CN110230325A - A kind of basement bottom board and supporting ground-connecting-wall are flexibly connected construction method - Google Patents

A kind of basement bottom board and supporting ground-connecting-wall are flexibly connected construction method Download PDF

Info

Publication number
CN110230325A
CN110230325A CN201910503567.3A CN201910503567A CN110230325A CN 110230325 A CN110230325 A CN 110230325A CN 201910503567 A CN201910503567 A CN 201910503567A CN 110230325 A CN110230325 A CN 110230325A
Authority
CN
China
Prior art keywords
wall
ground
supporting ground
bottom board
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910503567.3A
Other languages
Chinese (zh)
Inventor
张华魁
谢际宇
刘海明
林志斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201910503567.3A priority Critical patent/CN110230325A/en
Publication of CN110230325A publication Critical patent/CN110230325A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention relates to a kind of basement bottom boards and supporting ground-connecting-wall flexible connection construction method, include the following steps: one: the construction of supporting ground-connecting-wall, two: earth excavation, three: ground-connecting-wall dabbing, four: stripping rib straight thread connector picks chisel, five: extruded sheet picks chisel, six: channel steel welding, seven: steel plate for sealing water welding, eight: expansion sealing strip placement, nine: base plate steel bar binding, ten: sleeve valve barrel grouting.The present invention is to guarantee that the quality of basement bottom board and supporting ground-connecting-wall controls, and promotes the connection waterproof construction quality of basement bottom board and supporting ground-connecting-wall, improves quality, save cost, easy for construction, improves working efficiency, has saved the duration.

Description

A kind of basement bottom board and supporting ground-connecting-wall are flexibly connected construction method
Technical field
The present invention relates to the realm of building construction, specially one kind be guarantee be ground-connecting-wall, the unification of two wall of outer wall of basement and The waterproof construction of basement bottom board connection improves the waterproof construction matter of ground-connecting-wall, outer wall of basement and basement bottom board connection The basement bottom board and supporting ground-connecting-wall of amount are flexibly connected construction method.
Background technique
With the development of society, especially scientific and technical progress, is greatly facilitated the rapid development of social productive forces, greatly Social progress is promoted greatly, wherein being even more to be developed rapidly with the urbanization process that construction industry development is mark.
With deepening continuously for building field, deeper subsurface is built and is more than that layer superstructure obtains under the support of science and technology Fast development is arrived, wherein ground-connecting-wall is a highly important component part in many building fields.
Currently, ground-connecting-wall technology is generally implemented in China, how to guarantee that ground-connecting-wall or ground-connecting-wall, two wall of outer wall of basement close One becomes an important technology with basement bottom board quality of connection, to guarantee basement bottom board and supporting ground-connecting-wall quality of connection, Working efficiency is improved, save the cost is saved the duration, and a kind of special basement bottom board and supporting ground-connecting-wall are flexibly connected construction party Method is a good problem to study.
Summary of the invention
In order to solve above-mentioned the deficiencies in the prior art, the present invention provides one kind to improve ground-connecting-wall, basement The waterproof construction quality that exterior wall is connect with basement bottom board, saves cost, easy for construction, improves working efficiency, has saved work The basement bottom board and supporting ground-connecting-wall of phase is flexibly connected construction method.
The object of the present invention is achieved like this:
A kind of basement bottom board and supporting ground-connecting-wall are flexibly connected construction method, characterized by the following steps:
Step 1: supporting ground-connecting-wall construction;Step 2: earth excavation;Step 3: ground-connecting-wall dabbing;Step 4: stripping rib straight thread Connector picks chisel;Step 5: extruded sheet picks chisel;Step 6: channel steel welding;Step 7: steel plate for sealing water welding;Step 8: expansion Sealing rod is placed;Step 9: base plate steel bar binding;Step 10: sleeve valve barrel grouting.
The step one: the construction of supporting ground-connecting-wall: progress supporting ground-connecting-wall measurement and positioning work first carries out mud shield Wall drilling, places steel reinforcement cage after drilling to designed elevation;Steel reinforcement cage, which is placed, to be required: ground-connecting-wall and raft slab muscle link position are reserved Rib connector is shelled, rib connector diameter and the same baseplate reinforcing bar of spacing (C32@200) is shelled, is blocked using plastic cap, shells rib connector Stretch out ground-connecting-wall reinforcing bar 20mm;Ground-connecting-wall, which with raft plate connect middle position and stays, sets 400*100 water stopping trough, is filled using extruded sheet, Extruded sheet closure is filled out outside reinforcing bar, filling is finished using 4 reinforced mesh of Φ and the fixation of ground-connecting-wall muscle.
Step 2 earth excavation is to start earth excavation after the construction of supporting ground-connecting-wall finishes and intensity meets design requirement Operation, earth excavation bottom absolute altitude are bottom plate bottom absolute altitude;Step 3 ground-connecting-wall dabbing are as follows: start ground-connecting-wall chisel after the completion of earth excavation Hair work, the loose concrete in ground-connecting-wall surface is all chiseled out, and extruded sheet on the outside of ground-connecting-wall is cleaned out;
Step 4 is that stripping rib straight thread connector picks chisel: shelling rib connector position and carries out picking chisel, pay attention to the protection of connector, to applying The connector damaged during work is replaced or bar planting processing;Step 5 extruded sheet picks chisel are as follows: and 400*100 extruded sheet picks chisel, Play the role of water stopping trough in groove position.
Step 6 channel steel welding are as follows: 14# channel steel and ground-connecting-wall main reinforcement are welded;Step 7 steel plate for sealing water welding are as follows: water-stopping steel Plate and 14# channel steel weld, and welding position is channel steel center, steel plate for sealing water concave surface downward, towards upstream face direction.
Step 8 expansion sealing strip is placed are as follows: and ground-connecting-wall surface scum, dust etc. are cleaned out, rigid base is exposed, Ground-connecting-wall surface is directly bonded to using expansion sealing strip itself caking property;Step 9 base plate steel bar binding are as follows: baseplate reinforcing bar with The binding of ground-connecting-wall connector;Step 10 sleeve valve barrel grouting are as follows: in bottom plate and ground-connecting-wall interface, slip casting is carried out using mini-valve tube, Mini-valve tube outer diameter is 48mm, guarantees the density of seam crossing.
Positive beneficial effect: the present invention is suitable for ground-connecting-wall, the unification of two wall of outer wall of basement is connected with basement bottom board Waterproof construction, improve ground-connecting-wall, outer wall of basement and basement bottom board connection waterproof construction quality, lay steel plate for sealing water, Water expandable waterstop, sleeve valve barrel grouting guarantee connection waterproof quality, save cost, easy for construction, improve working efficiency, section About duration.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and embodiments:
Fig. 1 is the structural diagram of the present invention one;
Fig. 2 is structural schematic diagram two of the invention;
In figure are as follows: steel reinforcement cage 1, stripping rib connector 2, extruded sheet 3, channel steel 4, expansion sealing strip 6, steel plate for sealing water 5, mini-valve tube 7.
Specific embodiment
Below with reference to specific the drawings and specific embodiments, it is described further:
Embodiment 1
Step 1: supporting ground-connecting-wall construction
As shown in Figure 1 and Figure 2, the work of supporting ground-connecting-wall measurement and positioning is carried out first, carries out holing with slurry wall protection, and drilling extremely designs Steel reinforcement cage 1 is placed after absolute altitude;Steel reinforcement cage 1, which is placed, to be required: ground-connecting-wall and the reserved stripping rib connector 2 of raft slab muscle link position, stripping 2 diameter of rib connector and the same baseplate reinforcing bar of spacing (C32@200), are blocked using plastic cap, and stripping rib connector 2 stretches out ground-connecting-wall steel Muscle 20mm.Ground-connecting-wall, which with raft plate connect middle position and stays, sets 400*100 water stopping trough, is filled, is filled out outside reinforcing bar crowded using extruded sheet 3 Mould plate 3 blocks, and filling is finished using 4 reinforced mesh of Φ and the fixation of ground-connecting-wall muscle;
Step 2: earth excavation
Start earth excavation operation after the construction of supporting ground-connecting-wall finishes and intensity meets design requirement, earth excavation bottom absolute altitude is Bottom plate bottom absolute altitude;
Step 3: ground-connecting-wall dabbing
Start the work of ground-connecting-wall dabbing after the completion of earth excavation, the loose concrete in ground-connecting-wall surface is all chiseled out, and ground is connected Extruded sheet 3 is cleaned out on the outside of wall;
Step 4: stripping rib straight thread connector picks chisel
Stripping 2 position of rib connector carries out picking chisel, pays attention to the protection of connector, is replaced to the connector damaged in work progress Or bar planting processing;
Step 5: extruded sheet picks chisel
400*100 extruded sheet 3 picks chisel, and water stopping trough is played the role of at groove position;
Step 6: channel steel welding
14# channel steel 4 and ground-connecting-wall main reinforcement are welded;
Step 7: steel plate for sealing water welding
Steel plate for sealing water 5 and 14# channel steel 4 weld, and welding position is channel steel center, steel plate for sealing water concave surface downward, towards upstream face Direction;
Step 8: expansion sealing strip is placed
Ground-connecting-wall surface scum, dust etc. are cleaned out, expose rigid base, itself caking property is straight using expansion sealing strip 6 It connects and is bonded in ground-connecting-wall surface;
Step 9: base plate steel bar binding
Baseplate reinforcing bar and ground-connecting-wall connector 2 are bound;
Step 10: sleeve valve barrel grouting
In bottom plate and ground-connecting-wall interface, slip casting is carried out using mini-valve tube 7,7 outer diameter of mini-valve tube is 48mm, guarantees the close of seam crossing Reality.
The present invention is suitable for ground-connecting-wall, two wall of outer wall of basement unifies the waterproof construction connected with basement bottom board, is promoted The waterproof construction quality of ground-connecting-wall, outer wall of basement and basement bottom board connection, lays steel plate for sealing water, water-swellable sealing Item, sleeve valve barrel grouting guarantee connection waterproof quality, save cost, easy for construction, improve working efficiency, have saved the duration.
The foregoing is merely the preferred embodiment of the present invention, to the description and interpretation present invention rather than limit.In this hair Within bright objective and principle, it can modify to the scheme illustrated by above-described embodiment or equivalent replacement, without departing from Thought of the invention, made any modification or equivalent replacement are equally considered as the invention disclosure of that.

Claims (5)

1. a kind of basement bottom board and supporting ground-connecting-wall are flexibly connected construction method, characterized by the following steps:
Step 1: supporting ground-connecting-wall construction;Step 2: earth excavation;Step 3: ground-connecting-wall dabbing;Step 4: stripping rib straight thread Connector picks chisel;Step 5: extruded sheet picks chisel;Step 6: channel steel welding;Step 7: steel plate for sealing water welding;Step 8: expansion Sealing rod is placed;Step 9: base plate steel bar binding;Step 10: sleeve valve barrel grouting.
2. a kind of basement bottom board according to claim 1 and supporting ground-connecting-wall are flexibly connected construction method, feature exists In: the step one: the construction of supporting ground-connecting-wall: progress supporting ground-connecting-wall measurement and positioning work first carries out mud off brill Steel reinforcement cage is placed after drilling to designed elevation in hole;Steel reinforcement cage, which is placed, to be required: ground-connecting-wall and the reserved stripping rib of raft slab muscle link position Connector is shelled rib connector diameter and the same baseplate reinforcing bar of spacing (C32@200), is blocked using plastic cap, and stripping rib connector stretches out Ground-connecting-wall reinforcing bar 20mm;Ground-connecting-wall, which with raft plate connect middle position and stays, sets 400*100 water stopping trough, is filled using extruded sheet, reinforcing bar Extruded sheet closure is filled out in outside, and filling is finished using 4 reinforced mesh of Φ and the fixation of ground-connecting-wall muscle.
3. a kind of basement bottom board according to claim 1 and supporting ground-connecting-wall are flexibly connected construction method, feature exists In: step 2 earth excavation is to start earth excavation operation after the construction of supporting ground-connecting-wall finishes and intensity meets design requirement, Earth excavation bottom absolute altitude is bottom plate bottom absolute altitude;Step 3 ground-connecting-wall dabbing are as follows: start ground-connecting-wall dabbing work after the completion of earth excavation Make, the loose concrete in ground-connecting-wall surface is all chiseled out, and extruded sheet on the outside of ground-connecting-wall is cleaned out;
A kind of basement bottom board according to claim 1 and supporting ground-connecting-wall are flexibly connected construction method, it is characterised in that: Step 4 is that stripping rib straight thread connector picks chisel: shelling rib connector position and carries out picking chisel, pay attention to the protection of connector, to constructing The connector damaged in journey is replaced or bar planting processing;Step 5 extruded sheet picks chisel are as follows: 400*100 extruded sheet picks chisel, groove Play the role of water stopping trough in position.
4. a kind of basement bottom board according to claim 1 and supporting ground-connecting-wall are flexibly connected construction method, feature exists In: step 6 channel steel welding are as follows: 14# channel steel and ground-connecting-wall main reinforcement are welded;Step 7 steel plate for sealing water welding are as follows: steel plate for sealing water with 14# channel steel welding, welding position be channel steel center, steel plate for sealing water concave surface downward, towards upstream face direction.
5. a kind of basement bottom board according to claim 1 and supporting ground-connecting-wall are flexibly connected construction method, feature exists In: step 8 expansion sealing strip is placed are as follows: is cleaned out ground-connecting-wall surface scum, dust etc., is exposed rigid base, utilization is swollen Itself caking property of swollen sealing rod is directly bonded to ground-connecting-wall surface;Step 9 base plate steel bar binding are as follows: baseplate reinforcing bar and ground-connecting-wall Connector binding;Step 10 sleeve valve barrel grouting are as follows: in bottom plate and ground-connecting-wall interface, carry out slip casting, mini-valve tube using mini-valve tube Outer diameter is 48mm, guarantees the density of seam crossing.
CN201910503567.3A 2019-06-12 2019-06-12 A kind of basement bottom board and supporting ground-connecting-wall are flexibly connected construction method Pending CN110230325A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910503567.3A CN110230325A (en) 2019-06-12 2019-06-12 A kind of basement bottom board and supporting ground-connecting-wall are flexibly connected construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910503567.3A CN110230325A (en) 2019-06-12 2019-06-12 A kind of basement bottom board and supporting ground-connecting-wall are flexibly connected construction method

Publications (1)

Publication Number Publication Date
CN110230325A true CN110230325A (en) 2019-09-13

Family

ID=67858923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910503567.3A Pending CN110230325A (en) 2019-06-12 2019-06-12 A kind of basement bottom board and supporting ground-connecting-wall are flexibly connected construction method

Country Status (1)

Country Link
CN (1) CN110230325A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395352A (en) * 2020-03-17 2020-07-10 中国建筑一局(集团)有限公司 Foundation pit support next to super-deep foundation pit of super high-rise subway and construction method of foundation pit support
CN114411694A (en) * 2021-12-17 2022-04-29 上海建工二建集团有限公司 Ground connection wall internal connector embedded positioning system and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120122024A (en) * 2011-04-28 2012-11-07 이창남 Uniting Method of Temporary earth wall with basement exterior Wall using Couplers and Bolts.
CN103321231A (en) * 2013-06-10 2013-09-25 叶长青 Construction method of foundation pit support
CN203320518U (en) * 2013-06-27 2013-12-04 中建五局第三建设有限公司 Connector fixing device
CN103590428A (en) * 2013-11-28 2014-02-19 华东建筑设计研究院有限公司 Connection method for basic raft and 'two-in-one' underground diaphragm wall
CN204551483U (en) * 2015-02-03 2015-08-12 中国建筑股份有限公司 A kind of to be used for " Two walls unite as one " ground-connecting-wall-Vierendeel girder Joint's connection fabrication
CN109403631A (en) * 2018-12-08 2019-03-01 上海宝冶集团有限公司 A kind of ground-connecting-wall connect waterproof construction method with original place flowering structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120122024A (en) * 2011-04-28 2012-11-07 이창남 Uniting Method of Temporary earth wall with basement exterior Wall using Couplers and Bolts.
CN103321231A (en) * 2013-06-10 2013-09-25 叶长青 Construction method of foundation pit support
CN203320518U (en) * 2013-06-27 2013-12-04 中建五局第三建设有限公司 Connector fixing device
CN103590428A (en) * 2013-11-28 2014-02-19 华东建筑设计研究院有限公司 Connection method for basic raft and 'two-in-one' underground diaphragm wall
CN204551483U (en) * 2015-02-03 2015-08-12 中国建筑股份有限公司 A kind of to be used for " Two walls unite as one " ground-connecting-wall-Vierendeel girder Joint's connection fabrication
CN109403631A (en) * 2018-12-08 2019-03-01 上海宝冶集团有限公司 A kind of ground-connecting-wall connect waterproof construction method with original place flowering structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395352A (en) * 2020-03-17 2020-07-10 中国建筑一局(集团)有限公司 Foundation pit support next to super-deep foundation pit of super high-rise subway and construction method of foundation pit support
CN114411694A (en) * 2021-12-17 2022-04-29 上海建工二建集团有限公司 Ground connection wall internal connector embedded positioning system and construction method thereof

Similar Documents

Publication Publication Date Title
CN102562075B (en) Large cross-section weak surrounding rock tunnel three-step and six-part short-distance construction method
CN101649744B (en) Device and method for casting concrete continuous walls along gob-side entry retaining by mining working face
CN204000956U (en) A kind of basement bottom plate rear pouring tape structure
CN108930292A (en) The method that a kind of pair of new-old concrete interface carries out water-proofing treatment
CN105862990B (en) A kind of prefabrication and assembly construction shaft wall structure and its construction method
CN205242419U (en) Steel sheet caisson of usefulness that secretly blocks water
CN110004991B (en) Underground structure anti-floating system based on convex wing foot plate and construction method
CN104947700B (en) Well sealing method for dewatering well
CN108518230A (en) A kind of highly stress soft rock stress Tunnel Second Lining deformation control method and structure
CN105756059A (en) Back anchor type anti-floating anchor and construction method
CN110230325A (en) A kind of basement bottom board and supporting ground-connecting-wall are flexibly connected construction method
CN102011410A (en) Prefabricated prestressed underground continuous wall and construction method thereof
CN110409511A (en) A water-stopping method for joints between occlusal piles and ground-connected walls
CN113565087A (en) Underground continuous wall reinforcement cage structure with formwork and construction method thereof
CN206220277U (en) Simple Deformation Joint Structure for Field Construction
CN202689047U (en) Waterproof structure applied to construction joint in fabricated tube section of immersed tube
CN210216467U (en) Seepage-proofing structure without anchoring groove and anchoring platform
CN105604163A (en) Sewage pipeline internal plugging and external grouting construction method
CN103397637A (en) Pre-embedding method of grouting sleeve under raft foundation
CN206956791U (en) A kind of new-old concrete interface waterproof sealing structure
CN111636483A (en) Waterproof device for reverse construction concrete structure gap and construction method
CN106087761A (en) A kind of genuine bridge construction seam sealing system construction method
CN113235646B (en) Construction method for crossing subway station on comprehensive pipe rack
CN101644055A (en) Consolidation grouting method of steep base surfaces of marine structures
CN214656351U (en) Foundation pit construction water level reduces structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination