Info

Publication number
CN207048783U
CN207048783U CN201720008095.0U CN201720008095U CN207048783U CN 207048783 U CN207048783 U CN 207048783U CN 201720008095 U CN201720008095 U CN 201720008095U CN 207048783 U CN207048783 U CN 207048783U
Authority
CN
China
Prior art keywords
shield
counter
construction system
alignment pin
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720008095.0U
Other languages
Chinese (zh)
Inventor
黄君
杨旺兴
王磊
陶红杰
杨宝
范宇
李万春
李保平
张辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shijiazhuang Tiedao University
Original Assignee
Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority to CN201720008095.0U priority Critical patent/CN207048783U/en
Application granted granted Critical
Publication of CN207048783U publication Critical patent/CN207048783U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Shield launching construction system is the utility model is related to, it includes work well head, the portal treated shield tunnel, treat shield tunnel of design and positioned at the shield direction soil layer stabilization zone treated above shield tunnel;It is arranged on the outer fence of work well head upper end surrounding and reinforcing pile, at least three is laterally distributed in the rotary churning pile of the emergent dewatering well at the soil layer stabilization zone of shield direction and ten arrangement above at the soil layer stabilization zone of shield direction.It is the utility model is designed reasonably, compact-sized and easy to use.

Description

Shield launching construction system
Technical field
It the utility model is related to shield launching construction system.
Background technology
At present, as China urban construction and development, light rail subway turn into the necessary auxiliary facility in city, and with building light rail Iron must use shield tunnel, wherein, the shield launching construction system of shield tunnel is the starting point key of whole Tunnel Engineering, such as The shield launching construction system what designs optimization rational in infrastructure turns into the technical problem for being badly in need of solving.
Utility model content
For the above, technical problem to be solved in the utility model be generally speaking to provide it is a kind of it is reasonable in design, Cost is cheap, durable, safe and reliable, simple to operate, time saving and energy saving, saving fund, compact-sized and easy to use shield Structure originates construction system;The technical problem and acquirement beneficial effect solved in detail is in aftermentioned content and with reference to specific embodiment party Content specifically describes in formula.
To solve the above problems, technical solution adopted in the utility model is:
A kind of shield launching construction system, including work well head, design the portal treated shield tunnel, treat shield tunnel with And positioned at the shield direction soil layer stabilization zone treated above shield tunnel;Also include the outer fence for being arranged on work well head upper end surrounding Emergent dewatering well at the soil layer stabilization zone of shield direction is laterally distributed in reinforcing pile, at least three and ten arrangement above exist Rotary churning pile at the soil layer stabilization zone of shield direction.
Further improvement as above-mentioned technical proposal:
The material of rotary churning pile is more than 42.5 grades of Portland cement, must not be less than per linear meter(lin.m.) cement consumption 300kg, the ratio of mud of cement mortar is 1:1~1:1.5.
The unconfined compressive strength of shield direction soil layer stabilization zone after rotary churning pile reinforcing is not less than 2.0mpa and/or infiltration Coefficient cannot be greater than 10-7cm/s.
In a period of portal abolishes first five day to assembled 3 endless tube pieces completion, precipitation is provided with emergent dewatering well.
Sampling observation drilling is provided with rotary churning pile;With sampling observation drilling rotary churning pile quantity for the total radical of rotary churning pile 1% with Above and must not be less than 3.
The sampling observation drilling is uniformly distributed in the soil layer stabilization zone of shield direction, and the sampling observation drilling, which must not be located at, treats shield Tunnel upper.
The sampling observation bore diameter is Ф 50mm;Set in the sampling observation drilling using the closure of M10 cement mortar complete opening.
9 horizontal inspecting holes are provided with portal, horizontal inspecting hole depth is 1.5m-2m, and horizontal inspecting hole aperture is 50mm- 60mm。
Horizontal grouting is provided with the serious horizontal inspecting hole of leak.
It is provided with reaction frame corresponding with originating shield machine and originates bracket active well is intraoral;
Adjustment ground cushion is provided with below bracket originating;
Reaction frame includes the hollow out riser being vertically arranged, the counter-force alignment pin being horizontally set on hollow out riser and setting On hollow out riser and for positioning the counter-force positioner clamped to counter-force alignment pin;
Counter-force alignment pin is uniformly arranged and corresponding with originating shield machine on hollow out riser, is symmetrically set on counter-force alignment pin It is equipped with left wedged hole and right wedged hole;
Counter-force positioner includes the left adjustment positioner of structure identical and right adjustment positioner;Left adjustment positioning dress Put and be symmetricly set on right adjustment positioner at left and right sides of hollow out riser,
Right adjustment positioner includes founding the fixed guide block on side after being horizontally set on the hollow out riser right side and fixes tail Frame, moving direction and the vertically disposed radial regulation device of counter-force alignment pin, locking tightening nut and it is horizontally set on hollow out Wear-resisting fixed cover on riser;Counter-force alignment pin moves axially in wear-resisting fixed cover interior edge hollow out riser, and fixed guide block is with consolidating Determine tailstock to be arranged in parallel;
It is 1 that radial regulation device, which includes gradient,:1000-1:25000 movable tapered wedge body, it is arranged on movable tapered wedge body afterbody Movable tailstock, be arranged on the activity-oriented head on movable tapered wedge body head and one end is arranged on radially-directed on movable tailstock Locking screw;Movable tapered wedge body is located at the homonymy of fixed tailstock with radially-directed locking screw, and activity-oriented head is cylindric knot Structure, activity-oriented head are inserted into the through hole of corresponding fixed guide block, and corresponding movable tapered wedge body is inserted into accordingly respectively In left wedged hole and right wedged hole, movable tapered wedge body passes through corresponding fixed tailstock, is provided with fixed tailstock and radial direction The radial hole of locking screw adaptation is oriented to, radially-directed locking screw is connected after passing through radial hole with locking tightening nut;
It is 1 ° -5 ° to originate the upper surface of bracket and the angle α of horizontal plane, along the direction for originating shield machine advance, is originated The upper surface of bracket gradually rises;The top of counter-force alignment pin is socket cap, the summit line shape of the socket cap of counter-force alignment pin Into plane and perpendicular angle β be 1 ° -5 °, summit line formed plane upper end in the left side of lower end.
It is using beneficial effect caused by above-mentioned technical proposal:
The utility model is designed reasonably, the stress point for originating bracket is padded up by adjusting ground cushion, adjusted compared to tradition Site preparation pad is overall more reasonable with ground contact process, and the upper surface linearity for originating bracket is easier to adjust, and realization originates shield Structure machine precisely moves ahead;By hollow out riser, facilitate the installation of right lateral side face and adjustment, mitigate weight, when use, using polytetrafluoro The wear-resisting fixed cover of ethene or brass, counter-force alignment pin are installed in wear-resisting fixed cover, by adjusting the activity of the left and right sides tiltedly Wedge passes through fixed guide block and activity-oriented so as to more accurately adjust the exposed length on counter-force alignment pin left end summit Head, the optical axis portion of radial hole and radially-directed locking screw realize and be radially precisely oriented to, realized by locking tightening nut it is elastic, Coordinated respectively with left adjustment positioner, right adjustment positioner by left wedged hole, right wedged hole and realized to counter-force alignment pin Adjustment, by the design of gradient, there is the function of self-locking skidproof, designed by angle α, when shield machine advances, automatically Adjustment, diminishes, so as to improve forward linearity and levelness, is designed by β, the shortcomings that overcoming the amount of deflection of upper end big, when anti- So as to improving perpendicularity after power frame stress.
The utility model is designed reasonably, cost are cheap, durable, safe and reliable, simple to operate, time saving and energy saving, saving It is fund, compact-sized and easy to use.
The beneficial effects of the utility model not limited to this describes, in order to preferably readily appreciate, in embodiment portion Divide and carried out more preferably detailed description.
Brief description of the drawings
Fig. 1 is the overall structural representation of the utility model.
Fig. 2 is the structural representation of the utility model portal.
Fig. 3 is the structural representation that the utility model originates shield machine.
Fig. 4 is the structural representation of the right adjustment positioner of the utility model.
Wherein:1st, shield direction soil layer stabilization zone;2nd, work well head;3rd, outer fence;4th, reinforcing pile;5th, emergent dewatering well; 6th, rotary churning pile;7th, shield tunnel is treated;8th, portal;9th, horizontal inspecting hole;10th, reaction frame;11st, bracket is originated;12nd, shield machine is originated; 13rd, ground cushion is adjusted;14th, hollow out riser;15th, counter-force positioner;16th, counter-force alignment pin;17th, left adjustment positioner;18th, it is right Adjust positioner;19th, left wedged hole;20th, fixed guide block;21st, radial regulation device;22nd, movable tailstock;23rd, activity is oblique Wedge;24th, activity-oriented head;25th, fixed tailstock;26th, radially-directed locking screw;27th, locking tightening nut;28th, right wedge shape Hole;29th, wear-resisting fixed cover;30th, sampling observation drilling.
Embodiment
As Figure 1-4, this shield launching construction system, including work well head 2, design treat shield tunnel 7, treat shield The portal 8 in tunnel 7 and positioned at the shield direction soil layer stabilization zone 1 treated above shield tunnel 7;Also include being arranged on work well head The outer fence 3 and reinforcing pile 4, at least three of 2 upper end surroundings are laterally distributed in the emergent precipitation at shield direction soil layer stabilization zone 1 The rotary churning pile 6 of well 5 and ten arrangement above at shield direction soil layer stabilization zone 1.
The material of rotary churning pile 6 is more than 42.5 grades of Portland cement, must not be less than per linear meter(lin.m.) cement consumption 300kg, the ratio of mud of cement mortar is 1:1~1:1.5.
The unconfined compressive strength of shield direction soil layer stabilization zone 1 after the reinforcing of rotary churning pile 6 not less than 2.0mpa and/or is oozed Saturating coefficient cannot be greater than 10-7cm/s.
In a period of portal 8 abolishes first five day to assembled 3 endless tube pieces completion, precipitation is provided with emergent dewatering well 5.
Sampling observation drilling 30 is provided with rotary churning pile 6;The quantity of rotary churning pile 6 with sampling observation drilling 30 is 6 total root of rotary churning pile Several more than 1% and it must not be less than 3.
Sampling observation drilling 30 is uniformly distributed in shield direction soil layer stabilization zone 1, and sampling observation drilling 30, which must not be located at, treats shield tunnel The top of road 7.
30 a diameter of Ф 50mm of sampling observation drilling;Set in sampling observation drilling 30 using the closure of M10 cement mortar complete opening.
9 horizontal inspecting holes 9 are provided with portal 8, the horizontal depth of inspecting hole 9 is 1.5m-2m, and the horizontal aperture of inspecting hole 9 is 50mm-60mm。
Horizontal grouting is provided with the serious horizontal inspecting hole 9 of leak.
Reaction frame 10 corresponding with originating shield machine 12 is provided with work well head 2 and originates bracket 11;
Adjustment ground cushion 13 is provided with below bracket 11 originating;
Reaction frame 10 includes the hollow out riser 14 being vertically arranged, the counter-force alignment pin 16 being horizontally set on hollow out riser 14 And it is arranged on hollow out riser 14 and for the counter-force positioner 15 to the positioning clamping of counter-force alignment pin 16;
Counter-force alignment pin 16 is uniformly arranged and corresponding with originating shield machine 12 on hollow out riser 14, in counter-force alignment pin 16 On be symmetrically arranged with left wedged hole 19 and right wedged hole 28;
Counter-force positioner 15 includes the left adjustment positioner 17 of structure identical and right adjustment positioner 18;Left adjustment Positioner 17 is symmetricly set on the left and right sides of hollow out riser 14 with right adjustment positioner 18,
Right adjustment positioner 18 include being horizontally set on stand behind the right side of hollow out riser 14 fixed guide block 20 on side with Fixed tailstock 25, moving direction and the vertically disposed radial regulation device 21 of counter-force alignment pin 16, locking tightening nut 27 and The wear-resisting fixed cover 29 being horizontally set on hollow out riser 14;Counter-force alignment pin 16 is in the wear-resisting interior edge hollow out riser 14 of fixed cover 29 Axial movement, fixed guide block 20 be arranged in parallel with fixed tailstock 25;
It is 1 that radial regulation device 21, which includes gradient,:1000-1:25000 movable tapered wedge body 23, it is arranged on movable tapered wedge body The movable tailstock 22 of 23 afterbodys, the activity-oriented first 24 for being arranged on the head of movable tapered wedge body 23 and one end are arranged on movable tailstock Radially-directed locking screw 26 on 22;Movable tapered wedge body 23 is located at the same of fixed tailstock 25 with radially-directed locking screw 26 Side, activity-oriented first 24 are cylindrical-shaped structure, and activity-oriented first 24 is inserted into the through hole of corresponding fixed guide block 20, accordingly Movable tapered wedge body 23 be inserted into respectively in corresponding left wedged hole 19 and right wedged hole 28, movable tapered wedge body 23 is through corresponding Fixation tailstock 25, radial hole be adapted to radially-directed locking screw 26 is provided with fixed tailstock 25, radially-directed is locked Tight leading screw 26 is connected after passing through radial hole with locking tightening nut 27;
Originate bracket 11 upper surface and horizontal plane angle α be 1 ° -5 °, along originate shield machine 12 advance direction, The upper surface for originating bracket 11 gradually rises;The top of counter-force alignment pin 16 is socket cap, the socket cap of counter-force alignment pin 16 The plane and the angle β of perpendicular that summit line is formed are 1 ° -5 °, and the plane upper end that summit line is formed is on a left side for lower end Side.
During using the utility model, protect work well head 2 to prevent unrelated person from entering by outer fence 3 and reinforcing pile 4, lead to Cross before emergent dewatering well 5 carries out shield to shield direction soil layer stabilization zone 1 and conserve;Reinforced by rotary churning pile 6, drilled by inspecting by random samples The construction quality of 30 detection rotary churning piles 6, ensures the stabilization of shield direction soil layer stabilization zone 1, passes through the horizontal inspecting hole 9 on portal 8 Monitoring observation.
The stress point for originating bracket 11 is padded up by adjusting ground cushion 13, compared to 13 overall and ground of tradition adjustment ground cushion Face contact process is more reasonable, and the upper surface linearity for originating bracket 11 is easier to adjust, before realization originates shield machine 12 precisely OK;By hollow out riser 14, facilitate the installation of right lateral side face and adjustment, mitigate weight, when use, using polytetrafluoroethylene (PTFE) or Huang The wear-resisting fixed cover 29 of copper, counter-force alignment pin 16 are installed in wear-resisting fixed cover 29, by the movable tapered wedge for adjusting the left and right sides Body 23 is led so as to more accurately adjust the exposed length on the left end summit of counter-force alignment pin 16 by fixed guide block 20 with activity Realize to the optical axis portion of first 24, radial hole and radially-directed locking screw 26 and be radially precisely oriented to, pass through locking tightening nut 27 Realize it is elastic, by left wedged hole 19, right wedged hole 28 respectively with it is left adjustment positioner 17, it is right adjustment positioner 18 coordinate The adjustment to counter-force alignment pin 16 is realized, by the design of gradient, there is the function of self-locking skidproof, designed by angle α, in shield When structure machine advances, adjust automatically, diminish, so as to improve forward linearity and levelness, designed by β, overcome upper end The shortcomings that amount of deflection is big, so as to improving perpendicularity after 10 stress of reaction frame.
The utility model is designed reasonably, cost are cheap, durable, safe and reliable, simple to operate, time saving and energy saving, saving It is fund, compact-sized and easy to use.
The utility model, which fully describes, to be disclosed in order to more clear, and is not just being enumerated for prior art.
Finally it should be noted that:Above example is only to illustrate the technical solution of the utility model, rather than its limitations; Although the utility model is described in detail with reference to the foregoing embodiments, it will be understood by those within the art that: It can still be modified to the technical scheme described in previous embodiment, or which part technical characteristic is equal Replace;It is obvious that multiple technical schemes of the present utility model, which are combined, as those skilled in the art.And these Modification is replaced, and the essence of appropriate technical solution is departed from the spirit and model of the utility model embodiment technical scheme Enclose.

Claims (10)

1. a kind of shield launching construction system, including work well head (2), design treat shield tunnel (7), treat shield tunnel (7) Portal (8) and positioned at the shield direction soil layer stabilization zone (1) treated above shield tunnel (7);It is characterized in that:Also include setting Put work well head (2) upper end surrounding outer fence (3) and reinforcing pile (4), at least three be laterally distributed in shield direction soil layer The rotary churning pile of the emergent dewatering well (5) at stabilization zone (1) place and ten arrangement above at shield direction soil layer stabilization zone (1) place (6)。
2. shield launching construction system according to claim 1, it is characterised in that:The material of rotary churning pile (6) is 42.5 grades Portland cement above, 300kg must not be less than per linear meter(lin.m.) cement consumption, the ratio of mud of cement mortar is 1:1 ~1:1.5.
3. shield launching construction system according to claim 2, it is characterised in that:Shield side after rotary churning pile (6) reinforcing It is not less than 2.0mpa to the unconfined compressive strength of soil layer stabilization zone (1) and/or infiltration coefficient cannot be greater than 10-7cm/s。
4. shield launching construction system according to claim 3, it is characterised in that:First five day is abolished to spelling in portal (8) In a period of filling the completion of 3 endless tube pieces, precipitation is provided with emergent dewatering well (5).
5. shield launching construction system according to claim 4, it is characterised in that:Sampling observation is provided with rotary churning pile (6) Drill (30);Rotary churning pile (6) quantity with sampling observation drilling (30) is more than the 1% of the total radical of rotary churning pile (6) and must not be less than 3 Root.
6. shield launching construction system according to claim 5, it is characterised in that:The sampling observation drilling (30) is in shield It is uniformly distributed in direction soil layer stabilization zone (1), the sampling observation drilling (30), which must not be located at, treats above shield tunnel (7).
7. shield launching construction system according to claim 6, it is characterised in that:Described sampling observation drilling (30) a diameter of Ф 50mm;Set in the sampling observation drilling (30) using the closure of M10 cement mortar complete opening.
8. shield launching construction system according to claim 7, it is characterised in that:9 levels are provided with portal (8) Inspecting hole (9), horizontal inspecting hole (9) depth is 1.5m-2m, and horizontal inspecting hole (9) aperture is 50mm-60mm.
9. shield launching construction system according to claim 8, it is characterised in that:In the serious horizontal inspecting hole (9) of leak Inside it is provided with horizontal grouting.
10. according to the shield launching construction system described in claim any one of 1-9, it is characterised in that:In work well head (2) It is provided with reaction frame (10) corresponding with originating shield machine (12) and originates bracket (11);
Adjustment ground cushion (13) is provided with below bracket (11) originating;
Reaction frame (10) includes the hollow out riser (14) being vertically arranged, the counter-force alignment pin being horizontally set on hollow out riser (14) (16) and it is arranged on hollow out riser (14) and for the counter-force positioner (15) to counter-force alignment pin (16) positioning clamping;
Counter-force alignment pin (16) is uniformly arranged and corresponding with originating shield machine (12) on hollow out riser (14), in counter-force alignment pin (16) left wedged hole (19) and right wedged hole (28) are symmetrically arranged with;
Counter-force positioner (15) includes the left adjustment positioner (17) of structure identical and right adjustment positioner (18);Left tune Setting device (17) is symmetricly set at left and right sides of hollow out riser (14) with right adjustment positioner (18),
Right adjustment positioner (18) is including being horizontally set on the fixed guide block (20) stood behind hollow out riser (14) right side on side With fixed tailstock (25), moving direction and counter-force alignment pin (16) vertically disposed radial regulation device (21), locking screw spiral shell Female (27) and the wear-resisting fixed cover (29) being horizontally set on hollow out riser (14);Counter-force alignment pin (16) is in wear-resisting fixed cover (29) interior edge hollow out riser (14) moves axially, and fixed guide block (20) be arranged in parallel with fixed tailstock (25);
It is 1 that radial regulation device (21), which includes gradient,:1000-1:25000 movable tapered wedge body (23), it is arranged on movable tapered wedge body (23) the movable tailstock (22) of afterbody, be arranged on the activity-oriented head (24) on movable tapered wedge body (23) head and one end is arranged on Radially-directed locking screw (26) on movable tailstock (22);Movable tapered wedge body (23) is located at radially-directed locking screw (26) The homonymy of fixed tailstock (25), activity-oriented head (24) is cylindrical-shaped structure, and activity-oriented head (24) is inserted into corresponding fixation In the through hole of guide pad (20), corresponding movable tapered wedge body (23) is inserted into corresponding left wedged hole (19) and right wedge shape respectively In hole (28), movable tapered wedge body (23) is provided with and radial guiding on fixed tailstock (25) through corresponding fixed tailstock (25) To locking screw (26) be adapted to radial hole, radially-directed locking screw (26) pass through radial hole after with locking tightening nut (27) Connection;
Originate bracket (11) upper surface and horizontal plane angle α be 1 ° -5 °, along originate shield machine (12) advance direction, The upper surface for originating bracket (11) gradually rises;The top of counter-force alignment pin (16) is socket cap, the circle of counter-force alignment pin (16) The plane and the angle β of perpendicular that the summit line of column cap is formed are 1 ° -5 °, and the plane upper end that summit line is formed is in lower end Left side.
CN201720008095.0U 2017-01-05 2017-01-05 Shield launching construction system Expired - Fee Related CN207048783U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720008095.0U CN207048783U (en) 2017-01-05 2017-01-05 Shield launching construction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720008095.0U CN207048783U (en) 2017-01-05 2017-01-05 Shield launching construction system

Publications (1)

Publication Number Publication Date
CN207048783U true CN207048783U (en) 2018-02-27

Family

ID=61489312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720008095.0U Expired - Fee Related CN207048783U (en) 2017-01-05 2017-01-05 Shield launching construction system

Country Status (1)

Country Link
CN (1) CN207048783U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700853A (en) * 2019-10-31 2020-01-17 中铁十八局集团第三工程有限公司 Shallow soil covering shield tunnel reinforcing method based on weak stratum
CN112879018A (en) * 2021-01-27 2021-06-01 中铁十二局集团有限公司 Shield construction method for water-rich silt stratum

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700853A (en) * 2019-10-31 2020-01-17 中铁十八局集团第三工程有限公司 Shallow soil covering shield tunnel reinforcing method based on weak stratum
CN112879018A (en) * 2021-01-27 2021-06-01 中铁十二局集团有限公司 Shield construction method for water-rich silt stratum

Similar Documents

Publication Publication Date Title
CN104405399B (en) One kind passes through drift sand stratum tunnel excavation support body engineering method
WO2021139063A1 (en) Grouting pipe and method of reinforcing tunnel by surface grouting
CN101230570A (en) Layered multitime pressure regulating pulp conditioning casting method
CN107060834A (en) Grout injection control technique is oozed in drainage slowly under back rich water broken condition
CN207048783U (en) Shield launching construction system
CN102776899B (en) Anti-floating structure of shallow-buried shield tunnel
CN211258623U (en) Water-rich weak surrounding rock tunnel supporting system crossing fault fracture zone
CN206592139U (en) A kind of external poured is segmented anchoring rod
CN106194204A (en) A kind of drift cobble tunnel advanced support structure and method for protecting support
CN106087984B (en) A kind of deformed bar cage and a kind of construction method of special-shaped uplift pile
CN207331673U (en) Sleeve valve pipe horizontal grouting construction device
CN106884655A (en) A kind of two-way reinforcement means of gob side entry driving coal column
CN107201909B (en) Expansive soil tunnel supporting structure and method
CN108678781A (en) One kind closing on river shield launching end stratum consolidation method
WO2019109700A1 (en) Anchor bolting method for enhancing roof stability using reinforced roof and side of coal roadway
CN110206071B (en) Method and device for reinforcing joints of underground continuous wall
CN208564582U (en) One kind closing on river shield launching end stratum consolidation device
CN103670466B (en) A kind of constant-resistance deformer and using method thereof
CN206204974U (en) A kind of device for plugging for concrete pipe base core-drawing hole water burst
CN206110124U (en) Bored concrete pile stake end post grouting device
CN206144570U (en) Float cobble tunnel advance support structure
CN206092024U (en) Pipe -shed advance support structure in barrel section
CN205954617U (en) Deformed bar cage
CN214741347U (en) Be used for hydraulic shield to construct building structure and strengthen fixing device
CN209959261U (en) Real-time feedback grouting device for correcting horizontal deformation of subway tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Yang Zhihao

Inventor after: Song Hongfang

Inventor after: Yue Zurun

Inventor after: Sun Tiecheng

Inventor after: Zhang Song

Inventor after: Sun Xin

Inventor after: Liu Xiaohe

Inventor before: Huang Jun

Inventor before: Yang Wangxing

Inventor before: Wang Lei

Inventor before: Tao Hongjie

Inventor before: Yang Bao

Inventor before: Fan Yu

Inventor before: Li Wanchun

Inventor before: Li Baoping

Inventor before: Zhang Hui

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180404

Address after: 050000 Hebei province Shijiazhuang North Second Ring Road No. 17

Patentee after: Shijiazhuang Tiedao University

Address before: 101127 Beijing Tongzhou District city Tongzhou District in the home Hui Township Jufuyuan national industry development base and poly St. 2

Patentee before: China Railway 16 Bureau Group Beijing Metro Engineering Construction Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180227

Termination date: 20200105