CN207072789U - Dug pile device above and below a kind of personnel - Google Patents

Dug pile device above and below a kind of personnel Download PDF

Info

Publication number
CN207072789U
CN207072789U CN201720759654.1U CN201720759654U CN207072789U CN 207072789 U CN207072789 U CN 207072789U CN 201720759654 U CN201720759654 U CN 201720759654U CN 207072789 U CN207072789 U CN 207072789U
Authority
CN
China
Prior art keywords
steel
safety
bolt
cable
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720759654.1U
Other languages
Chinese (zh)
Inventor
杨帆
翁艾平
范雪强
方俊杰
吴斌
潘金锋
梁赟赟
蒋胜昔
屠绿章
马建君
姜志新
葛东亮
张杭炎
李季
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jiaogong Qianchao Construction Co Ltd
Original Assignee
Zhejiang Jiaogong Qianchao Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jiaogong Qianchao Construction Co Ltd filed Critical Zhejiang Jiaogong Qianchao Construction Co Ltd
Priority to CN201720759654.1U priority Critical patent/CN207072789U/en
Application granted granted Critical
Publication of CN207072789U publication Critical patent/CN207072789U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to job execution field under hole, disclose a kind of personnel dug pile device up and down, including I-shaped steel frame, two coasters, two steel wire rope locking devices, hanging basket platform, two motors, two safety locks, two load cables, two safety steel cables and controller, in operation use, using I-steel frame stability structure, facilitate and moved between hole stake and hole stake, recycle, conveniently move integrally, using coaster, it is convenient to be moved in aperture, caisson bursting work is not influenceed, when load cable card rope, disconnected rope, skid off or workbench tilt 3 ° 8 ° when safety lock pin safety steel cable, so as to avoid the danger of hanging-basket from drop, securely and reliably, the personal safety of operating personnel is ensured.

Description

Dug pile device above and below a kind of personnel
Technical field
It the utility model is related to job execution field under hole, more particularly to a kind of upper and lower dug pile devices of personnel.
Background technology
Artificial digging pile, be cut the earth with manpower, the reinforced concrete pile of cast in situs.Because excavation pile construction is convenient, speed Degree is very fast, does not need heavy mechanical equipment, the punching of cost specific impulse cone, impact cone punching, percussive drill punching, abrasion drill machine drill Hole, well foundation are saved.So as to be used widely in highway, civil buildings.But caisson underground work condition is poor, environment Badly, labor intensity is big, and safety and quality are particularly important.
In conventional digging pile hole above and below operating personnel, inder pot is all taken out or is used above and below cat ladder, safety It cannot be guaranteed.In order to preferably solve in hole safety problem above and below personnel, need that utility model is a kind of and safety and side badly at present Just, and portion does not influence the equipment of caisson normal construction.
The content of the invention
There is the shortcomings that potential safety hazard in the utility model, there is provided a kind of up and down for operating personnel in prior art mesopore Dug pile device above and below personnel.
In order to solve the above-mentioned technical problem, the utility model is addressed by following technical proposals:
A kind of personnel dug pile device up and down, including I-shaped steel frame, two coasters, two steel wire rope locking devices, hang Basket platform, two motors, two safety locks, two load cables, two safety steel cables and controller, I-shaped steel frame bag Four the first I-steel perpendicular to horizontal plane are included, the second I-steel is fixed between the first I-steel top in two, front, It is fixed with the 3rd I-steel between first I-steel top of back two, the two of the both ends of the second I-steel and the 3rd I-steel The first channel-section steel is all fixed between end, two are fixed between the middle part of the second I-steel and the middle part of the 3rd I-steel and is mutually handed over Second channel-section steel of fork, the 3rd channel-section steel is all fixed between the first adjacent I-steel bottom;Second I-steel and the 3rd I-shaped Coaster is mounted on steel, steel wire rope locking device is bolted to below coaster, one end of load cable and safe steel wire One end of rope is all fixed on steel wire rope locking device, and the other end of safety steel cable through safety lock and extends downwardly, hanging basket Platform is fixed on below safety lock, and motor is arranged on hanging basket platform, and the other end of load cable is fastened in the defeated of motor On shaft, controller is arranged in hanging basket platform and controlled motor running.Using this I-shaped steel frame, structure safety and stability, it is Coaster provides walking track, and conveniently moves integrally, and coaster rated load is 1t, can be moved on I-steel, does not influence to dig Hole stake operation, safety lock are ZLS30 type safety locks, and basket swing arm anti-dumping security lock technology technique is advanced, safety steel cable it is another One end is through safety lock and extends downwardly, and when load cable is broken or workbench tilts 3 ° -8 °, safety lock pins safety Steel wire rope, hanging basket platform is fixed, securely and reliably.
Preferably, the first I-steel and the second I-steel end junction are provided with the first reinforcement, the first I-steel with 3rd I-steel end junction is provided with the second reinforcement.
Preferably, steel wire rope locking device includes pressing plate, pressing plate is provided with the first bolt, the second bolt, the first nut With the second nut, the bolt head of the first bolt outwardly, offers first through hole on the key of the first bolt, and load cable is through the The output axis connection of one through hole and motor, the first nut are connected with the first bolt thread and compress load cable, the second bolt Bolt head inwardly, offer the second through hole on the key of the first bolt, output of the safety steel cable through the second through hole and motor Axis connection, the second nut are connected with the second bolt thread and compress safety steel cable.Compressing steel wire rope by this way will not damage It is effective to hinder safe wire cable, and it is easy to operate.
The utility model has significant technique effect as a result of above technical scheme:In operation in use, using I-steel frame stability structure, facilitates and is moved between hole stake and hole stake, recycles, conveniently moves integrally, convenient using coaster Moved in aperture, do not influence caisson bursting work, when load cable card rope, disconnected rope, skidded off or workbench tilts 3 ° -8 ° When safety lock pin safety steel cable, so as to avoid the danger of hanging-basket from drop, securely and reliably, ensured operating personnel the person peace Entirely.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of steel wire rope locking device.
The toponym that each number designation is referred in the figures above is as follows:Wherein, 1-I-shaped steel frame, 2-coaster, 3-steel wire rope locking device, 4-hanging basket platform, 5-motor, 6-safety lock, 7-load cable, 8-safety steel cable, 9-controller, the 10-the first I-steel, the 11-the second I-steel, the 12-the three I-steel, the 13-the first channel-section steel, 14-the second Channel-section steel, the 15-the three channel-section steel, the 16-the first reinforcement, the 17-the second reinforcement, 18-pressing plate, the 19-the first bolt, 20-the Two bolts, the 21-the first nut, the 22-the second nut, 23-first through hole, the 24-the second through hole.
Embodiment
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings.
Embodiment 1
Dug pile device above and below a kind of personnel, as shown in Figure 1-2, including 2, two, the coaster steel wire of I-shaped steel frame 1, two Restrict locking device 3,4, two, hanging basket platform, 5, two, the motor load cable 7, two of safety lock 6, two and of safety steel cable 8 Controller 9, I-shaped steel frame 1 include the first I-steel 10 four perpendicular to horizontal plane, first I-steel 10 in two, front The second I-steel 11 is fixed between top, the 3rd I-steel 12 is fixed between the top of the first I-steel 10 of back two, The first channel-section steel 13 is all fixed between the both ends of second I-steel 11 and the both ends of the 3rd I-steel 12, in the second I-steel 11 Two cross one another second channel-section steels 14, the first adjacent I-steel 10 are fixed between portion and the middle part of the 3rd I-steel 12 The 3rd channel-section steel 15 is all fixed between bottom;Coaster 2, steel wire rope are mounted on second I-steel 11 and the 3rd I-steel 12 Locking device 3 is bolted to the lower section of coaster 2, and one end of load cable 7 and one end of safety steel cable 8 are all fixed on steel wire Restrict on locking device 3, the other end of safety steel cable 8 through safety lock 6 and extends downwardly, and hanging basket platform 4 is fixed on safety lock 6 Lower section, motor 5 are arranged on hanging basket platform 4, and the other end of load cable 7 is fastened on the output shaft of motor 5, controller 9, which are arranged on the interior simultaneously controlled motor 5 of hanging basket platform 4, operates.
First I-steel 10 and the end junction of the second I-steel 11 are provided with the first reinforcement 16, the first I-steel 10 and The end junction of three I-steel 12 is provided with the second reinforcement 17.
Steel wire rope locking device 3 includes pressing plate 18, and pressing plate 18 is provided with the first bolt 19, the second bolt 20, the first nut 21 and second nut 22, the bolt head of the first bolt 19 outwardly, first through hole 23 is offered on the key of the first bolt 19, work steel Cord 7 is threadedly coupled with the first bolt 19 through first through hole 23 and the output axis connection of motor 5, the first nut 21 and compresses work Make steel wire rope 7, the bolt head of the second bolt 20 inwardly, offers the second through hole 24, safety steel cable 8 on the key of the first bolt 19 Through the output axis connection of the second through hole 24 and motor 5, the second nut 22 is threadedly coupled with the second bolt 20 and compresses safe steel Cord 8.
When the card of load cable 7 rope, disconnected rope, skid off or safety lock 6 pins safety steel cable when workbench tilts 3 ° -8 ° 8, staff can immediate operation controller 9 close motor 5, it is therefore prevented that it is unexpected to occur.In a word, it the foregoing is only this reality With new preferred embodiment, all equivalent changes and modifications made according to present utility model application the scope of the claims, it should all belong to this reality With the covering scope of new patent.

Claims (3)

  1. A kind of 1. dug pile device above and below personnel, it is characterised in that:Including I-shaped steel frame (1), two coasters (2), two steel Cord locking device (3), hanging basket platform (4), two motors (5), two safety locks (6), two load cables (7), two Safety steel cable (8) and controller (9), I-shaped steel frame (1) includes the first I-steel (10) four perpendicular to horizontal plane, preceding The second I-steel (11), the first I-steel (10) top of back two are fixed between first I-steel (10) top on two, side The 3rd I-steel (12) is fixed between end, it is all solid between the both ends of the second I-steel (11) and the both ends of the 3rd I-steel (12) Surely there is the first channel-section steel (13), two are fixed between the middle part of the second I-steel (11) and the middle part of the 3rd I-steel (12) mutually The second channel-section steel (14) intersected, the 3rd channel-section steel (15) is all fixed between adjacent the first I-steel (10) bottom;Second work Coaster (2) is mounted on word steel (11) and the 3rd I-steel (12), steel wire rope locking device (3) is bolted to coaster (2) Lower section, one end of load cable (7) and one end of safety steel cable (8) are all fixed on steel wire rope locking device (3), safety The other end of steel wire rope (8) is through safety lock (6) and extends downwardly, and hanging basket platform (4) is fixed on below safety lock (6), motor (5) hanging basket platform (4) is arranged on, the other end of load cable (7) is fastened on the output shaft of motor (5), controller (9) it is arranged in hanging basket platform (4) and controlled motor (5) operates.
  2. 2. dug pile device above and below a kind of personnel according to claim 1, it is characterised in that:First I-steel (10) and the Two I-steel (11) end junction is provided with the first reinforcement (16), and the first I-steel (10) connects with the 3rd I-steel (12) end Meet place and be provided with the second reinforcement (17).
  3. 3. dug pile device above and below a kind of personnel according to claim 1, it is characterised in that:Steel wire rope locking device (3) Including pressing plate (18), pressing plate (18) is provided with the first bolt (19), the second bolt (20), the first nut (21) and the second nut (22), the bolt head of the first bolt (19) outwardly, offers first through hole (23), load cable on the key of the first bolt (19) (7) it is threadedly coupled simultaneously with the first bolt (19) through first through hole (23) and the output axis connection of motor (5), the first nut (21) Load cable (7) is compressed, the bolt head of the second bolt (20) inwardly, the second through hole is offered on the key of the first bolt (19) (24), safety steel cable (8) passes through the output axis connection of the second through hole (24) and motor (5), the second nut (22) and the second spiral shell Bolt (20) is threadedly coupled and compresses safety steel cable (8).
CN201720759654.1U 2017-06-27 2017-06-27 Dug pile device above and below a kind of personnel Expired - Fee Related CN207072789U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720759654.1U CN207072789U (en) 2017-06-27 2017-06-27 Dug pile device above and below a kind of personnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720759654.1U CN207072789U (en) 2017-06-27 2017-06-27 Dug pile device above and below a kind of personnel

Publications (1)

Publication Number Publication Date
CN207072789U true CN207072789U (en) 2018-03-06

Family

ID=61513161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720759654.1U Expired - Fee Related CN207072789U (en) 2017-06-27 2017-06-27 Dug pile device above and below a kind of personnel

Country Status (1)

Country Link
CN (1) CN207072789U (en)

Similar Documents

Publication Publication Date Title
CN102953373B (en) Quicksand condition For Artificial Excavation Caisson Pile construction
CN109296374B (en) TBM hoisting and translation method for deep well enclosed space
CN106192995A (en) A kind of apparatus for work about caisson mechanical hole building and construction method thereof
CN102926388B (en) Earth moving method for deep foundation pit excavation
CN106948347A (en) Pile extracting method and pile pulling system
CN207072789U (en) Dug pile device above and below a kind of personnel
CN104032775A (en) Resistance barrel and method for detecting static loads of engineering pile foundations
CN106968252A (en) Pile pulling recharge method and pile pulling recharge system
CN203053721U (en) Coal rock heading machine large-gradient testing stand
CN206902712U (en) Pile pulling recharge system
CN113818828A (en) Screw principle fishing device
CN206928296U (en) Pile pulling system
CN205116239U (en) Engineering pile foundation static load detects resistance anchor hoe
CN106836354A (en) Rectangle friction pile mechanical hole building device
CN208361757U (en) The hanging device of railroad bridge drilled pile reinforcing cage under a kind of high-voltage line
CN213574165U (en) Coal mine tunneling and supporting device
CN204530747U (en) A kind of underground infrastructures of head tower machine platform
CN2893124Y (en) Derrick support device
CN114541806A (en) Building displacement method used in project supervision construction
CN206902713U (en) Oblique cord pile pulling system
JPH11229751A (en) Widening device for existing tunnel
CN218778627U (en) Fixed gantry for manual hole digging pile
CN218025011U (en) Hole assembled longmen gallows is dug in manual work
CN106836223A (en) A kind of pile extracting method
CN213953633U (en) Supporting structure with auxiliary support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant