CN207713472U - A kind ofization water recycling system - Google Patents

A kind ofization water recycling system Download PDF

Info

Publication number
CN207713472U
CN207713472U CN201721766242.7U CN201721766242U CN207713472U CN 207713472 U CN207713472 U CN 207713472U CN 201721766242 U CN201721766242 U CN 201721766242U CN 207713472 U CN207713472 U CN 207713472U
Authority
CN
China
Prior art keywords
water
sedimentation basin
support plate
recycling system
driving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721766242.7U
Other languages
Chinese (zh)
Inventor
方幸平
徐崇蛟
何计民
戴晓骏
柴佳彬
金腾
孙祖云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Anji Tian Zi Lake Thermoelectric Co Ltd
Original Assignee
Zhejiang Anji Tian Zi Lake Thermoelectric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Anji Tian Zi Lake Thermoelectric Co Ltd filed Critical Zhejiang Anji Tian Zi Lake Thermoelectric Co Ltd
Priority to CN201721766242.7U priority Critical patent/CN207713472U/en
Application granted granted Critical
Publication of CN207713472U publication Critical patent/CN207713472U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

The utility model discloses a kind ofization water recycling systems, a kind ofization water recycling system includes boiler, the sewage draining exit of boiler is connected by pipeline with the water inlet of Sewage treatment tank, the water outlet of Sewage treatment tank is connected with sedimentation basin, sedimentation basin is connect by water pipe with softened water cistern, softened water cistern is communicated with the water supplement port of boiler, the sedimentation basin port sliding is provided with support plate, the storage bin hopper of the input sediment in sedimentation basin is set in the support plate, it is provided with by the sedimentation basin for driving support plate to move back and forth to drive the drive component of storage tank uniform blanking, have the advantages that improve sedimentation basin deposition efficiency.

Description

A kind ofization water recycling system
Technical field
The utility model is related to field of boilers, more particularly to a kind ofization water recycling system.
Background technology
In operation, since quality problem constantly generates calcium chloride and calcium carbonate, the high temperature saliferous in drum softens boiler Water is constantly concentrated by evaporation, and to make boiler water meet prescribed requirement, need to carry out blowdown to boiler water.Continuous blowdown is recycled from boiler The highest position of salt concentration in circuit, continuous continual a certain amount of condensed water of exclusion, and the new soft of equivalent is inputted simultaneously Change water, to reduce stove water salt content and basicity, comes down in torrents in more than ten times for assigning to twenties points for concentrating discharge short tens of thousands of The big heat for snapping into hundreds of thousands kilocalorie, has no alternative, these high-temperature water have to be directly discharged in trench by many enterprises, causes big Calorimetric can be with the waste of water resource.The heat energy recycle problem of boiler operatiopn sewerage never obtains effectively for a long time Ground solves.
In order to reduce the waste of water resource, water would generally will be changed in factory with this used Sewage treatment tank, sedimentation basin, softening Water cistern, then the water in softened water cistern is re-delivered in boiler to reach reduction water resource waste by air pump, And the recycling of realization water.
But when being precipitated usually using sedimentation basin to changing water, directly sediment is put into sedimentation basin, sediment point Portion is uneven so that it is incomplete to change water sedimentation.
Utility model content
The purpose of this utility model is to provide a kind ofization water recycling system, and it is non-uniform which solve precipitate distributions Problem has the advantages that improve sedimentation basin deposition efficiency.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind ofization water recycling system, including boiler, the water inlet that the sewage draining exit of boiler passes through pipeline and Sewage treatment tank Mouth is connected, and the water outlet of Sewage treatment tank is connected with sedimentation basin, and sedimentation basin is connect by water pipe with softened water cistern, softened water Cistern is communicated with the water supplement port of boiler, and the sedimentation basin port sliding is provided with support plate, is arranged in the support plate toward heavy The storage bin hopper of sediment is put into the pond of shallow lake, is provided with by the sedimentation basin for driving support plate to move back and forth to drive storage tank The drive component of uniform blanking.
Using the above scheme, it drives support plate to be moved back and forth along the length direction of sedimentation basin by drive component, drives Storage tank uniform blanking so that sediment is evenly distributed in sedimentation basin so that sediment comes into full contact with Hua Shui, improves precipitation Effect is reduced to flow into the sundries in softened water cistern.
Preferably, the driving component includes the mounting shell being arranged in sedimentation basin avris, and the support plate, which is connected with, to be placed in Activity box in mounting shell, the mounting shell are endless in being provided in the drive shaft that is provided centrally with of activity box, the drive shaft All gear is provided with the tooth socket engaged with partial gear on activity box, is provided in the mounting shell for driving drive shaft The driving part of rotation.
Using the above scheme, drive shaft turns are driven by driving part, drives partial gear rotation, partial gear It is only engaged with the tooth socket of activity box side, activity box is driven to travel forward, after partial gear rotates 180 degree, with the other side Tooth socket engages, and activity box is driven to move backward, realizes that supporting rod is moved back and forth along the length direction of sedimentation basin.
Preferably, the driving part includes the driving motor being arranged in mounting shell, and sliding tooth is provided in drive shaft It takes turns, the transmission gear engaged with driving gear is provided on the output shaft of the driving motor.
Using the above scheme, start driving motor, driving transmission gear rotation drives the sliding tooth engaged with transmission gear Wheel rotation, drives drive shaft turns, realizes that supporting rod is moved back and forth along the length direction of sedimentation basin so that blanking is more equal It is even.
Such mounting structure is stablized, and when needing replacing each gear, need not remove driving motor and can be carried out Operation, the probability that cross when reducing due to dismounting motor on bolt is destroyed, improves work efficiency to a certain extent.
Preferably, it is provided with and uncaps on the mounting shell.
Using the above scheme, mounting shell is opened by uncapping, the drive component in mounting shell is repaired or replaced.
Preferably, the regulating member for adjusting storage bin hopper discharging speed is provided in support plate.
Further, the regulating member includes the gear for being slidably arranged in support plate and being abutted with the discharge port of storage bin hopper Plate is provided in the support plate for driving baffle movement to adjust the lead screw of discharging speed.
Using the above scheme, barrier slides are driven by lead screw, changes the amount of water in sedimentation basin as needed, to adjust discharging The size of mouth, controls the discharging speed of storage bin hopper.
Preferably, the screen being connected in the support plate in stretching into water.
Using the above scheme, the screen being connected in support plate in stretching into water, as support plate moves, screen is in water Sliding, avoids sediment from being accumulated in changing water, increases sediment and changes the contact area of water, improves work effect to a certain extent Rate.
Preferably, the exhaust outlet of the Sewage treatment tank is connected with softened water cistern.
Using the above scheme, since the change coolant-temperature gage of boiler discharge is very high, also subsidiary a big chunk vapor, pass through by The exhaust outlet of Sewage treatment tank is connected with softened water cistern, by high-temperature steam by softened water cistern, to softened water plus Temperature, reduces the heat needed by promoting temperature after boiler, and the heat of taking full advantage of water vapour saves to a certain extent The energy.
In conclusion the utility model has the advantages that:Drive support plate along sedimentation basin by drive component Length direction move back and forth, drive storage tank uniform blanking so that sediment is evenly distributed in sedimentation basin so that sediment It is come into full contact with water is changed, improves sedimentation effect, be reduced to flow into the sundries in softened water cistern.
Description of the drawings
Fig. 1 is the structure diagram of embodiment;
Fig. 2 is the vertical view of embodiment sedimentation basin;
Fig. 3 is the phantom of embodiment support plate;
Fig. 4 is the structural schematic diagram in embodiment mounting shell.
In figure, 1, Sewage treatment tank;2, boiler;3, sedimentation basin;4, softened water cistern;5, elevator pump;6, support plate;7、 Storage bin hopper;8, limiting slot;9, baffle;10;Lead screw;11, mounting shell;121, activity box;122, drive shaft;123, incomplete tooth Wheel;124, gear is driven;125, transmission gear;126, driving motor;127, tooth socket;13, screen;14, sliding slot.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
A kind ofization water recycling system, as shown in Figure 1, including boiler 2, the sewage draining exit of boiler 2 passes through pipeline and waste water The water inlet of recycling can 1 is connected, and the water outlet of Sewage treatment tank 1 is connected by water pipe with sedimentation basin 3, and sedimentation basin 3 passes through water pipe Connect with softened water cistern 4, softened water cistern 4 is communicated with the water supplement port of boiler 2 by water pipe, softened water cistern 4 with Elevator pump 5 is provided between the water supplement port of boiler 2, the exhaust outlet of Sewage treatment tank 1 is connected with softened water cistern 4.And it is each It is both provided with valve on a water pipe.
With reference to shown in Fig. 2 and Fig. 3, the sliding of 3 port of sedimentation basin is provided with several support plates 6, and the present embodiment shows two pieces of branch Fagging 6.Support plate 6 is arranged along the width direction of sedimentation basin 3, and the end set of sedimentation basin 3 has sliding slot 14, the lower end of support plate 6 It is provided with the sliding block that can be slided in sliding slot 14.Opening is provided in support plate 6, the avris of opening is provided with limiting slot 8, limit Sliding is provided with baffle 9 in slot 8, and the lead screw 10 abutted with baffle 9 in limiting slot 8 is stretched into the both ends setting of support plate 6.
With reference to shown in Fig. 2, the both ends in support plate 6 are both provided with storage bin hopper 7, and storage bin hopper 7 is in inverted hollow tetragonous The discharge port of mesa-shaped, storage bin hopper 7 is abutted with baffle 9.
With reference to described in Fig. 3, the lower end of support plate 6 is connected with screen 13, height of the screen 13 along sedimentation basin 3 by connecting rod Direction is arranged, and screen 13 is not abutted with the side wall of sedimentation basin 3.
With reference to shown in Fig. 4,3 avris of sedimentation basin is provided with mounting shell 11, and mounting shell 11 is bolted on sedimentation basin 3 On, cover board is hinged on mounting shell 11, cover board is bolted on mounting shell 11, and activity box is provided in mounting shell 11 121, support plate 6 is stretched by connecting rod in mounting shell 11 to be connected with activity box 121, and mounting shell 11 is in the center of activity box 121 It is provided with drive shaft 122, drive shaft 122 is arranged along the width direction of mounting shell 11, and partial gear is provided in drive shaft 122 123, the tooth socket 127 engaged with partial gear 123 is provided on activity box 121.
It is provided with driving motor 126 in mounting shell 11, transmission gear 125 is provided on the output shaft of driving motor 126, drives The driving gear 124 engaged with transmission gear 125 is provided on moving axis 122.
Use process:
Water will be changed first to enter in Sewage treatment tank 1 through 1 water inlet of Sewage treatment tank by 2 sewage draining exit of boiler, passed through The separation of Sewage treatment tank 1, water will be changed by sedimentation basin 3 by opening valve, and open the valve of 1 gas outlet of Sewage treatment tank, By vapor by softened water cistern 4, after heating a period of time, closing the valve on 2 sewage draining exit of boiler, opening softened water The valve of 4 water outlet of cistern, and elevator pump 5 is opened, the water in softened water cistern 4 is passed through in boiler 2;
After the water level in sedimentation basin 3 reaches preset height, the valve on 3 water inlet of sedimentation basin is closed, in storage bin hopper 7 Add flocculation and softening agent, drives baffle 9 to slide by lead screw 10, to adjust the size of discharge port;
Then start driving motor 126, driving transmission gear 125 rotates, and drives the sliding tooth engaged with transmission gear 125 Wheel 124 rotation, drive drive shaft 122 rotate, drive partial gear 123 rotate, partial gear 123 only with activity box 121 The tooth socket 127 of side engages, and activity box 121 is driven to travel forward, after partial gear 123 rotates 180 degree, the tooth with the other side Slot 127 engages, and activity box 121 is driven to move backward, realizes that supporting rod is moved back and forth along the length direction of sedimentation basin 3, will wad a quilt with cotton Solidifying and softening agent is evenly distributed in sedimentation basin 3, and passes through 13 agitationization water of screen so that is changed water and is fully connect with material It touches, sedimentation and sofening treatment is carried out to changing water;
Then the valve on 3 water outlet of sedimentation basin is opened, change water is passed through in softened water cistern 4 by treated.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can as needed make the present embodiment the modification of not creative contribution after reading this specification, but As long as within the protection scope of the present utility model all protected by Patent Law.

Claims (8)

1. the sewage draining exit of a kind ofization water recycling system, including boiler (2), boiler (2) passes through pipeline and Sewage treatment tank (1) Water inlet be connected, the water outlet of Sewage treatment tank (1) is connected with sedimentation basin (3), sedimentation basin (3) pass through water pipe and softened water storage Pond (4) connects, and softened water cistern (4) is communicated with the water supplement port of boiler (2), it is characterized in that:It slides sedimentation basin (3) port It is dynamic to be provided with support plate (6), the storage bin hopper (7) of the input sediment in sedimentation basin (3) is set on the support plate (6), it is described It is provided with by sedimentation basin (3) for driving support plate (6) to move back and forth to drive the drive component of storage tank uniform blanking.
2. a kind ofization water recycling system according to claim 1, it is characterized in that:The driving component includes that setting exists The mounting shell (11) of sedimentation basin (3) avris, the support plate (6) are connected with the activity box (121) being placed in mounting shell (11), institute It states mounting shell (11) and is provided centrally with drive shaft (122) in activity box (121), be provided on the drive shaft (122) endless All gear (123) is provided with the tooth socket (127) engaged with partial gear (123), the mounting shell on activity box (121) (11) driving part for driving drive shaft (122) to rotate is provided in.
3. a kind ofization water recycling system according to claim 2, it is characterized in that:The driving part includes that setting exists Driving motor (126) in mounting shell (11) is provided with driving gear (124), the driving motor in drive shaft (122) (126) transmission gear (125) engaged with driving gear (124) is provided on output shaft.
4. a kind ofization water recycling system according to claim 2, it is characterized in that:It is provided on the mounting shell (11) It uncaps.
5. a kind ofization water recycling system according to claim 1, it is characterized in that:It is provided with and is used in support plate (6) Adjust the regulating member of storage bin hopper (7) discharging speed.
6. a kind ofization water recycling system according to claim 5, it is characterized in that:The regulating member includes that sliding is set The baffle set in support plate (6) and abutted with the discharge port of storage bin hopper (7) is provided with for driving on the support plate (6) Baffle is moved to adjust the lead screw (10) of discharging speed.
7. a kind ofization water recycling system according to claim 1, it is characterized in that:It is connected on the support plate (6) Screen (13) in stretching into water.
8. a kind ofization water recycling system according to claim 1, it is characterized in that:The row of the Sewage treatment tank (1) Gas port is connected with softened water cistern (4).
CN201721766242.7U 2017-12-16 2017-12-16 A kind ofization water recycling system Active CN207713472U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721766242.7U CN207713472U (en) 2017-12-16 2017-12-16 A kind ofization water recycling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721766242.7U CN207713472U (en) 2017-12-16 2017-12-16 A kind ofization water recycling system

Publications (1)

Publication Number Publication Date
CN207713472U true CN207713472U (en) 2018-08-10

Family

ID=63056140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721766242.7U Active CN207713472U (en) 2017-12-16 2017-12-16 A kind ofization water recycling system

Country Status (1)

Country Link
CN (1) CN207713472U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112915616A (en) * 2021-04-22 2021-06-08 广西科学院 Sewage treatment plant convenient to clearance

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112915616A (en) * 2021-04-22 2021-06-08 广西科学院 Sewage treatment plant convenient to clearance

Similar Documents

Publication Publication Date Title
CN208327573U (en) A kind of municipal wastewater processing dedicated unit
CN207713472U (en) A kind ofization water recycling system
CN107827306A (en) A kind of thermal power plant desulfurization wastewater zero-discharge treatment system
CN103977584A (en) Automatic feeding and discharging control method of copper sulfate vacuum evaporator
CN107115706B (en) A kind of spiral-flow type sewage filter device
CN205635218U (en) Sewage treatment device
CN110759468A (en) HFST aerobic fluidized reactor pulse sludge discharge system
CN209507876U (en) A kind of sewage disposal device
CN207877490U (en) A kind of thermal power plant desulfurization wastewater zero-discharge treatment system
CN215576258U (en) Intelligent controller for rainwater and sewage diversion
CN108793557A (en) A kind of desulfurization wastewater bypass flue evaporation treatment process and system
CN211521734U (en) Pulse sludge discharge system of aerobic fluidized reactor
CN205241476U (en) Mud spiral propulsion pyrolysis treatment in vertical cities and towns deals with equipment
CN210065437U (en) Desulfurization waste water is concentrated, evaporation and modulation all-in-one
CN103120867A (en) Fully-automatic adjustable continuous blowdown device for industrial circulating water
CN210495667U (en) Water dust removal and dust removal water treatment device for small straw boiler
CN209853921U (en) Gasification buck removes hard turbidity reduction device
CN209128231U (en) A kind of flying dust leaching liquid treating system
CN207957954U (en) A kind of ore cleaning sullage filtration processing equipment of environmental protection
CN207762921U (en) Leachate recycle device
CN206063952U (en) A kind of high-quality trade effluent pretreatment unit
CN205323299U (en) Hydraulic engineering advection deposits device
CN210683269U (en) Circulating water purification device for open type circulating water cooling system
CN205007651U (en) Novel two heavy ponds
CN211946722U (en) Storage stirring integration sludge treatment pond

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant