2020-05-27 2020-08-14 中建一局集团建设发展有限公司 Full-length steel sleeve construction device and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102304922A (en) * 2011-09-19 2012-01-04 北京市三一重机有限公司 Full-pile casing construction device
WO2013040887A1 (en) * 2011-09-19 2013-03-28 湖南三一智能控制设备有限公司 Construction equipment using total guard barrel construction method
CN104314083A (en) * 2014-09-18 2015-01-28 中国水利水电第十三工程局有限公司 Novel power-traction soil-taking system and using method thereof
CN104314083B (en) * 2014-09-18 2016-04-13 中国水利水电第十三工程局有限公司 New type power draws fetch earth system and using method
CN104452750A (en) * 2014-11-17 2015-03-25 李春江 Self-propelled automatic-lifting and full-rotation integrated building machine
CN111535308A (en) * 2020-05-27 2020-08-14 中建一局集团建设发展有限公司 Full-length steel sleeve construction device and construction method thereof
CN111535308B (en) * 2020-05-27 2022-04-08 中建一局集团建设发展有限公司 Full-length steel sleeve construction device and construction method thereof

Similar Documents

Publication Publication Date Title
CN102304922B (en) Full-pile casing construction device
CN102425372B (en) Vibrato-drilling type punching drilling rig
CN202227346U (en) Construction device for full casing construction method
CN201915824U (en) Truck-mounted rotary drilling rig with construction function of diaphragm wall
CN101205728A (en) Endless-tracked multifunctional rotary excavating driller
CN201826837U (en) Movable double-platform partitioned four-arm drill carriage for construction of hangwall anchor rods and anchor cables
CN201865563U (en) Multifunctional rotary drilling rig
CN204371098U (en) A kind of Combined hydraulic jump bit rig
CN105888545A (en) Raise boring machine orienting to low roadway
CN103806834B (en) Casing pressure pulls out rig
CN203742443U (en) Pile casing pressing and pulling drill rig
CN202417302U (en) Vibrating drilling type impact digging drilling machine
CN102536117B (en) Machine-mounted type multipurpose anchor rod drilling machine
CN204851053U (en) Double dynamical first all -hydraulic core -drill(ing) machine of top formula of driving
CN215332668U (en) Hydroelectric engineering highway tunnel pipe shed creeps into drive protection mechanism
JP4693586B2 (en) Circular shaft excavation method
CN202249835U (en) Pipe rolling drill and secondary clamp component thereof
CN211777162U (en) Suspension arm down-the-hole hammer drilling equipment
CN205116239U (en) Engineering pile foundation static load detects resistance anchor hoe
CN202227345U (en) A pipe-rubbing drilling machine used in combination with an earth collecting apparatus
CN201144432Y (en) Crawler type multifunctional rotary drilling rig
CN209539258U (en) Steel-pipe pile drilling machine
CN202431186U (en) Drilling machine and drill arm mechanism thereof
CN202401978U (en) Deep hole drilling machine
CN205733660U (en) A kind of transport erecting device of drilling platforms preventer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120523

Effective date of abandoning: 20131030

RGAV Abandon patent right to avoid regrant