CN207047015U - A kind of three-level sedimentation basin of concrete mixing plant - Google Patents

A kind of three-level sedimentation basin of concrete mixing plant Download PDF

Info

Publication number
CN207047015U
CN207047015U CN201720989014.XU CN201720989014U CN207047015U CN 207047015 U CN207047015 U CN 207047015U CN 201720989014 U CN201720989014 U CN 201720989014U CN 207047015 U CN207047015 U CN 207047015U
Authority
CN
China
Prior art keywords
sedimentation basin
level sedimentation
level
waterwheel
fix bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720989014.XU
Other languages
Chinese (zh)
Inventor
刘桂兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Qingnian Road Concrete Co Ltd
Original Assignee
Beijing Qingnian Road Concrete Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Qingnian Road Concrete Co Ltd filed Critical Beijing Qingnian Road Concrete Co Ltd
Priority to CN201720989014.XU priority Critical patent/CN207047015U/en
Application granted granted Critical
Publication of CN207047015U publication Critical patent/CN207047015U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Aeration Devices For Treatment Of Activated Polluted Sludge (AREA)

Abstract

The utility model discloses a kind of three-level sedimentation basin of concrete mixing plant, including the first order sedimentation basin being sequentially connected, second level sedimentation basin and third level sedimentation basin, the first order sedimentation basin and second level sedimentation basin, gap is all provided between second level sedimentation basin and third level sedimentation basin, the side of first order sedimentation basin is provided with waterwheel in the second level sedimentation basin, fix bar is equipped with the axle center of the waterwheel, the waterwheel is located at the gap lower zone that first order sedimentation basin is connected with second level sedimentation basin and is in gap in approximately the same plane;The side of the fix bar is provided with the drive mechanism consistent with fix bar rotational frequency, and the drive mechanism is fixedly connected with the executing agency that acid adding operation can be performed to sewage in the second sedimentation basin.The utility model has the advantages that:This three-level sedimentation basin can carry out acid adding automatically, and then improve the discharge efficiency of sewage.

Description

A kind of three-level sedimentation basin of concrete mixing plant
Technical field
It the utility model is related to a kind of three-level sedimentation basin, the three-level sedimentation basin of more particularly to a kind of concrete mixing plant.
Background technology
Concrete mixing plant can produce substantial amounts of waste water in process of production, cause the wasting of resources and environmental pollution.Such as Substantial amounts of waste water is produced after rinsing stirring host, concrete transportation tank car and production site ground, because containing in these waste water There are the strong alkaline substances such as cement, sandstone, flyash, miberal powder and additive, pH value is up to 11-12, therefore directly these give up Water discharges, and can cause the waste of water resource and environment can be caused seriously to pollute.
Notification number is that CN202700156U Chinese patent discloses a kind of concrete mixing plant detention tank.The sedimentation basin It is sequentially connected and is formed by first stage precipitation tank, second-level settling pond, three-level sedimentation basin, first stage precipitation tank, second-level settling pond and three-level is sunk Shallow lake pond is separated by sedimentation basin partition wall, and first stage precipitation tank bottom plate is ramp, and sedimentation basin partition wall is provided with gap.This sedimentation basin In being carried out by adding acidic materials and sewage in three-level sedimentation basin and, sewage discharge after most neutralizing at last to municipal administration pipe Road.Technical staff need to manually add acidic materials when carrying out aforesaid operations, due to night nobody to the dirt in three-level sedimentation basin Water is added so that every morning, three-level sedimentation basin showed strong basicity, and then reduced the discharge efficiency of sewage, had much room for improvement.
Utility model content
The purpose of this utility model is to provide a kind of three-level sedimentation basin of concrete mixing plant, and this three-level sedimentation basin can It is automatic to carry out acid adding, and then improve the discharge efficiency of sewage.
Above-mentioned technical purpose of the present utility model technical scheme is that:A kind of concrete mixing plant Three-level sedimentation basin, including first order sedimentation basin, second level sedimentation basin and the third level sedimentation basin being sequentially connected, described All it is provided with gap between first stage precipitation tank and second level sedimentation basin, second level sedimentation basin and third level sedimentation basin, described The side of first order sedimentation basin is provided with waterwheel in second-level settling pond, is equipped with the axle center of the waterwheel and waterwheel rotating speed Identical fix bar, the both ends of the fix bar are socketed the locating part that guaranteed fix bar is rotated, and the waterwheel is positioned at the Gap lower zone that first stage precipitation tank is connected with second level sedimentation basin and it is in gap in approximately the same plane;It is described The side of fix bar is provided with the drive mechanism consistent with waterwheel rotational frequency, and the drive mechanism is fixedly connected with can be to second Sewage performs the executing agency of acid adding operation in level sedimentation basin.
By using above-mentioned technical proposal, when the sewage in first order sedimentation basin is sunk by gap into the second level During the pond of shallow lake, current direction flows down and dropped down onto in the plate face of waterwheel.Because the Action of Gravity Field of current applies in downward direction to the plate face of waterwheel Power, final waterwheel can be rotated around the axial line of fix bar.Now, the fix bar while generation being fixedly connected with waterwheel turn It is dynamic.Drive mechanism of the rotation driving of fix bar positioned at fix bar side is rotated with identical rotational frequency, and then is driven Mechanism is by driving executing agency to carry out performing sewage in the sedimentation basin of the second level acid adding operation.When gap flows into the discharge of sewage When higher, velocity of rotation of the waterwheel at fix bar axle center is faster, drives the faster rotational speed for the fix bar being fixedly connected, and then The rotational frequency of drive mechanism is also gradually accelerated.So that executing agency toward the acidic materials added in the sedimentation basin of the second level with overflowing The mouth of a river flows into discharge of sewage increase and increased, and vice versa.Pass through above-mentioned setting so that the addition of acidic materials can basis Flow into the discharge of sewage in real time and change, neutralization reaction is carried out to the sewage in the sedimentation basin of the second level automatically.
The utility model is further arranged to:The drive mechanism includes the first gear being fixedly connected with fix bar, institute The side for stating first gear is provided with the gear band that can be meshed with first gear, and the gear band opposite side is provided with can be with tooth The second gear of wheel belt engagement, the side of the second gear is fixedly connected with retainer ring, the side of the retainer ring and execution Mechanism is fixedly connected.
By using above-mentioned technical proposal, when sewage is flowed into second level sedimentation basin by first order sedimentation basin by gap When, ultimately result in the fix bar being fixedly connected with waterwheel and rotate.Because one end of fix bar is fixedly connected with first gear, So that first gear drives second gear to rotate by the effect of gear band, work that the side of second gear passes through retainer ring The executing agency being fixedly connected with driving is moved, and then realizes and second level sedimentation basin acid adding is operated.
The utility model is further arranged to:The locating part includes the bearing positioned at fix bar both ends, each axle The side held is fixedly connected with second level sedimentation basin inwall.
By using above-mentioned technical proposal, due to being all provided with bearing at fix bar both ends so that when fix bar is with dampening When the rotation of car is synchronously rotated, the bearing on both sides can reduce the influence rotated to fix bar, reducing friction resistance.Meanwhile Bearing can play the supporting role to fix bar, and then the waterwheel for ensureing to be fixedly connected with fix bar is vacantly set, and further protect Card waterwheel can synchronously rotate with the gap discharge of sewage, ensure that rotational efficienty.
The utility model is further arranged to:The executing agency includes the feed hopper that can place acidic materials, described Feed hopper is provided with the sealing ring around charging aperture close to the side of charging aperture, and the side of the sealing ring, which abuts, rotating disk, institute State and be fixedly connected at the axle center of rotating disk with retainer ring, if the side of the rotating disk is provided with what can be engaged with feed hopper charging aperture The groove of dry circumferential arrangement.
By using above-mentioned technical proposal, when current are flowed into the sedimentation basin of the second level from the first sedimentation basin, under gap The water impact fallen is located at the waterwheel below gap, and then drives the fix bar being fixedly connected with waterwheel to be rotated.It is fixed Bar drives rotating disk to be rotated by the drive mechanism being fixedly connected.Side due to rotating disk and phase at feed hopper charging aperture Mutually abut, and the sealing ring positioned at feed hopper side improves the sealing effectiveness between feed hopper and rotating disk.When recessed on rotating disk When groove is turned to at feed hopper charging aperture, it is located at the acidic materials in feed hopper and entered in groove.Now rotating disk continues to turn When dynamic, acidic materials in groove can fallen to due to gravity in the sedimentation basin of the second level and with second level sedimentation basin Interior sewage carries out neutralization reaction.Abut against and not recessed with any one when rotating disk is turned at the charging aperture with feed hopper When groove is coordinated, now rotating disk does not provide the space that the acidic materials in feed hopper fall so that acidic materials still stay In feed hopper.Above-mentioned sealing ring strengthens the sealing effectiveness between rotating disk and feed hopper.
The utility model is further arranged to:One end of the fix bar, which is socketed with, avoids extraneous aqueous vapor contact drive mechanism Drive chamber, it is described driving chamber interior walls be fixedly connected with fixing axle, the fixing axle at second gear axle center with socket-connecting.
By using above-mentioned technical proposal, because the sewage in the sedimentation basin of the second level is under open environment for a long time, its The aqueous vapor that sewage can be evaporated and then change into air at a certain temperature.Aqueous vapor in upward motion process can directly with Drive mechanism is contacted.For the influence to caused by drive mechanism after avoiding aqueous vapor from being contacted with drive mechanism, outside drive mechanism The drive chamber of cladding drive mechanism is set.Drive chamber can improve overall aesthetic measure simultaneously.
The utility model is further arranged to:The first order sedimentation basin, second level sedimentation basin and third level sedimentation basin Opening all sets grid.
By using above-mentioned technical proposal, when rainy season set, three-level sedimentation basin is entered by the extraneous rainwater of grid PH value that is interior and then reducing high alkalinity solution in three-level sedimentation basin, reduce the usage amount of acid solution needed for neutralizing.
In summary, the utility model has the advantages that:
By being provided with waterwheel in the sedimentation basin of the second level, waterwheel is located at first order sedimentation basin and connected with second level sedimentation basin Logical gap lower zone and it is in gap in approximately the same plane, fix bar is fixedly connected with the axle center of waterwheel, Gu Fixed pole has executing agency by drive mechanism synchronized links so that the current size that waterwheel can flow into according to top gap is carried out The velocity of rotation of change waterwheel, so that amount of the real-time automatic change executing agency toward addition acidic materials in the sedimentation basin of the second level, And then improve the discharge efficiency of sewage.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment;
Fig. 2 is the structural representation that Fig. 1 removes grid;
Fig. 3 is the structural representation that Fig. 2 removes sedimentation basin;
Fig. 4 is the structural representation that Fig. 3 removes drive chamber;
Fig. 5 is Fig. 4 exploded perspective view.
Reference:1st, first order sedimentation basin;2nd, second level sedimentation basin;3rd, third level sedimentation basin;4th, dividing plate;5th, spilling water Mouthful;6th, grid;7th, water inlet;8th, waterwheel;9th, fix bar;10th, bearing;11st, drive chamber;12nd, drive mechanism;13rd, first gear; 14th, gear band;15th, second gear;16th, fixing axle;17th, retainer ring;18th, executing agency;19th, feed hopper;20th, sealing ring;21、 Rotating disk;22nd, groove.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but As long as all protected in right of the present utility model by Patent Law.
As depicted in figs. 1 and 2, the three-level sedimentation basin of a kind of concrete mixing plant, including the first order being sequentially connected are sunk Shallow lake pond 1, second level sedimentation basin 2 and third level sedimentation basin 3.First order sedimentation basin 1, second level sedimentation basin 2 and third level precipitation Pond 3 is separated by dividing plate 4, and the side of dividing plate 4 is provided with gap 5.First order sedimentation basin 1, second level sedimentation basin 2 and the 3rd The opening of level sedimentation basin 3 all sets grid 6.The side of first order sedimentation basin 1 is provided with water inlet 7.
As shown in Figures 2 and 3, the side of first order sedimentation basin 1 is provided with waterwheel 8 in second level sedimentation basin 2.Waterwheel Fix bar 9 is equipped with 8 axle center, fix bar 9 is provided at both ends with bearing 10, and side and the second level of each bearing 10 are precipitated The inwall of pond 2 is fixedly connected.Particularly, waterwheel 8 is located under the gap 5 that first order sedimentation basin 1 is connected with second level sedimentation basin 2 Square region and it is in gap 5 in approximately the same plane.When the sewage in first order sedimentation basin 1 is entered by gap 5 During the sedimentation basin 2 of the second level, current direction flows down and dropped down onto in the plate face of waterwheel 8.Because the Action of Gravity Field of current is applied to the plate face of waterwheel 8 Add power in downward direction, final waterwheel 8 can be rotated around the axial line of fix bar 9.Now, consolidate with what waterwheel 8 was fixedly connected Fixed pole 9 rotates simultaneously.
As shown in Fig. 3, Fig. 4 and Fig. 5, one end of fix bar 9 is socketed with drive chamber 11, the side and the second level of drive chamber 11 The inwall of sedimentation basin 2 is fixedly connected.Drive mechanism 12 is provided with drive chamber 11, drive mechanism 12 includes fixes with fix bar 9 The first gear 13 of connection, the side of first gear 13 are provided with the gear band 14 that can be meshed with first gear 13, gear band 14 opposite sides are provided with the second gear 15 that can be engaged with gear band 14.Second gear 15 is equipped with fixing axle 16, fixing axle 16 One end be fixedly connected with drive chamber 11 inwall.Side of the second gear 15 away from fixing axle 16 is fixedly connected with retainer ring 17, The side of retainer ring 17 passes drive chamber 11 and is fixedly connected with the execution that acid adding operation can be performed to sewage in second level sedimentation basin 2 Mechanism 18.
When sewage is flowed into second level sedimentation basin 2 by first order sedimentation basin 1 by gap 5, ultimately result in solid with waterwheel 8 Surely the fix bar 9 connected rotates.Because one end of fix bar 9 is fixedly connected with first gear 13 so that first gear 13 Second gear 15 is driven to rotate by the effect of gear band 14, the zone of action that the side of second gear 15 passes through retainer ring 17 The dynamic executing agency 18 being fixedly connected is moved, and then realizes and the acid adding of second level sedimentation basin 2 is operated.
As shown in figure 4, executing agency 18 includes the feed hopper 19 above grid 6, acid can be placed in feed hopper 19 Property material.Feed hopper 19 penetrate grid 6 be provided with one end in second level sedimentation basin 2 it is close at feed hopper 19 charging aperture Seal 20, the side of sealing ring 20, which abuts, rotating disk 21, is fixedly connected at the axle center of rotating disk 21 with retainer ring 17.The one of rotating disk 21 Side is provided with the groove 22 for some circumferential arrangements that can be engaged with the charging aperture of feed hopper 19.
When current are flowed into second level sedimentation basin 2 from the first sedimentation basin, the water impact that gap 5 falls is located at spilling water The waterwheel 8 of the lower section of mouth 5, and then drive the fix bar 9 being fixedly connected with waterwheel 8 to be rotated.Fix bar 9 is by being fixedly connected Drive mechanism 12 so drive rotating disk 21 rotated.Because the side of rotating disk 21 at the charging aperture of feed hopper 19 with mutually abutting, And the sealing ring 20 positioned at the side of feed hopper 19 improves the sealing effectiveness between feed hopper 19 and rotating disk 21.When on rotating disk 21 When groove 22 is turned to at the charging aperture of feed hopper 19, it is located at the acidic materials in feed hopper 19 and entered in groove 22.Now When rotating disk 21 is rotated further, the acidic materials in groove 22 can be falling in second level sedimentation basin 2 due to gravity And carry out neutralization reaction with the sewage in second level sedimentation basin 2.When rotating disk 21 is turned to being offseted at the charging aperture of feed hopper 19 When connecing and not coordinated with any one groove 22, now rotating disk 21 is not provided under the acidic materials in feed hopper 19 The space fallen so that acidic materials are still kept in feed hopper 19.Above-mentioned sealing ring 20 strengthen rotating disk 21 and feed hopper 19 it Between sealing effectiveness.
The course of work:
Sewage first flows into first order sedimentation basin 1 and carries out natural sedimentation, and first order sedimentation basin 1 plays major precipitation effect.When When sewage product in first order sedimentation basin 1 completely reaches 5 height of gap being connected with second level sedimentation basin 2, positioned at the first order Top sewage in sedimentation basin 1 flows into second level sedimentation basin 2 by gap 5.Now, it is located in second level sedimentation basin 2 Waterwheel 8 can be changed the velocity of rotation of waterwheel 8 according to the current size that top gap 5 flows into.When inflow velocity is larger, Velocity of rotation of the waterwheel 8 at the axle center of fix bar 9 is faster, and then drives the faster rotational speed for the fix bar 9 being fixedly connected.
When fix bar 9 rotates, first gear 13 drives second gear 15 to occur to turn by the effect of gear band 14 It is dynamic, and then drive rotating disk 21 to be rotated.Now, the rotating speed of rotating disk 21 can synchronize change according to the rotating speed of fix bar 9, And then determine the size of rotating speed by flowing into the flow in second level sedimentation basin 2.When the rotating speed of rotating disk 21 becomes big, feed hopper The number that acidic materials in 19 enter the groove 22 of rotating disk 21 becomes more, and then causes the acidity launched toward in second level sedimentation basin 2 Material becomes more.When the rotating speed of rotating disk 21 becomes small, its result is contrary to the above.
Pass through above-mentioned setting so that three-level sedimentation basin can be carried out automatically according to the flow for entering second level sedimentation basin 2 The dosage of acid adding, and then improve the efficiency of sewage neutralization reaction.Simultaneously as waterwheel 8 is turned around the axial line of fix bar 9 It is dynamic so that the sewage in second level sedimentation basin 2 can be sufficiently stirred by waterwheel 8 with acidic materials, can accelerate to neutralize instead The progress answered.Its mixing speed and the velocity of rotation of waterwheel 8 match.Further, to avoid the sewage in second level sedimentation basin 2 Sewage that is excessive and causing gap 5 to flow out can not fully contact with the plate face of waterwheel 8, and then reduce the rotational efficienty of waterwheel 8. Therefore, its position of gap 5 that second level sedimentation basin 2 is connected between being precipitated with the third level is less than the axial line position of fix bar 9 Put.When the water in second level sedimentation basin 2 is entered in third level sedimentation basin 3 by gap 5, technical staff can be tested by PH Sewage PH value in instrument detection third level sedimentation basin 3.When the sewage PH value in third level sedimentation basin 3 reaches in the range of pollution emission standard When, it can be expelled to by suction pump in municipal pipeline.Set by above-mentioned automatical dosing, avoid the cumbersome of artificial, carry The high operating efficiency of technical staff.

Claims (6)

1. a kind of three-level sedimentation basin of concrete mixing plant, including be sequentially connected first order sedimentation basin (1), second level precipitation Pond (2) and third level sedimentation basin (3), the first order sedimentation basin (1) and second level sedimentation basin (2), second level sedimentation basin (2) Gap (5) is all provided between third level sedimentation basin (3), it is characterized in that:Close to first in the second level sedimentation basin (2) The side of level sedimentation basin (1) is provided with waterwheel (8), is equipped with the axle center of the waterwheel (8) and consolidates with waterwheel (8) rotating speed identical Fixed pole (9), the both ends of the fix bar (9) are socketed the locating part that guaranteed fix bar (9) is rotated, waterwheel (8) position Gap (5) lower zone that is connected in first order sedimentation basin (1) with second level sedimentation basin (2) and it is in gap (5) In approximately the same plane;
The side of the fix bar (9) is provided with the drive mechanism (12) consistent with waterwheel (8) rotational frequency, the drive mechanism (12) executing agency (18) of acid adding operation can be performed to the interior sewage of second level sedimentation basin (2) by being fixedly connected with.
2. a kind of three-level sedimentation basin of concrete mixing plant according to claim 1, it is characterized in that:The drive mechanism (12) first gear (13) that is fixedly connected with fix bar (9) is included, the side of the first gear (13) is provided with can be with the The gear band (14) that one gear (13) is meshed, gear band (14) opposite side are provided with can be engaged with gear band (14) Two gears (15), the side of the second gear (15) are fixedly connected with retainer ring (17), the side of the retainer ring (17) with Executing agency (18) is fixedly connected.
3. a kind of three-level sedimentation basin of concrete mixing plant according to claim 1, it is characterized in that:The locating part bag The bearing (10) positioned at fix bar (9) both ends is included, the side of each bearing (10) is fixed with second level sedimentation basin (2) inwall Connection.
4. a kind of three-level sedimentation basin of concrete mixing plant according to claim 2, it is characterized in that:The executing agency (18) feed hopper (19) of acidic materials can be placed by including, and the feed hopper (19) is provided with circular close to the side of charging aperture The sealing ring (20) of charging aperture, the side of the sealing ring (20), which abuts, rotating disk (21), at the axle center of the rotating disk (21) with Retainer ring (17) is fixedly connected, and the side of the rotating disk (21) is provided with some circles that can be engaged with feed hopper (19) charging aperture The groove (22) of week arrangement.
5. a kind of three-level sedimentation basin of concrete mixing plant according to claim 2, it is characterized in that:The fix bar (9) one end is socketed with the drive chamber (11) for avoiding extraneous aqueous vapor contact drive mechanism (12), and drive chamber (11) inwall is solid Surely fixing axle (16) is connected with, the fixing axle (16) at second gear (15) axle center with socket-connecting.
6. a kind of three-level sedimentation basin of concrete mixing plant according to claim 5, it is characterized in that:The first order is sunk The opening in shallow lake pond (1), second level sedimentation basin (2) and third level sedimentation basin (3) all sets grid (6).
CN201720989014.XU 2017-08-08 2017-08-08 A kind of three-level sedimentation basin of concrete mixing plant Expired - Fee Related CN207047015U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720989014.XU CN207047015U (en) 2017-08-08 2017-08-08 A kind of three-level sedimentation basin of concrete mixing plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720989014.XU CN207047015U (en) 2017-08-08 2017-08-08 A kind of three-level sedimentation basin of concrete mixing plant

Publications (1)

Publication Number Publication Date
CN207047015U true CN207047015U (en) 2018-02-27

Family

ID=61499444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720989014.XU Expired - Fee Related CN207047015U (en) 2017-08-08 2017-08-08 A kind of three-level sedimentation basin of concrete mixing plant

Country Status (1)

Country Link
CN (1) CN207047015U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109205697A (en) * 2018-09-26 2019-01-15 骆玉蓉 It is convenient for the multistage liquid stream sewage disposal device removed contamination using siphon principle
CN110092525A (en) * 2019-06-05 2019-08-06 江苏凯勒奇环保设备有限公司 A kind of multiple spot launching trap water coagulation sedimentation device based on micro- magnetic condensation technique
CN110339626A (en) * 2019-07-31 2019-10-18 江苏百海环保科技有限公司 A kind of purification of sewage filtrate precipitating pool structure and its application method
CN113415942A (en) * 2021-07-23 2021-09-21 成都志达商品混凝土厂 Concrete mixing plant waste water recovery system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109205697A (en) * 2018-09-26 2019-01-15 骆玉蓉 It is convenient for the multistage liquid stream sewage disposal device removed contamination using siphon principle
CN110092525A (en) * 2019-06-05 2019-08-06 江苏凯勒奇环保设备有限公司 A kind of multiple spot launching trap water coagulation sedimentation device based on micro- magnetic condensation technique
CN110339626A (en) * 2019-07-31 2019-10-18 江苏百海环保科技有限公司 A kind of purification of sewage filtrate precipitating pool structure and its application method
CN113415942A (en) * 2021-07-23 2021-09-21 成都志达商品混凝土厂 Concrete mixing plant waste water recovery system

Similar Documents

Publication Publication Date Title
CN207047015U (en) A kind of three-level sedimentation basin of concrete mixing plant
CN207856394U (en) A kind of precipitation pool structure for river sewage processing
CN106477712B (en) Multimedium cleaning system in situ with self-rotary partial pressure water-locator
CN206205127U (en) Roadway rainwater collection system
CN107875828A (en) A kind of immersion multi-stage flue gas environment protection desulphurization tower
CN206715393U (en) A kind of chain transmission type second pond mud-scraping apparatus for sewage disposal
CN214635879U (en) Mixing arrangement is used in flocculating agent production
CN215576258U (en) Intelligent controller for rainwater and sewage diversion
CN207596587U (en) A kind of sewage greasy dirt detaches tapping equipment
CN108675414B (en) Device for treating sewage through separating upper tank body and lower tank body
CN107935090A (en) A kind of efficiently high tower air floatation machine
CN103657140A (en) Efficient continuous extraction device
CN204543653U (en) The lotion thickener of a kind of steel construction pond body
CN108050008A (en) Separation of solid and liquid power generator
CN107225017A (en) A kind of building castoff cracking and sorting recycles processing unit
CN107372430A (en) A kind of nursery stock grug feeding device for municipal gardens construction
CN207919725U (en) Rainwater deslagging and sand settling device
CN209890364U (en) Ecological remediation floats area for water purification
CN102580511B (en) Liquid oxidation and solid concentration tower
CN207950806U (en) A kind of recycling residual heat high-efficiency energy-saving heat water pump
CN207713472U (en) A kind ofization water recycling system
CN206256525U (en) A kind of just rain automatic-diversion closure formula gutter inlet device
CN108383317B (en) System of processing for Industrial Waste Water Treatments
CN206950812U (en) A kind of gas cleaning plant for being used to remove dust and tar
CN218989782U (en) Grouting device with anti-sedimentation effect

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180227

Termination date: 20210808

CF01 Termination of patent right due to non-payment of annual fee