CN206092024U - Pipe -shed advance support structure in barrel section - Google Patents
Pipe -shed advance support structure in barrel section Download PDFInfo
- Publication number
- CN206092024U CN206092024U CN201621144491.8U CN201621144491U CN206092024U CN 206092024 U CN206092024 U CN 206092024U CN 201621144491 U CN201621144491 U CN 201621144491U CN 206092024 U CN206092024 U CN 206092024U
- Authority
- CN
- China
- Prior art keywords
- pipe
- concrete
- wall steelframe
- barrel
- barrel section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
Pipe -shed advance support structure in barrel section, this structure includes pipe -shed advance support district, concrete support region, and direction wall steelframe is the support main part of barrel section, and direction wall steelframe is fixed on the cement concrete piece of barrel section bottom, pipe -shed advance support district, concrete support region are the advance support structure of direction wall steelframe, pipe -shed advance support comprises well tub of canopy in the district, and equidistant the arranging of direction wall steelframe hoop is followed to each steel pipe of well tub of canopy, and concrete support region comprises early strength concrete, and concrete support region symmetry sets up bottom outside direction wall steelframe, and the pipe -shed advance support district sets up the intermediate position at direction wall steelframe, is the scope that pipe -shed advance support strutted in the district angle a 90 160. There is firm support frame the inboard of direction wall steelframe through bolted connection. The utility model discloses has good economic benefits and shortened construction period. Both save the spending, and can guarantee the safety of being under construction again, saved the time again simultaneously for the construction progress.
Description
Technical field
The utility model is related to advanced middle pipe canopy technical field, it is adaptable to barrel fault belt or Shallow-buried location,
Underground water develop location, and under wear important building location excavation construction.
Background technology
In the case where ensureing not affecting existing line to be open to traffic, works construction is safely carried out, it is general using advanced big
Pipe canopy or double-deck advanced tubule construction, high cost, work efficiency is low, the construction difficult problem such as operation inconvenience, and often the circulation engineering time is long, shadow
Ring construction speed.
Utility model content
In order to overcome the problems referred to above, the utility model proposes a kind of suitable advance support mode, efficiently solves
Problem is stated, and construction quality can also be protected, save expense, shorten the engineering time, accelerating construction progress.
The technical solution adopted in the utility model is barrel vault advanced support structure in barrel section, and the structure includes that pipe canopy is advanced
Supporting area I, concrete support area II, are oriented to supportive body of the wall steelframe 1 for barrel section, are oriented to wall steelframe 1 and are fixed on barrel section
On the coagulating cement soil block 4 of bottom;Barrel vault advanced support area I, concrete support area II are the advance support knot for being oriented to wall steelframe 1
Structure;Barrel vault advanced support area I is made up of middle pipe canopy 2, and each steel pipe of middle pipe canopy 2 is equally spaced along the ring of wall steelframe 1 is oriented to, and mixes
Solidifying soil Support II is made up of early strength concrete 3, and concrete support area II is symmetricly set on the exterior bottom of guiding wall steelframe 1, pipe
Canopy advance support area I is arranged on the centre position for being oriented to wall steelframe 1;The scope of barrel vault advanced support area I supporting angles a be 90 °-
160°.The inner side for being oriented to wall steelframe 1 has been bolted firm bracing frame 5.
Cement grout is marked with each steel pipe of middle pipe canopy 2.
The steel pipe of middle pipe canopy 2 is hot rolled seamless steel tube.
Cement grout is cement mortar and the ratio of mud is 1:1 cement grout.
The beneficial effects of the utility model are:
1st, this practical advanced middle pipe canopy, material is simple, handling ease, and it is convenient to construct;
2nd, this practical advanced middle pipe canopy, the engineering time substantially reduces.
3rd, this practical advanced middle pipe canopy, with good economic benefit and shortening construction period.Both spending had been saved, and
Construction safety is can guarantee that, while and save the time, accelerate construction speed.
Description of the drawings
Fig. 1 is agent structure of the present utility model.
Fig. 2 is the construction process figure of the utility model structure.
Specific embodiment
Such as Fig. 1-2, the specific implementation step of utility model structure is as follows:
This it is practical it is advanced in pipe canopy solve the technical scheme that its technical problem adopted and be:140 ° of tunnel cross-section arch model
Enclose tube shed grouting leading pre-supporting in interior employing.
1) pipe canopy adopts a diameter of 89mm hot rolled seamless steel tubes of wall thickness 5mm in.
2) injected hole, aperture 10mm~16mm, pitch of holes 15cm are bored on steel floral tube.
3) to 1 °~3 ° of middle 40cm, steel pipe axis and lining cutting outer rim angle, pipe roof construction error footpath in pipe canopy circumferential distance
To no more than 20cm, ring is not more than 10cm.
4) tube shed grouting adopts cement grout, the cement mortar ratio of mud 1:1 (weight ratio), 0.5~2.0MPa of grouting pressure.Root
According to live country rock actual conditions, country rock porosity is 10%.
5) injecting paste material:Cement grout, slurry intensity grade is not less than M10.
Claims (4)
1. barrel vault advanced support structure in barrel section, it is characterised in that:The structure includes barrel vault advanced support area (I), concrete
Support (II), is oriented to supportive body of the wall steelframe (1) for barrel section, is oriented to the water that wall steelframe (1) is fixed on barrel section bottom
On cement concrete block (4);Barrel vault advanced support area (I), concrete support area (II) are tied for the advance support for being oriented to wall steelframe (1)
Structure;Barrel vault advanced support area (I) is made up of middle pipe canopy (2), and each steel pipe of middle pipe canopy (2) is along between guiding wall steelframe (1) ring etc.
Away from arrangement, concrete support area (II) is made up of early strength concrete (3), and concrete support area (II) is symmetricly set on guiding wall steel
Frame (1) exterior bottom, barrel vault advanced support area (I) is arranged on the centre position for being oriented to wall steelframe (1);Barrel vault advanced support area
(I) scope of supporting angle a is 90 ° -160 °;It is oriented on the inside of wall steelframe (1) and has been bolted firm bracing frame (5).
2. barrel vault advanced support structure in barrel section according to claim 1, it is characterised in that:Each steel of middle pipe canopy (2)
Cement grout is marked with pipe.
3. barrel vault advanced support structure in barrel section according to claim 1, it is characterised in that:The steel pipe of middle pipe canopy (2)
For hot rolled seamless steel tube.
4. barrel vault advanced support structure in barrel section according to claim 1, it is characterised in that:Cement grout is cement mortar
It is 1 with the ratio of mud:1 cement grout.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621144491.8U CN206092024U (en) | 2016-10-20 | 2016-10-20 | Pipe -shed advance support structure in barrel section |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621144491.8U CN206092024U (en) | 2016-10-20 | 2016-10-20 | Pipe -shed advance support structure in barrel section |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206092024U true CN206092024U (en) | 2017-04-12 |
Family
ID=58484754
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621144491.8U Expired - Fee Related CN206092024U (en) | 2016-10-20 | 2016-10-20 | Pipe -shed advance support structure in barrel section |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206092024U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108150187A (en) * | 2017-12-21 | 2018-06-12 | 中铁十八局集团有限公司 | A kind of huge loose talus shield encircles the method into hole |
CN109372540A (en) * | 2018-11-23 | 2019-02-22 | 贵州大学 | A kind of constructing tunnel fixes device with bracing members |
-
2016
- 2016-10-20 CN CN201621144491.8U patent/CN206092024U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108150187A (en) * | 2017-12-21 | 2018-06-12 | 中铁十八局集团有限公司 | A kind of huge loose talus shield encircles the method into hole |
CN109372540A (en) * | 2018-11-23 | 2019-02-22 | 贵州大学 | A kind of constructing tunnel fixes device with bracing members |
CN109372540B (en) * | 2018-11-23 | 2020-08-04 | 贵州大学 | Steel support fixing device for tunnel construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101614125B (en) | Construction method of V-level surrounding rock tunnel | |
CN102996133B (en) | Construction method applicable to intersection between inclined shaft and slant hole of weak surrounding rock tunnel | |
CN202117686U (en) | Surrounding rock advanced support structure for railway tunnel at deep-buried watery and weak stratums | |
CN206419031U (en) | A kind of tunnel double-lining chassis steel and wood composite end head formwork | |
CN103628885A (en) | Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel | |
CN104806267A (en) | Shield end socket reinforcing system of scree soil layer advance large pipe roof and construction method thereof | |
CN111502696A (en) | Dense-mesh type advanced support system of underground excavation tunnel and construction method | |
CN104989434A (en) | Method for treating landslide of tunneling working face with pipe penetration combined lagging jacks | |
CN107201909B (en) | Expansive soil tunnel supporting structure and method | |
CN110195604B (en) | Construction method for tunnel main tunnel TBM (tunnel boring machine) tunneling section | |
CN203855970U (en) | Assembly type foundation pit supporting double-row hollow pile structure | |
CN107965341A (en) | A kind of large-section underground pipe canopy pipe network concrete support method | |
CN113153308B (en) | Construction method for collapse section of double-arch tunnel | |
CN206092024U (en) | Pipe -shed advance support structure in barrel section | |
CN109403987A (en) | Shield end horizontal frozen combines reception device and construction method with short steel case | |
CN107237638A (en) | Both wired concealed tunneling structure and its construction method are worn under a kind of | |
CN204960946U (en) | Prevention tunnel subsides supporting construction of deformation | |
CN207348879U (en) | Tailwater tunnel structure | |
CN205225272U (en) | Mantlet constructs section of jurisdiction come -up construction structures | |
CN202215261U (en) | Soft soil layer top moving wheel type steel casing for inclined hole construction | |
CN205100997U (en) | Tunnel is high strength pipe canopy pipe for advance support | |
CN103835731A (en) | Supporting device and method for primary supporting of expansible soil layer tunnel | |
CN112832824A (en) | Tunnel strong supporting structure and method suitable for broken surrounding rock condition | |
CN109026031B (en) | Reconstruction construction method for collapsed section of gas tunnel after strong earthquake | |
CN209637781U (en) | A kind of self-locking connection structure of tunnel mini pile and arch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Patentee after: CCCC FIRST HIGHWAY ENGINEERING GROUP Co.,Ltd. Address before: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Patentee before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170412 Termination date: 20211020 |
|
CF01 | Termination of patent right due to non-payment of annual fee |