CN207034386U - A kind of piping lane support quick installation mechanism - Google Patents
A kind of piping lane support quick installation mechanism Download PDFInfo
- Publication number
- CN207034386U CN207034386U CN201720991116.5U CN201720991116U CN207034386U CN 207034386 U CN207034386 U CN 207034386U CN 201720991116 U CN201720991116 U CN 201720991116U CN 207034386 U CN207034386 U CN 207034386U
- Authority
- CN
- China
- Prior art keywords
- hold
- down support
- hole
- support
- pillar steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 22
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 31
- 239000010959 steel Substances 0.000 claims abstract description 31
- 238000010276 construction Methods 0.000 abstract description 5
- 240000009087 Crescentia cujete Species 0.000 description 1
- 235000005983 Crescentia cujete Nutrition 0.000 description 1
- 235000009797 Lagenaria vulgaris Nutrition 0.000 description 1
- 235000014676 Phragmites communis Nutrition 0.000 description 1
- 238000004873 anchoring Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000000567 combustion gas Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000009428 plumbing Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 241000894007 species Species 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
A kind of piping lane support quick installation mechanism, including pillar steel, in addition to hold-down support and steady pin are the utility model is related to, the pillar steel is fixed on the wall by multiple hold-down supports;The hold-down support center section is swelled with respect to left and right side part, formed with the fixing hole for fixing the hold-down support on left and right side part;Center section is arranged at intervals some first hardy holes;When hold-down support is installed, ensure that the first hardy hole is up big and down small;Also it is arranged at intervals the second hardy hole on the whole stationary plane of pillar steel, it is equidistant between the first hardy hole in the distance and hold-down support between the second hardy hole;When pillar steel is installed, ensure that the second hardy hole is up-small and down-big;The steady pin is into dumbbell shaped, and interlude is with both ends in cylinder;The steady pin passes through hardy hole, and the hold-down support is connected with pillar steel to the utility model is simple in construction, and the Fast Installation of pillar steel can be achieved.
Description
Technical field
A kind of piping lane support mounting means is the utility model is related to, specifically discloses a kind of piping lane support quick installation mechanism.
Background technology
Pipe gallery is exactly underground urban duct synthesis corridor, i.e., builds a tunnel space in Urban Underground, by electric power,
The various utilities pipelines such as communication, combustion gas, heat supply, plumbing are integrated in one.The pipeline species that pipe gallery accommodates is various, and arrangement is close
Collection, in order to meet unified planning, Uniting, the unified needs built and managed, pipeline is typically using classification, layer-built cables installation.
Therefore piping lane support Design, construction are parts important during pipe gallery is built.Existing pipe gallery line holder installation
Typically there are two types:1) fixed in piping lane inwall using expansion bolt;2) built-in groove is fixed in concrete.At present in piping lane
Mounting system is mostly most commonly seen with pre-buried welded and installed.
Existing piping lane support has the following disadvantages:
1) built-in groove is fixed, and built-in groove adds the difficulty of template pouring construction.Built-in groove easily shifts, to pipeline
Final installation brings inconvenience;And built-in groove setting is dumb, once construction completion can not be changed.
2) each layer horizontal pipe trailing arm of piping lane support, bracket dismounting are dumb, and height adjusts inconvenient.
3) but mounting means uses the cooperation of T-bolt and nut or using connection more between built-in groove and bracket upright post
Part, screwing for this bolt also increase manpower according to bolt length.
Utility model content
Goal of the invention of the present utility model is:A kind of simple in construction, achievable piping lane branch is provided to solve problem above
The piping lane support quick installation mechanism of the Fast Installation of frame.
The technical solution adopted in the utility model is such:
A kind of piping lane support quick installation mechanism, including pillar steel, in addition to hold-down support and steady pin, the column
Shaped steel is fixed on the wall by multiple hold-down supports;
The hold-down support center section is swelled with respect to left and right side part, formed with for fixing on left and right side part
The fixing hole of the hold-down support;Center section is arranged at intervals some first hardy holes;When hold-down support is installed, ensure the first calabash
Reed hole is up big and down small;
Also it is arranged at intervals the second hardy hole on the whole stationary plane of pillar steel, distance and fixation between the second hardy hole
It is equidistant between the first hardy hole on bearing;When pillar steel is installed, ensure that the second hardy hole is up-small and down-big;
The steady pin is into dumbbell shaped, and interlude is with both ends in cylinder;The steady pin passes through hardy hole, by described in
Hold-down support is connected with pillar steel.
Further, the fixing hole on the hold-down support left and right side part is waist hole.
Further, one length direction of the waist hole on the hold-down support left and right side part is relatively fixed standoff length
Direction is parallel, a Relative vertical.
Further, there are 2-3 the first hardy holes on the hold-down support center section.
Further, segment length is equal to hold-down support interlude thickness and pillar steel stationary plane thickness among the steady pin
Spend sum.
Further, relatively-movable rubber blanket is set on the steady pin interlude.
In summary, due to being using above-mentioned technical proposal, the beneficial effects of the utility model:
1) this scheme is mounted directly anchoring, does not destroy concrete reinforcement and structure without pre-buried, installed in native tension and by
Nip;
2) later stage can directly extend pipeline;
3) accessory structure is simple, and the quick dispatch of pillar steel can be achieved.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is steady pin structure chart described in the utility model.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples.
As shown in Fig. 1-2, a kind of piping lane support quick installation mechanism, including pillar steel 1, in addition to the He of hold-down support 2
Steady pin 3, the pillar steel 1 are fixed on wall by least two hold-down supports 2;
The center section of hold-down support 2 is swelled with respect to left and right side part, i.e., center section is not adjacent to metope, itself and wall
There is certain distance between face, steady pin 3 is installed for convenience, formed with for fixing the hold-down support on left and right side part
Waist hole 21, it is parallel that the length direction of one of waist hole 21 is relatively fixed standoff length direction, a Relative vertical, so may be used
Realize the fine setting up and down of hold-down support 2;Center section is arranged at intervals 2 the first hardy holes 22, and quantity can not be too many, installation
Pillar steel 1 need to be directed at installation, it is more can be more troublesome;When hold-down support 2 is installed, ensure that the first hardy hole 22 is up big and down small;
Also the second hardy hole 11 is arranged at intervals on the 1 whole stationary plane of pillar steel (with the first cucurbit on hold-down support 2
The grade of hole 22 is big), the quantity of the second hardy hole 11 can meet that pillar steel is adjusted about 1 more, further meet installation needs;Second
It is equidistant between first hardy hole 22 in distance and hold-down support 2 between hardy hole 11;When pillar steel 1 is installed, ensure the first cucurbit
Hole 11 is up-small and down-big;
The steady pin 3 is equal to hold-down support 2 with both ends into dumbbell shaped, interlude in cylinder, in-between segment length
Interlude thickness fixes face thickness sum with pillar steel 1, ensures that hold-down support 2 is close with being bonded between pillar steel 1, prevents from shaking
It is dynamic to send the sound;Relatively-movable rubber blanket (being not drawn into figure) is set on the interlude of steady pin 3, after installation just
Between pillar steel 1 and hold-down support 2, it is further ensured that pillar steel 1 is close with being bonded between hold-down support 2.
The steady pin 3 connects the hold-down support 2 with pillar steel 1 through the first hardy hole 22, the second hardy hole 11
Connect, steady pin 3 enters from the big one end of the first hardy hole 22, the second hardy hole 11 just falls into small one end clamping, fixed branch
Seat 2 is up big and down small, and pillar steel 1 is up-small and down-big, and such design realization is reliably connected.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model
All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model
Protection domain within.
Claims (6)
1. a kind of piping lane support quick installation mechanism, including pillar steel, it is characterised in that:Also include hold-down support and fixation
Pin, the pillar steel are fixed on the wall by multiple hold-down supports;
The hold-down support center section is swelled with respect to left and right side part, formed with for described in fixation on left and right side part
The fixing hole of hold-down support;Center section is arranged at intervals some first hardy holes;When hold-down support is installed, ensure the first hardy hole
It is up big and down small;
Also it is arranged at intervals the second hardy hole on the whole stationary plane of pillar steel, distance and hold-down support between the second hardy hole
It is equidistant between upper first hardy hole;When pillar steel is installed, ensure that the second hardy hole is up-small and down-big;
The steady pin is into dumbbell shaped, and interlude is with both ends in cylinder;The steady pin passes through hardy hole, by the fixation
Bearing is connected with pillar steel.
A kind of 2. piping lane support quick installation mechanism according to claim 1, it is characterised in that:The hold-down support left side,
Fixing hole in right part is waist hole.
A kind of 3. piping lane support quick installation mechanism according to claim 2, it is characterised in that:The hold-down support left side,
It is parallel that one length direction of waist hole in right part is relatively fixed standoff length direction, a Relative vertical.
A kind of 4. piping lane support quick installation mechanism according to claim 1, it is characterised in that:Among the hold-down support
There are 2-3 the first hardy holes on part.
A kind of 5. piping lane support quick installation mechanism according to claim 1, it is characterised in that:The steady pin interlude
Length is equal to hold-down support interlude thickness and fixes face thickness sum with pillar steel.
A kind of 6. piping lane support quick installation mechanism according to claim 1, it is characterised in that:Among the steady pin
Relatively-movable rubber blanket is set in section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720991116.5U CN207034386U (en) | 2017-08-09 | 2017-08-09 | A kind of piping lane support quick installation mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720991116.5U CN207034386U (en) | 2017-08-09 | 2017-08-09 | A kind of piping lane support quick installation mechanism |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207034386U true CN207034386U (en) | 2018-02-23 |
Family
ID=61475479
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720991116.5U Expired - Fee Related CN207034386U (en) | 2017-08-09 | 2017-08-09 | A kind of piping lane support quick installation mechanism |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207034386U (en) |
-
2017
- 2017-08-09 CN CN201720991116.5U patent/CN207034386U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202074119U (en) | Circular pipe rack support and circular pipe rack | |
CN207034386U (en) | A kind of piping lane support quick installation mechanism | |
CN202194159U (en) | Square pipe gallery bracket and square pipe gallery | |
CN217462239U (en) | Evacuation platform and comprehensive pipeline integrated installation device | |
CN211371458U (en) | Environment-friendly gas pipeline prevents aversion device | |
CN109386655A (en) | A kind of piping lane bracket quick installation mechanism | |
CN208668462U (en) | A kind of pipe gallery supporting structure | |
CN208603629U (en) | A kind of fixed device of basis installation of embedded parts | |
CN204113295U (en) | A kind of municipal shield tunnel | |
CN203766764U (en) | Subway platform reinforcing device | |
CN207959267U (en) | A kind of pipe gallery C-type steel holder | |
CN217130556U (en) | Porch pipeline fixing device | |
CN207394108U (en) | A kind of piping lane stent quick assembling mechanism | |
CN210529486U (en) | Cable bridge construction | |
CN210344554U (en) | Comprehensive support and hanger | |
CN209909315U (en) | Piping lane support is used in municipal administration pipeline installation | |
CN204401904U (en) | Siphon rainwater suspension pipe fixing device | |
CN209278631U (en) | Suspension and support fixed structure | |
CN206831352U (en) | A kind of lamppost tower | |
CN208058126U (en) | A kind of city integrated piping lane water supply heavy type holder | |
CN205479753U (en) | Pipeline combination gallows | |
CN109386652A (en) | A kind of piping lane bracket quick assembling mechanism | |
CN203686381U (en) | Adjustable interlayer cable installation support for inner portion of top pipe | |
CN215172844U (en) | Maintain convenient assembled subway station room layer pipeline and lay structure | |
CN218405536U (en) | Utility tunnel for municipal works |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190517 Address after: 212000 Jincheng Village, Sanmao Town, Yangzhong City, Zhenjiang City, Jiangsu Province Patentee after: ZHENGJIANG QIPEI HANGER Co.,Ltd. Address before: 212000 No. 888 Chunloubei Road, Sanmao Street, Yangzhong City, Zhenjiang City, Jiangsu Province Patentee before: YANGZHONG QIPEI INTELLIGENT ASSEMBLING TECHNOLOGY CO.,LTD. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180223 |