CN109386655A - A kind of piping lane bracket quick installation mechanism - Google Patents
A kind of piping lane bracket quick installation mechanism Download PDFInfo
- Publication number
- CN109386655A CN109386655A CN201710676393.1A CN201710676393A CN109386655A CN 109386655 A CN109386655 A CN 109386655A CN 201710676393 A CN201710676393 A CN 201710676393A CN 109386655 A CN109386655 A CN 109386655A
- Authority
- CN
- China
- Prior art keywords
- hold
- down support
- hole
- pillar steel
- hardy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
Abstract
The present invention relates to a kind of piping lane bracket quick installation mechanisms, including pillar steel, further include hold-down support and fixed pin, and the pillar steel is fixed on the wall by multiple hold-down supports;The hold-down support middle section is swelled with respect to left and right side part, and the fixation hole for fixing the hold-down support is formed on left and right side part;Several first hardy holes are arranged in middle section interval;When hold-down support is installed, guarantee that the first hardy hole is up big and down small;Also the second hardy hole is arranged in interval on the entire stationary plane of pillar steel, equidistant between the first hardy hole in the distance and hold-down support between the second hardy hole;When pillar steel is installed, guarantee that the second hardy hole is up-small and down-big;For the fixed pin at dumbbell shaped, interlude is cylindrical with both ends;The fixed pin passes through hardy hole, the hold-down support with pillar steel is connect the configuration of the present invention is simple, it can be achieved that pillar steel Fast Installation.
Description
Technical field
The present invention relates to a kind of piping lane bracket mounting means, specifically disclose a kind of piping lane bracket quick installation mechanism.
Background technique
Pipe gallery is exactly the comprehensive corridor of underground urban duct, i.e., builds a tunnel space in Urban Underground, by electric power,
Communication, the various utilities pipelines such as combustion gas, heat supply, plumbing are integrated in one.The pipeline that pipe gallery accommodates is many kinds of, arranges close
Collection, in order to meet unified planning, Uniting, the unified needs built and manage, pipeline is generally using classification, layer-built cables installation.
Therefore piping lane support Design, construction are component parts important in pipe gallery construction.Existing pipe gallery line holder installation
General there are two types of types: 1) being fixed in piping lane inner wall using expansion bolt;2) built-in groove is fixed in concrete.At present in piping lane
Support system is installed mostly with pre-buried welding most commonly seen.
Existing piping lane bracket has the disadvantage that
1) built-in groove is fixed, and built-in groove increases the difficulty of template pouring construction.Built-in groove is easy to happen offset, gives pipeline
Final installation brings inconvenience;And built-in groove setting is not flexible, once construction is completed to change.
2) each layer horizontal pipe trailing arm of piping lane bracket, bracket disassembly are not flexible, and height adjustment is inconvenient.
3) but between built-in groove and bracket upright post mounting means mostly uses the cooperation of T-bolt and nut or using connection
Part, screwing for this bolt also increase manpower according to bolt length.
Summary of the invention
It is an object of the invention to: to solve the above problem a kind of structure it is simple, it can be achieved that piping lane bracket it is quick
The piping lane bracket quick installation mechanism of installation.
The technical solution adopted by the present invention is that such:
A kind of piping lane bracket quick installation mechanism, including pillar steel further include hold-down support and fixed pin, the column
Fashioned iron is fixed on the wall by multiple hold-down supports;
The hold-down support middle section is swelled with respect to left and right side part, is formed on left and right side part for fixing
The fixation hole of the hold-down support;Several first hardy holes are arranged in middle section interval;When hold-down support is installed, guarantee the first calabash
Reed hole is up big and down small;
Also the second hardy hole, distance and fixation between the second hardy hole is arranged in interval on the entire stationary plane of pillar steel
It is equidistant between the first hardy hole on support;When pillar steel is installed, guarantee that the second hardy hole is up-small and down-big;
For the fixed pin at dumbbell shaped, interlude is cylindrical with both ends;The fixed pin passes through hardy hole, will be described
Hold-down support is connect with pillar steel.
