CN206457187U - A kind of pole of mounting steel chimney - Google Patents
A kind of pole of mounting steel chimney Download PDFInfo
- Publication number
- CN206457187U CN206457187U CN201720002039.6U CN201720002039U CN206457187U CN 206457187 U CN206457187 U CN 206457187U CN 201720002039 U CN201720002039 U CN 201720002039U CN 206457187 U CN206457187 U CN 206457187U
- Authority
- CN
- China
- Prior art keywords
- pole
- ladder
- steel
- square frame
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Ladders (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及一种工业施工辅助装置,尤其是涉及一种安装钢烟囱的抱杆。The utility model relates to an auxiliary device for industrial construction, in particular to a pole for installing a steel chimney.
背景技术Background technique
在一些偏远地区的设备安装中,大型吊车因租赁困难,安装超高的烟囱难度就非常大,如运输大型吊车到偏远地区就会大大增加工程造价,而且影响现场的施工效率。In the installation of equipment in some remote areas, it is very difficult to install super high chimneys due to the difficulty of renting large cranes. For example, transporting large cranes to remote areas will greatly increase the project cost and affect the construction efficiency on site.
实用新型内容Utility model content
本实用新型针对现有产品的不足,而提供一种安装钢烟囱的抱杆。本实用新型所要解决的技术问题是:解决因无大型吊车而无法安装超高的钢烟囱的困难。The utility model aims at the deficiencies of the existing products, and provides a pole for installing a steel chimney. The technical problem to be solved by the utility model is to solve the difficulty that a superhigh steel chimney cannot be installed because there is no large crane.
本实用新型的一种安装钢烟囱的抱杆,所述抱杆包括左梯子、右梯子、组对平台、抱杆基础、正方形框架、立柱;所述左梯子、右梯子的顶端固定连接有正方形框架,所述左梯子、右梯子由4根立柱和数根横杆构成,所述立柱的下端和抱杆基础固定连接,所述抱杆基础表面设置有组对平台,所述正方形框架和立柱之间设置有斜拉筋,所述正方形框架下表面两侧端固定连接有吊耳,所述吊耳上连接有卷扬机,所述卷扬机通过钢丝绳和钢烟囱底部连接。The utility model relates to a pole for installing a steel chimney. The pole includes a left ladder, a right ladder, a paired platform, a pole foundation, a square frame, and a column; the tops of the left and right ladders are fixedly connected with a square Frame, the left ladder and the right ladder are composed of 4 uprights and several cross bars, the lower ends of the uprights are fixedly connected to the pole-holding foundation, the surface of the pole-holding foundation is provided with a paired platform, the square frame and the uprights Diagonal stays are arranged between them, and lifting lugs are fixedly connected to both sides of the lower surface of the square frame, and a winch is connected to the lifting lugs, and the winch is connected to the bottom of the steel chimney through a steel wire rope.
进一步,所述立柱采用无缝钢管制成。Further, the column is made of seamless steel pipe.
进一步,所述左梯子、右梯子均为上端宽4m和下端宽6m的梯子型框架结构。Further, the left ladder and the right ladder are ladder-shaped frame structures with an upper end width of 4m and a lower end width of 6m.
进一步,所述吊耳采用由圆钢制作,所述吊耳两侧固定连接有两个10mm厚的吊耳钢板。Further, the lifting lug is made of round steel, and two 10mm thick lifting lug steel plates are fixedly connected to both sides of the lifting lug.
本实用新型的有益效果是:1、结构合理,易于制造,使用便捷快速,安装质量可靠,解决了因无大型吊车而无法安装超高的钢烟囱的困难,成本低,大大降低施工成本。The beneficial effects of the utility model are: 1. The structure is reasonable, easy to manufacture, convenient and quick to use, and the installation quality is reliable, which solves the difficulty of installing a super high steel chimney without a large crane, and the cost is low, greatly reducing the construction cost.
附图说明Description of drawings
图1为本实用新型的主视图。Fig. 1 is the front view of the utility model.
图2为本实用新型的左视图。Fig. 2 is a left view of the utility model.
图3为本实用新型的安装结构示意图。Fig. 3 is a schematic diagram of the installation structure of the utility model.
图4为图3的A放大正视图。FIG. 4 is an enlarged front view of A in FIG. 3 .
图5为图3的A放大左视图。FIG. 5 is an enlarged left view of A in FIG. 3 .
图中:抱杆1、左梯子2、右梯子3、横杆4、斜拉筋5、吊耳6、钢烟囱7、组对平台8、抱杆基础9、正方形框架10、立柱11、卷扬机12、正方形框架的钢管13、吊耳钢板14、圆钢15。In the figure: holding pole 1, left ladder 2, right ladder 3, cross bar 4, cable tie bar 5, lifting lug 6, steel chimney 7, paired platform 8, pole holding foundation 9, square frame 10, column 11, hoist 12, steel pipe 13 of square frame, lug steel plate 14, round steel 15.
具体实施方式detailed description
下面结合实施例对本实用新型作进一步的描述。Below in conjunction with embodiment the utility model is further described.
本实用新型的一种安装钢烟囱的抱杆主要由抱杆1、左梯子2、右梯子3、横杆4、斜拉筋5、吊耳6、钢烟囱7、组对平台8、抱杆基础9、正方形框架10、立柱11、卷扬机12、正方形框架的钢管13、吊耳钢板14、圆钢15组成。A pole for installing a steel chimney of the utility model is mainly composed of a pole 1, a left ladder 2, a right ladder 3, a cross bar 4, a diagonal tie bar 5, a lifting lug 6, a steel chimney 7, a paired platform 8, and a pole Foundation 9, square frame 10, column 11, winch 12, steel pipe 13 of square frame, lug steel plate 14, round steel 15 are formed.
所述抱杆包括左梯子2、右梯子3、组对平台8、抱杆基础9、正方形框架10、立柱11;所述左梯子2、右梯子3的顶端固定连接有正方形框架10,所述左梯子2、右梯子3由4根立柱11和数根横杆4构成,所述立柱11的下端和抱杆基础9固定连接,所述抱杆基础9表面设置有组对平台8,所述正方形框架10和立柱11之间设置有斜拉筋5,所述正方形框架10下表面两侧端固定连接有吊耳6,所述吊耳6上连接有卷扬机12,所述卷扬机12通过钢丝绳和钢烟囱7底部连接。The poles include a left ladder 2, a right ladder 3, a pair of platforms 8, a pole foundation 9, a square frame 10, and a column 11; the tops of the left ladder 2 and the right ladder 3 are fixedly connected with a square frame 10, and the The left ladder 2 and the right ladder 3 are composed of 4 uprights 11 and several cross bars 4, the lower ends of the uprights 11 are fixedly connected with the pole-holding foundation 9, and the surface of the pole-holding foundation 9 is provided with a grouping platform 8, and the A diagonal tie bar 5 is arranged between the square frame 10 and the column 11, and the two sides of the lower surface of the square frame 10 are fixedly connected with lifting lugs 6, and the hoisting machine 12 is connected to the lifting lug 6, and the hoisting machine 12 passes through a steel wire rope and Steel chimney 7 bottom connection.
所述立柱11采用无缝钢管制成。The column 11 is made of seamless steel pipe.
所述左梯子2、右梯子3均为上端宽4m和下端宽6m的梯子型框架结构。The left ladder 2 and the right ladder 3 are ladder-shaped frame structures with an upper end width of 4m and a lower end width of 6m.
所述吊耳6采用由圆钢15制作,所述吊耳6两侧固定连接有两个10mm厚的吊耳钢板14。The lifting lug 6 is made of round steel 15, and two 10mm thick lifting lug steel plates 14 are fixedly connected to both sides of the lifting lug 6.
从图1-图3中可以看出:一种安装钢烟囱的抱杆,抱杆1整体的形状是立体梯形四方桁架结构,四根立柱11采用¢426x7mm无缝钢管,左侧和右侧立面焊接横杆4,形成上4m和下6m的梯子型框架,在左梯子2、右梯子3的顶端¢159x7mm钢管作为斜拉筋5加固梯子型框架,形成牢固的整体结构,用再用满足吊装要求的无缝钢管做成4m的正方形框架10架,正方形框架10与梯子型框架铰接牢固,作为起吊架,在正方形框架10靠梯子型框架侧分别安装一台吊装卷扬机,以提升钢烟囱。安装卷扬机的吊点采用两10mm厚的钢板作为吊耳钢板14,与正方形框架10焊接牢固,吊耳6由圆钢制作,与吊耳筋板焊接牢固。It can be seen from Fig. 1-Fig. 3: a pole for installing a steel chimney. The overall shape of the pole 1 is a three-dimensional trapezoidal square truss structure. The cross bar 4 is welded on the surface to form a ladder-shaped frame with an upper 4m and a lower 6m. On the top of the left ladder 2 and the right ladder 3, ¢159x7mm steel pipes are used as diagonal tension bars 5 to reinforce the ladder-shaped frame to form a firm overall structure, which can be reused to meet The seamless steel pipe required for hoisting is made into 10 square frames of 4m. The square frame 10 is firmly hinged with the ladder-shaped frame. The hoisting point that installs winch adopts two 10mm thick steel plates as the lug steel plate 14, is firmly welded with the square frame 10, and the lug 6 is made of round steel, and is welded firmly with the lug reinforcement plate.
使用时,抱杆基础9必须牢固,卷扬机12利用周边固定构造物进行约束,用小型起重机将钢烟囱7送入自制抱杆1内组对平台8进行组对,每段烟囱的安装高度为10m,安装焊接牢固后用起重卷扬机起吊11m,再将下一段烟囱用小吊车送入抱杆内组对平台内进行组对,直到完成所有烟囱的吊装。When in use, the pole-holding foundation 9 must be firm, and the hoist 12 is constrained by the surrounding fixed structures, and the steel chimney 7 is sent into the self-made pole 1 to assemble the platform 8 with a small crane, and the installation height of each section of the chimney is 10m , After the installation and welding are firm, use a hoist to lift 11m, and then use a small crane to send the next section of chimney into the inner grouping platform of the pole for grouping, until the hoisting of all chimneys is completed.
本实用新型的一种安装钢烟囱的抱杆,结构合理,易于制造,使用便捷快速,安装质量可靠,解决了因无大型吊车而无法安装超高的钢烟囱的困难,成本低,大大降低施工成本。A pole for installing a steel chimney according to the utility model has a reasonable structure, is easy to manufacture, is convenient and quick to use, and has reliable installation quality. cost.
以上所述仅为本实用新型的实施例,并非因此限制本实用新型的专利范围,凡是利用本实用新型说明书内容所作的等效结构或等效流程变换,或直接或间接运用在其他相关的技术领域,均同理包括在本实用新型的专利保护范围内。The above is only an embodiment of the utility model, and does not limit the patent scope of the utility model. Any equivalent structure or equivalent process conversion made by using the content of the utility model description, or directly or indirectly used in other related technologies Fields are all included in the scope of patent protection of the utility model in the same way.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720002039.6U CN206457187U (en) | 2017-01-03 | 2017-01-03 | A kind of pole of mounting steel chimney |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720002039.6U CN206457187U (en) | 2017-01-03 | 2017-01-03 | A kind of pole of mounting steel chimney |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206457187U true CN206457187U (en) | 2017-09-01 |
Family
ID=59697009
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720002039.6U Expired - Fee Related CN206457187U (en) | 2017-01-03 | 2017-01-03 | A kind of pole of mounting steel chimney |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206457187U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108999459A (en) * | 2018-08-31 | 2018-12-14 | 国网山东省电力公司电力科学研究院 | A kind of power transmission tower inclination erection device |
| CN116372432A (en) * | 2023-03-16 | 2023-07-04 | 中国十七冶集团有限公司 | A high-altitude welding platform for large-diameter coil-welded steel pipes and its manufacturing method |
-
2017
- 2017-01-03 CN CN201720002039.6U patent/CN206457187U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108999459A (en) * | 2018-08-31 | 2018-12-14 | 国网山东省电力公司电力科学研究院 | A kind of power transmission tower inclination erection device |
| CN116372432A (en) * | 2023-03-16 | 2023-07-04 | 中国十七冶集团有限公司 | A high-altitude welding platform for large-diameter coil-welded steel pipes and its manufacturing method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103643800B (en) | The erection & lift system of buckling-restrained bracing member and construction method thereof | |
| CN201671391U (en) | Light Line Repair Tower | |
| CN103132766A (en) | Truss for lifting power transmission line tower connecting leg and erection method | |
| CN103993745B (en) | An integral hoisting device for a transfer beam and its hoisting method | |
| CN105275253A (en) | Equal-diameter rod erecting device and application method thereof | |
| CN211368423U (en) | Stay cable tower top lifting traction operation platform | |
| CN202544468U (en) | Drawbar-type electrical steel tubular rod | |
| CN201420385Y (en) | Cantilevered construction unloading platform | |
| CN206457187U (en) | A kind of pole of mounting steel chimney | |
| CN202260192U (en) | Derrick mast with adjustable height | |
| CN201908447U (en) | Lift-type horizontal safety net | |
| CN202944998U (en) | Attached installation and maintenance platform of calibrated tower crane | |
| CN204999517U (en) | Coal transporting trestle steel truss hoist device in power plant's chimney | |
| CN103967263A (en) | Novel hydraulic automatic climbing discharging platform | |
| CN203547125U (en) | Column type overall steel platform hydraulic creeping formwork | |
| CN103147401B (en) | Construction method of self-climbing portal frame | |
| CN206267031U (en) | A kind of solid pier climbing support of bridge construction | |
| CN203626212U (en) | Pier stud construction operation platform quick to disassemble and assemble | |
| CN219931554U (en) | A cantilevered steel structure construction platform with formwork system | |
| CN102277999B (en) | Large-section portal steel structure holding pole | |
| CN205500628U (en) | Climb in tower crane and install conversion equipment who climbs between roof beam and bracket | |
| CN203361596U (en) | Auxiliary support of integrated lifting operation platform | |
| CN205688778U (en) | A kind of elevating scaffold special over sling structure | |
| CN117005664A (en) | Electric translation type hanging basket | |
| CN103896153A (en) | Zig-zag derrick for replacing disconnecting link |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170901 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |