CN207062973U CN201720878775.8U CN201720878775U CN207062973U CN 207062973 U CN207062973 U CN 207062973U CN 201720878775 U CN201720878775 U CN 201720878775U CN 207062973 U CN207062973 U CN 207062973U
Authority
CN
China
Prior art keywords
steel plate
mould
layers
bolt
mould steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720878775.8U
Other languages
Chinese (zh)
Inventor
成后唐
李平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry 22 Construction Co Ltd
Original Assignee
China Nuclear Industry 22 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry 22 Construction Co Ltd filed Critical China Nuclear Industry 22 Construction Co Ltd
Priority to CN201720878775.8U priority Critical patent/CN207062973U/en
Application granted granted Critical
Publication of CN207062973U publication Critical patent/CN207062973U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of frock for aiding in accurately foot bolt Embedment Construction, it includes steel plate mould and bamboo slab rubber mould.The steel plate mould includes one layer of mould steel plate, two layers of mould steel plate and three layers of mould steel plate, the structure of one layer of mould steel plate and two layers of mould steel plate is identical, the first screwed hole is machined with the corner of steel plate, the first spacing hole is machined with the middle, the corner of three layers of mould steel plate is machined with the second screwed hole, it is fixedly linked between one layer of mould steel plate, two layers of mould steel plate and three layers of mould steel plate by leading screw, forms three-decker.Now foundation bolt is assembled using steel plate mould, bamboo slab rubber mould fixes the foundation bolt assembled in steel structure base template, using correct vibrating method, is corrected in time before concrete initial set.The axis shift of foundation bolt was so both can guarantee that, and can improves the installation rate of foundation bolt, saves more artificial, times, can create considerable economic benefit again.

Description

A kind of frock for aiding in accurately foot bolt Embedment Construction
Technical field
The utility model belongs to architectural furniture field, and in particular to one kind aids in accurately foot bolt Embedment Construction Frock.
Background technology
The pre-buried substantial amounts of foundation bolt of steel structure base construction palpus, conventional foundation bolt are single using preformed hole and scene Fixed construction method, tedious process are positioned, fixed difficult, installation accuracy is difficult to ensure that.The method for embedding of foundation bolt, root According to the context constructed with base concrete, it is divided into direct-burried and is buried with after.Before direct-burried is casting concrete, bolt is positioned, mixed After coagulating native pouring molding, bolt is buried;After bury when being casting concrete, reserve embedded bolt hole, treat that concrete reaches one After determining intensity, bolt, secondary casting concrete are inserted.
The shortcomings that direct-burried foundation bolt is bolt without the fixed strong point, if error occurs in bolt positioning, processing is suitable It is cumbersome.It is that the concreting after-hardening of reserving hole part is shunk the shortcomings that buried foot bolt afterwards, easily between former concrete Crack is produced, overall shearing strength is reduced, the overall durability of structure is affected, both tedious process are fixed tired Difficult, installation accuracy is difficult to ensure that.Because steel structure base bolt specification is more, quantity is big and installation precise requirements are high, indivedual spiral shells The pre-buried installation and debugging for once relatively large deviation occur and directly affecting equipment of bolt, it will have a strong impact on that construction speed increases work Cheng Chengben.
Utility model content
The utility model is directed to above-mentioned the deficiencies in the prior art, there is provided a kind of to aid in accurately foot bolt Embedment Construction Frock and construction method, now foundation bolt is assembled using steel plate mould, bamboo slab rubber mould is by the foundation bolt assembled in steel It is fixed in architecture basics template, using correct vibrating method, corrected in time before concrete initial set.It so both can guarantee that lower margin The axis shift of bolt, and can improve the installation rate of foundation bolt, save more artificial, times, can create again considerable Economic benefit.
In order to solve the above-mentioned technical problem, the utility model proposes following technical scheme:One kind aids in high-precision lower margin spiral shell The frock of bolt Embedment Construction, it includes steel plate mould and bamboo slab rubber mould.
The steel plate mould includes one layer of mould steel plate, two layers of mould steel plate and three layers of mould steel plate, one layer of mould The structure of steel plate and two layers of mould steel plate is identical, is machined with the first screwed hole in the corner of steel plate, is machined with first in the middle Spacing hole, the corners of three layers of mould steel plate are machined with the second screwed hole, one layer of mould steel plate, two layers of mould steel plate and It is fixedly linked between three layers of mould steel plate by leading screw, forms three-decker.
Bracing diagonal is welded with the edge of three layers of mould steel plate.
Location and installation has foundation bolt on the spacing hole.
The diameter of the spacing hole is more than the diameter of foundation bolt.
The bamboo slab rubber mould includes bamboo slab rubber, and the second spacing hole, second spacing hole are machined with the bamboo slab rubber Positioning is engaged with foundation bolt, cross lumps of wood frame is provided between two layers of bamboo slab rubber.
Bracing piece is welded between the foundation bolt.
The quantity and spacing of first screwed hole determine according to the size of specific foundation bolt in construction and spacing.
The utility model achieves following technique effect:
1st, foundation bolt is assembled using steel plate mould, bamboo slab rubber mould is by the foundation bolt assembled in steel structure base It is fixed in template, using correct vibrating method, corrected in time before concrete initial set, so both can guarantee that the axle of foundation bolt Displacement of the lines, and can improve the installation rate of foundation bolt, save more artificial, times, can create considerable economic benefit again.
2nd, bolt installation rate is fast, and steel structure base foundation bolt axis shift tolerance is 5mm, belongs to master control item The installation quality of mesh, only guaranteed foundation bolt, it just can guarantee that the installation quality of steel construction, the lower margin spiral shell of steel form mould assembling Bolt relative position zero deflection;Hole internal diameter in template plate face is only bigger 1mm than design foundation bolt external diameter, and its center and design Unanimously, when foundation bolt is placed in wherein, maximum displacement deviation that each bolt can be generated is 0.5mm, any two spiral shell The maximum displacement deviation that bolt can be generated is 1mm, and the center displacement reaches between so ensuring that arbitrarily each bolt of same bolt group Pre-control of constructing target≤1mm.Because the precision controlling of particular manufacturing craft bolt aperture in itself is preferable, as long as ensureing the essence in assembling Degree, it is ensured that the foundation bolt precision controlling being inserted in mould is within scope of design.
3rd, bolt installation rate is fast;Bolt installation quality is high, and position is accurate;Need to be few with equipment, operating procedure is simple;Steel plate Mould, bamboo slab rubber Mold Making are simple, practical, can be suitably used for giving for various bolts and bury installation;According to different type basis The form of bolt formulates specific mould, and mould is reusable;Construction precision is improved, reduces difficulty of construction, improves construction work Effect, can satisfy social needs, and accelerate steel construction development, improve the rate of investment and utilization rate of steel construction.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is one layer of mould steel plate structure schematic diagram of the present utility model.
Fig. 2 is two layers of mould steel plate structure schematic diagram of the present utility model.
Fig. 3 is three layers of mould steel plate structure schematic diagram of the present utility model.
Fig. 4 is the assembly structure diagram of steel plate mould of the present utility model.
Fig. 5 is steel plate mould of the present utility model and foundation bolt assembly structure diagram.
Fig. 6 is bamboo slab rubber structural representation of the present utility model.
Fig. 7 is cross lumps of wood frame structural representation of the present utility model.
Fig. 8 is bamboo slab rubber mould structure schematic diagram of the present utility model.
Fig. 9 is foundation bolt of the present utility model and bamboo slab rubber mould assembling structure schematic diagram.
In figure:One layer of mould steel plate 1, two layers of mould steel plate 2, three layers of mould steel plate 3, leading screw 4, bracing diagonal 5, lower margin spiral shell Bolt 6, bamboo slab rubber 7, cross lumps of wood frame 8, bracing piece 9;
Spacing hole 101,201, the second screwed hole 301, the second spacing hole 701.
Embodiment
Embodiment of the present utility model is described further below in conjunction with the accompanying drawings.
Such as Fig. 1-9, a kind of frock for aiding in accurately foot bolt Embedment Construction, it includes steel plate mould and bamboo slab rubber mould Tool.
Further, the steel plate mould includes one layer of mould steel plate, 1, two layer of mould steel plate 2 and three layers of mould steel plate 3, One layer of mould steel plate 1 is identical with the structure of two layers of mould steel plate 2, be machined with the corner of steel plate the first screwed hole 102, 202, the first spacing hole 101,201 is machined with the middle, and the corner of three layers of mould steel plate 3 is machined with the second screwed hole 301, it is fixedly linked, is formed by leading screw 4 between described one layer of mould steel plate, 1, two layer of mould steel plate 2 and three layers of mould steel plate 3 Three-decker.
Further, it is welded with bracing diagonal 5 at the edge of three layers of mould steel plate.
Further, location and installation has foundation bolt 6 on the spacing hole 101,201.
Further, the diameter of the spacing hole 101,201 is more than the diameter of foundation bolt 6.
Further, the bamboo slab rubber mould includes bamboo slab rubber 7, and the second spacing hole 701 is machined with the bamboo slab rubber 7, Second spacing hole 701 is engaged positioning with foundation bolt 6, and cross lumps of wood frame 8 is provided between two layers of bamboo slab rubber 7.
Further, it is welded with bracing piece 9 between the foundation bolt 6.
Further, the quantity of first screwed hole 102,202 and spacing are according to specific foundation bolt in construction Size and spacing determine.
Embodiment 2:
When steel plate special mould is installed by independent support in advance, corner carries out support, regulation using adjustable leading screw Adjustable nut on corner, by the basis of the horizon rule that is set on the side of steel plate mould four, making three layers of mould steel plate respective On horizontal plane.Foundation bolt, which is inserted in, again makes in the big 1mm positioning holes of its external diameter.Because this mould is assembled by mould steel plate , the plate face of each layer is all horizontal, and each bolt can ensure that respective precision will after this allows for bolt-inserting hole Ask.After being aligned after bolt is inserted using theodolite to it, in the middle part of foundation bolt and bottom is straight not less than bolt using diameter 1/3 reinforcing bar in footpath is by bolt is oblique and bottom level spot welding makes it without moving left and right, by making die sheet surface be in level, spiral shell In the middle part of bolt and bottom uses the horizontal and oblique spot welding of corresponding reinforcing bar, makes it up and down and level is not floated, it is ensured that construction pre-control ginseng Number requires;Bamboo slab rubber mould is made, foundation bolt, solid and reliable, non-loosening are fixed by bamboo slab rubber mould installion.
Embodiment 3:
Such as Fig. 1-3, according to the relative position of bolt first on steel plate unwrapping wire, the relative position of bolt hole is each steel column The relative position of bolt, one or two layers of mould steel plate are spot-welded together, it is placed on bench drill and is drilled, the diameter in hole is more straight than bolt The big 1mm in footpath, it is then that third layer mould steel plate and preceding two layers of mould steel plate is spot-welded together, it is placed on remaining four group on bench drill Dress bolt hole is drilled.
Such as Fig. 4, cut-and-dried three layers of mould is carried out by assembled formation with leading screw according to the length of foundation bolt in drawing. It is corrected with theodolite after assembling, to prevent modification from carrying out consolidation process using round steel, entered again after the completion of fixed Row precisely check, after acceptance(check) after come into operation.
Such as Fig. 5, foundation bolt is poured on the steel plate mould made, treats that one group of bolt is right after inserting Every bolt carries out perpendicularity check, meets after requiring, consolidation process is carried out to it with 8 round steel, after reinforcing by mould and Bolt group separates, and this assembly working is to complete.
Such as Fig. 6-7, two pieces of bamboo slab rubbers are made with the same method of steel plate Mold Making, with two root long degree than basic column section The long 300mm of size flitch, first two pieces of flitches are placed on the four sides planing of two flitches and straight on planer, then two Individual flitch middle part opening, and check whether two flitches are vertical by two flitch dowels together.
Such as Fig. 8, when flitch assembles with bamboo slab rubber, the axis on bamboo slab rubber must be with flitch wherein while overlapping, so The edge of flitch is the axis of foundation bolt.
Such as Fig. 9, the top of basic column template is supported with flitch and adjacent foundation platform and foundation trench wall cushioning bamboo slab rubber, Then axis is put at the four sides of basic column template.Flitch edge must be aligned with axis point drawn on basic column template, Then nut is tightened on screw mandrel and carrys out elevation control, then by two flitches and column template iron nail and iron plate clamp fix tightly Gu.The installment work of so bolt has been completed.
By above-mentioned description, those skilled in the art completely can be without departing from this item utility model technological thought In the range of, various changes and amendments are carried out all within the scope of protection of the utility model.It is of the present utility model not most Matters, belong to the common knowledge of those skilled in the art.

Claims (5)

  1. A kind of 1. frock for aiding in accurately foot bolt Embedment Construction, it is characterised in that:It includes steel plate mould and bamboo slab rubber Mould;
    The steel plate mould includes one layer of mould steel plate(1), two layers of mould steel plate(2)With three layers of mould steel plate(3), described one layer Mould steel plate(1)With two layers of mould steel plate(2)Structure it is identical, be machined with the first screwed hole in the corner of steel plate(102、202), The first spacing hole is machined with the middle(101、201), three layers of mould steel plate(3)Corner be machined with the second screwed hole (301), one layer of mould steel plate(1), two layers of mould steel plate(2)With three layers of mould steel plate(3)Between pass through leading screw(4)It is fixed It is connected, forms three-decker;
    Bracing diagonal is welded with the edge of three layers of mould steel plate(5);
    The spacing hole(101、201)Upper location and installation has foundation bolt(6).
  2. A kind of 2. frock for aiding in accurately foot bolt Embedment Construction according to claim 1, it is characterised in that:It is described Spacing hole(101、201)Diameter be more than foundation bolt(6)Diameter.
  3. A kind of 3. frock for aiding in accurately foot bolt Embedment Construction according to claim 1, it is characterised in that:It is described Bamboo slab rubber mould includes bamboo slab rubber(7), the bamboo slab rubber(7)On be machined with the second spacing hole(701), second spacing hole (701)With foundation bolt(6)It is engaged positioning, two layers of bamboo slab rubber(7)Between be provided with cross lumps of wood frame(8).
  4. A kind of 4. frock for aiding in accurately foot bolt Embedment Construction according to claim 1, it is characterised in that:It is described Foundation bolt(6)Between be welded with bracing piece(9).
  5. A kind of 5. frock for aiding in accurately foot bolt Embedment Construction according to claim 1, it is characterised in that:It is described First screwed hole(102、202)Quantity and spacing determined according to the size of specific foundation bolt in construction and spacing.
CN201720878775.8U 2017-07-19 2017-07-19 A kind of frock for aiding in accurately foot bolt Embedment Construction Active CN207062973U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720878775.8U CN207062973U (en) 2017-07-19 2017-07-19 A kind of frock for aiding in accurately foot bolt Embedment Construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720878775.8U CN207062973U (en) 2017-07-19 2017-07-19 A kind of frock for aiding in accurately foot bolt Embedment Construction

Publications (1)

Publication Number Publication Date
CN207062973U true CN207062973U (en) 2018-03-02

Family

ID=61511002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720878775.8U Active CN207062973U (en) 2017-07-19 2017-07-19 A kind of frock for aiding in accurately foot bolt Embedment Construction

Country Status (1)

Country Link
CN (1) CN207062973U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109129849A (en) * 2018-10-26 2019-01-04 中建局集团第二建筑有限公司 A kind of precast beam wedge block and pre-embedded bolt installation mold and its construction method
CN110409854A (en) * 2019-08-30 2019-11-05 山西五建集团有限公司 A kind of foundation bolt is clustered to assembling installation mold and method
CN111395783A (en) * 2020-04-25 2020-07-10 五冶集团上海有限公司 Construction method for carrying out in-place fine correction and adjustment on bolt
CN114809673A (en) * 2022-05-08 2022-07-29 山西三建集团有限公司 Rear-buried foundation bolt suspension positioning method in street lamp concrete foundation pouring

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109129849A (en) * 2018-10-26 2019-01-04 中建局集团第二建筑有限公司 A kind of precast beam wedge block and pre-embedded bolt installation mold and its construction method
CN109129849B (en) * 2018-10-26 2024-01-23 中建一局集团第二建筑有限公司 Prefabricated beam wedge block and embedded bolt mounting die and construction method thereof
CN110409854A (en) * 2019-08-30 2019-11-05 山西五建集团有限公司 A kind of foundation bolt is clustered to assembling installation mold and method
CN111395783A (en) * 2020-04-25 2020-07-10 五冶集团上海有限公司 Construction method for carrying out in-place fine correction and adjustment on bolt
CN111395783B (en) * 2020-04-25 2024-01-30 五冶集团上海有限公司 Construction method for carrying out positioning fine adjustment on bolts
CN114809673A (en) * 2022-05-08 2022-07-29 山西三建集团有限公司 Rear-buried foundation bolt suspension positioning method in street lamp concrete foundation pouring

Similar Documents

Publication Publication Date Title
CN207062973U (en) A kind of frock for aiding in accurately foot bolt Embedment Construction
CN104695557B (en) Steel structure building construction method for one-step pre-burying of foundation bolts
CN102345377A (en) Method for making spatial multi-curved-surface as-cast finish concrete stay in place formwork by using plywood
CN108661225B (en) But height-adjusting's precast concrete coincide floor
CN106150055A (en) Concrete embedded part essence flat hanging installment work stand and the installation method of built-in fitting
CN107246026B (en) Tower equipment foundation bolt embedding construction mold and embedding method thereof
CN113152742A (en) Semi-prefabricated non-demolition waterproof superimposed shear wall structure
CN105970804A (en) Structure and construction method of fan-shaped tenon joints of prefabricated assembly pier
CN215211876U (en) Waterproof hollow wall structure of precast concrete
CN105040973B (en) Construction method of outer decorating layer formwork for conical columns of comprehensive gym
CN210216896U (en) Prefabricated plate skeleton and prefabricated plate
CN203867172U (en) Aluminum alloy building formwork device
CN206319632U (en) A kind of assembled architecture foundation pole rib precise positioning instrument
CN206189607U (en) Rag bolt location structure
CN113339055B (en) Filling body pouring and curing device and using method thereof
CN206495329U (en) Adjustable accurately foot bolt reinforces mould and hardened system
CN206071056U (en) A kind of constructional column casting system
CN211447004U (en) Reinforced GRC plate and pipe ditch foundation formwork system combining same
CN210758333U (en) Concrete annular interlocking formula stand combination basis prefabricated component pouring mould
CN203994169U (en) A kind of combined wall board casting mold
CN211566170U (en) Improve die set of clear water concrete building template trompil precision
CN204645304U (en) A kind of heavy roof truss sliding connection structure
CN104763152A (en) Construction method for flower-basket-shaped support of steel structure water tower
CN204676886U (en) House column apparatus for pouring
CN204645624U (en) A kind of cast-in-place concrete stair is marked time set shaped steel formwork

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant