CN207063968U - A kind of two wells connection circulates enhanced underground heat completion system - Google Patents

A kind of two wells connection circulates enhanced underground heat completion system Download PDF

Info

Publication number
CN207063968U
CN207063968U CN201720213713.5U CN201720213713U CN207063968U CN 207063968 U CN207063968 U CN 207063968U CN 201720213713 U CN201720213713 U CN 201720213713U CN 207063968 U CN207063968 U CN 207063968U
Authority
CN
China
Prior art keywords
water
well
protective casing
water injection
injection well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720213713.5U
Other languages
Chinese (zh)
Inventor
查永进
任威严
刘明鑫
杜世亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum Beijing
CNPC Engineering Technology R&D Co Ltd
Original Assignee
China University of Petroleum Beijing
CNPC Drilling Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum Beijing, CNPC Drilling Research Institute Co Ltd filed Critical China University of Petroleum Beijing
Priority to CN201720213713.5U priority Critical patent/CN207063968U/en
Application granted granted Critical
Publication of CN207063968U publication Critical patent/CN207063968U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Landscapes

  • Earth Drilling (AREA)

Abstract

It the utility model is related to a kind of two wells connection and circulate enhanced underground heat completion system, its feature is:By injecting water in water injection well; water carries out poorly efficient heat exchange in water injection well straight well section; then enter geothermal reservoir along horizontal heat-collection well; water adopts hot well with geothermal reservoir by entering after the fully efficient heat exchange of high temperature resistant sleeve pipe progress; after the heat-barrier coating that high-temperature-hot-water scribbles heat-barrier material by adopting protective casing inside and outside in hot well is formed; ground is produced, extraction hot water is used to generate electricity.

Description

A kind of two wells connection circulates enhanced underground heat completion system
Technical field
It the utility model is related to underground heat production technique field, and in particular to a kind of two wells connection circulates enhanced underground heat completion System.
Background technology
Resource and environment is the primary condition that the mankind depend on for existence, multiply and developed, and resource environment and sustainable development are As the significant problem of mankind's facing.Since a nearly century, global population increases 2 times, the energy and naturally money The consumption in source increases 10 times, and the utilization to non-renewable energy resources is well beyond the ability that environment can bear, air Pollution and the living environment of the global warming serious threat mankind, geothermal energy resources as a kind of regenerative resource of cleanliness without any pollution, In today that people's environmental consciousness is increasingly stronger, also receive more and more attention.
Geothermal energy resources refer under current techniques economy and geological conditions, can be from earth's crust clinical practice, reasonably open The useful constituent of heat in heat, geothermal fluid and its association in the High temperature rocks issued.The earth is one huge Thermal store, from ground, more down temperature is higher, and normal geothermal gradient is to increase by 20 DEG C or so per 1000m, when surface temperature is 10 DEG C when, in the case of normal geothermal gradient, formation temperature is about 90 DEG C at the 4000m of underground.Due to constructing reason, the whole world is differently The geothermal gradient difference in area is larger so that the formation temperature difference of the same depth of different regions is larger, the ground temperature of some areas Gradient just forms high-temperature geothermal reservoir when being more than normal geothermal gradient, there are many area formation temperatures at the 4000m of underground in the whole world Abnormal high temperature geothermal reservoir is formed more than 200 DEG C, the energy storage stores very high heat, i.e. referred to as geothermal energy.China Thermal resource enriches, and market potential is huge, and development prospect is wide.Speeding up development using geothermal energy resources not only to readjusting the energy structure, Energy-saving and emission-reduction, improvement environment are significant.To implement《Renewable Energy Law》, according to《Renewable Energy Development " 13 Five " planning》, formulate《Geothermal energy development utilizes " 13 " planning》, plan and elaborate the guidance side that geothermal energy development utilizes Pin and target, key task, great layout, and safeguard of planning implementation etc., the planning are " 13 " period China The basic foundation that geothermal energy development utilizes.
Geothermal energy is divided into hot water type underground heat and xeothermic lithotype underground heat, and hot water type underground heat is that have high-temperature-hot-water in subsurface reservoir, Xeothermic lithotype underground heat is that subsurface reservoir is High temperature rocks, and the world exploits and is mainly hot water type underground heat using geothermal energy resources at present, I.e. from ground drilling to high-temperature geothermal reservoir, geothermal water is then produced into ground and generated electricity, xeothermic lithotype is from ground by water Underground is injected into, by absorbing heat water body after being contacted with High temperature rocks, then high temperature water body, which returns, is discharged to ground to generate electricity, The system is referred to as enhanced geothermal system, Future potentiality it is bigger be xeothermic lithotype underground heat exploitation, i.e., enhanced underground heat Electricity generation system.
The enhanced existing development scheme of geothermal system is:In the area with geothermal energy reservoir, on ground at a distance of 1000 Then two positions of rice carry out pressure break, by reservoir simultaneously to two mouthfuls of wells of underground drilling in Liang Koujing underground geothermal reservoir position Rock is pressed into crack, and the crack of two mouthfuls of well pressure breaks is connected, two mouthfuls of wells is connected by the crack of pressure break in underground, then passes through A bite well absorbs heat to ground high-pressure pump to ground bet normal-temperature water, water by temperature reservoirs flow in fracture therefrom, then Hot water is generated electricity from another mouthful of well extraction to ground.But deficiency existing for the system is:Need to carry out pressure break after boring two mouthfuls of wells, The pressure break expense of 1000m length probably needs 6,000,000, the somewhat expensive of pressure break, adds development cost.
Analysis based on more than, the development cost of geothermal energy are high, if it is possible to which researching and developing a set of needs to bung down together When do not need pressure break mode just can mining geothermal energy technology, development cost can be substantially reduced.Analyzed based on more than, this practicality is new A kind of two wells connection of type Patent design circulates enhanced underground heat completion system, it is intended to it is unified in enhanced geothermal system to fill up China Kind two wells connection circulates the vacancy of enhanced underground heat completion system, and compared with existing development scheme, the system only needs to bore two mouthfuls Well head well is docked, and geothermal energy is absorbed by the circulation of water body, and underground heat is reduced by the design of the development system Energy development cost, to realize safe efficient, sustainable, the inexpensive development and utilization to geothermal energy.
Utility model content
The purpose of this utility model is to provide a kind of two wells connection circulation enhancing into well for the exploitation of enhanced geothermal system Type underground heat completion system, to improve the high efficiency of exploitation of geothermal resource, security, sustainability.
In order to achieve the above object, the utility model adopts the following technical scheme that:
A kind of two wells connection circulates enhanced underground heat completion system, mainly by water injection well and water acquisition well construction, by water injection well, Water acquisition well connects to form U-shaped casing programme, and water acquisition well well type is straight well, and water injection well well type is horizontal well, water injection well casing programme Including straight well section and horizontal segment;Before drilling well, it is necessary in the selection of previously selected geothermal reservoir top at a distance of the two of 2000m Point, as water injection well, the geographical coordinates of water acquisition well;Then to underground subdrilling a bite water acquisition well to geothermal reservoir, water filling is then bored Well, in water injection well drilling process, straight well section is first drilled to, straight well section reaches in geothermal reservoir, horizontal segment is then bored, until getting into Position of the water acquisition well in geothermal reservoir, the horizontal segment of water injection well drill the straight well section of water acquisition well, realize the connection of two mouthfuls of wells, water Flat segment length is 2000m.Bored in geothermal reservoir before water injection well horizontal segment, it is necessary to which that magnetic steering instrument is lowered into water injection well is straight Well section bottom, the magnetic steering instrument play a part of orientation, that is, guide brill chance water acquisition well in water injection well horizontal segment drilling process to exist Position in geothermal reservoir.
U-shaped casing programme is formed after water injection well, the connection of water acquisition well, then injects normal-temperature water from water injection well, water is from water injection well Straight well section protective casing flows to horizontal segment protective casing, because horizontal segment protective casing is in geothermal reservoir, geothermal reservoir heat Endlessly it is delivered in protective casing, heat is absorbed when water flows in the horizontal segment protective casing and becomes high-temperature water, so High-temperature water flows to water acquisition well protective casing from horizontal segment protective casing afterwards, and then flowing to ground from water acquisition well protective casing is sent out Electricity.
The protective casing of water injection well horizontal segment described in the utility model size is more than water acquisition underground portion protective casing size, should Design water injection well horizontal segment protective casing size is larger, and water flowing velocity in large-sized horizontal segment protective casing is slower, water Flowing time in the protective casing is longer, i.e. the time of water absorption geothermal reservoir heat is just longer, and heat transfer effect is more Good, water temperature becomes higher, and generating efficiency is more preferable after hot water reaches ground.
The protective casing of water acquisition well described in the utility model is divided into top protective casing and bottom protective casing, and water acquisition well Bottom protective casing size is less than water acquisition well top protective casing size, be because high-temperature-hot-water in water acquisition well protective casing from Under when flowing up, due to pressure action, in water acquisition underground portion protective casing in the pressure ratio top protective casing of water water pressure Power is big, because the three-phase of water is determined by the temperature and pressure of water, when the timing of temperature one of water, the pressure that water is subject to are larger When be liquid, be changed into gaseous state when reverse pressure is smaller, therefore, the high-temperature-hot-water in water acquisition well protective casing is in bottom protective casing Pressure is big during place, is liquid, and pressure is small when at the protective casing of top, and aqueous water becomes gaseous state.Aqueous water becomes body after gaseous state Product expansion, pressure increase, it is possible to the protective casing for ruining top can be squeezed, is ruined in order to avoid well top protective casing is not squeezed, So increase top protective casing size, buffering aqueous water becomes the pressure that volumetric expansion after gaseous state is brought.
Water injection well straight well section protective casing is different from water injection well horizontal segment protective casing size, can be formed in the reducer Current are hoarded, and row buffering is flowed into water, it is miscellaneous can will not to inject air etc. on the premise of ensureing that injection flow, pressure are constant Matter, air take heat transfer space in water injection well horizontal segment protective casing, influence heat-transfer effect.
Brief description of the drawings
Accompanying drawing 1 is cross-sectional view of the present utility model.
1 water injection well straight well section, 2 water injection well horizontal segments, 3 water acquisition wells, 4 water injection well surface pipes, 5 water injection well straight well section technologies Sleeve pipe, 6 water injection well horizontal segment protective casings, 7 water acquisition well top protective casings, 8 water acquisition underground portion protective casings, 9 water acquisition well tables Layer sleeve pipe.
Embodiment
Below in conjunction with accompanying drawing 1, the utility model is described in detail, it is as follows:
A kind of main 1 water injection well straight well section of the enhanced underground heat completion system of two wells connection circulation, 2 water injection well horizontal segments, 3 are adopted Well, 4 water injection well surface pipes, 5 water injection well straight well section protective casings, 6 water injection well horizontal segment protective casings, 7 water acquisition well tops Protective casing, 8 water acquisition underground portion protective casings, 9 water acquisition well surface pipes composition.
The utility model is in the case where the parameters such as geothermal reservoir geographical position, orientation, depth determine, in geothermal reservoir A bite straight well, as water acquisition well 3 are bored in top first, and the well type of water acquisition well 3 is straight well, is spudded in first by 374.4mm drill bits, under Enter 272.8mm surface pipes 9 and cementing well, it is therefore an objective to isolate top layer complicated geological structure;Then using the resistance to of 250.6mm High temperature drill bit is drilled into geothermal reservoir, then the water acquisition underground portion of the large-sized water acquisition well top protective casing 7 of tripping in and small size Protective casing 8, and shunt in a well after cementing well.
During water injection well drilling well, water injection well straight well section 1 gets into geothermal reservoir, and the well type of water injection well is horizontal well, is sequentially note Well straight well section 1, water injection well horizontal segment 2, pit shaft and stratum heat exchange area, water filling well water can fully be increased using horizontal well technology The length of flat section 2 is more than 2000m.During 1 drilling well of water injection well, spudded in first by 444.2mm drill bits, subsequent tripping in 406.1mm Water injection well surface pipe 4 and cementing well, isolate stratum top layer complicated geological structure;Secondly it is drilled into using 374.4mm drill bits Geothermal reservoir kickoff point (KOP), tripping in water injection well straight well section protective casing 5 are simultaneously cemented the well;Then using 250.6mm drill bits and high temperature resistant magnetic Guide instrument directional inclination.
Water injection well straight well section protective casing 5 is different from water injection well horizontal segment 6 sizes of protective casing, is formed in the reducer Current are hoarded, and row buffering is flowed into water, can will not inject the impurity such as air, air exists on the premise of guarantee flow, pressure Heat transfer space is taken in water injection well horizontal segment protective casing 6, influences heat-transfer effect.
When boring water injection well horizontal segment 2, it is oriented by high temperature resistant magnetic steering instrument, controls drill bit in real time in geothermal reservoir The direction of middle drilling, until water injection well horizontal segment 2 reaches position of the water acquisition well 3 in geothermal reservoir, water injection well horizontal segment 2 bores Water acquisition underground portion protective casing 8 is worn, realizes the connection of two mouthfuls of wells.
A kind of two wells connection circulates enhanced underground heat completion system by injecting normal-temperature water from water injection well straight well section 1, water from Water injection well straight well section protective casing 5 flows to water injection well horizontal segment protective casing 6, because water injection well horizontal segment protective casing 6 is on ground In heat reservori, geothermal reservoir heat is endlessly delivered to water injection well horizontal segment protective casing 6, and water is in water injection well horizontal segment skill Heat is absorbed when being flowed in art sleeve pipe 6 and becomes high-temperature water, then high-temperature water flows to water acquisition from water injection well horizontal segment protective casing 6 Underground portion protective casing 8, then high temperature flow to ground from water acquisition well top protective casing 7 and generated electricity.

Claims (3)

1. a kind of two wells connection circulates enhanced underground heat completion system, mainly by water injection well, water acquisition well construction, it is characterised in that: The water injection well is made up of water injection well surface pipe, water injection well straight well section protective casing, water injection well horizontal segment protective casing, three kinds Sleeve pipe is sequentially connected from top to bottom;The water acquisition well is by water acquisition well surface pipe, water acquisition well top protective casing, water acquisition underground portion Protective casing is formed, and three kinds of sleeve pipes are sequentially connected from top to bottom;Completion casing programme connected by water injection well with water acquisition well formed it is U-shaped Casing programme.
2. a kind of two wells connection according to claim 1 circulates enhanced underground heat completion system, it is characterised in that:Water injection well Horizontal segment protective casing size is more than water acquisition underground portion protective casing size.
3. a kind of two wells connection according to claim 1 circulates enhanced underground heat completion system, it is characterised in that:Water acquisition well Bottom protective casing size is less than water acquisition well top protective casing size.
CN201720213713.5U 2017-03-06 2017-03-06 A kind of two wells connection circulates enhanced underground heat completion system Expired - Fee Related CN207063968U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720213713.5U CN207063968U (en) 2017-03-06 2017-03-06 A kind of two wells connection circulates enhanced underground heat completion system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720213713.5U CN207063968U (en) 2017-03-06 2017-03-06 A kind of two wells connection circulates enhanced underground heat completion system

Publications (1)

Publication Number Publication Date
CN207063968U true CN207063968U (en) 2018-03-02

Family

ID=61500916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720213713.5U Expired - Fee Related CN207063968U (en) 2017-03-06 2017-03-06 A kind of two wells connection circulates enhanced underground heat completion system

Country Status (1)

Country Link
CN (1) CN207063968U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108775275A (en) * 2018-05-28 2018-11-09 中国石油大学(华东) Individual well closed cycle underground thermoelectric heat generation system and method
CN108799024A (en) * 2018-05-28 2018-11-13 中国石油大学(华东) U-tube heat exchange closed cycle underground thermoelectric heat generation system and method
CN111236904A (en) * 2020-01-19 2020-06-05 中国地质科学院勘探技术研究所 Geothermal exploitation method for double horizontal wells in butt joint communication to extract heat by water separation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108775275A (en) * 2018-05-28 2018-11-09 中国石油大学(华东) Individual well closed cycle underground thermoelectric heat generation system and method
CN108799024A (en) * 2018-05-28 2018-11-13 中国石油大学(华东) U-tube heat exchange closed cycle underground thermoelectric heat generation system and method
CN111236904A (en) * 2020-01-19 2020-06-05 中国地质科学院勘探技术研究所 Geothermal exploitation method for double horizontal wells in butt joint communication to extract heat by water separation
CN111236904B (en) * 2020-01-19 2021-03-23 中国地质科学院勘探技术研究所 Geothermal exploitation method for double horizontal wells in butt joint communication to extract heat by water separation

Similar Documents

Publication Publication Date Title
CN106640028A (en) Completion method of enhanced geothermal system through communication and circulation of two wells
Qu et al. Influence of different fracture morphology on heat mining performance of enhanced geothermal systems based on COMSOL
CN110318675B (en) Deep coal bed gas thermal co-production method
CN106948795B (en) A kind of method of multi-branched horizontal well closed cycle exploitation hot water type underground heat
CN108571307A (en) A kind of enhanced geothermal system pressure-break net design and completion method
CN101629485B (en) Exploitation method of communication well of geothermal energy bore well
CN107100605B (en) Method for developing dry hot rock by using double horizontal wells and circulating supercritical carbon dioxide
CN103090571B (en) Method of circular mining geothermal resources
CN105840146A (en) Method for self-circulation exploitation of geothermal energy of hot dry rock with multilateral well and volume fracturing technologies
CN103362442B (en) Drilling well multiple spot communication loop gathers geothermal method
CN208594924U (en) Develop the well pattern structure of enhanced underground heat
CN105863569A (en) Single-well fracture gravity self-circulation dry-hot-rock geotherm mining method
CN105863568A (en) Method for exploring dry-hot-rock geotherm through underground heat siphon self-circulation
US20070245729A1 (en) Directional geothermal energy system and method
CN207063968U (en) A kind of two wells connection circulates enhanced underground heat completion system
CN106968661A (en) It is a kind of to strengthen the completion method of hot water type geothermal system
CN206419171U (en) A kind of geothermal exploitation system
CN104695926A (en) Low temperature geothermal energy production technique method
CN106894804A (en) A kind of enhanced geothermal system completion method of standing column well
CN104713259A (en) Method and system for extracting heat energy of hot dry rocks
CN108222831A (en) Multidirectional geothermal well and high-efficiency mining hot dry rock method
CN105178963B (en) A kind of drill well water mixeding mining method of novel sylvite deposit
CN108489124A (en) Multiloop heat-exchange method under a kind of geothermal well
Lv et al. Analysis of heat transfer based on complex embedded discrete fracture network (EDFN) for field-scale EGS
CN207348838U (en) A kind of enhanced underground heat completion system of standing column well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180302

Termination date: 20190306