CN207105239U - If the concrete prefabricated bridge plate producing device of wire rope tensioning mechanism - Google Patents

If the concrete prefabricated bridge plate producing device of wire rope tensioning mechanism Download PDF

Info

Publication number
CN207105239U
CN207105239U CN201720732779.5U CN201720732779U CN207105239U CN 207105239 U CN207105239 U CN 207105239U CN 201720732779 U CN201720732779 U CN 201720732779U CN 207105239 U CN207105239 U CN 207105239U
Authority
CN
China
Prior art keywords
bridge plate
canopy
wire rope
tensioning mechanism
rope tensioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720732779.5U
Other languages
Chinese (zh)
Inventor
尤琦
周桥
夏辉
刘立海
吴圳
王忠亮
杨康
周泽哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHEC Fourth Engineering Co Ltd Anhui Branch
Original Assignee
CCCC SHEC Fourth Engineering Co Ltd Anhui Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHEC Fourth Engineering Co Ltd Anhui Branch filed Critical CCCC SHEC Fourth Engineering Co Ltd Anhui Branch
Priority to CN201720732779.5U priority Critical patent/CN207105239U/en
Application granted granted Critical
Publication of CN207105239U publication Critical patent/CN207105239U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

It the utility model is related to bridge tunnel architectural precast manufacture technology field.A kind of concrete prefabricated bridge plate producing device for setting wire rope tensioning mechanism, steam canopy and wire rope tensioning mechanism including being provided with cement bridge plate mould in setting gradually, wire rope tensioning mechanism includes base, the slide rail being arranged on base, the driving cylinder that the pull bar and driving pull bar being slidably connected on slide rail slide on slide rail, pull bar is provided with the cable wire via extended along slide rail bearing of trend, the one end of cable wire via away from steam canopy is provided with conical surface section and the conic clamp coordinated with conical surface section, conic clamp is provided with the clamping through hole axially extended, conic clamp is stitched together along the circumferentially distributed grip block of conic clamp by least two pieces and is encircled into clamping through hole, the base is provided with mounting hole.The utility model has laborsaving during tensioned cable and the advantages of can improve curing rate, solves the problems, such as that artificial tensioned cable is laborious in concrete prefabricated bridge plate manufacturing process and curing rate is slow.

Description

If the concrete prefabricated bridge plate producing device of wire rope tensioning mechanism
Technical field
Bridge tunnel architectural precast manufacture technology field is the utility model is related to, more particularly to one kind sets cable wire tensioning The concrete prefabricated bridge plate producing device of mechanism.
Background technology
In the preparation method in the tunnel of bridge etc., it is first prefabricated bridge plate to have a kind of, is then transported to live splicing.Turning During the concrete prefabricated bridge plate of axle bridge, some need by cable wire be tensioned and be located in concrete prefabricated bridge along bridge plate length direction In the hole of plate.By the way that cement bridge plate mould is placed on outdoor sports, then the existing concrete prefabricated bridge plate of making is Shelve port Embarrassing skeletons, pour into concrete again after air-set form.Cable wire is to draw to be tensioned to realize by people.It is therefore existing mixed The solidifying prefabricated bridge plate production method of soil has the following disadvantages:It is laborious during tensioned cable;Firm time is grown.
Utility model content
The utility model is laborsaving when providing a kind of tensioned cable and can improve setting rate sets wire rope tensioning mechanism Concrete prefabricated bridge plate producing device, solve in concrete prefabricated bridge plate manufacturing process that artificial tensioned cable is laborious and hardening Slow-footed problem.
Above technical problem is that solved by following technical proposal:A kind of concrete prefabricated bridge for setting wire rope tensioning mechanism Plate producing device, including cement bridge plate mould, it is characterised in that also including steam canopy and the cable wire positioned at steam canopy one end Strainer, the cement bridge plate mould are located in the steam canopy, and the wire rope tensioning mechanism includes base, is arranged at Slide rail, the pull bar being slidably connected on slide rail and the driving cylinder for driving pull bar to be slided on slide rail, the pull bar on base are set There is the cable wire via extended along slide rail bearing of trend, the described one end of cable wire via away from steam canopy is provided with conical surface section and the same conical surface Duan Peihe conic clamp, the conic clamp are provided with the clamping through hole axially extended, and the conic clamp is by least two pieces The grip block circumferentially distributed along conic clamp is stitched together and is encircled into the clamping through hole, and the base is provided with mounting hole. Cable wire tensioning is made through being inserted on bottom surface after pile passes through mounting hole and realizing and fixed.When making bridge plate, tensioned cable Process be:By the head of cable wire from framework of steel reinforcement be used for wear cable wire preset clearance pass through after be then passed through after be then passed through cable wire Via, then through clamping in through hole, conic clamp is inserted in conical surface section, is passing through driving cylinder(Usually oil cylinder)It is super remote The direction pull bar of steam canopy causes pull bar to be slided on slide rail, is tensioned cable wire so as to realize, one section of duration is maintained after tensioning Push rod is retreated to cable wire sizing again after straight configuration, so as to cause cable wire because the effect grip block of the conical surface clamps cable wire It will not depart from from push rod.By in concreting to cement bridge plate mould, steam then is filled with steam canopy, so as to Realize and improve setting rate.
Preferably, the steam canopy includes two grade beams be arrangeding in parallel, some canopies being distributed along grade beam bearing of trend Bone and the canopy cloth being fixed on canopy bone, the cement bridge plate mould is between two grade beams, and the one of the canopy bone End is another by the way that hinge same root grade beam is hinged, the other end is provided with connector using the hinge as the arc in the center of circle Root grade beam is provided with the connecting hole using the hinge as the arc in the center of circle, and the connector is removedly plugged on the connecting hole It is interior.Open steam canopy and make when pouring operation canopy bone so that hinge rotates and extracts connector, and then removed together with canopy cloth Above cement bridge plate mould.It is convenient during steam canopy to open.
Preferably, the connector is provided with upper guide pad, the connecting hole is provided with lower guide pad, the upper guiding Formed between block and lower guide pad and inserted for concrete pouring head along grade beam bearing of trend and eject connector out of connecting hole Targeting port.When carrying out pouring operation, it is only necessary to concrete pouring head is designed the side of connector through canopy bone and be input to steam It is the height position that can enter targeting port when concrete pouring head is positioned at translation above cement bridge plate mould in canopy Put, whole cement bridge plate mould is expired into concreting along grade beam bearing of trend transportable concrete pouring head, works as coagulation When native pouring head passes through targeting port, corresponding connector is ejected out of connecting hole, causes canopy bone not hinder concrete pouring head Movement, the connector that concrete pouring head is pulled out under gravity after leaving is inserted into connecting hole from newly, even if The position that steam canopy is raised is obtained to cover again.Without steam canopy is all lifted when pouring such as concrete, and can be by mixed The movement of solidifying native pouring head carrys out automatic synchronization and lifts corresponding canopy bone, and concrete pouring head leaves rear canopy bone and can connected automatically And realize on the automatic cover of canopy cloth.
Preferably, the outside of the grade beam is provided with the positioning rail extended along grade beam bearing of trend.
The utility model tool has the advantage that:It can improve setting rate, it is laborsaving during tensioned cable.
Brief description of the drawings
Fig. 1 is the real schematic top plan view of the utility model.
Fig. 2 is the schematic top plan view of wire rope tensioning mechanism.
Fig. 3 is the schematic elevation view of steam canopy.
Fig. 4 is the left view schematic diagram of steam canopy.
In figure:Contiguous block 3, steam canopy 6, grade beam 61, preceding grade beam 611, rear grade beam 612, connecting hole 613, hinge 614, canopy Bone 62, connector 621, upper guide pad 622, lower guide pad 623, targeting port 624, canopy cloth 63, positioning rail 64, the shaping of cement bridge plate Mould 65, wire rope tensioning mechanism 7, base 71, mounting hole 711, slide rail 72, pull bar 73, cable wire via 731, conical surface section 732, drive Dynamic cylinder 74, conic clamp 75, clamping through hole 751, grip block 752, concrete pouring head 8.
Embodiment
The utility model is further described with embodiment below in conjunction with the accompanying drawings.
It is a kind of to set the concrete prefabricated bridge plate producing device of wire rope tensioning mechanism referring to Fig. 1, including steaming is set from right to left Vapour canopy 6 and wire rope tensioning mechanism 7.
Steam canopy 6 includes two grade beams 61 be arrangeding in parallel, some canopy bones 62 and canopy cloth being distributed along grade beam bearing of trend 63.Grade beam 61 extends in left-right direction.Two grade beams 61 are preceding grade beam 611 and rear grade beam 612.The both ends of canopy bone 62 correspond Ground is connected on two grade beams 61.Canopy cloth 63 is fixed on canopy bone 62.
Wire rope tensioning mechanism 7 includes base 71, two one slide rails 72 being arranged on base, the drawing being slidably connected on slide rail The driving cylinder 74 that bar 73 and driving pull bar slide on slide rail.Base 71 is provided with mounting hole 711.Slide rail 72 prolongs in left-right direction Stretch.Pull bar 73 extends along the longitudinal direction.Pull bar 73 is provided with the cable wire via 731 extended along slide rail bearing of trend.Cable wire via 731 Left end be provided with conical surface section 732 and with conical surface section coordinate conic clamp 75.
Referring to Fig. 2, conic clamp 75 is provided with the clamping through hole 751 axially extended.Conic clamp 75 is by two pieces along taper The circumferentially distributed grip block 752 of dop is stitched together composition.Two pieces of grip blocks 752 are encircled into clamping through hole 751.
Referring to Fig. 3, the outside of preceding grade beam 611 is that front side is provided with the positioning rail 64 extended in left-right direction.Preceding grade beam 611 is set There are some connecting holes 613 being distributed in left-right direction.The front end of canopy bone 62 is provided with connector 621.The front end of canopy bone 62 passes through it On connector 621 be inserted in connecting hole 613 the same grade beam 611 and link together.The corresponding connecting hole of one connector.Even Joint 621 is provided with upper guide pad 622.Connecting hole 613 is provided with lower guide pad 623.Upper guide pad 622 and lower guide pad 623 Form the guiding inserted towards left opening for concrete pouring head along grade beam bearing of trend and eject connector out of connecting hole Mouth 624.
Referring to Fig. 4.The rear end of canopy bone 62 is hinged with rear grade beam 612 by hinge 614.The axis edge of hinge 614 Left and right directions extends.Connecting hole 613 is along the arc with hinge 614 for the circumferentially extending of the circle in the center of circle.Connector 621 be along with Hinge 614 is the arc of the circumferentially extending of the circle in the center of circle.Connector is removedly plugged in the connecting hole.Preceding grade beam 611 Cement bridge plate mould 65 is provided between rear grade beam 612.Cement bridge plate mould 65 is located in steam canopy 6.Positioning rail 64 are linked together by the same grade beam 611 of some contiguous blocks 3.
Referring to Fig. 1 to Fig. 4, in use, by being punched on cement floor, will through mounting hole 711 by setscrew Wire rope tensioning mechanism 7 is fixed.The process of tensioned cable is:Make the head of cable wire from cement bridge plate mould 65 Framework of steel reinforcement be used for wear cable wire preset clearance pass through after be then passed through after be then passed through cable wire via, then through clamping through hole It is interior, conic clamp is inserted in conical surface section, then pushed away by driving cylinder towards a left side and pull bar slides on slide rail, so as to realize by Cable wire is tensioned, and maintains to grow to cable wire at one section and shape after tensioning to retreat push rod again after straight configuration, due to the effect of the conical surface Grip block clamps cable wire so that cable wire will not depart from from push rod.By in concreting to cement bridge plate mould, so Steam is filled with steam canopy afterwards, so as to realize raising setting rate.
Specifically cast concrete is to the process in cement bridge plate mould 65:It is resisted against concrete pouring head stroller Enter line slip on positioning rail 64 in left-right direction, concrete pouring head 8 extend into steam canopy 6 and is located at cement bridge plate shaping mould Concrete is inputted above tool 65.When concrete pouring head move into said in targeting port targeting port open and cause connector Extracted out of connecting hole.Concrete pouring head enable by canopy bone 62, concrete pouring head by after canopy bone in gravity Effect lower union joint is reinserted in connecting hole.

Claims (4)

1. a kind of concrete prefabricated bridge plate producing device for setting wire rope tensioning mechanism, including cement bridge plate mould, its feature It is, in addition to steam canopy and the wire rope tensioning mechanism positioned at steam canopy one end, the cement bridge plate mould is positioned at described In steam canopy, the wire rope tensioning mechanism include base, the slide rail being arranged on base, the pull bar that is slidably connected on slide rail and The driving cylinder that driving pull bar slides on slide rail, the pull bar are provided with the cable wire via extended along slide rail bearing of trend, the steel The one end of rope via away from steam canopy is provided with conical surface section and the conic clamp coordinated with conical surface section, and the conic clamp is provided with along axle To the clamping through hole of extension, the conic clamp be stitched together by least two pieces along the circumferentially distributed grip block of conic clamp and The clamping through hole is encircled into, the base is provided with mounting hole.
2. the concrete prefabricated bridge plate producing device according to claim 1 for setting wire rope tensioning mechanism, it is characterised in that institute Stating steam canopy includes two grade beams be arrangeding in parallel, some canopy bones being distributed along grade beam bearing of trend and the canopy being fixed on canopy bone Cloth, for the cement bridge plate mould between two grade beams, one end of the canopy bone passes through hinge same root grade beam The hinged, other end is provided with the connector using the hinge as the arc in the center of circle, and another grade beam is provided with the hinge Axle is the connecting hole of the arc in the center of circle, and the connector is removedly plugged in the connecting hole.
3. the concrete prefabricated bridge plate producing device according to claim 2 for setting wire rope tensioning mechanism, it is characterised in that institute State connector and be provided with upper guide pad, the connecting hole is provided with lower guide pad, shape between the upper guide pad and lower guide pad Into the targeting port for being inserted for concrete pouring head along grade beam bearing of trend and ejecting connector out of connecting hole.
4. the concrete prefabricated bridge plate producing device for setting wire rope tensioning mechanism according to Claims 2 or 3, its feature exist In the outside of the grade beam is provided with the positioning rail extended along grade beam bearing of trend.
CN201720732779.5U 2017-06-22 2017-06-22 If the concrete prefabricated bridge plate producing device of wire rope tensioning mechanism Active CN207105239U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720732779.5U CN207105239U (en) 2017-06-22 2017-06-22 If the concrete prefabricated bridge plate producing device of wire rope tensioning mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720732779.5U CN207105239U (en) 2017-06-22 2017-06-22 If the concrete prefabricated bridge plate producing device of wire rope tensioning mechanism

Publications (1)

Publication Number Publication Date
CN207105239U true CN207105239U (en) 2018-03-16

Family

ID=61578775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720732779.5U Active CN207105239U (en) 2017-06-22 2017-06-22 If the concrete prefabricated bridge plate producing device of wire rope tensioning mechanism

Country Status (1)

Country Link
CN (1) CN207105239U (en)

Similar Documents

Publication Publication Date Title
CN210032663U (en) Positioning device for steel embedded part of batter post
CN206740471U (en) A kind of compaction test apparatus of energy automatic turning marshal piece
CN207105239U (en) If the concrete prefabricated bridge plate producing device of wire rope tensioning mechanism
CN206419032U (en) A kind of side and roof arch band mid-board lining cutting chassis
CN207105237U (en) The concrete prefabricated bridge plate making apparatus of securable cable wire
CN104191502B (en) A kind of conveniently stripped concrete square pile die
CN201693661U (en) Light concrete wallboard production line
DE102016205554B4 (en) Mandrel device for a block molding machine, block molding machine and method for producing shaped blocks
CN107443568B (en) If the concrete prefabricated bridge plate producing device of cable wire volume support frame
CN107443569B (en) Concrete prefabricated bridge plate production equipment
CN206359897U (en) A kind of radial type steel core form unit
CN106079057B (en) Bottom machine is removed in building block overturning
CN205512750U (en) To go up and only beat solid device on zipper strip
CN207104578U (en) The device for the cable wire being tensioned in prefabricated bridge plate
CN104742398B (en) A kind of shoemaking apparatus for pouring
DE2156680C3 (en) Device for demolding castings
CN206180488U (en) Cable pit moving die carrier
CN205552802U (en) A pouring ferry device for evaporating press aerated concrete block production
CN107794916B (en) A kind of hollow square pile cast-in-place equipment
CH498987A (en) Shaft made of prefabricated parts
CN106182640B (en) The curved pin core-pulling die of varied angle for special-shaped taper product and its working method
CN207295388U (en) A kind of concrete slip-form device
CN107150458A (en) A kind of bracing means for die location
CN107322785B (en) Wire rope tensioning mechanism is used in concrete prefabricated bridge plate production