CN207068816U - Continuous crystal solidifying apparatus - Google Patents

Continuous crystal solidifying apparatus Download PDF

Info

Publication number
CN207068816U
CN207068816U CN201721069332.0U CN201721069332U CN207068816U CN 207068816 U CN207068816 U CN 207068816U CN 201721069332 U CN201721069332 U CN 201721069332U CN 207068816 U CN207068816 U CN 207068816U
Authority
CN
China
Prior art keywords
die bond
station
platform
tablet
bond station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721069332.0U
Other languages
Chinese (zh)
Inventor
向军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhida New Energy Equipment Co Ltd
Original Assignee
Jiangsu Zhida New Energy Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhida New Energy Equipment Co Ltd filed Critical Jiangsu Zhida New Energy Equipment Co Ltd
Priority to CN201721069332.0U priority Critical patent/CN207068816U/en
Application granted granted Critical
Publication of CN207068816U publication Critical patent/CN207068816U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Die Bonding (AREA)

Abstract

The utility model provides a kind of continuous crystal solidifying apparatus, including workbench, is provided with the workbench:Die bond station, the quantity of the die bond station are at least two, and each die bond station is used to wafer being placed at the different die bond points of tablet;Transfer station, several described transfer stations are successively set between the two neighboring die bond station, for tablet to be picked and placeed to the latter die bond station by the previous die bond station, by setting multiple die bond stations in a process for taking brilliant die bond, and the conveying of tablet between each die bond station is realized by transfer station, the output of the tablet die bond process of unit interval is improved, greatly reduces the pitch time of the process, substantially increases the efficiency of dress encapsulation.

Description

Continuous crystal solidifying apparatus
Technical field
It the utility model is related to diode package field, more particularly to a kind of continuous crystal solidifying apparatus.
Background technology
In the encapsulation process of diode, it is one very important chip to be fitted between the upper and lower tablet of diode Process.In the prior art it is generally necessary to win wafer from blue film to carry out die bond operation, this to take crystal type be to be directed to Single wafer is picked up operation, and in existing streamline encapsulation operation, this blue film takes brilliant die bond operation time-consuming longer, is whole The bottleneck of individual water operation, leverage the efficiency entirely encapsulated.
Utility model content
The technical problems to be solved in the utility model is:In existing streamline encapsulation process, existing blue film takes brilliant die bond work Sequence man-hour is longer, reduces the efficiency entirely encapsulated, and the utility model provides a kind of continuous crystal solidifying apparatus to solve above-mentioned ask Topic.
Technical scheme is used by the utility model solves its technical problem:A kind of continuous crystal solidifying apparatus, including work Platform, it is provided with the workbench:Die bond station, the quantity of the die bond station are at least two, each die bond station For wafer to be placed at the different die bond points of tablet;Transfer station, several described transfer stations are successively set on adjacent Between two die bond stations, for tablet to be picked and placeed to the latter die bond station by the previous die bond station.
Further:The die bond station includes being used to install the mounting disc hoop of blue film, the platform for placing material for placing tablet With the arm that gets rid of for taking brilliant die bond, it is described get rid of to be provided with arm take brilliant suction nozzle, it is described to take brilliant suction nozzle in mounting disc hoop and platform for placing material Top move back and forth.
Further:The die bond station also includes cross lead screw, the cross motor that the driving cross lead screw rotates, peace Horizontal slide unit on the cross lead screw, the vertical screw mandrel in the horizontal slide unit, the driving vertical screw mandrel The vertical motor and the vertical slide unit on the vertical screw mandrel, the platform for placing material rotated is arranged on the vertical slide unit On;The quantity of the die bond station is two, and two die bond station levels are successively set on the workbench, two institutes Cross lead screw is stated transversely to be arranged in parallel.
Further:The transfer station includes guide rail, sliding block and straight line cylinder;The guide rail is transversely horizontally disposed with, Its one end is arranged on above the platform for placing material of the previous die bond station, and the other end is arranged on the platform for placing material of the latter die bond station Top;The sliding block is slidably mounted on the guide rail and can moved under the driving of the straight line cylinder along guide rail;It is described Support is installed on sliding block, the vacuum slot for adsorbing tablet is provided with the support.
Further:Pneumatic slid platform is additionally provided with the sliding block, the work along rectilinear movement is included on the Pneumatic slid platform Dynamic platform, the moving direction of the traveling table is longitudinally disposed, and the support is fixedly connected with the traveling table.
The beneficial effects of the utility model are that the continuous crystal solidifying apparatus of the utility model passes through in a process for taking brilliant die bond It is middle that multiple die bond stations are set, and the conveying of tablet between each die bond station is realized by transfer station, when improving unit Between tablet die bond process output, greatly reduce the pitch time of the process, substantially increase the efficiency of dress encapsulation.
Brief description of the drawings
The utility model is further illustrated with reference to the accompanying drawings and examples.
Fig. 1,2 be the continuous crystal solidifying apparatus of the utility model structural representation;
Fig. 3 is the structural representation of transfer station.
1, workbench in figure, 2, mounting disc hoop, 3, platform for placing material, 4, get rid of arm, 5, take brilliant suction nozzle, 6, cross lead screw, 7, laterally Slide unit, 8, cross motor, 9, vertical screw mandrel, 10, vertical slide unit, 11, vertical motor, 12, guide rail, 13, straight line cylinder, 14, sliding Block, 15, support.
Embodiment
Embodiment of the present utility model is described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning Same or similar element is represented to same or similar label eventually or there is the element of same or like function.Below by ginseng The embodiment for examining accompanying drawing description is exemplary, is only used for explaining the utility model, and it is not intended that to of the present utility model Limitation.On the contrary, embodiment of the present utility model includes falling into owning in the range of the spirit and intension of attached claims Change, modification and equivalent.
In description of the present utility model, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " length ", " width Degree ", " thickness ", " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outer ", " axle To ", " radial direction ", the orientation of the instruction such as " circumference " or position relationship be based on orientation shown in the drawings or position relationship, be only for It is easy to the description present invention and simplifies description, rather than instruction or implies that signified device or element there must be specific side Position, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicating or implying relatively important Property., it is necessary to which explanation, unless otherwise clearly defined and limited, term " connected ", " connects in description of the present utility model Connect " it should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or it is integrally connected;It can be machine Tool connects or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary.For this area For those of ordinary skill, concrete meaning of the above-mentioned term in the utility model can be understood with concrete condition.In addition, in this reality With in new description, unless otherwise indicated, " multiple " are meant that two or more.
Any process or method described otherwise above description in flow chart or herein is construed as, and represents to include Module, fragment or the portion of the code of the executable instruction of one or more the step of being used to realize specific logical function or process Point, and the scope of preferred embodiment of the present utility model includes other realization, wherein can not press shown or discuss Order, including according to involved function by it is basic simultaneously in the way of or in the opposite order, carry out perform function, this should be by this The embodiment person of ordinary skill in the field of utility model is understood.
As shown in Figure 1, 2, the utility model provides a kind of continuous crystal solidifying apparatus, including workbench 1, the workbench 1 On be provided with:Die bond station, the quantity of the die bond station are at least two, and each die bond station is used to place wafer At the different die bond points of tablet;Transfer station, several described transfer stations are successively set on the two neighboring die bond work Between position, for tablet to be picked and placeed to the latter die bond station by the previous die bond station.
Multiple die bond stations are arranged on workbench 1, carry out some die bonds that each die bond station during die bond is directed to tablet Point carries out die bond, and the die bond point of different die bond stations is different, and completes wafer being placed on tablet in previous die bond station After the die bond point specified, tablet is picked and placeed to latter die bond station by transfer station, to facilitate latter die bond station to not Die bond point with position carries out die bond, and the die bond operating time of each die bond station keeps identical, so each die bond station Productive temp is identical, tablet can be integrally moved rearwards to one by transfer station after the completion of the die bond operation of a station Station, until all die bond stations all complete die bond operation, so each die bond of reasonable distribution for the diverse location on tablet The operating time of station can cause die bond efficiency to maximize, and reduce the time that tablet waits.
The die bond station includes being used to install the mounting disc hoop 2 of blue film, the platform for placing material 3 for placing tablet and for taking Brilliant die bond gets rid of arm 4, it is described get rid of to be provided with arm 4 take brilliant suction nozzle 5, it is described to take brilliant suction nozzle 5 in mounting disc hoop 2 and platform for placing material 3 Top moves back and forth.
Get rid of arm 4 move back and forth drive take brilliant suction nozzle 5 to be moved back and forth in the top of mounting disc hoop 2 and platform for placing material 3, take brilliant suction nozzle Wafer in mounting disc hoop 2 on blue film is drawn specified location above the tablet being placed on platform for placing material 3 by 5 by adsorbing and discharging Place, so as to complete to take the work of brilliant die bond, brilliant die bond is taken only to take a wafer every time although getting rid of arm 4, but the weight acted every time Multiple precision is higher, and die bond location point is accurate, coordinates the setting of multiple die bond stations, can greatly improve production efficiency, make up and get rid of Arm 4 can only single take brilliant slow-footed defect.
The die bond station also includes cross lead screw 6, the cross motor 8 that the driving cross lead screw 6 rotates, installed in institute State the horizontal slide unit 7 on cross lead screw 6, the vertical screw mandrel 9 in the horizontal slide unit 7, driving vertical 9 turns of the screw mandrel Dynamic vertical motor 11 and the vertical slide unit 10 on the vertical screw mandrel 9, the platform for placing material 3 are arranged on described vertical sliding On platform 10;The quantity of the die bond station is two, and two die bond station levels are successively set on the workbench 1, Two cross lead screws 6 transversely be arranged in parallel.
By cross lead screw 6 and horizontal slide unit 7 coordinate can platform for placing material 3 there is the ability laterally moved, lead to Crossing vertical screw mandrel 9 and vertical slide unit 10 can be so that platform for placing material 3 has the ability vertically moved, when a certain position is consolidated on tablet It after fisheye obtains the wafer for taking brilliant suction nozzle 5 to send, can laterally or vertically move, brilliant suction nozzle 5 is taken by crystalline substance to allow Member is delivered at next die bond point.
Two cross lead screws 6 are parallel, can so facilitate the arrangement of transfer station, while transfer station can be caused to turn Arranged when moving tablet along the axial location of cross lead screw 6, so parallel 6 mutual position adjustment of cross lead screw is convenient It is more accurate, it is ensured that two platform for placing material 3 and transfer station may be adjusted on same straight line so that the operation of transfer station It is more accurate.
As shown in figure 3, the transfer station includes guide rail 12, sliding block 14 and straight line cylinder 13;The guide rail 12 is transversely Horizontally disposed, its one end is arranged on the top of platform for placing material 3 of the previous die bond station, and the other end is arranged on the latter die bond work The top of platform for placing material 3 of position;The sliding block 14 is slidably mounted on the guide rail 12 and under the driving of the straight line cylinder 13 It can be moved along guide rail 12;Support 15 is installed on the sliding block 14, the vacuum for adsorbing tablet is provided with the support 15 Suction nozzle.
Straight line cylinder 13 can promote sliding block 14 rapidly to be slided on guide rail 12, and support 15 is arranged on sliding block 14, On support 15 and vacuum slot is mounted with, can so ensure that tablet can be realized rapidly from previous die bond station to latter The transfer of die bond station, improves operating efficiency.
Pneumatic slid platform is additionally provided with the sliding block 14, the traveling table along rectilinear movement, institute are included on the Pneumatic slid platform It is longitudinally disposed to state the moving direction of traveling table, the support 15 is fixedly connected with the traveling table.Traveling table is longitudinally disposed, When moving downward close to tablet on platform for placing material 3, vacuum slot is adsorbed on support 15, and then motion is remote upwards for traveling table From the upper surface of platform for placing material 3, so easily tablet can be picked up;When the tablet for needing to adsorb on vacuum slot is placed into When on platform for placing material 3, traveling table moves down along longitudinal direction, the upper surface of platform for placing material 3 of close tablet to be placed, then vacuum slot pressure Power discharges, and tablet drops down onto the upper surface of platform for placing material 3 under gravity.Traveling table vertically moves the pressure for coordinating vacuum slot Control can facilitate the absorption of tablet it is also possible that the off-position of tablet is more accurate.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, structure, material or the spy for combining the embodiment or example description Point is contained at least one embodiment or example of the present utility model.In this manual, to the schematic table of the term State and be not necessarily referring to identical embodiment or example.Moreover, specific features, structure, material or the feature of description can be Combined in an appropriate manner in any one or more embodiments or example.
Using it is above-mentioned according to desirable embodiment of the present utility model as enlightenment, pass through above-mentioned description, related work people Member can carry out various changes and amendments in the range of without departing from this item utility model technological thought completely.This item is real The content being not limited to new technical scope on specification, it is necessary to which its technology is determined according to right Property scope.

Claims (5)

1. a kind of continuous crystal solidifying apparatus, it is characterised in that including workbench(1), the workbench(1)On be provided with:
Die bond station, the quantity of the die bond station are at least two, and each die bond station is used to wafer being placed on material At the different die bond points of piece;
Transfer station, several described transfer stations are successively set between the two neighboring die bond station, for by tablet Picked and placeed by the previous die bond station to the latter die bond station.
2. continuous crystal solidifying apparatus as claimed in claim 1, it is characterised in that:The die bond station includes being used to install blue film Mounting disc hoop(2), platform for placing material for placing tablet(3)Arm is got rid of with for take brilliant die bond(4), it is described to get rid of arm(4)Upper setting Take brilliant suction nozzle(5), it is described to take brilliant suction nozzle(5)In mounting disc hoop(2)And platform for placing material(3)Top move back and forth.
3. continuous crystal solidifying apparatus as claimed in claim 2, it is characterised in that:The die bond station also includes cross lead screw(6)、 Drive the cross lead screw(6)The cross motor of rotation(8), installed in the cross lead screw(6)On horizontal slide unit(7), peace Mounted in the horizontal slide unit(7)On vertical screw mandrel(9), the driving vertical screw mandrel(9)The vertical motor rotated(11)And peace Mounted in the vertical screw mandrel(9)On vertical slide unit(10), the platform for placing material(3)Installed in the vertical slide unit(10)On;Institute The quantity for stating die bond station is two, and two die bond station levels are successively set on the workbench(1)On, described in two Cross lead screw(6)Transversely it be arranged in parallel.
4. continuous crystal solidifying apparatus as claimed in claim 3, it is characterised in that:The transfer station includes guide rail(12), sliding block (14)And straight line cylinder(13);The guide rail(12)Transversely it is horizontally disposed with, its one end is arranged on the previous die bond station Platform for placing material(3)Top, the other end are arranged on the platform for placing material of the latter die bond station(3)Top;The sliding block(14)Slide peace Mounted in the guide rail(12)Above and in the straight line cylinder(13)Driving under can be along guide rail(12)It is mobile;The sliding block(14) On support is installed(15), the support(15)On be provided with vacuum slot for adsorbing tablet.
5. continuous crystal solidifying apparatus as claimed in claim 4, it is characterised in that:The sliding block(14)On be additionally provided with aerodynamic slide Platform, the traveling table along rectilinear movement is included on the Pneumatic slid platform, the moving direction of the traveling table is longitudinally disposed, the branch Frame(15)It is fixedly connected with the traveling table.
CN201721069332.0U 2017-08-24 2017-08-24 Continuous crystal solidifying apparatus Active CN207068816U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721069332.0U CN207068816U (en) 2017-08-24 2017-08-24 Continuous crystal solidifying apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721069332.0U CN207068816U (en) 2017-08-24 2017-08-24 Continuous crystal solidifying apparatus

Publications (1)

Publication Number Publication Date
CN207068816U true CN207068816U (en) 2018-03-02

Family

ID=61514156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721069332.0U Active CN207068816U (en) 2017-08-24 2017-08-24 Continuous crystal solidifying apparatus

Country Status (1)

Country Link
CN (1) CN207068816U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110379746A (en) * 2019-08-05 2019-10-25 江苏新智达新能源设备有限公司 A kind of semiconductor packaging device of multistation multi-chip

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110379746A (en) * 2019-08-05 2019-10-25 江苏新智达新能源设备有限公司 A kind of semiconductor packaging device of multistation multi-chip

Similar Documents

Publication Publication Date Title
CN202066956U (en) Transposition device for electric energy meter between meter case and single position fixture plate
CN108043990A (en) A kind of linear tank mouth former
CN105883063B (en) The feeding packaging mechanism of limit switch packing machine
CN103177976B (en) Diode encapsulation method
CN205931349U (en) Automatic change cell -phone gift box packagine machine
CN103786079A (en) Full-automatic stacking adhering and grinding gem processing machine
CN207165522U (en) A kind of loader
CN105858569A (en) Capping and sealing method for linear type filling production line and device thereof
CN106240256A (en) Linear type tire assembly line
CN108346602B (en) Efficient chip packaging device for smart card
CN207068816U (en) Continuous crystal solidifying apparatus
CN206704584U (en) Plating medium auto-filling oscillating uniform device
CN206108349U (en) Vertical four -shaft mechanical arm moves material equipment
CN205773200U (en) A kind of spiral cover sealing device
CN207068814U (en) A kind of diode automatic packaging device
CN107553126A (en) A kind of automatic assembly equipment for spinneret assembly
CN104816850B (en) The clamping device of food box packing machine
CN106141636B (en) Bottle cap exterior and interior cover automatic assembling device
CN207103041U (en) A kind of magnetic sheet laminator
CN106166854B (en) A kind of plate joggling apparatus device and method of unidirectional feeding
CN108861532A (en) Medicine bottle and its production process method
CN104890286B (en) Non-woven fabric solid shape bag forming machine
CN207068815U (en) Automatically dropping glue crystal solidifying apparatus for diode package
CN103500908A (en) Cam bending mechanism
CN205291642U (en) Bead filler laminating machine steel wire winding loading and unloading machine constructs

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant