CN207058842U - A kind of assembly concrete prefabricated post slip casting groove and its making mould - Google Patents
A kind of assembly concrete prefabricated post slip casting groove and its making mould Download PDFInfo
- Publication number
- CN207058842U CN207058842U CN201720625999.8U CN201720625999U CN207058842U CN 207058842 U CN207058842 U CN 207058842U CN 201720625999 U CN201720625999 U CN 201720625999U CN 207058842 U CN207058842 U CN 207058842U
- Authority
- CN
- China
- Prior art keywords
- prefabricated post
- slip casting
- assembly concrete
- casting groove
- concrete prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a kind of assembly concrete prefabricated post slip casting groove, it is characterized in that, including prefabricated post, the bottom surface of prefabricated post is provided with profiled slot and permeability cell, the port of permeability cell one end is in profiled slot, the other end of permeability cell is additionally provided with grouting connected entrance on the side of prefabricated post on the bottom surface of prefabricated post.A kind of making mould of assembly concrete prefabricated post slip casting groove, it is characterized in that, including die bottom plate, the bottom surface of die bottom plate is provided with the ventilative mouth of pipe that the abnormal shape to match with described profiled slot is raised, matches with described permeability cell, the grouting connectivity part to match with described grouting connected entrance, breathes freely the mouth of pipe in special-shaped projection.The utility model is easy to make, convenient construction scene grouting operation, enhancing structure security.
Description
Technical field
It the utility model is related to a kind of assembly concrete prefabricated post slip casting groove and its make mould, belong to assembled architecture
Technical field of construction.
Background technology
In recent years, country payes attention to energy-conserving and environment-protective industry further, and carries out in the whole industry.On September 14th, 2016, state affairs
Institute premier Li Keqiang holds Executive Meeting of the State Council.The assembled architectures such as steel construction, concrete are greatly developed in decision, are promoted
Industry restructuring upgrades:Using other cities of Jing-jin-ji region, the Yangtze River Delta, Pearl River Delta group of cities and permanent resident population more than 3,000,000 as
Emphasis, accelerate to improve the ratio that assembled architecture accounts for new building area.Under such major premise, assembled architecture has been enter into
The phase of flourishing, the assembled architecture accounting of various regions will significantly improve.In assembly concrete construction, prefabricated components it
Between cast-in-place connection, very big, and the key takeaway of quality control on construction is influenceed on reliability of structure.Prefabricated structure is commonly used at present
Part, prefabricated post bottom surface is merely through dabbing processing, or only sets a concave block in center.At post bottom during grouting construction, easily go out
Now it is in the milk irregular phenomenon, greatly reduces the security of structure.
The content of the invention
The technical problems to be solved in the utility model is:Provide one kind and be both easy to making, convenient construction scene grouting behaviour
Work, the assembly concrete prefabricated post slip casting groove of enhancing structure security and its making mould, solve and commonly use prefabricated structure at present
During part post bottom grouting construction, easily there is the irregular phenomenon of being in the milk, the problem of greatly reducing safety of structure.
In order to solve the above-mentioned technical problem, it is prefabricated to there is provided a kind of assembly concrete for the technical solution of the utility model
Post slip casting groove, it is characterised in that including prefabricated post, the bottom surface of prefabricated post is provided with profiled slot and permeability cell, permeability cell one end
Port in the profiled slot, the other end of permeability cell is additionally provided with filling on the side of prefabricated post on the bottom surface of prefabricated post
Starch connected entrance.
Preferably, described grouting connected entrance is distributed in the surrounding of profiled slot.
Preferably, the height of the permeability cell on the prefabricated post side is not less than 1.5 times of grout sleeve height,
Grouting connected entrance is connected with grout sleeve.
Preferably, described profiled slot is located at the center of prefabricated post bottom surface, and profiled slot is progressive structure, from
The post side of prefabricated post to post center, gradually it is incremented by from shallow to deep.
Preferably, the depth in the centre position of described profiled slot is twice of its edge depth.
Preferably, described profiled slot is in rice font.
Preferably, the port of described permeability cell one end is located at the center of profiled slot, using PVC material flexible pipe.
A kind of making mould of assembly concrete prefabricated post slip casting groove, it is characterised in that including die bottom plate, mould bottom
The bottom surface of plate is provided with the permeability cell that the abnormal shape to match with described profiled slot is raised, matches with described permeability cell
Mouthful, the grouting connectivity part that matches with described grouting connected entrance, breathe freely the mouth of pipe located at it is special-shaped it is raised on.
Preferably, the raised center for being located at die bottom plate bottom surface of described abnormal shape, special-shaped projection is progressive structure,
From the edge of die bottom plate to center, gradually it is incremented by from low to high, the height in special-shaped raised centre position is its edge
Twice of height, the mouth of pipe of breathing freely is located at special-shaped raised center.
Preferably, the side of described die bottom plate is welded with the otic placode for facilitating mould to fix.
The utility model is easy to make, convenient construction scene grouting operation, enhancing structure security.According to the tool of prefabricated post
Body size, using software modeling and calculate, obtain the accurately slip casting bottom land mould Mold Making figure for being adapted to the prefabricated post, mould factory
After bottom mold being produced by figure, you can the batch making for precast column unit.Slip casting groove is profiled slot, in rice font, is
Gradual, outer shallow interior depth, post bottom centre set permeability cell, can reach good grouting material drainage, are easy to construction existing
Grouting operation, while it is full to enable to be in the milk, and uniformly closely knit, structure shear behavior is remarkably reinforced, seismic resistance, peace
Full property, which has, greatly to be lifted.
Brief description of the drawings
Fig. 1 is a kind of making mould schematic diagram of assembly concrete prefabricated post slip casting groove;
Fig. 2 is a kind of schematic diagram of assembly concrete prefabricated post slip casting groove.
Embodiment
To become apparent the utility model, hereby with preferred embodiment, and accompanying drawing is coordinated to be described in detail below.
A kind of assembly concrete prefabricated post slip casting groove, as shown in Fig. 2 it includes profiled slot, permeability cell 2, grouting company
Port 3 and prefabricated post 4.The bottom surface of prefabricated post 4 is provided with profiled slot and permeability cell 2, and permeability cell 2 is in profiled slot.It is different
Type groove is in rice font, i.e. rice font groove 1.Profiled slot is located at the center of the bottom surface of prefabricated post 4, and rice font groove 1 is
Progressive structure, from the post side of prefabricated post 4 to post center, gradually it is incremented by from shallow to deep, the depth in the centre position of profiled slot
For twice of its edge depth, i.e., end depth is n, and centre depth is 2n.Grouting is additionally provided with the bottom surface of prefabricated post 4 to connect
Port 3, grouting connected entrance 3 are distributed in the surrounding of profiled slot.The port of the one end of permeability cell 2 is located at the centre bit of profiled slot
Put, using PVC hose, the other end of permeability cell 2 is arranged on the side of prefabricated post 4, is highly highly adjusted with grout sleeve
Whole, the height of the permeability cell 2 on the side of prefabricated post 4 is not less than 1.5 times of grout sleeve height.Connected entrance 3 be in the milk with filling
Slurry sleeve is connected, and grout sleeve permeability cell is arranged in prefabricated post 4.
A kind of assembly concrete prefabricated post slip casting groove prefabricated post mold with bed die is made.
A kind of making mould of assembly concrete prefabricated post slip casting groove, as shown in figure 1, it include it is special-shaped raised, ventilative
The mouth of pipe 12, grouting connectivity part 13 and die bottom plate 14.The bottom surface of die bottom plate 14 is provided with the abnormal shape to match with profiled slot
The grouting connectivity part 13 that the ventilative mouth of pipe 12 and grouting connected entrance 3 that raised and permeability cell 2 matches match.Special-shaped projection is set
In the center of the bottom surface of die bottom plate 14, special-shaped projection is progressive structure, from the edge of die bottom plate 14 to center,
Gradually it is incremented by from low to high, i.e., its end height is n, center part height 2n.The height in special-shaped raised centre position is
Twice of its brim height, the mouth of pipe 12 of breathing freely is located at special-shaped raised centre position.Special-shaped projection is rice font projection 11, grouting
Connectivity part 13 is connected with prefabricated post grout sleeve.The mould should be made by meeting the steel plate of precast production intensity requirement, mould
Tool answers smooth seamless, solderable ear connecting plate on the side of die bottom plate 14 with concrete soil contact face, to facilitate the fixation of mould.
Claims (10)
1. a kind of assembly concrete prefabricated post slip casting groove, it is characterised in that including prefabricated post (4), on the bottom surface of prefabricated post (4)
Provided with profiled slot and permeability cell (2), in profiled slot, the other end of permeability cell (2) is set for the port of permeability cell (2) one end
In on the side of prefabricated post (4), be additionally provided with the bottom surface of prefabricated post (4) grouting connected entrance (3).
A kind of 2. assembly concrete prefabricated post slip casting groove as claimed in claim 1, it is characterised in that described grouting connection
Mouth (3) is distributed in the surrounding of profiled slot.
3. a kind of assembly concrete prefabricated post slip casting groove as claimed in claim 1, it is characterised in that located at the prefabricated post
(4) height of the permeability cell on side (2) is not less than 1.5 times of grout sleeve height, be in the milk connected entrance (3) and grout sleeve phase
Even.
A kind of 4. assembly concrete prefabricated post slip casting groove as claimed in claim 1, it is characterised in that described profiled slot
Located at the center of prefabricated post (4) bottom surface, profiled slot is progressive structure, from the post side of prefabricated post (4) to post center, by
It is shallow to deep to be gradually incremented by.
A kind of 5. assembly concrete prefabricated post slip casting groove as claimed in claim 4, it is characterised in that described profiled slot
The depth in centre position be twice of its edge depth.
6. a kind of assembly concrete prefabricated post slip casting groove as described in claim 1 or 2 or 4 or 5, it is characterised in that described
Profiled slot be in rice font.
7. a kind of assembly concrete prefabricated post slip casting groove as described in claim 1 or 3, it is characterised in that described is ventilative
The port for managing (2) one end is located at the center of profiled slot, using PVC material flexible pipe.
A kind of 8. making mould of assembly concrete prefabricated post slip casting groove as claimed in claim 1, it is characterised in that including
Die bottom plate (14), the bottom surface of die bottom plate (14) be provided with the abnormal shape to match with described profiled slot it is raised, with it is described
Permeability cell (2) the ventilative mouth of pipe (12) to match, the grouting connectivity part (13) that matches with described grouting connected entrance (3),
The ventilative mouth of pipe (12) is in special-shaped projection.
9. a kind of making mould of assembly concrete prefabricated post slip casting groove as claimed in claim 8, it is characterised in that described
The raised center for being located at die bottom plate (14) bottom surface of abnormal shape, special-shaped projection is progressive structure, from die bottom plate (14)
Edge to center, be gradually incremented by from low to high, the height in special-shaped raised centre position is twice of its brim height,
The ventilative mouth of pipe (12) is located at special-shaped raised center.
A kind of 10. making mould of assembly concrete prefabricated post slip casting groove as claimed in claim 8, it is characterised in that institute
The side for the die bottom plate (14) stated is welded with the otic placode for facilitating mould to fix.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720625999.8U CN207058842U (en) | 2017-06-01 | 2017-06-01 | A kind of assembly concrete prefabricated post slip casting groove and its making mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720625999.8U CN207058842U (en) | 2017-06-01 | 2017-06-01 | A kind of assembly concrete prefabricated post slip casting groove and its making mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207058842U true CN207058842U (en) | 2018-03-02 |
Family
ID=61506029
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720625999.8U Expired - Fee Related CN207058842U (en) | 2017-06-01 | 2017-06-01 | A kind of assembly concrete prefabricated post slip casting groove and its making mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207058842U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108481525A (en) * | 2018-05-21 | 2018-09-04 | 浙江庄辰建筑科技有限公司 | A kind of prefabricated post of size adjustable |
CN109605565A (en) * | 2018-12-27 | 2019-04-12 | 中建三局集团有限公司 | A kind of prefabricated cylinder uprightly makes bed die |
-
2017
- 2017-06-01 CN CN201720625999.8U patent/CN207058842U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108481525A (en) * | 2018-05-21 | 2018-09-04 | 浙江庄辰建筑科技有限公司 | A kind of prefabricated post of size adjustable |
CN109605565A (en) * | 2018-12-27 | 2019-04-12 | 中建三局集团有限公司 | A kind of prefabricated cylinder uprightly makes bed die |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206319886U (en) | Tunnel lining structure | |
CN207058842U (en) | A kind of assembly concrete prefabricated post slip casting groove and its making mould | |
CN107443550A (en) | Prefabricated cushion cap template and its installation method | |
CN207846457U (en) | The ductility connecting structure of assembled vertical member and basis | |
CN206299024U (en) | A kind of precast shear wall of reserved pouring hole | |
CN107975152A (en) | The ductility connecting structure and construction method of first floor vertical member and basement roof | |
CN105862894B (en) | A kind of installation method of catch pit anti-floating integral mold plate | |
CN207348280U (en) | A kind of novel precast floor slab | |
CN207228347U (en) | A kind of connector, prefabricated component and prefabricated component and the connecting node on basis | |
CN212478572U (en) | Construction equipment of assembled building slip casting shutoff | |
CN211143053U (en) | Pretensioned prestressed concrete pipe pile | |
CN214786237U (en) | Connecting device for constructional column top steel bar and reinforcing beam | |
CN205399744U (en) | Assembly steel bars of shear wall muffjoint packer grouting structure | |
CN205329682U (en) | What blade was expanded in area expands bottom tube stake | |
CN206987373U (en) | Core column concrete pours mouth mold tool | |
CN211622016U (en) | Cast-in-place floor construction hole shutoff hangs mould device | |
CN206562702U (en) | A kind of new brick structure of civil engineering | |
CN207775807U (en) | A kind of concrete cut guide groove structure | |
CN106480996A (en) | A kind of method are in the milk by docking structure of levels prefabricated component and the faying face to levels prefabricated component | |
CN211421832U (en) | Masonry wall constructional column pouring device | |
CN207846677U (en) | The ductility connecting structure of first floor vertical member and basement roof | |
CN203034790U (en) | Basic prefabricated concrete formwork for basement | |
CN106498938B (en) | A kind of application method of cast-in-place concrete pile head shaping equipment | |
CN206128361U (en) | Attend butt -joint structural of lower floor's prefab | |
CN205637334U (en) | Prefabricated taper joint sleeve and precast concrete post |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180302 |