Further, the fixation hole on hold-down support left and right side part is waist hole.
Further, the relatively fixed standoff length of one length direction of waist hole on hold-down support left and right side part
Direction is parallel, a Relative vertical.
Further, there are 2-3 the first hardy holes on the hold-down support middle section.
Further, segment length is equal to hold-down support interlude thickness among the fixed pin and pillar steel stationary plane is thick
The sum of degree.
Further, relatively-movable rubber pad is set on the fixed pin interlude.
In conclusion due to the adoption of the above technical scheme, the beneficial effects of the present invention are:
1) this scheme is mounted directly anchoring, does not destroy concrete reinforcement and structure without pre-buried, be mounted on native tension and by
Pressure area;
2) later period can directly extend pipeline;
3) accessory structure is simply, it can be achieved that the quick dispatch of pillar steel.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is fixed pin structure chart of the present invention.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and examples.
As shown in Figs. 1-2, a kind of piping lane bracket quick installation mechanism, including pillar steel 1 further include 2 He of hold-down support
Fixed pin 3, the pillar steel 1 are fixed on the wall by least two hold-down supports 2;
2 middle section of hold-down support is swelled with respect to left and right side part, i.e., middle section is not adjacent to metope, with wall
There is certain distance between face, in order to facilitate the installation of fixed pin 3, is formed on left and right side part for fixing the hold-down support
Waist hole 21, the relatively fixed standoff length direction of the length direction of one of waist hole 21 is parallel, and a Relative vertical in this way may be used
Realize the fine tuning up and down of hold-down support 2;2 the first hardy holes 22 are arranged in middle section interval, and quantity cannot be too many, installation
Pillar steel 1 need to be directed at installation, and Duo Liaohui is more troublesome;When hold-down support 2 is installed, guarantee that the first hardy hole 22 is up big and down small;
Also the second hardy hole 11 is arranged (with the first cucurbit on hold-down support 2 in interval on the entire stationary plane of the pillar steel 1
Holes 22 etc. are big), the quantity of the second hardy hole 11 can mostly meet 1 up and down adjustment of pillar steel, and further satisfaction installation needs;Second
It is equidistant between first hardy hole 22 in distance between hardy hole 11 and hold-down support 2;When pillar steel 1 is installed, guarantee the first cucurbit
Hole 11 is up-small and down-big;
For the fixed pin 3 at dumbbell shaped, interlude is cylindrical with both ends, and in-between segment length is equal to hold-down support 2
The sum of interlude thickness and the fixed face thickness of pillar steel 1, guarantee to be bonded between hold-down support 2 and pillar steel 1 closely, prevent from shaking
It is dynamic to issue the sound;Relatively-movable rubber pad (being not drawn into figure) is set on 3 interlude of fixed pin, after installation just
Between pillar steel 1 and hold-down support 2, it is further ensured that between pillar steel 1 and hold-down support 2 and is bonded closely.
The fixed pin 3 passes through the first hardy hole 22, the second hardy hole 11, and the hold-down support 2 is connected with pillar steel 1
It connects, fixed pin 3 enters from the big one end of the first hardy hole 22, the second hardy hole 11 just falls into small one end clamping, fixed branch
Seat 2 is up big and down small, and pillar steel 1 is up-small and down-big, and such design realization is reliably connected.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.
Claims (6)
1. a kind of piping lane bracket quick installation mechanism, including pillar steel, it is characterised in that: further include hold-down support and fixation
Pin, the pillar steel are fixed on the wall by multiple hold-down supports;
The hold-down support middle section is swelled with respect to left and right side part, is formed with described in being used to fix on left and right side part
The fixation hole of hold-down support;Several first hardy holes are arranged in middle section interval;When hold-down support is installed, guarantee the first hardy hole
It is up big and down small;
Also the second hardy hole, distance and hold-down support between the second hardy hole is arranged in interval on the entire stationary plane of pillar steel
It is equidistant between upper first hardy hole;When pillar steel is installed, guarantee that the second hardy hole is up-small and down-big;
For the fixed pin at dumbbell shaped, interlude is cylindrical with both ends;The fixed pin passes through hardy hole, by the fixation
Support is connect with pillar steel.
2. a kind of piping lane bracket quick installation mechanism according to claim 1, it is characterised in that: the hold-down support left side,
Fixation hole in right part is waist hole.
3. a kind of piping lane bracket quick installation mechanism according to claim 2, it is characterised in that: the hold-down support left side,
The relatively fixed standoff length direction of one length direction of waist hole in right part is parallel, a Relative vertical.
4. a kind of piping lane bracket quick installation mechanism according to claim 1, it is characterised in that: among the hold-down support
There are 2-3 the first hardy holes on part.
5. a kind of piping lane bracket quick installation mechanism according to claim 1, it is characterised in that: the fixed pin interlude
Length is equal to the sum of hold-down support interlude thickness and the fixed face thickness of pillar steel.
6. a kind of piping lane bracket quick installation mechanism according to claim 1, it is characterised in that: among the fixed pin
Relatively-movable rubber pad is set in section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710676393.1A CN109386655A (en) | 2017-08-09 | 2017-08-09 | A kind of piping lane bracket quick installation mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710676393.1A CN109386655A (en) | 2017-08-09 | 2017-08-09 | A kind of piping lane bracket quick installation mechanism |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109386655A true CN109386655A (en) | 2019-02-26 |
Family
ID=65415097
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710676393.1A Withdrawn CN109386655A (en) | 2017-08-09 | 2017-08-09 | A kind of piping lane bracket quick installation mechanism |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109386655A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111371043A (en) * | 2020-03-13 | 2020-07-03 | 上海外高桥造船有限公司 | Supporting device |
-
2017
- 2017-08-09 CN CN201710676393.1A patent/CN109386655A/en not_active Withdrawn
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111371043A (en) * | 2020-03-13 | 2020-07-03 | 上海外高桥造船有限公司 | Supporting device |
CN111371043B (en) * | 2020-03-13 | 2022-05-03 | 上海外高桥造船有限公司 | Supporting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201795174U (en) | Fixing support for erecting and laying ductile iron pipes | |
CN109386655A (en) | A kind of piping lane bracket quick installation mechanism | |
CN109706959B (en) | Installation method of groove type embedded part in underground comprehensive pipe gallery | |
CN109386653A (en) | Piping lane bracket quick assembling mechanism | |
CN207034386U (en) | A kind of piping lane support quick installation mechanism | |
CN205571809U (en) | Flange rapid Assembly frock | |
US3506229A (en) | Meter mounting apparatus | |
CN209229137U (en) | One kind is for setting up line holder in pipe gallery | |
CN208668462U (en) | A kind of pipe gallery supporting structure | |
CN109386652A (en) | A kind of piping lane bracket quick assembling mechanism | |
CN207394108U (en) | A kind of piping lane stent quick assembling mechanism | |
CN205659303U (en) | Connection structure of shower nozzle for track traffic | |
CN209278631U (en) | Suspension and support fixed structure | |
CN205479753U (en) | Pipeline combination gallows | |
CN108006324A (en) | A kind of riser clamp | |
CN201089374Y (en) | Conduit for fixing contacting net | |
CN208835650U (en) | A kind of motor enters line apparatus | |
CN205278551U (en) | Fixed frame | |
CN215084515U (en) | Fixing device for pipeline | |
CN208633143U (en) | Component, pre-buried channel flow mounting device and the fixed structure of fixed pre-buried channel flow | |
CN205300589U (en) | Hydroelectric power plant's dam observation device | |
CN208701746U (en) | A kind of underground pipe gallery abnormity section bracket | |
CN110409626A (en) | A kind of pre-buried hanging ring and installation process method | |
CN209994049U (en) | But height-adjusting's crane span structure furred ceiling | |
CN214171499U (en) | Assembled antidetonation support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190226 |
|
WW01 | Invention patent application withdrawn after publication |