CN207062786U - A kind of construction bracket of continuous beam cantilever 0# blocks - Google Patents

A kind of construction bracket of continuous beam cantilever 0# blocks Download PDF

Info

Publication number
CN207062786U
CN207062786U CN201721013498.0U CN201721013498U CN207062786U CN 207062786 U CN207062786 U CN 207062786U CN 201721013498 U CN201721013498 U CN 201721013498U CN 207062786 U CN207062786 U CN 207062786U
Authority
CN
China
Prior art keywords
bar
transverse horizontal
construction
fixed
stupefied
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721013498.0U
Other languages
Chinese (zh)
Inventor
何义
袁晓晨
顾留碗
郭敏
侍光耀
倪小海
全有维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201721013498.0U priority Critical patent/CN207062786U/en
Application granted granted Critical
Publication of CN207062786U publication Critical patent/CN207062786U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of construction bracket of continuous beam cantilever 0# blocks, and the both sides of bridge pier along its length are separately installed with two temporary supports, and the bottom of temporary support is fixed on cushion cap;The top of temporary support sets a vertical equity bar being connected with bridge pier, and vertical equity bar is connected with pier shaft built-in fitting;Some height gradual increased vertical supporting bar from inside to outside is provided with vertical equity bar;Transverse horizontal bar is set above vertical supporting bar, and the both ends of transverse horizontal bar are separately fixed on the corresponding vertical supporting bar of two temporary supports of bridge pier homonymy;Set above transverse horizontal bar longitudinal brace master stupefied, transverse horizontal bar and longitudinal brace master it is stupefied between connected by voussoir.The utility model, which makes, implements safety simple, easy for construction, has saved construction cost, has improved the quality and efficiency of construction.

Description

A kind of construction bracket of continuous beam cantilever 0# blocks
Technical field
The utility model belongs to field of bridge construction, and in particular to a kind of construction bracket of continuous beam cantilever 0# blocks.
Background technology
With the fast development of China's infrastructure, continuous beam cantilever pouring construction method is superior because its ripe uniqueness Property, it is increasingly used for the region of the support cast-in-place constructional difficulties such as cross a river stream, mountain valley, road.Poured in continuous beam cantilever During construction, basis that 0# blocks are constructed as cantilever pouring, because of its size and quality is larger and its surrounding enviroment is complicated and changeable, easily Cause safety and quality problems.
When cantilever pouring continuous beam 0# blocks are constructed, construction condition is typically poor, need to be complete in narrow and small high dummy section Poured into prevention of mass concrete, and construction site geological conditions typically changes greatly.If using conventional construction support, it is necessary to 0# blocks Neighbouring place is handled on a large scale, could strictly control the sedimentation of 0# blocks.Also, this method is using material is more, constructing accounts for Ground is larger, and in the environment of geological condition complexity, narrow space, the diagonally disposed construction safety risk of steel pipe is larger, and branch be present The problem of frame sedimentation is uneven, construction safety hidden danger is larger.
Utility model content
Purpose of utility model:The utility model purpose is in view of the shortcomings of the prior art, there is provided a kind of continuous beam cantilever The construction bracket of 0# blocks.The utility model, which makes, implements safety simple, easy for construction, has saved construction cost, has improved construction Quality and efficiency.
Technical scheme:The construction bracket of continuous beam cantilever 0# blocks described in the utility model, bridge pier along its length two Side is separately installed with two temporary supports, and the bottom of temporary support is fixed on cushion cap;The top of temporary support set one with The vertical equity bar of bridge pier connection, vertical equity bar are connected with pier shaft built-in fitting;Some height are provided with vertical equity bar Gradual increased vertical supporting bar from inside to outside;Transverse horizontal bar, the both ends point of transverse horizontal bar are set above vertical supporting bar It is not fixed on the corresponding vertical supporting bar of two temporary supports of bridge pier homonymy;Longitudinal brace master is set above transverse horizontal bar It is stupefied, transverse horizontal bar and longitudinal brace master it is stupefied between connected by voussoir.
Further, it is fixed with shelf bracket between the temporary support and vertical equity bar.
Further, the bottom of the temporary support is welded and fixed by pre-embedded steel slab on cushion cap.
Further, the transverse horizontal bar at longitudinal stupefied contact position of brace master using U-bolt with being fixed.
Beneficial effect:(1)The utility model is less using material installation, Neng Gou less demanding to construction site condition Narrow space carries out crossed construction, has saved cost, has shortened the engineering time, has improved efficiency of construction;
(2)Due to eliminating original primary load bearing steel pipe support, by temporary support, load is transferred to pier cap On, avoid the support caused by Geological condition difference and settle non-uniform phenomenon, enhance working security;
(3)Because being not provided with rigid temporary support between pier coping portion and 0# block box beams, it is possible to achieve the lotus that bearing is born It is loaded in the propulsion of cantilever casting construction progress and increases, avoids to greatest extent after beam body is closed up when contacting temporary support because of branch Seat depression and the problem of produce larger structure second inner force.
Brief description of the drawings
Fig. 1 is the structure chart of the construction bracket of continuous cantilever beam 0# blocks described in the utility model;
Fig. 2 is Figure 1A-A profiles.
In figure, 1, cushion cap;2nd, bridge pier;3rd, temporary support;4th, shelf bracket;5th, vertical equity bar;6th, vertical supporting bar;7、 Transverse horizontal bar;8th, voussoir;9th, longitudinal brace master is stupefied.
Embodiment
Technical solutions of the utility model are described in detail below by accompanying drawing, but the scope of protection of the utility model It is not limited to the embodiment.
Embodiment 1:A kind of construction bracket of continuous beam cantilever 0# blocks, as shown in figure 1, bridge pier 2 along its length two Side is separately installed with two temporary supports 3, and the bottom of temporary support 3 is fixed on cushion cap 1;The top of temporary support 3 sets one The vertical equity bar 5 that root is connected with bridge pier 2, vertical equity bar 5 are connected with pier shaft built-in fitting;Temporary support 3 and vertical equity bar 5 Between be fixed with shelf bracket 4;Some height gradual increased vertical supporting bar from inside to outside is provided with vertical equity bar 5 6;The top of vertical supporting bar 6 sets transverse horizontal bar 7, and the both ends of transverse horizontal bar 7 are separately fixed at 2 homonymy of bridge pier two temporarily On the corresponding vertical supporting bar 6 of support 3;The top of transverse horizontal bar 7 sets longitudinal brace master stupefied 9, and transverse horizontal bar 7 and longitudinal direction are tiltedly Connected between bar master stupefied 9 by voussoir 8.
The construction bracket of continuous beam cantilever 0# blocks described in the utility model be by it is lower from the upper vertical equity bar of consolidation in advance 5, Shelf bracket 4, vertical supporting bar 6, transverse horizontal bar 7 and longitudinal brace master stupefied 9 are then placed, then on longitudinal brace master stupefied 9 The lumps of wood, bed die and Bian Mo are laid, so as to form complete 0# block construction supports and template system.
More specifically, the temporary support 3 uses material to be made up of Q235 spiral steel pipe, temporary support 3, which is supported on, holds On platform 1, temporary support 3 is welded and fixed away from the side 15cm of cushion cap 1 with 700mm × 700mm pre-buried on cushion cap 1 × 20mm steel plates.Phase [20 channel-section steel is welded and fixed, to strengthen the steadiness of 0# block construction supports by 2 at the middle part of adjacent two temporary supports 3.
[36 channel-section steel is made, and vertical equity bar 5 passes through pier shaft pre-embedded steel slab and bridge pier 2 for the use of vertical equity bar 52 It is welded to connect, surface of steel plate slightly concave 2-3cm into pier shaft, facilitates the construction of 0# blocks to terminate the outward appearance processing of rear steel plate surface.Steel plate is carried on the back Face is welded with anchor bar, and the position of steel plate, the specification of size and anchor bar, size determine after design calculates.
[20 channel-section steel is made, and shelf bracket 4 welds with temporary support 3 and vertical equity bar 5 for the use of shelf bracket 42 Connection.
[36 channel-section steel is made, and bottom and the vertical equity bar 5 of vertical supporting bar 6 weld for the use of vertical supporting bar 62 Connection.
[36 channel-section steel is made, and the top of transverse horizontal bar 7 and vertical supporting bar 6 is welded for the use of transverse horizontal bar 72 Connection.
Longitudinal brace master stupefied 9 is made of Two bors d's oeuveres 25b channel-section steels, and length is with spacing depending on Bridge Design situation. Transverse horizontal bar 7 prevents both sides cantilever extension from toppling with being fixed at stupefied 9 contact position of longitudinal brace master using U-bolt.It is horizontal Two bors d's oeuveres 25b channel-section steels web is strengthened with 20mm steel plates to horizon bar 7 and stupefied 9 intersection of longitudinal brace master, spacing 10cm, strengthened Scope is more than the stupefied 9 width 20cm of longitudinal brace master.10cm × 10cm lumps of wood, lumps of wood upper berth bamboo are placed on longitudinal brace master stupefied 9 Offset plate bed die and Bian Mo.
The voussoir 8 is formed using channel-section steel cutting processing, filling M15 mortars in voussoir 8.
Permanent bearing, the branch that the 0# blocks edge of a wing is carried using sizing punching block outer side mold are fixed between 0# blocks box beam and bridge pier 2 Frame, support is erected on Two bors d's oeuveres 25b channel-section steel along bridge to setting, spacing 90cm, support, while places installation flange template. After construction, steel pipe guard rail and Dense mesh screen are set in the outer rim of longitudinal brace master stupefied 9 and the outside of set shaped steel formwork, with Plan safety.
Precompressed is carried out by code requirement on the bed die that 0# blocks have been laid, to eliminate the inelastic deformation of construction bracket. Treat that permanent bearing and pier shaft built-in fitting and assembling reinforcement are installed after the completion of precompressed, finally pour 0# block concretes.
As described above, although the utility model has been represented and described with reference to specific preferred embodiment, but it must not It is construed to the limitation to the utility model itself.In the spirit and scope of the present utility model for not departing from appended claims and defining Under the premise of, can various changes can be made in the form and details to it.

Claims (4)

  1. A kind of 1. construction bracket of continuous beam cantilever 0# blocks, it is characterised in that:Install respectively the both sides of bridge pier along its length There are two temporary supports, the bottom of temporary support is fixed on cushion cap;What the top setting one of temporary support was connected with bridge pier Vertical equity bar, vertical equity bar are connected with pier shaft built-in fitting;Be provided with vertical equity bar some height from inside to outside by Gradually increased vertical supporting bar;Transverse horizontal bar is set above vertical supporting bar, and the both ends of transverse horizontal bar are separately fixed at bridge On the corresponding vertical supporting bar of two temporary supports of pier homonymy;Set longitudinal brace master stupefied above transverse horizontal bar, transverse horizontal Connected between bar and longitudinal brace master are stupefied by voussoir.
  2. 2. the construction bracket of continuous beam cantilever 0# blocks according to claim 1, it is characterised in that:The temporary support is with indulging To being fixed with shelf bracket between horizon bar.
  3. 3. the construction bracket of continuous beam cantilever 0# blocks according to claim 1, it is characterised in that:The bottom of the temporary support End is welded and fixed by pre-embedded steel slab on cushion cap.
  4. 4. the construction bracket of continuous beam cantilever 0# blocks according to claim 1, it is characterised in that:The transverse horizontal bar with Fixed at longitudinal stupefied contact position of brace master using U-bolt.
CN201721013498.0U 2017-08-14 2017-08-14 A kind of construction bracket of continuous beam cantilever 0# blocks Expired - Fee Related CN207062786U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721013498.0U CN207062786U (en) 2017-08-14 2017-08-14 A kind of construction bracket of continuous beam cantilever 0# blocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721013498.0U CN207062786U (en) 2017-08-14 2017-08-14 A kind of construction bracket of continuous beam cantilever 0# blocks

Publications (1)

Publication Number Publication Date
CN207062786U true CN207062786U (en) 2018-03-02

Family

ID=61514996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721013498.0U Expired - Fee Related CN207062786U (en) 2017-08-14 2017-08-14 A kind of construction bracket of continuous beam cantilever 0# blocks

Country Status (1)

Country Link
CN (1) CN207062786U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115262613A (en) * 2022-08-15 2022-11-01 江苏海洋大学 No. 0 block floor bracket cantilever type vibration damping concrete foundation attached to bearing platform
WO2023165628A1 (en) * 2022-09-16 2023-09-07 中铁七局集团郑州工程有限公司 Curved girder base bearing apparatus with superposition of tied arch and continuous girder

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115262613A (en) * 2022-08-15 2022-11-01 江苏海洋大学 No. 0 block floor bracket cantilever type vibration damping concrete foundation attached to bearing platform
WO2023165628A1 (en) * 2022-09-16 2023-09-07 中铁七局集团郑州工程有限公司 Curved girder base bearing apparatus with superposition of tied arch and continuous girder

Similar Documents

Publication Publication Date Title
CN202359506U (en) Double hoop supporting system for pier column capping beam
CN102888815B (en) The pouring construction method of a kind of wide-angle V-type pier and 0# block case beam
CN103866697B (en) A kind of bridge pier and straining beam calf support method for synchronously constructing
CN202954299U (en) Template support structure for large-angle V-shaped pier and No.0 block of continuous rigid framework bridge
CN102900230B (en) Liftable reinforced concrete post-casting strip construction method
CN106592406A (en) Through tied arch bridge and construction method thereof
CN203270461U (en) Bailey beam support without buttress in soft foundation
CN102251481B (en) Railway pier layered construction method and construction device
CN104727223A (en) Annular platform for bridge pier stud construction and construction method
CN103882813A (en) Corbel bracket platform for bridge pier and transverse straining beam synchronous construction and construction method of corbel bracket platform
CN107905114A (en) A kind of construction method of large span Successive interference cancellation
CN207062786U (en) A kind of construction bracket of continuous beam cantilever 0# blocks
CN106012851A (en) Synchronous construction method of steel box girder and concrete pier studs
CN202659247U (en) Back templates and combined steel die for tunnel inverted arch construction
CN102733307B (en) Method for constructing cast-in-place beam falsework
CN103233426A (en) Bailey beam support free of buttress in soft foundation and supporting method thereof
CN203248170U (en) Lining trolley for secondary lining construction of pedestrian crosswalk
CN105908638B (en) It is a kind of to turn rigid frame bridge steel box-girder and the construction method of concrete pier consolidation
CN104929047A (en) V-shaped pier outer support construction method
CN111910520B (en) Construction method of high-speed inclined leg crossing rigid frame overpass
CN204780635U (en) Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures
CN205276694U (en) Hang bench
CN105887922B (en) A kind of method that inwall construction is carried out using truss support device
CN207685855U (en) A kind of anti-anti-floating large steel moulding plate device that inclines of cast-in-place concrete retaining wall
CN202577158U (en) Hyperbolic cable tower cross beam adjusting bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180302

CF01 Termination of patent right due to non-payment of annual fee