CN207109792U - A kind of sea wall explosive replacement construction of soft soil treatment quality detection device - Google Patents

A kind of sea wall explosive replacement construction of soft soil treatment quality detection device Download PDF

Info

Publication number
CN207109792U
CN207109792U CN201721048022.0U CN201721048022U CN207109792U CN 207109792 U CN207109792 U CN 207109792U CN 201721048022 U CN201721048022 U CN 201721048022U CN 207109792 U CN207109792 U CN 207109792U
Authority
CN
China
Prior art keywords
base tube
bottom plate
detection device
construction
soft soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721048022.0U
Other languages
Chinese (zh)
Inventor
张华�
陈吉森
莫微
陈惠忠
徐锦才
吴方宁
潘珊
汪建波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU REGIONAL CENTER FOR SMALL HYDRO POWER (HRC)
Second Institute of Oceanography SOA
Original Assignee
HANGZHOU REGIONAL CENTER FOR SMALL HYDRO POWER (HRC)
Second Institute of Oceanography SOA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU REGIONAL CENTER FOR SMALL HYDRO POWER (HRC), Second Institute of Oceanography SOA filed Critical HANGZHOU REGIONAL CENTER FOR SMALL HYDRO POWER (HRC)
Priority to CN201721048022.0U priority Critical patent/CN207109792U/en
Application granted granted Critical
Publication of CN207109792U publication Critical patent/CN207109792U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of sea wall explosive replacement construction of soft soil treatment quality detection device, including bottom plate, base tube, anti-filter geomembrane, WG;Base tube is fixed on the middle part of bottom plate vertically, and several bottom plate permeable holes for running through bottom plate are provided with the range of bottom plate fixes base tube;Base tube bottom is equipped with anti-filter geomembrane, and the lower surface of anti-filter geomembrane covers whole bottom plate permeable holes;WG is fixed on the inwall of base tube bottom, and the bottom of WG is provided with several base tube permeable holes through the tube wall of base tube in base tube bottom close to the upper surface of anti-filter geomembrane.Above-mentioned detection device is simple in construction, easy to operate, and testing result is accurate, substantially reduces the error of embankment project construction clearing.

Description

A kind of sea wall explosive replacement construction of soft soil treatment quality detection device
Technical field
It the utility model is related to a kind of detection of construction quality device, and in particular to a kind of sea wall explosive replacement treatment of soft foundation is applied Working medium amount detecting device, belong to construction technology in geotechnical engineering field.
Background technology
It is more and more extensive in the application of sea wall construction using explosive replacement progress sea wall treatment of soft foundation, treatment of soft foundation effect Accurate detection, whether detection of construction quality, blast working design verification, construction investment are calculated, or theoretical problem ground Study carefully, it is all of crucial importance.
The domestic detection method commonly used for sea wall treatment of soft foundation using explosive replacement construction quality is had at present:Boring method is examined Survey and Ground Penetrating Radar detects.Boring method detection has the following disadvantages:(1) block churn drill hole difficulty causes testing cost greatly It is high;(2) sampling of mudstone mixed layer is difficult, and THICKNESS CALCULATION is inaccurate, quantities calculation is influenceed big;(3) rig uses bavin Oily power, pollute environment.Ground Penetrating Radar detection has the following disadvantages:(1) detection device Meteorological is high;(2) degree of accuracy It is low.
Utility model content
The purpose of this utility model is overcome the deficiencies in the prior art, there is provided a kind of sea wall explosive replacement treatment of soft foundation is applied Working medium amount detecting device, improve accuracy in detection.Concrete technical scheme is as follows:
A kind of sea wall explosive replacement construction of soft soil treatment quality detection device, including bottom plate, base tube, anti-filter geomembrane, water Pressure gauge;Base tube is fixed on the middle part of bottom plate vertically, and several bottoms for running through bottom plate are provided with the range of bottom plate fixes base tube Plate permeable hole;Base tube bottom is equipped with anti-filter geomembrane, and the lower surface of anti-filter geomembrane covers whole bottom plate permeable holes;WG It is fixed on the inwall of base tube bottom, and the bottom of WG is provided with close to the upper surface of anti-filter geomembrane in base tube bottom Several run through the base tube permeable hole of the tube wall of base tube.
Further, base tube permeable hole is opened in the range of the 50cm of base tube bottom.
Further, base tube end is provided with connection screw thread.Further, connection screw thread is provided in the inwall of base tube Internal thread.
Further, the inwall of base tube is additionally provided with the first retainer ring of the cable of constraint WG, WG Cable passes through from the inside of the first retainer ring.
Further, detection means also includes the first extension tube, and the first extension tube is provided with installation screw thread, installs screw thread and base The connection screw thread of pipe coordinates so that the first extension tube is connected fastening with base tube.
Further, the inwall of the first extension tube is provided with the second retainer ring, and the second retainer ring is aligned with the first retainer ring Passed through for the cable of WG.First retainer ring is welded on the inwall of base tube, and the second retainer ring is welded on the first extension tube Inwall.
Further, bottom plate selects steel plate, and base tube selects galvanized pipe, and the first extension tube selects galvanized pipe.Further, Bottom plate is welded and fixed with base tube.
The beneficial effects of the utility model are:Structure of the detecting device is simple, easy to operate, and testing result is accurate, drops significantly The error of low embankment project construction clearing.
Brief description of the drawings
Fig. 1 is the structural representation of the detection means of one preferred embodiment of the utility model.
Structure label declaration in figure:1- bottom plates;2- bottom plate permeable holes;3- anti-filter geomembranes;4- WGs;5- base tubes are saturating Water hole;6- base tubes;7- connection screw threads;8- cable retainer rings.
Embodiment
Design, concrete structure and caused technique effect of the present utility model are made furtherly below with reference to accompanying drawing It is bright, to be fully understood from the purpose of this utility model, feature and effect.
Such as Fig. 1, a kind of sea wall explosive replacement construction of soft soil treatment quality detection device, including bottom plate 1, base tube 6, anti-filter soil Work film 3, WG 4.Bottom plate 1 selects steel plate, and base tube 6 selects galvanized pipe.Base tube 6 is fixed on bottom plate vertically by welding manner 1 middle part, several bottom plate permeable holes 2 for running through bottom plate are provided with the range of bottom plate 1 fixes base tube 6.The bottom of base tube 6 is equipped with Anti-filter geomembrane 3, the thickness about 1cm of anti-filter geomembrane 3, its lower surface covers whole bottom plate permeable holes 2.WG 3 is solid It is scheduled on the inwall of the bottom of base tube 6, and the bottom of WG 4 is close to the upper surface of anti-filter geomembrane 3, in the bottom of base tube 6 Several base tube permeable holes 5 for running through its tube wall are provided with the range of 50cm.Preferably, bottom plate is welded and fixed with base tube.
The end of base tube 6 is provided with connection screw thread 7.Preferably, connection screw thread 7 is provided in the internal thread of the inwall of base tube.Inspection Surveying device also includes extension tube, and extension tube is provided with installation screw thread, and installation screw thread is external screw thread, is coordinated with the connection screw thread 7 of base tube So that extension tube is connected fastening with base tube 6, increase the length of detection means.Extension tube selects galvanized pipe.
The cable retainer ring 8 of the cable of inwall welding Constrained WG 4 of base tube 6, the cable of WG 4 is from cable The inside of retainer ring 8 passes through.The inwall of extension tube is equally welded with cable retainer ring, and two cable retainer ring alignments are for hydraulic pressure The cable of power meter 4 passes through.
Preferred embodiment of the present utility model described in detail above.It should be appreciated that the ordinary skill people of this area Member makes many modifications and variations without creative work can according to design of the present utility model.Therefore, all this technology necks Technical staff passes through logic analysis, reasoning or limited reality on the basis of existing technology according to design of the present utility model in domain Available technical scheme is tested, all should be in the protection domain being defined in the patent claims.

Claims (10)

1. a kind of construction of soft soil treatment quality detection device, it is characterised in that the detection means includes bottom plate, base tube, anti-filter Geomembrane, WG;The base tube is fixed on the middle part of the bottom plate vertically, and the scope of the base tube is fixed in the bottom plate Inside it is provided with several bottom plate permeable holes for running through the bottom plate;The base tube bottom is equipped with anti-filter geomembrane, the anti-filter geotechnique The lower surface of film covers all bottom plate permeable holes;The WG is fixed on the inwall of the base tube bottom, and institute The bottom of WG is stated close to the upper surface of the anti-filter geomembrane, several are provided with the base tube bottom and runs through the base The base tube permeable hole of the tube wall of pipe.
2. a kind of construction of soft soil treatment quality detection device according to claim 1, it is characterised in that the base tube is permeable Hole is opened in the range of the base tube bottom 50cm.
A kind of 3. construction of soft soil treatment quality detection device according to claim 1, it is characterised in that the base tube end Provided with connection screw thread.
A kind of 4. construction of soft soil treatment quality detection device according to claim 3, it is characterised in that the connection screw thread It is provided in the internal thread of the inwall of the base tube.
A kind of 5. construction of soft soil treatment quality detection device according to claim 4, it is characterised in that the base tube it is interior Wall is additionally provided with the first retainer ring of the cable for constraining the WG, and the cable of the WG is fixed from described first The inside of ring passes through.
A kind of 6. construction of soft soil treatment quality detection device according to claim 5, it is characterised in that the detection means Also include the first extension tube, first extension tube is provided with installation screw thread, the connection screw thread of the installation screw thread and the base tube Coordinate so that first extension tube is connected fastening with the base tube.
7. a kind of construction of soft soil treatment quality detection device according to claim 6, it is characterised in that described first extends The inwall of pipe is provided with the second retainer ring, and second retainer ring is aligned for the WG with first retainer ring Cable passes through.
8. a kind of construction of soft soil treatment quality detection device according to claim 7, it is characterised in that described first fixes Boxing is connected on the inwall of the base tube, and second retainer ring is welded on the inwall of first extension tube.
9. a kind of construction of soft soil treatment quality detection device according to claim 8, it is characterised in that the bottom plate is selected Steel plate, the base tube select galvanized pipe, and first extension tube selects galvanized pipe.
A kind of 10. construction of soft soil treatment quality detection device according to claim 9, it is characterised in that the bottom plate with The base tube is welded and fixed.
CN201721048022.0U 2017-08-21 2017-08-21 A kind of sea wall explosive replacement construction of soft soil treatment quality detection device Active CN207109792U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721048022.0U CN207109792U (en) 2017-08-21 2017-08-21 A kind of sea wall explosive replacement construction of soft soil treatment quality detection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721048022.0U CN207109792U (en) 2017-08-21 2017-08-21 A kind of sea wall explosive replacement construction of soft soil treatment quality detection device

Publications (1)

Publication Number Publication Date
CN207109792U true CN207109792U (en) 2018-03-16

Family

ID=61577062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721048022.0U Active CN207109792U (en) 2017-08-21 2017-08-21 A kind of sea wall explosive replacement construction of soft soil treatment quality detection device

Country Status (1)

Country Link
CN (1) CN207109792U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109975523A (en) * 2019-04-29 2019-07-05 华侨大学 A kind of compacting mud by explosion mudstone mixed layer engineering properties prediction technique

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109975523A (en) * 2019-04-29 2019-07-05 华侨大学 A kind of compacting mud by explosion mudstone mixed layer engineering properties prediction technique
CN109975523B (en) * 2019-04-29 2021-06-29 华侨大学 Method for predicting engineering property of explosive silt-squeezing mixed layer

Similar Documents

Publication Publication Date Title
CN103821544B (en) Tunneling and underground engineering high-pressure high-flow is dashed forward Water outburst treatment method
CN206845146U (en) A kind of water-stop and antipriming to be drawn water for Geology Drilling layering
CN206627405U (en) The double embolism original position injection pressure water penetration detectors of expansion type
CN103512693B (en) Coal and rock mass stress orientation monitoring method and device
CN102445307B (en) Method for measuring flow rate and flow direction of single-well underground water and leaking point of reservoir, and measuring device thereof
CN105716960A (en) Foundation pit excavation model test device used in complicated groundwater environment
CN205719868U (en) Contaminated soil and subsoil water inject in situ repairs the pilot system that dilation angle determines
CN107436140A (en) The settling column test instrument and test method that vacuum preloading and piling prepressing are combined
CN111914373A (en) Long-distance rock jacking pipe frictional resistance calculation method and pipe rock contact state detection method
CN110468887A (en) A kind of miniature steel pipe stake body soil pressure and displacement monitoring method
CN105675846A (en) Foundation pit excavation model testing device capable of cooperatively hoisting phreatic water level and pressure-bearing water head
CN107102378B (en) Utilize the method for hole pressure touching methods measurement artesian aquifer water level and head height
CN106643649B (en) Device and method for measuring deep settlement and pore water pressure of soil body
CN207109792U (en) A kind of sea wall explosive replacement construction of soft soil treatment quality detection device
CN105804041A (en) Large-area ultra-soft foundation settlement monitoring device and method
CN205712213U (en) The dynamically excavation of foundation pit model test apparatus of artesian water effect
CN110485482A (en) A kind of miniature steel pipe stake body soil pressure and displacement monitor
CN208254458U (en) Soft base deepwater diking settlement monitoring device
CN205636709U (en) Recoverable pore water pressure and layered settlement observation device
CN205719795U (en) Excavation of foundation pit model test apparatus under complicated groundwater environment
CN205720219U (en) Phreatic table and artesian head work in coordination with the excavation of foundation pit model test apparatus of lifting
CN107503387A (en) A kind of application method of sea wall explosive replacement construction of soft soil treatment quality detection device
CN216524522U (en) Outer water pressure test equipment of rich water stratum tunnel lining
CN109885958A (en) The underground detection method of top plate leaking crevice belt developmental morphology
CN108534943A (en) Glass reinforced plastic pipe uplift pressure measuring device in sink

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant