CN207091365U - A kind of Biohazard Waste gasification treatment device - Google Patents

A kind of Biohazard Waste gasification treatment device Download PDF

Info

Publication number
CN207091365U
CN207091365U CN201721000542.4U CN201721000542U CN207091365U CN 207091365 U CN207091365 U CN 207091365U CN 201721000542 U CN201721000542 U CN 201721000542U CN 207091365 U CN207091365 U CN 207091365U
Authority
CN
China
Prior art keywords
water
box
gas
treatment device
biohazard waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721000542.4U
Other languages
Chinese (zh)
Inventor
邱华桥
刘正华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shao Yangxin Dolly Technology Development Co Ltd
Original Assignee
Shao Yangxin Dolly Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shao Yangxin Dolly Technology Development Co Ltd filed Critical Shao Yangxin Dolly Technology Development Co Ltd
Priority to CN201721000542.4U priority Critical patent/CN207091365U/en
Application granted granted Critical
Publication of CN207091365U publication Critical patent/CN207091365U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model discloses a kind of Biohazard Waste gasification treatment device, including gasification furnace, hot-water boiler and combustion-supporting ignitor, the hot-water boiler includes warm water unit, hot water unit and the gas-cooker being sequentially arranged from top to bottom, the gasification furnace is connected by Gas Pipe with gas-cooker, and access cover and dirt collecting tank are provided with the Gas Pipe.The Biohazard Waste gasification treatment device of the structure, there is the advantages of simple, practical, inexpensive, easy to use and environment protecting is good.

Description

A kind of Biohazard Waste gasification treatment device
Technical field
The utility model belongs to environmental protection and field of new energy technologies, and in particular to a kind of Biohazard Waste gasification process dress Put.
Background technology
Biohazard Waste processing is a global problem, currently used burning, high-temperature disinfection treatment, recycling All there is drawback in the technologies such as recycling, plasma treatment, the social resources of consumption are very big, sometimes social stability be caused great Influence.
Utility model is a kind of simple, practical, low cost, Biohazard Waste can be carried out immediately, on the spot, harmless treatment, And it is needed for society with the method for certain using energy source value.Continuous development and product work with biomass gasification technology The maturation of skill, the innoxious gasification disposal of Biohazard Waste are possibly realized.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of Biohazard Waste gasification treatment device, makes it have letter The advantages of single, practical, inexpensive, easy to use and environment protecting is good.
The utility model is solved the above problems by following technological means:A kind of Biohazard Waste gasification treatment device, bag Include gasification furnace, hot-water boiler and combustion-supporting ignitor, warm water unit that the hot-water boiler includes being sequentially arranged from top to bottom, Hot water unit and gas-cooker, the gasification furnace are connected by Gas Pipe with gas-cooker, and access cover is provided with the Gas Pipe And dirt collecting tank.
Further, the cross section of the Gas Pipe is square.
Further, the warm water unit includes cold water box, warming box, warm water tube and economizer bank, the cold water box and Warm water tube is connected with warming box, and the economizer bank is arranged in warming box, the hot water unit include water inflowing box, water inlet pipe, Heater box, heating tube, rotating jet flow pipe and hot-water line, the water inflowing box connect with warm water tube, and described water inlet pipe one end is with entering Water box are connected, and the other end is connected with heater box, and the heating tube and rotating jet flow pipe are arranged inside heater box, the heat Water pipe connects with heater box.
Further, more economizer banks are evenly distributed with the middle part of the warming box.
Further, more rotating jet flow pipes are evenly distributed with the middle part of the heater box, are uniformly distributed on the outside of rotating jet flow pipe There are more heating tubes, the economizer bank is staggeredly arranged with heating tube.
Further, the gasification stove internal wall is provided with heat-insulated asbestos.
Further, access cover is in the upside of Gas Pipe, and dirt collecting tank is in the downside of Gas Pipe.
Further, 1-3 lamination fiery disks are provided with the gas-cooker.
The beneficial effects of the utility model:
1st, the processing unit of the structure, there is the advantages of simple, practical, inexpensive and easy to use, strictly control Sewage and tar, do not discharge tar and waste water completely;Processing procedure whole process smoke dust discharges;Waste gas discharge after fuel gas buring reaches Mark.It is unsatisfactory for explosion condition.Can be to carrying out desulphurization denitration processing from the tail gas of hot-water boiler smokestack discharge after heat energy utilization.
2nd, gasification furnace performance requirement:Biohazard Waste is not pre-processed before gasification process, Biohazard Waste enters After gasification furnace, gasification every time starts to the normal time at 10 minutes or so, and gasification quality is good, and maintenance cleaning is convenient, and work is strong Spend it is small, each interval usage time be not less than 2 hours.Feed cap is renovated from watertight construction, is not smoldered completely.Using electricity Sub- fire rod igniting.Lime-ash cleaning is convenient.The heat-insulated asbestos of gasification stove internal wall play heat-blocking action.
3rd, the access cover easy access on the upside of Gas Pipe, clear up and prevent blast.
4th, the dirt collecting tank on the downside of Gas Pipe is used to collect caused a small amount of containing Jiao in the of short duration time that combustion gas passes through Gas Pipe Oily waste water, waste water do not discharge, and flowing back into gasification furnace, gasification process is fallen again.
5th, combustion-supporting ignitor:Using liquefied gas to gas of gas range combustion ignition, the relatively low situation of fuel gases calorific value is run into, Sintering aids role is played, prevents peculiar smell of smoldering and produce.
6th, set 1-3 to be laminated fiery disk in gas-cooker, form multiple combustion chambers, fuel gas buring is abundant, and passes through multilayer banking fire Disk improves infrared radiation effect.
7th, hot-water boiler:Cold water flows into hot water unit heating again after the preheating of warm water unit, effectively increases the thermal efficiency;It is logical Cross heating tube, rotating jet flow pipe and economizer bank and carry out energy recovery conversion jointly, substantially increase the thermal efficiency;Inhaled using radiation The distribution form that heat pipe is distributed in the middle part of heater box, heating tube is distributed around rotating jet flow pipe, has given full play to rotating jet flow work With because the rotating jet flow thermal efficiency is significantly larger than the contact thermal efficiency, therefore this kind of topology layout is advantageous to improve the thermal efficiency;In advance Heat pipe is staggeredly arranged with heating tube, has delayed the speed of the preheated pipe of thermal current and heating tube, that is, has extended the hot-cast socket time, enter One step improves heat recovery efficiency.Similarly, flue gas leading is connected by waste gas box with warming box, and hot gas buffers in waste gas box, Extend the hot-cast socket time.
Brief description of the drawings
The utility model is further described with reference to the accompanying drawings and examples.
Fig. 1 is side view of the present utility model;
Fig. 2 is top view of the present utility model;
Fig. 3 is the stereogram of hot-water boiler;
Fig. 4 is the sectional view of hot-water boiler;
Fig. 5 is the sectional view of warming box;
Fig. 6 is the sectional view of heater box.
Embodiment
The utility model is described in detail below with reference to accompanying drawing.
As shown in figures 1 to 6:The utility model provides a kind of Biohazard Waste gasification treatment device, including gasification furnace 1, heat Homogeneous solution-type reactor 2 and combustion-supporting ignitor 3, the gasification stove internal wall are provided with heat-insulated asbestos, the hot-water boiler include from upper and Under the warm water unit, hot water unit and the gas-cooker 211 that are sequentially arranged, the gasification furnace connected by Gas Pipe 4 with gas-cooker, Access cover 5 and dirt collecting tank 6 are provided with the Gas Pipe, specifically, the warm water unit includes cold water box 201, warming box 202nd, warm water tube 203 and economizer bank 204, the cold water box and warm water tube are connected with warming box, and the economizer bank is set In warming box, more economizer banks are evenly distributed with the middle part of warming box, the hot water unit includes water inflowing box 205, water inlet pipe 206th, heater box 207, heating tube 208, rotating jet flow pipe 209 and hot-water line 210, the water inflowing box connect with warm water tube, institute State water inlet pipe one end to connect with water inflowing box, the other end is connected with heater box, and the heating tube and rotating jet flow pipe are arranged at Inside heater box, more rotating jet flow pipes are evenly distributed with the middle part of heater box, more are evenly distributed with the outside of rotating jet flow pipe and is added Heat pipe, the economizer bank are staggeredly arranged with heating tube, and rotating jet flow pipe is highly less than the height of heater box, usually 100- 460mm, the hot-water line connect with heater box, and the cross section of the Gas Pipe is square, and access cover is in the upside of Gas Pipe, Dirt collecting tank is in the downside of Gas Pipe, and 1-3 lamination fiery disks 212 are provided with gas-cooker.In use, Biohazard Waste is through gasification furnace Gasification, produce combustion gas and burnt for gas-cooker, gas-cooker burning is heated to the water in hot-water boiler, and hot-water boiler heats the tool of water Body process is:Cold water becomes warm water by cold water box into warming box, and warm water exits into water inflowing box by warm water tube, in water inflowing box Water is flowed into heater box and heated.
The Biohazard Waste gasification treatment device of the structure, has the following advantages that:
1st, the processing unit of the structure, there is the advantages of simple, practical, inexpensive and easy to use, strictly control Sewage and tar, do not discharge tar and waste water completely;Processing procedure whole process smoke dust discharges;Waste gas discharge after fuel gas buring reaches Mark.It is unsatisfactory for explosion condition.Can be to carrying out desulphurization denitration processing from the tail gas of hot-water boiler smokestack discharge after heat energy utilization.
2nd, gasification furnace performance requirement:Biohazard Waste is not pre-processed before gasification process, Biohazard Waste enters After gasification furnace, gasification every time starts to the normal time at 10 minutes or so, and gasification quality is good, and maintenance cleaning is convenient, and work is strong Spend it is small, each interval usage time be not less than 2 hours.Feed cap is renovated from watertight construction, is not smoldered completely.Using electricity Sub- fire rod igniting.Lime-ash cleaning is convenient.The heat-insulated asbestos of gasification stove internal wall play heat-blocking action.
3rd, the access cover easy access on the upside of Gas Pipe, clear up and prevent blast.
4th, the dirt collecting tank on the downside of Gas Pipe is used to collect caused a small amount of containing Jiao in the of short duration time that combustion gas passes through Gas Pipe Oily waste water, waste water do not discharge, and flowing back into gasification furnace, gasification process is fallen again.
5th, combustion-supporting ignitor:Using liquefied gas to gas of gas range combustion ignition, the relatively low situation of fuel gases calorific value is run into, Sintering aids role is played, prevents peculiar smell of smoldering and produce.
6th, set 1-3 to be laminated fiery disk in gas-cooker, form multiple combustion chambers, fuel gas buring is abundant, and passes through multilayer banking fire Disk improves infrared radiation effect.
7th, hot-water boiler:Cold water flows into hot water unit heating again after the preheating of warm water unit, effectively increases the thermal efficiency;It is logical Cross heating tube, rotating jet flow pipe and economizer bank and carry out energy recovery conversion jointly, substantially increase the thermal efficiency;Inhaled using radiation The distribution form that heat pipe is distributed in the middle part of heater box, heating tube is distributed around rotating jet flow pipe, has given full play to rotating jet flow work With because the rotating jet flow thermal efficiency is significantly larger than the contact thermal efficiency, therefore this kind of topology layout is advantageous to improve the thermal efficiency;In advance Heat pipe is staggeredly arranged with heating tube, has delayed the speed of the preheated pipe of thermal current and heating tube, that is, has extended the hot-cast socket time, enter One step improves heat recovery efficiency.Similarly, flue gas leading is connected by waste gas box with warming box, and hot gas buffers in waste gas box, Extend the hot-cast socket time.
Finally illustrate, above example is only unrestricted to illustrate the technical solution of the utility model, although ginseng The utility model is described in detail according to preferred embodiment, it will be understood by those within the art that, can be to this The technical scheme of utility model is modified or equivalent substitution, without departing from the objective and model of technical solutions of the utility model Enclose, it all should cover among right of the present utility model.

Claims (8)

  1. A kind of 1. Biohazard Waste gasification treatment device, it is characterised in that:Filled including gasification furnace, hot-water boiler and combustion-assistant ignition Put, the hot-water boiler includes warm water unit, hot water unit and the gas-cooker being sequentially arranged from top to bottom, and the gasification furnace leads to Cross Gas Pipe to connect with gas-cooker, access cover and dirt collecting tank are provided with the Gas Pipe.
  2. 2. Biohazard Waste gasification treatment device according to claim 1, it is characterised in that:The cross section of the Gas Pipe To be square.
  3. 3. Biohazard Waste gasification treatment device according to claim 1, it is characterised in that:The warm water unit includes cold Water box, warming box, warm water tube and economizer bank, the cold water box and warm water tube are connected with warming box, and the economizer bank is set Put in warming box, the hot water unit includes water inflowing box, water inlet pipe, heater box, heating tube, rotating jet flow pipe and hot water Pipe, the water inflowing box connect with warm water tube, and described water inlet pipe one end connects with water inflowing box, and the other end connects with heater box, described Heating tube and rotating jet flow pipe are arranged inside heater box, and the hot-water line connects with heater box.
  4. 4. Biohazard Waste gasification treatment device according to claim 3, it is characterised in that:In the middle part of the warming box uniformly More economizer banks are distributed with.
  5. 5. Biohazard Waste gasification treatment device according to claim 4, it is characterised in that:In the middle part of the heater box uniformly More rotating jet flow pipes are distributed with, more heating tubes are evenly distributed with the outside of rotating jet flow pipe, the economizer bank is wrong with heating tube Open arrangement.
  6. 6. Biohazard Waste gasification treatment device according to claim 1, it is characterised in that:The gasification stove internal wall is set There are heat-insulated asbestos.
  7. 7. Biohazard Waste gasification treatment device according to claim 1, it is characterised in that:Access cover is in Gas Pipe Upside, dirt collecting tank are in the downside of Gas Pipe.
  8. 8. Biohazard Waste gasification treatment device according to claim 1, it is characterised in that:It is provided with the gas-cooker 1-3 is laminated fiery disk.
CN201721000542.4U 2017-08-10 2017-08-10 A kind of Biohazard Waste gasification treatment device Expired - Fee Related CN207091365U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721000542.4U CN207091365U (en) 2017-08-10 2017-08-10 A kind of Biohazard Waste gasification treatment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721000542.4U CN207091365U (en) 2017-08-10 2017-08-10 A kind of Biohazard Waste gasification treatment device

Publications (1)

Publication Number Publication Date
CN207091365U true CN207091365U (en) 2018-03-13

Family

ID=61541094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721000542.4U Expired - Fee Related CN207091365U (en) 2017-08-10 2017-08-10 A kind of Biohazard Waste gasification treatment device

Country Status (1)

Country Link
CN (1) CN207091365U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107384475A (en) * 2017-08-10 2017-11-24 邵阳信多利科技发展有限公司 A kind of Biohazard Waste gasification treatment device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107384475A (en) * 2017-08-10 2017-11-24 邵阳信多利科技发展有限公司 A kind of Biohazard Waste gasification treatment device

Similar Documents

Publication Publication Date Title
CN202002119U (en) Treatment device for condensation, gasification and incineration of organic waste liquid via flue gas
CN203190418U (en) Novel garbage pyrolysis incineration equipment
CN103267293B (en) A kind of refuse gasification boiler
CN208983426U (en) Kitchen range off-gas recovery, waste heat recycling system
CN204693805U (en) A kind of energy-saving, emission-reducing, environment friendly boiler
CN207091365U (en) A kind of Biohazard Waste gasification treatment device
CN202522109U (en) Waste heat recovery device for tail gas in flues of heat-pipe type boiler and kiln
CN109373332B (en) Flue gas waste heat recovery system and method for coal-fired coupled garbage power generation
CN107384475A (en) A kind of Biohazard Waste gasification treatment device
CN207132737U (en) A kind of closed vessel furnace furnace gas recovery and cleaning treatment system
CN206222681U (en) A kind of energy-conserving and environment-protective gas-heating and hot-water boiler
CN204757012U (en) Waste heat recovery's return air stove can carry out
CN100549553C (en) Taking-out back water reciprocating flue type boiler
CN204513749U (en) A kind of Novel heating boiler of energy-conserving and environment-protective
CN206755243U (en) Efficient energy-saving smokeless heat supply stove
CN203771707U (en) Flue gas waste heat recycling system for boiler
CN208282395U (en) A kind of natural gas boiler of high-efficiency environment friendly
CN205351333U (en) Rural discarded object burner of environment -friendly
CN205227762U (en) Biomass fuel furnace's residual heat from flue gas device
CN203571694U (en) Steam boiler
CN205909512U (en) Horizontal boiler of many piece built -in heating pipes
CN204693511U (en) A kind of energy-saving high-efficiency environment-friendly type air return stove
CN205048723U (en) Energy -conserving coal fired boiler who removes dust
CN208457946U (en) Set boiler structure in burner bottom
CN103335400A (en) Energy-saving boiler

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180313

Termination date: 20200810