CN207051163U - A kind of experimental rig for Corroded Reinforced Concrete Beam - Google Patents

A kind of experimental rig for Corroded Reinforced Concrete Beam Download PDF

Info

Publication number
CN207051163U
CN207051163U CN201720918887.1U CN201720918887U CN207051163U CN 207051163 U CN207051163 U CN 207051163U CN 201720918887 U CN201720918887 U CN 201720918887U CN 207051163 U CN207051163 U CN 207051163U
Authority
CN
China
Prior art keywords
reinforced concrete
concrete beam
experimental rig
corroded
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720918887.1U
Other languages
Chinese (zh)
Inventor
于晓辉
吕大刚
张伟恒
代旷宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Institute of Technology
Original Assignee
Harbin Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Technology filed Critical Harbin Institute of Technology
Priority to CN201720918887.1U priority Critical patent/CN207051163U/en
Application granted granted Critical
Publication of CN207051163U publication Critical patent/CN207051163U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to concrete construction technical field, more particularly to a kind of experimental rig for Corroded Reinforced Concrete Beam, including outsourcing box, and the outsourcing box is spliced into rectangular box by transparent panel sealing;One group of relative side panel of the outsourcing box is provided with the fluting for spacer bar beams of concrete;Preventing water leakage metallic plate is prefabricated with reinforced beam, the preventing water leakage metallic plate is tightly connected by waterproof bed course and the fluting, to form the containing body for accommodating reinforced beam and chloride solution.The utility model installation is simple and convenient, safe and reliable, cost is cheap, and Corroded Reinforced Concrete Beam experiment can be quickly and easily carried out in common laboratory environment.

Description

A kind of experimental rig for Corroded Reinforced Concrete Beam
Technical field
The utility model belongs to concrete construction technical field, more particularly to a kind of examination for Corroded Reinforced Concrete Beam Experiment device.
Background technology
Under long-term environmental activity, concrete can be carbonized concrete structure, and reinforcing bar can produce corrosion, structure it is resistance to Long performance and bearing capacity can be reduced constantly.New China build since, people excessively pay attention to building and bridge construction scale and Speed, and ignore its quality, so as to cause the reinforcing bar of part old building and bridge that corrosion occurs in the cycle under arms.To grind Study carefully bearing capacity of the structure after corrosion, component and structural test are highly important, and beams of concrete is as concrete knot The most important bending resistance of structure and Force transmission partses, it is that current field of civil engineering is ground that steel bar corrosion, which causes the degenerate case of its bearing capacity, The big focus studied carefully.
At present, corrosion test is carried out in laboratory mainly has two kinds of approach, first, it is prepared by artificial environment simulation laboratory, two It is artificial energization accelerating corrosion.Cost is low because it is prepared for wherein artificial energization accelerating corrosion method, sample dimensions are flexibly etc. excellent Point is most widely used.Artificial energization accelerating corrosion method is broadly divided into two methods, and method one is to prepare electrolytic cell by component Be powered corrosion in immersion chloride solution, and method two is the outer accelerating corrosion of veneer, the i.e. absorbent material such as outsourcing sponge, passes through artificial hand Section, which is injected NaCl solution into sponge while is powered, carries out corrosion.Above two preparation method has inconvenience in actual use Place, a pair of site requirements of method are higher, while need substantial amounts of NaCl solution, and large scale is difficult to for common laboratory Component provides enough places;Second method needs manually to pour chloride solution every a few houres toward absorbent materials such as sponges, for Manpower requirements are very high, it is most important that such a method concrete resistivity it is very big, it is necessary to very high voltage can be only achieved electric current will Ask.Therefore need that a kind of more easily corrosion test device disclosure satisfy that the space enrironment of common laboratory.
Utility model content
In order to solve the above technical problems, the purpose of this utility model be to provide that a kind of installation is simple and convenient, safe to use can Lean on, the experimental rig for Corroded Reinforced Concrete Beam that cost is cheap, for quickly and easily in common laboratory environment Interior progress Corroded Reinforced Concrete Beam experiment.
The utility model provides a kind of experimental rig for Corroded Reinforced Concrete Beam, including outsourcing box, outsourcing Box is spliced into rectangular box by transparent panel sealing;One group of relative side panel of outsourcing box is provided with for spacer bar coagulation Tu Liang fluting;Preventing water leakage metallic plate is prefabricated with reinforced beam, preventing water leakage metallic plate is close with slotting by waterproof bed course Envelope connection, to form the containing body for accommodating reinforced beam and chloride solution.
Further, another group of relative side panel top of outsourcing box offers hoisting ring, is installed with and is used in hoisting ring By through steel wire rope fixed steel bars beams of concrete.
Further, in hoisting ring, soft protection ring is surrounded by along the outer ring of hoisting ring.
Further, soft protection ring is rubber ring.
Further, the height for opening up the chloride solution horizontal plane of addition when position is carried out higher than experiment of hoisting ring.
Further, the shape of hoisting ring is including but not limited to circular, oval and square.
Further, transparent panel is PVC board or armorplate glass, and transparent panel is bonded and scribbles epoxy resin waterproof Layer.
Further, waterproof bed course is bonded by the bonding agent with waterproof seal and formed, and bonding agent includes epoxy resin And glass silica gel.
Further, preventing water leakage metallic plate is galvanized iron sheet.
By such scheme, this is used for the experimental rig of Corroded Reinforced Concrete Beam, and installation is simple and convenient, safe to use can Lean on, cost it is cheap, can quickly and easily in common laboratory environment carry out Corroded Reinforced Concrete Beam experiment.
Described above is only the general introduction of technical solutions of the utility model, in order to better understand skill of the present utility model Art means, and being practiced according to the content of specification, with preferred embodiment of the present utility model and coordinate accompanying drawing detailed below Describe in detail bright as after.
Brief description of the drawings
Fig. 1 is that a kind of experimental rig outsourcing box three-dimensional structure for Corroded Reinforced Concrete Beam of the utility model is illustrated Figure;
Fig. 2 is a kind of schematic three dimensional views for Corroded Reinforced Concrete Beam preventing water leakage iron sheet of the utility model;
Fig. 3 is a kind of front view for Corroded Reinforced Concrete Beam preventing water leakage iron sheet of the utility model;
Fig. 4 is a kind of left view for Corroded Reinforced Concrete Beam preventing water leakage iron sheet of the utility model;
Fig. 5 is a kind of front view for Corroded Reinforced Concrete Beam outsourcing box of the utility model;
Fig. 6 is a kind of left view for Corroded Reinforced Concrete Beam outsourcing box of the utility model;
Fig. 7 is a kind of three-dimensional signal of experimental rig overall work for Corroded Reinforced Concrete Beam of the utility model Figure.
Label in figure:
1- reinforced beams, 2- preventing water leakage galvanized iron sheets, 3- outsourcing boxes, 4- waterproof bed courses, 5- hoisting rings.
Embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below Embodiment is used to illustrate the utility model, but is not limited to the scope of the utility model.
Join shown in Fig. 1 to Fig. 6, present embodiments provide a kind of experimental rig for Corroded Reinforced Concrete Beam:Main body Including preventing water leakage galvanized iron sheet 2 (can also be other kinds of antirust iron sheet or preventing water leakage metallic plate), the waterproof of beam box junction Bed course 4 and the three parts of outsourcing box 3.Preventing water leakage galvanized iron sheet 2 will pass through insulating tape and ring before pouring reinforcement concrete beam 1 Oxygen resin glue fixing seal and carries out encapsulation process with epoxide-resin glue, has then measured iron sheet in the specified location of steel reinforcement cage Length is bent, allows the iron sheet being folded over to be close to template inwall iron sheet bending, and is closely wound with adhesive tape outer in waiting to stretch out To prevent from becaming one with reinforced beam 1 on the iron sheet of side, then after test piece maintenance form removal with spanner by iron sheet from The bending of concrete outer surface is returned, to form a good preventing water leakage confined space.
Outsourcing box is assembled by transparent PVC plate (or armorplate glass) or any transparent material with waterproof effect Form, the size and thickness of outsourcing box 3 and on-fixed, need to be according to experiment actual conditions depending on, wherein box both sides reserve Hole hoisting ring 5 and outpacking rubber ring, are easy to the later stage with steel wire rope colligation.Outsourcing box 3 is in bonding with PVC glue or glass Glue, and apply epoxy resin and make waterproof sealing processing, and waterproof bed course 4 is done in beam box junction, waterproof bed course 4 uses epoxy before this Resin carrys out smooth interface surface, then seals one layer using glass silica gel, and box finally is bonded in into reinforced concrete using anchoring adhesive On the preventing water leakage galvanized iron sheet 2 that the native inside of beam 1 is stretched out.Finally by steel wire penetrating reserving hole, box colligation is mixed in reinforcing bar On solidifying Tu Liang, to play fixation.
In the present embodiment, hoisting ring 5 can be circular, oval or square.
Join shown in Fig. 7, operation principle of the present utility model is:Reinforced beam is treated into corrosion portion envelops stainless steel Net, sodium chloride solution is then added in the outsourcing box 3 of the present apparatus, while reinforcing bar to be become rusty is connected to direct current by power line On the anode of voltage-stabilized power supply, stainless (steel) wire is connected on the negative electrode of D.C. regulated power supply by power line.Mixed in reinforcing bar In solidifying Tu Liang tarnishing processes, the external wrapping concrete caused by steel bar corrosion bulk product expands can be observed by outsourcing box 3 Cracking and crack progressing process, are easy to test data sheet.After reinforcing bar reaches testing program regulation corrosion ratio, can deenergization, will Sodium chloride solution is discharged, and the present apparatus is removed by reinforced beam bottom.
Experimental rig provided by the utility model for Corroded Reinforced Concrete Beam, have the following technical effect that:
1) each component assembly and connection is simple and reliable, and cost is cheap, can save to Corroded Reinforced Concrete Beam component corrosion The required expense for building corrosion pond, or the artificial labour cost for manually pouring chloride solution every a few houres toward absorbent materials such as sponges With.
2) the corrosion situation of institute's acquisition reinforced beam more tallies with the actual situation, while avoids reinforced beam examination The unwanted corrosion in testing of the reinforcing bar at other positions of part.
3) because outsourcing box uses transparent material, therefore the crack caused by steel bar corrosion can be observed in the whole test period Development condition, record can be observed with crack observer.
4) because preventing water leakage iron sheet inside beams of concrete by stretching out, so device can solve beam box interface bonding well Not firm the problem of causing leak.
Described above is only preferred embodiment of the present utility model, is not limited to the utility model, it is noted that For those skilled in the art, on the premise of the utility model technical principle is not departed from, can also do Go out some improvement and modification, these improvement and modification also should be regarded as the scope of protection of the utility model.

Claims (9)

  1. A kind of 1. experimental rig for Corroded Reinforced Concrete Beam, it is characterised in that including outsourcing box, the outsourcing box Rectangular box is spliced into by transparent panel sealing;One group of relative side panel of the outsourcing box is provided with for spacer bar coagulation Tu Liang fluting;Preventing water leakage metallic plate is prefabricated with reinforced beam, the preventing water leakage metallic plate passes through waterproof bed course and institute State fluting to be tightly connected, to form the containing body for accommodating reinforced beam and chloride solution.
  2. 2. a kind of experimental rig for Corroded Reinforced Concrete Beam according to claim 1, it is characterised in that described outer Another group of relative side panel top of bag box offers hoisting ring, is installed with the hoisting ring for by consolidating through steel wire rope Determine reinforced beam.
  3. 3. a kind of experimental rig for Corroded Reinforced Concrete Beam according to claim 2, it is characterised in that described to hang Fill in ring, soft protection ring is surrounded by along the outer ring of the hoisting ring.
  4. 4. a kind of experimental rig for Corroded Reinforced Concrete Beam according to claim 3, it is characterised in that described soft Quality guarantee retaining ring is rubber ring.
  5. 5. a kind of experimental rig for Corroded Reinforced Concrete Beam according to claim 4, it is characterised in that described to hang The height for opening up the chloride solution horizontal plane of addition when position is carried out higher than experiment of dress ring.
  6. 6. a kind of experimental rig for Corroded Reinforced Concrete Beam according to claim 5, it is characterised in that described to hang The shape of ring is filled including circular, oval and square.
  7. 7. a kind of experimental rig for Corroded Reinforced Concrete Beam according to claim 1, it is characterised in that described Bright panel is PVC board or armorplate glass, and the transparent panel is bonded and scribbles epoxy resin waterproof layer.
  8. 8. a kind of experimental rig for Corroded Reinforced Concrete Beam according to claim 1, it is characterised in that described anti- Water subfill is bonded by the bonding agent with waterproof seal and formed, and the bonding agent includes epoxy resin and glass silica gel.
  9. 9. a kind of experimental rig for Corroded Reinforced Concrete Beam according to claim 1, it is characterised in that described anti- Leak metallic plate is galvanized iron sheet.
CN201720918887.1U 2017-07-27 2017-07-27 A kind of experimental rig for Corroded Reinforced Concrete Beam Active CN207051163U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720918887.1U CN207051163U (en) 2017-07-27 2017-07-27 A kind of experimental rig for Corroded Reinforced Concrete Beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720918887.1U CN207051163U (en) 2017-07-27 2017-07-27 A kind of experimental rig for Corroded Reinforced Concrete Beam

Publications (1)

Publication Number Publication Date
CN207051163U true CN207051163U (en) 2018-02-27

Family

ID=61498078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720918887.1U Active CN207051163U (en) 2017-07-27 2017-07-27 A kind of experimental rig for Corroded Reinforced Concrete Beam

Country Status (1)

Country Link
CN (1) CN207051163U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110553907A (en) * 2018-05-31 2019-12-10 福建江夏学院 Frame node self-balancing continuous loading device for chlorine salt environment and load coupling
CN111504895A (en) * 2020-06-08 2020-08-07 华侨大学 Outdoor simulated reinforced concrete member corrosion test device and test method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110553907A (en) * 2018-05-31 2019-12-10 福建江夏学院 Frame node self-balancing continuous loading device for chlorine salt environment and load coupling
CN111504895A (en) * 2020-06-08 2020-08-07 华侨大学 Outdoor simulated reinforced concrete member corrosion test device and test method

Similar Documents

Publication Publication Date Title
CN202433536U (en) Physical model testing system for tunnel-penetrated ground crack zone
CN105568955B (en) The compound straight-line vacuum pre-pressed joint method experimental rig of EKG electro-osmosis methods and method
CN207051163U (en) A kind of experimental rig for Corroded Reinforced Concrete Beam
CN202450559U (en) Waterproof structure of basement
CN207812277U (en) A kind of splicing construction of precast pier and prefabricated cushion cap
CN105040584A (en) Anti-seepage drainage pipe fitting for bridge
CN107314969A (en) A kind of experimental rig for armored concrete planar structure corrosion
CN209485862U (en) A kind of buried concrete stray electrical current and cyclical impact loading pilot system
CN106013267B (en) A kind of vertical anti-pulling concrete model stake and its method of construction and application
CN205276337U (en) Grout maintenance test device is consolidated to microorganism
CN204662506U (en) A kind of cable communication well
CN209323574U (en) Closed basement roof pouring after settlement structure in advance
CN208309897U (en) A kind of elastic connecting device of masonry filler wall and main structure
US11566960B1 (en) Simulation platform and simulation method for leakage detection and treatment
CN206015611U (en) The SR water sealing structures that a kind of connecting plate and cut-pff wall connect between stitching
CN104458556A (en) Device and method for testing concrete sulfate attack
CN110230325A (en) A kind of basement bottom board and supporting ground-connecting-wall are flexibly connected construction method
CN204287005U (en) A kind of test unit of concrete sulphate corrosion
CN106149634A (en) The SR water sealing structure being connected between connecting plate with cut-pff wall seam and water-stopping method thereof
CN209494063U (en) A kind of water expandable waterstop
CN201258471Y (en) Pannier gabion
CN107119742A (en) A kind of hydration process system in situ of disposal storehouse padded coaming
CN203514342U (en) Corrosion resistant precast pile for gas insulated substation (GIS) device foundation in transformer substation in salt lake area
CN211395769U (en) Sewage treatment pond cell body movement joint stagnant water structure
CN206960206U (en) A kind of experimental rig for reinforced column corrosion

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant