CN207120210U - A kind of construction material storage rack - Google Patents

A kind of construction material storage rack Download PDF

Info

Publication number
CN207120210U
CN207120210U CN201721171163.1U CN201721171163U CN207120210U CN 207120210 U CN207120210 U CN 207120210U CN 201721171163 U CN201721171163 U CN 201721171163U CN 207120210 U CN207120210 U CN 207120210U
Authority
CN
China
Prior art keywords
rack
bar
column
material storage
storage rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721171163.1U
Other languages
Chinese (zh)
Inventor
张剑
龙坪峰
童方平
吴勇
张德春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxiang Yuanda Residential Industry Co Ltd
Original Assignee
Ningxiang Yuanda Residential Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxiang Yuanda Residential Industry Co Ltd filed Critical Ningxiang Yuanda Residential Industry Co Ltd
Priority to CN201721171163.1U priority Critical patent/CN207120210U/en
Application granted granted Critical
Publication of CN207120210U publication Critical patent/CN207120210U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

A kind of construction material storage rack, it includes breast piece and transhipment part, the breast piece includes connecting rod and at least two racks, adjacent rack is connected by connecting rod, rack includes placing bar, the all or part of top for placing bar or both sides are provided with column, and the transhipment part includes the boom hoisting and/or running gear being arranged on breast piece.Change storage rack and form the rack of different structure by placing bar and column, so as to be stacked to different types of reinforcing bar or steel classification, not only save big quantity space, and be easy to workmen's drawn material and all material is subjected to shipment storage.

Description

A kind of construction material storage rack
Technical field
The utility model belongs to the realm of building construction, more particularly, to a kind of construction material storage rack.
Background technology
In architectural process, reinforcing bar and protection tubing are required for after being completed in workshop, then are deposited into Unified Set Scene, but because live place is small, construction tool is more, reinforcing bar or the random of tubing are put, and not only area occupied is big, influences Worker constructs, while is not easy to worker and takes and transport, and the longer straight steel bar of length or tubing at the scene random Stack, it is easy to bend and deform.
The U of CN 204433560 disclose a kind of warehouse separated type adjustable steel bar storing unit, in two bases be arrangeding in parallel two End is fixedly mounted with two vertical pins and bearing diagonal is fixedly mounted between base on the inside of pin respectively;It is formed with base multiple for installing The vertical preformed groove for dividing storehouse bar, bearing diagonal is respectively welded between block rod both sides and base.The storing unit does not utilize storage to grow The longer straight steel bar of degree, and do not possess the function that the reinforcing bar that will will be placed in storing unit concentrate transhipment.
The content of the invention
The technical problems to be solved in the utility model is:A kind of overcome the deficiencies in the prior art, there is provided construction material Expect storage rack, construction material storage rack provided by the utility model has simple in construction, easy for installation and structure strong The characteristics of high is spent,
Technical scheme is used by the utility model solves its technical problem:A kind of construction material storage rack, Including breast piece and transhipment part, the breast piece includes connecting rod and at least two racks, and adjacent rack passes through Connecting rod is connected, and rack includes placing bar, and all or part of top for placing bar or both sides are provided with column, described turn Fortune part includes the boom hoisting and/or running gear being arranged on breast piece.
Specifically, by placing the combination of bar and column, a variety of different racks can be set, multiple gloves are set Frame can be by the reinforcing bar and tubing sorting placement of different specification shapes, and all reinforcing bar and tubing can be uniformly transported into finger Determine place.
Further, placement bar, column and the connecting rod are connected by dismountable mode.
Specifically, bolt connection and the mode such as snap connection, it is possible to achieve that places bar, column and connecting rod can Dismounting is connected, so as to which workmen can be according to the demand used, the rack of the different structure of flexible assembling.
Further, the rack includes the first rack and the second rack, and the first rack includes being arranged on connection First places bar on bar, and second rack includes the second of several columns and the several columns of connection and places bar, and described the Two placement bars or column are connected with connecting rod.
First rack only includes the first placement bar, and the support mainly served to reinforcing bar or steel is anti-bending;Second Rack is the frame-shaped construction being made up of the second placement bar and column, places the species of thing as needed, sets multiple upper bottom lefts Right multiple placing columns, so as to place one or more kinds of reinforcing bars or steel.
Further, the second placement bar is connected in a manner of horizontal and/or be inclined with column.
When the length that second places bar is longer, workmen is not easy to get positioned at the second placement for placing bar centre position Thing, the second placement bar being now obliquely installed can make placement thing to two Slideslips, consequently facilitating workmen takes.
Further, the boom hoisting is to be arranged on the suspension ring above column.
Further, the suspension ring upper end is arcuate structure, and lower end is connected with column.
Specifically, suspension ring are formed by round steel or reinforcing bar bending, and its upper end is inverted U-shaped, semicircle or oval Deng arcuate structure, lower end both sides are connected with column.Arcuate structure makes steel wire rope or withheld smoothly slide on suspension ring, It can effectively prevent breast piece from occurring tiltedly to hang and tilt during lifting.
Further, it is provided with base below the column.Set base that the stability of whole breast piece can be made more preferable, It is not susceptible to topple over.
Further, the running gear is to be arranged on the self-locking universal wheel below column.
Further, it is provided with the Wire channel in building extended radially through on the upside of the connecting rod and/or placement bar.
Reinforcing bar steel are placed directly in after placing in bar or connecting rod, it is difficult to by the bundled colligation of reinforcing bar tubing, and lead to Steel wire can pass through below the reinforcing bar tubing by crossing Wire channel in building, so that by reinforcing bar or the bundled colligation of frame pipe.
Further, reinforcing plate is provided between the column and placement bar and/or connecting rod, is set in the reinforcing plate There is threading hole.
Specifically, connecting steel wire ropes form fence between threading hole and suspension ring, can prevent during lifting, frame The reinforcing bar or frame pipe placed in body portion drop out.
A kind of beneficial effect of the utility model construction material storage rack:The utility model is by placing bar and standing Post forms the rack of different structure, so as to be stacked to different types of reinforcing bar or steel classification, not only saves big Quantity space, and be easy to workmen's drawn material and all material is subjected to shipment storage.
Brief description of the drawings
The positive structure diagram of a kind of construction material storage rack in Fig. 1-embodiment 1;
The overlooking the structure diagram of a kind of construction material storage rack in Fig. 2-embodiment 1;
The side structure schematic view of a kind of construction material storage rack in Fig. 3-embodiment 1;
The positive structure diagram of a kind of construction material storage rack in Fig. 4-embodiment 2;
The overlooking the structure diagram of a kind of construction material storage rack in Fig. 5-embodiment 2;
The side structure schematic view of a kind of construction material storage rack in Fig. 6-embodiment 2;
The positive structure diagram of a kind of construction material storage rack in Fig. 7-embodiment 3;
The overlooking the structure diagram of a kind of construction material storage rack in Fig. 8-embodiment 3;
The side structure schematic view of a kind of construction material storage rack in Fig. 9-embodiment 3;
A kind of construction uses structural representation with material storage rack in Figure 10-embodiment 3.
In figure:1-the second rack, 11-column, 12-base, 13-the second places bar;2-connecting rod, 3-lifting Device, the 4-the first rack, 41-the first places bar;5-preset bolt hole, 6-connecting bolt, 7-Wire channel in building, 8-reinforcement Plate, 81-threading hole.
Embodiment
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Embodiment 1
Reference picture 1 ~ 3:
A kind of construction material storage rack, including breast piece and transhipment part, the breast piece include setting Two the second racks 1 and the first rack 4 for being arranged between two the second racks 1 in both sides, and three passes through Two connecting rods 2 are connected.
Specifically, according to the difference of use demand, the first rack 4, the second rack 1 of varying number can be set And connecting rod 2, the quantity of three is more, and load-bearing and useful load are also more, but deadweight also increases therewith.
First rack 4, which includes being arranged on the first placement bar 41, second rack 1 in connecting rod 2, includes water Flat the second placement bar 13 set and the two root posts 11 for being connected to the both sides of the second placement bar 13, the column 11 and connecting rod 2 are connected.Strip reinforcing bar or steel can be placed on the breast piece, the first placement bar 41 of setting can effectively prevent from growing Bar reinforcing bar or steel mode flexural deformation.
The top of column 11 is provided with boom hoisting 3, and boom hoisting 3 is the suspension ring for being arranged on the top of column 11, described Suspension ring are the inverted U-shaped being bent into by round steel, and its upper end is arc, and lower end both sides are connected with column 11.
The lower section of column 11 is provided with base 12.Set base 12 that the stability of whole breast piece can be made more preferable, It is not susceptible to topple over.
The present embodiment has the characteristics of simple in construction, reliable and stable, the straight steel bar longer available for stacking length or pipe Material, it can ensure that it will not flexural deformation;And it can use, can maximize in the case of complicated condition and narrow space Release construction space.
Embodiment 2:
Reference picture 4 ~ 6
Compared with Example 1, there is following difference in a kind of construction material storage rack of the present embodiment:
First rack 4 includes three the first parallel placement bars 41 being arranged in connecting rod 2, and described second puts Rack 1 includes horizontally disposed two second and places bar 13 and be connected to the two root posts 11 of the both sides of the second placement bar 13, institute Column 11 is stated with connecting rod 2 to be connected.
Be provided with default bolt hole 5 in the connecting rod 2 and column 11, connecting rod 2 and first place bar 41 and column 11, Column 11 is connected with the second placement bar 13 by connecting bolt 6.
In this embodiment, default bolt hole 5 is provided with the column 11 and connecting rod 2, workmen can be according to reality Border use demand, varying number and the first rack 4 and the second rack 1 of structure are installed.
Embodiment 3:
Reference picture 7 ~ 9:
Compared with Example 1, there is following difference in a kind of construction material storage rack of the present embodiment:
A kind of construction material storage rack, including breast piece and transhipment part, the breast piece include relative The connecting rod 2 of the second rack 1 of three the second racks 1 and connection set, second rack 1 include laterally setting Three root posts 11 and be arranged between adjacent upright posts 11 second in an inclined manner and place bar 13.Due to the width of storage rack It is wider, therefore the second placement bar 13 is obliquely installed, the reinforcing bar that is placed on breast piece and steel can be made to slide to both sides, It is easy to workmen to take and use.
The upside of connecting rod 2 is disposed radially several Wire channel in building 7 run through, and steel wire can be incited somebody to action through Wire channel in building 7 The bundled colligation of the reinforcing bar that is placed on breast piece.
Reinforcing plate 8 is provided between the column 11 and connecting rod 2, threading hole 81 is provided with the reinforcing plate 8, is wearing Connecting steel wire ropes form fence between string holes 81 and suspension ring, can prevent during lifting, the reinforcing bar placed in breast piece Or frame pipe drops out.
The running gear is the self-locking universal wheel for being arranged on the lower section of column 11.Workmen is by self-locking universal wheel by frame Body portion, which is flexibly moved to, to be formulated place and is fixed.
In the present embodiment, workmen easily can take reinforcing bar or tubing from breast piece, and can be fast Being tied up to the reinforcing bar on breast piece or steel for speed, greatly improves efficiency of construction and the simple operation of workmen.
For above-described embodiment only to illustrate technical concepts and features of the present utility model, its object is to allow be familiar with technique Personage can understand content of the present utility model and be carried out, the scope of protection of the utility model can not be limited with this, All equivalent change or modifications made according to the utility model Spirit Essence, should all cover the scope of protection of the utility model it It is interior.

Claims (10)

  1. A kind of 1. construction material storage rack, it is characterised in that:Including breast piece and transhipment part, the breast piece Including connecting rod and at least two racks, adjacent rack is connected by connecting rod, rack include place bar, all or The top of bar is placed in part or both sides are provided with column, and the transhipment part includes the boom hoisting being arranged on breast piece And/or running gear.
  2. 2. construction as claimed in claim 1 material storage rack, it is characterised in that:Placement bar, column and the connection Bar is connected by dismountable mode.
  3. 3. construction as claimed in claim 1 or 2 material storage rack, it is characterised in that:The rack is put including first Rack and the second rack, the first rack, which includes being arranged on the first placement bar, second rack in connecting rod, includes number Second placement bar of root post and the several columns of connection, the second placement bar or column are connected with connecting rod.
  4. 4. construction as claimed in claim 3 material storage rack, it is characterised in that:Described second place bar with it is horizontal and/ Or inclined mode is connected with column.
  5. 5. construction as claimed in claim 1 or 2 material storage rack, it is characterised in that:The boom hoisting is to be arranged on Suspension ring above column.
  6. 6. construction as claimed in claim 5 material storage rack, it is characterised in that:The suspension ring upper end is arcuate structure, Lower end is connected with column.
  7. 7. construction as claimed in claim 1 or 2 material storage rack, it is characterised in that:Bottom is provided with below the column Seat.
  8. 8. construction as claimed in claim 1 or 2 material storage rack, it is characterised in that:The running gear is to be arranged on Self-locking universal wheel below column.
  9. 9. construction as claimed in claim 1 or 2 material storage rack, it is characterised in that:The connecting rod and/or placement The Wire channel in building extended radially through is provided with the upside of bar.
  10. 10. construction as claimed in claim 1 or 2 material storage rack, it is characterised in that:The column with place bar and/ Or reinforcing plate is provided between connecting rod, it is provided with threading hole in the reinforcing plate.
CN201721171163.1U 2017-09-13 2017-09-13 A kind of construction material storage rack Active CN207120210U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721171163.1U CN207120210U (en) 2017-09-13 2017-09-13 A kind of construction material storage rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721171163.1U CN207120210U (en) 2017-09-13 2017-09-13 A kind of construction material storage rack

Publications (1)

Publication Number Publication Date
CN207120210U true CN207120210U (en) 2018-03-20

Family

ID=61601802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721171163.1U Active CN207120210U (en) 2017-09-13 2017-09-13 A kind of construction material storage rack

Country Status (1)

Country Link
CN (1) CN207120210U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111483681A (en) * 2019-12-31 2020-08-04 圣沃建设集团有限公司 Fixed device of easily getting is deposited to reinforcing bar for construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111483681A (en) * 2019-12-31 2020-08-04 圣沃建设集团有限公司 Fixed device of easily getting is deposited to reinforcing bar for construction

Similar Documents

Publication Publication Date Title
CN203352056U (en) Universal hanging beam of tackle for paying-off
CN104631810A (en) High-altitude movable hanging basket system and construction method thereof
CN207120210U (en) A kind of construction material storage rack
CN206065298U (en) A kind of suspension type reinforcement cage processing device
CN205282953U (en) Assembled goods shelves of spatial structure of transformer substation
CN203185326U (en) Tree-shaped pipe rack and stacking rack composed of tree-shaped pipe racks
CN205530270U (en) Bank protection concrete device that puts in storage
CN206719742U (en) A kind of charging basket
CN201962679U (en) Lifting bracket used for vertically and aswirl lifting steel reinforcement cage and lifting system
CN213589689U (en) Concatenation formula basketball rack
CN209194967U (en) A kind of construction combined type hanging cage
CN209193384U (en) Portal frame
CN208549466U (en) The edible fungi frame of stack
CN207749810U (en) A kind of Novel moveable scaffold
CN207497867U (en) A kind of building machinery lifts machine support
CN206457187U (en) A kind of pole of mounting steel chimney
CN201485204U (en) Gas tank hanging device
CN205668650U (en) A kind of electrostatic precipitator anode package assembling device
CN208716689U (en) Force bearing frame for installing reinforcement cage
CN214031423U (en) Wire rod hoisting accessory
CN203819870U (en) Hanging bracket
CN211254964U (en) Hoisting frame
CN207903747U (en) A kind of device applied to the transport of multi-rope friction hoisting machine directive wheel
CN207184377U (en) The general section bar of solar energy
CN220373228U (en) Pump shaft protective storage device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant