CN207062768U - The trapezoidal ripple batten attachment structure of combined bridge deck - Google Patents

The trapezoidal ripple batten attachment structure of combined bridge deck Download PDF

Info

Publication number
CN207062768U
CN207062768U CN201720542746.4U CN201720542746U CN207062768U CN 207062768 U CN207062768 U CN 207062768U CN 201720542746 U CN201720542746 U CN 201720542746U CN 207062768 U CN207062768 U CN 207062768U
Authority
CN
China
Prior art keywords
batten
trapezoidal ripple
steel
longitudinal
bridge deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720542746.4U
Other languages
Chinese (zh)
Inventor
陈颖
姜海波
梁晨
李佳航
李子豪
李勇浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong University of Technology
Original Assignee
Guangdong University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong University of Technology filed Critical Guangdong University of Technology
Priority to CN201720542746.4U priority Critical patent/CN207062768U/en
Application granted granted Critical
Publication of CN207062768U publication Critical patent/CN207062768U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to the technical field of combined bridge deck connection design, is a kind of trapezoidal ripple batten attachment structure of combined bridge deck.Including trapezoidal ripple batten, longitudinal reinforcement, transverse steel, weld seam;Described trapezoidal ripple batten is in advance in longitudinal direction and lateral opening, trapezoidal ripple batten is distributed on girder steel at a certain distance, welded on trapezoidal ripple batten recess both sides by weld seam and girder steel, longitudinal reinforcement extended through longitudinal perforate and lateral opening with transverse steel, and casting concrete is connected as entirety with girder steel.

Description

The trapezoidal ripple batten attachment structure of combined bridge deck
Technical field
The utility model belongs to the technical field of combined bridge deck connection design, is a kind of combined bridge deck trapezoidal wave Line bar board connecting structure.
Background technology
It is very extensive in Bridges in Our Country engineering field, steel-mixed combined bridge deck application.Steel-mixed combined bridge deck makes It is the interface switching performance of steel plate and concrete with the key issue of period, to cause reinforced concrete bridge deck plate and girder steel common Work, must be provided with shear connector therebetween so that not occur between reinforced concrete bridge deck plate and girder steel relatively wrong It is dynamic.However, with China's rapid economic development, the continuous increase of the magnitude of traffic flow and vehicle load, simultaneously because lacking standardization Maintenance management, Steel Bridge Deck fatigue crack generally occurs in steel-mixed combined bridge deck, and pave-load layer damage and interfacial adhesion destroy Etc. disease.Main reason is that the shearing strength and anti-fatigue performance of combining structure are poor caused by disease.Therefore, exploitation is needed badly A kind of bonding strength is high, anti-fatigue performance is good, construction is convenient, the trapezoidal ripple batten connection knot of the combined bridge deck of safety economy Structure.
Utility model content
Solves the bridge defect such as Steel Bridge Deck fatigue crack and pave-load layer damage to be comprehensive, the utility model proposes one kind to connect The trapezoidal ripple batten attachment structure of combined bridge deck that intensity is high, anti-fatigue performance is good.With wider applicability and excellent Economy.
To achieve these goals, the technical solution of the utility model is as follows:
A kind of trapezoidal ripple batten attachment structure of combined bridge deck, it is characterised in that:The attachment structure includes trapezoidal Ripple batten 1, longitudinal reinforcement 2, transverse steel 3, weld seam 4;Trapezoidal ripple batten 1 is welded by weld seam 4 and girder steel, longitudinal reinforcement 2 extended through longitudinal perforate 1-1 and lateral opening 1-2 with transverse steel 3, formed floorings framework of steel reinforcement, casting concrete Afterwards entirety is connected as with girder steel.
Described trapezoidal ripple batten 1 is distributed on girder steel at a certain distance, and trapezoidal ripple batten 1 leads on its recess both sides Weld seam 4 is crossed to weld with girder steel.
Described trapezoidal ripple batten 1 is provided with longitudinal perforate 1-1, lateral opening 1-2;Longitudinal perforate 1-1 and lateral opening 1-2 mutually staggers on locus;Longitudinal perforate 1-1, lateral opening 1-2 hole size and longitudinal reinforcement 2, transverse steel 3 diameter matches.
Described longitudinal reinforcement 2 extended through longitudinal perforate 1-1 and lateral opening 1-2 with transverse steel 3, without colligation Reinforcing bar can form floorings framework of steel reinforcement, convenient, safety economy of constructing.
The beneficial effects of the utility model are:After casting concrete, trapezoidal ripple batten 1, longitudinal reinforcement 2, horizontal steel Muscle 3 is connected as overall structure with girder steel.The overall structure cooperation, securely and reliably so that reinforced concrete bridge deck plate and steel The relative changing of the relative positions does not occur between beam.Be advantageous to improve the shearing strength and anti-fatigue performance of combining structure.
Brief description of the drawings
Fig. 1 is cross-sectional view of the present utility model;
Fig. 2 is floor map of the present utility model;
Fig. 3 is schematic longitudinal section of the present utility model;
Fig. 4 is the elevation of the trapezoidal ripple batten of the utility model;
Fig. 5 is the plan of the trapezoidal ripple batten of the utility model.
Embodiment
The utility model is described further below in conjunction with accompanying drawing:
In figure:The trapezoidal ripple battens of 1-, 2- longitudinal reinforcements, 3- transverse steels, 4- weld seams, the perforate of 1-1 longitudinal directions, 1-2 are horizontal Perforate.
Embodiment:The trapezoidal ripple batten attachment structure of combined bridge deck as shown in the figure, including trapezoidal ripple batten 1, indulge To reinforcing bar 2, transverse steel 3, weld seam 4;Trapezoidal ripple batten 1 is welded by weld seam 4 and girder steel, longitudinal reinforcement 2 and transverse steel 3 Longitudinal perforate 1-1 and lateral opening 1-2 were extended through, casting concrete is connected as entirety with girder steel.Described trapezoidal ripple Batten 1 is distributed on girder steel at a certain distance, and trapezoidal ripple batten 1 is welded on its recess both sides by weld seam 4 and girder steel.It is described Trapezoidal ripple batten 1 be provided with longitudinal perforate 1-1, lateral opening 1-2;Longitudinal perforate 1-1 and lateral opening 1-2 is in locus On mutually stagger;Longitudinal perforate 1-1, lateral opening 1-2 hole size and longitudinal reinforcement 2, the diameter phase of transverse steel 3 Matching.Described longitudinal reinforcement 2 extended through longitudinal perforate 1-1 and lateral opening 1-2, casting concrete with transverse steel 3 Afterwards, trapezoidal ripple batten 1, longitudinal reinforcement 2, transverse steel 3 and girder steel are connected as overall structure.
Implementation steps:
(1) the trapezoidal ripple batten of prefabrication, trapezoidal ripple batten is in advance in longitudinal direction and lateral opening;
(2) trapezoidal ripple batten is welded on girder steel in scene at a certain distance;
(3) longitudinal reinforcement extended through longitudinal perforate and lateral opening with transverse steel, formed floorings framework of steel reinforcement;
(4) casting concrete, reinforced concrete bridge deck plate and girder steel are connected as entirety.

Claims (2)

1. the trapezoidal ripple batten attachment structure of combined bridge deck, including trapezoidal ripple batten (1), longitudinal reinforcement (2), horizontal steel Muscle (3), weld seam (4);Characterized in that, described trapezoidal ripple batten (1) is distributed on girder steel by spacing, trapezoidal ripple batten (1) welded on its recess both sides by weld seam (4) and girder steel;Described longitudinal reinforcement (2) extended through with transverse steel (3) Longitudinal perforate (1-1) and lateral opening (1-2), form floorings framework of steel reinforcement, and entirety is connected as with girder steel after casting concrete.
2. the trapezoidal ripple batten attachment structure of combined bridge deck according to claim 1, it is characterised in that described ladder Shape ripple batten (1) is provided with longitudinal perforate (1-1), lateral opening (1-2);Longitudinal perforate (1-1) is with lateral opening (1-2) in sky Between mutually stagger on position;Longitudinal perforate (1-1), hole size and the longitudinal reinforcement (2) of lateral opening (1-2), transverse steel (3) diameter matches.
CN201720542746.4U 2017-05-08 2017-05-08 The trapezoidal ripple batten attachment structure of combined bridge deck Expired - Fee Related CN207062768U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720542746.4U CN207062768U (en) 2017-05-08 2017-05-08 The trapezoidal ripple batten attachment structure of combined bridge deck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720542746.4U CN207062768U (en) 2017-05-08 2017-05-08 The trapezoidal ripple batten attachment structure of combined bridge deck

Publications (1)

Publication Number Publication Date
CN207062768U true CN207062768U (en) 2018-03-02

Family

ID=61504617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720542746.4U Expired - Fee Related CN207062768U (en) 2017-05-08 2017-05-08 The trapezoidal ripple batten attachment structure of combined bridge deck

Country Status (1)

Country Link
CN (1) CN207062768U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110747985A (en) * 2019-11-16 2020-02-04 江苏泰源环保科技股份有限公司 Trapezoidal corrugated module wallboard of reassembling type cell body for sewage treatment
CN115305813A (en) * 2022-08-30 2022-11-08 山东高速济青中线公路有限公司 Prefabricated bridge deck steel-concrete shear connector structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110747985A (en) * 2019-11-16 2020-02-04 江苏泰源环保科技股份有限公司 Trapezoidal corrugated module wallboard of reassembling type cell body for sewage treatment
CN115305813A (en) * 2022-08-30 2022-11-08 山东高速济青中线公路有限公司 Prefabricated bridge deck steel-concrete shear connector structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN203546589U (en) Steel girder-integral lifting arm prefabricated concrete bridge panel combined girder bridge
CN106567458B (en) Assembled steel-is mixed to combine Beam-post Frame Structure system
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN106948533B (en) A kind of assembled floor
CN109487707A (en) A kind of precast assembly expanded letter box beam and its assembling method
CN207062768U (en) The trapezoidal ripple batten attachment structure of combined bridge deck
CN103334374B (en) PCSS shearing coupling arrangement
CN104251038A (en) Encased steel plate-concrete composite coupling beam and construction method thereof
CN109853802A (en) It is a kind of whole across precast prestressed flute profile floor, building cover structure and its assembly method
CN103726613B (en) A kind of novel fabricated concrete column
CN109024221A (en) A kind of Novel steel combined box beam and its application method
CN107842132A (en) The precast reinforced concrete shear wall attachment means and connection method that a kind of bending resistance is cut
CN203452271U (en) Tie bar connecting structure of profile steel reinforced concrete beam
CN208844771U (en) The connected support structure of T plate edge joint position
CN207958956U (en) A kind of assembly steel-concrete combination beam
CN205046458U (en) Shaped steel and light -duty combination beam bridge of reinforced concrete assembled
CN206233084U (en) A kind of combined Wavelike steel webplate base plate Shear connection key
CN204850189U (en) Composite beam structure
CN209039975U (en) One kind can temporarily turn permanent superstructure
CN209243946U (en) A kind of prefabricated board and shear wall connection structure
CN106400668A (en) Combined shear connector for corrugated steel web and corrugated steel base plate and construction method
CN110835883A (en) Pi-shaped corrugated steel plate-concrete combined beam
CN108677712A (en) A kind of connecting structure and its construction method of Steel Bridge Deck concrete anti-collision guard bar
CN106869320B (en) The frame and its construction method that coupled column combination beam is constituted
CN207296062U (en) A kind of honeycomb hole combined steel plate shearing force wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Chen Ying

Document name: Notification to Pay the Fees

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180302

Termination date: 20190508