CN207032521U - A kind of toilet threshold stone waterproof construction - Google Patents

A kind of toilet threshold stone waterproof construction Download PDF

Info

Publication number
CN207032521U
CN207032521U CN201720877852.8U CN201720877852U CN207032521U CN 207032521 U CN207032521 U CN 207032521U CN 201720877852 U CN201720877852 U CN 201720877852U CN 207032521 U CN207032521 U CN 207032521U
Authority
CN
China
Prior art keywords
waterproof
layer
laying
threshold stone
cement mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720877852.8U
Other languages
Chinese (zh)
Inventor
门玉晓
吴新灵
张广进
张福栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong urban construction vocational college
Decai Decoration Co Ltd
Original Assignee
Shandong urban construction vocational college
Decai Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong urban construction vocational college, Decai Decoration Co Ltd filed Critical Shandong urban construction vocational college
Priority to CN201720877852.8U priority Critical patent/CN207032521U/en
Application granted granted Critical
Publication of CN207032521U publication Critical patent/CN207032521U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of toilet threshold stone waterproof construction, including threshold stone, the first cement mortar adhered layer, the second cement mortar adhered layer, fish tail and waterproof layer, waterproof layer, structure of capital construction layer;Also include the pre- laying of waterproof, it includes:The pre- laying of first waterproof, it is located at the lower section of the first cement mortar adhered layer and the second cement mortar adhered layer;The pre- laying of second waterproof, it forms one with the pre- laying of the first waterproof, and positioned at the top of the pre- laying of the first waterproof, and between the first cement mortar adhered layer and the second cement mortar adhered layer, the contour shape of the longitudinal section of the pre- laying of second waterproof is in inverted V-shaped, waterproof layer is laid on the upper surface of the pre- laying of the first waterproof and the pre- laying of the second waterproof, is located at the lower section of threshold stone at the top of the pre- laying of the second waterproof, and marine glue is coated between top and threshold stone lower surface.The pre- laying of second waterproof coordinates waterproof layer on its side and the marine glue effectively to prevent the steam in toilet from leaking into floor in room.

Description

A kind of toilet threshold stone waterproof construction
Technical field
The utility model belongs to buildings waterproof technical field of structures, is to be related to a kind of door for toilet specifically Sill stone waterproof construction designs.
Background technology
The ground that toilet is laundry, has a bath and washes one's face and rinses one's mouth, so unrestrained regimen condition often occurs in ground, occur in short-term when serious Between ponding.Therefore, it is necessary to carry out water-proofing treatment to the ground of toilet, such as waterproof is laid below the floor tile of toilet Layer, when water between the brickwork joint of toilet floor tile from when being seeped into below floor tile, because there is the presence of waterproof layer, water will not be seeped into downstairs, Play certain waterproof action.But during water saturation below floor tile can afterflow to toilet doorway.If metope and health Between outside region do not carry out waterproof measure, current would generally be inhaled on metope, cause metope emulsion paint or wallpaper to be grown Phase is in dampness, causes the peeling and mouldy of coming off in the course of time.Furthermore if the room outside toilet is using solid wood Plate, because wood materials are easy to absorb moisture, over time, the easily mouldy blackening of wood floors, influence U.S.s of room floors The property seen, severe patient there is also musty.
To avoid the water of toilet from penetrating into room floor, common practice is at present:In toilet and room floors Threshold stone is set up in joint portion, and takes the mode of wet-laying, is applied and brushed one times with surrounding of the waterproof material along threshold stone, and in threshold The waterproof material of stone and the joint portion brushing certain altitude of door girder construction, to prevent the water of toilet from being inhaled on metope.It is this Way can play certain waterproof effect really, but when the water accumulation of accomodation ground is excessive, waterproof material can not yet Good interception function is played, the water that still there can be toilet crosses threshold stone and the waterproof material brushed with penetrating into room The situation of plate.
Chinese patent notification number CN202990369 discloses a kind of toilet threshold stone waterstop device, by health Between the junction of earth construction and threshold stone set up the waterstop formed using pea gravel concreten, and by pea gravel concreten waterstop It is arranged between basic unit and waterproof layer, so as to solve the waterproof problem of waterproof layer lower floor well.But for anti- Any water-proofing treatment is not done between water layer and threshold stone, finds still to have part water in practice along threshold stone with infiltrating into room Face.And mentioned in the construction method:After pea gravel concreten sealing belt construction is completed 7 days, waterproof material is smeared, completes threshold stone Construction operation.It can be seen that the construction period that the waterproofing process needs is longer, it is unsuitable for surface construction in large area.
The content of the invention
The utility model provides a kind of toilet threshold stone waterproof construction, solves ponding in existing toilet along threshold The problem of stone seeps water, the reliability of waterproof at toilet threshold is improved, and it is fairly simple to construct.
In order to solve the above technical problems, the utility model is achieved using following technical scheme:
A kind of toilet threshold stone waterproof construction, including threshold stone, the first cement mortar below the threshold stone Adhered layer, the second cement mortar adhered layer, fish tail and waterproof layer, waterproof layer, structure of capital construction layer below toilet floor tile;Also Including:The pre- laying of waterproof, it includes:The pre- laying of first waterproof, it is located at the first cement mortar adhered layer and described second The lower section of cement mortar adhered layer, the waterproof layer and fish tail and waterproof layer are laid on the pre- laying of the first waterproof and described first Between cement mortar adhered layer, the second cement mortar adhered layer;The pre- laying of second waterproof, itself and the pre- laying shape of first waterproof Integrally, and positioned at the top of the pre- laying of the first waterproof, and between the first cement mortar adhered layer and the second cement Between mortar adhered layer, the waterproof layer is laid on the pre- laying of the second waterproof and the first cement mortar adhered layer, the Between two cement mortar adhered layers;The contour shape of the longitudinal section of the pre- laying of second waterproof is in inverted V-shaped, the waterproofing protection Layer is laid on waterproof layer and the first mortar adhered layer, the stickup of the second cement mortar in addition at the top of the pre- laying of second waterproof Between layer, the top is located at the lower section of the threshold stone, and waterproof is coated between the top and threshold stone lower surface Glue.
For the toilet part by moisture barrier within threshold stone as early as possible, the top of the setting pre- laying of the second waterproof The seaming position of the neighbouring threshold stone and toilet floor tile;The marine glue extends from the top of the pre- laying of the second waterproof To described seaming position, the waterproof surface of threshold stone lower surface is which increased, strengthens waterproof effect.
Preferably, threshold stone 2 ~ 3mm of lower surface described in the distance from top of the pre- laying of the second waterproof.
Preferred scheme is similarly, the height of the pre- laying of the second waterproof is between 3 ~ 5cm;The pre- laying of second waterproof Longitudinal section the widest part width between 3 ~ 5cm.
The top surface of the pre- laying of the first waterproof in the present embodiment below the second cement mortar adhered layer is formed tiltedly Face, and from the inside of a lateral toilet of the neighbouring threshold stone in overbank from high to low.It can make toilet The trend of the oriented toilet internal flow of water storage under floor tile, ensure that bathroom door oral area divides relatively dry, reduce waterproof difficulty, Strengthen waterproof effect.
To reduce the first cement mortar adhered layer as far as possible on the premise of firmly installation toilet floor tile is ensured Reservoir storage, the present embodiment preferably the distance between lower surface of top surface and the toilet floor tile of the pre- laying of the first waterproof 3 ~ Between 5cm.
Structure of capital construction layer described in the present embodiment includes the Part I and position below the pre- laying of the first waterproof In the Part II in the room abutted with the threshold stone below floor, the Part II is higher than Part I;It is described anti- The pre- laying of water also overlays layer including the 3rd waterproof, and it forms one with the pre- laying of the first waterproof, and anti-positioned at described first The top of the pre- laying of water, and between Part II between the structure of capital construction layer and the first cement mortar adhered layer.Increase Add the flatness of the structure of capital construction layer Part II vertical plane, it is easier to lay waterproof layer in its right flank.
It is anti-described in specially overlaying and be equipped between layer and the first cement mortar adhered layer in the 3rd waterproof Water layer and fish tail and waterproof layer.It can stop that the steam of the first mortar adhered layer enters the Part II of structure of capital construction layer.
3rd waterproof described in the present embodiment overlays the lower section that layer is located at the threshold stone, and layer is overlay in the 3rd waterproof Top surface be equipped with waterproof layer, and be laid on the 3rd waterproof and overlay the waterproof layer of layer top surface and glued from first cement mortar The structure of capital construction layer Part II top surface extension under floor into the room of the position of paste layer, and more than ground in the room The seaming position of plate and threshold stone.This structure makes that the 3rd waterproof overlays layer top surface and the top surface of structure of capital construction layer Part II is formed Waterproof surface.
To strengthen waterproof effect, in the threshold stone and it is laid on the 3rd waterproof and overlays between the waterproof layer of layer top surface And it is coated with the threshold stone and the room under floor between the waterproof layer of structure of capital construction layer Part II top surface Marine glue.It is with reference to described in can stopping the waterproof surface for the top surface that the 3rd waterproof overlays layer top surface and structure of capital construction layer Part II Steam in first cement mortar adhered layer penetrates into floor in room along threshold stone lower surface.
The utility model having the beneficial effect that compared with prior art:
The pre- laying of second waterproof coordinates at the top of waterproof layer on its side and the pre- laying of second waterproof and described Marine glue between threshold stone lower surface can effectively prevent the water storage in the second cement mortar adhered layer from crossing described second The pre- laying of waterproof reaches the first cement mortar adhered layer, and so as to leak into floor in room, this structure is by setting one The pre- laying of the second waterproof of inverted V-shaped, the seepage of steam is effectively prevented, structure and technique are all very simple, strong operability, are adapted to Promote the use of on a large scale.
Brief description of the drawings
Fig. 1 be the utility model proposes toilet threshold stone waterproof construction a kind of embodiment structural representation;
Fig. 2 is the enlarged drawing in A portions in Fig. 1.
In figure
1 structure of capital construction layer Part I;The 2 first pre- layings of waterproof;3 waterproof layers;4 fish tail and waterproof layers;5 second cement mortar Adhered layer;6 toilet floor tiles;The 7 second pre- layings of waterproof;8 marine glues;9 first cement mortar adhered layers;10 threshold stones;Rooms 11 Interior floor;12 Dampproof floor board pads;13 the 3rd waterproofs overlay layer;14 structure of capital construction layer Part II.
Embodiment
Specific embodiment of the present utility model is described in more detail below in conjunction with the accompanying drawings.
1 and accompanying drawing 2 referring to the drawings, the utility model provide a kind of toilet threshold stone waterproof construction, and the structure includes door Sill stone 10, the first cement mortar adhered layer 9, the second cement mortar adhered layer 5, waterproof layer 3, waterproof layer protective layer 4, structure of capital construction Layer;Also include the pre- laying of waterproof, it includes the pre- laying 2 of the first waterproof, the pre- laying 7 of the second waterproof.The pre- laying 2 of first waterproof Positioned at the lower section of the first cement mortar adhered layer 9 and the second cement mortar adhered layer 5, the pre- laying of the second waterproof 7 form one with the pre- laying 2 of first waterproof, and positioned at the top of the pre- laying 2 of first waterproof, and between described first Between the cement mortar adhered layer 5 of cement mortar adhered layer 9 and second.Overlay in the pre- waterproof of laying 2 and second of first waterproof The upper surface laying waterproof layer 3 of layer 7, lays on the waterproof layer in addition to the waterproof layer at the top of the pre- laying 7 of second waterproof Fish tail and waterproof layer 4, marine glue is coated between the top of the pre- laying 7 of second waterproof and the lower surface of threshold stone 10, The waterproof layer at the pre- top of laying 7 of second waterproof is set directly to be connected with marine glue 8.The pre- laying 2 of first waterproof combines it The waterproof layer 3 on surface prevents the downward seepage of water storage in its second cement mortar adhered layer 5 above, the pre- laying of the second waterproof 7 with reference to the marine glue between the waterproof layer 3 on its surface and the pre- top of laying 7 of second waterproof and the lower surface of threshold stone 10 Prevent the water storage in the second cement mortar adhered layer 5 from permeating the pre- laying 7 of the second waterproof to first cement mortar to paste Layer 9, so as to prevent its steam from infiltrating into timber floor 11, ensure that waterproof effect, and construction is simple.
For stopping the steam in toilet as early as possible, the top of the pre- laying 7 of second waterproof is arranged on neighbour The seaming position of the nearly threshold stone 10 and toilet floor tile 6.Pushed up for the increase lower surface of threshold stone 10 in the pre- laying 7 of the second waterproof Waterproof surface near portion, the marine glue 8 at the pre- top of laying 7 of second waterproof is extended into the seam position from its described top Put.For increase threshold stone 10 and the seam crossing of toilet floor tile 6 it is attractive in appearance, connect around the threshold stone 10 with toilet floor tile Marine glue is coated with seam.
Preferably, threshold stone 2 ~ 3mm of lower surface described in the distance from top of the pre- laying of the second waterproof.
Equally preferably, the height of the pre- laying of the second waterproof is between 3 ~ 5cm;Second waterproof is overlay The width of the widest part of the longitudinal section of layer is between 3 ~ 5cm.
To adapt to toilet warterproof needs, the structure of capital construction layer includes two parts, and structure of capital construction layer Part I 1 is located at The lower section of the pre- laying 2 of first waterproof, structure of capital construction layer Part II 14 are located at ground in the room of the threshold stone 10 adjoining The lower section of plate 11, the Part II 14 are higher than Part I 1.Spread using the indentation space of the structure of capital construction layer Part I 1 If toilet waterproofing structure and forming toilet less than the physical features in room, to avoid the water in toilet outflow is defended from surface So as to flowing in room between life.
Further, the pre- laying 2 of first waterproof is located at the top of the structure of capital construction layer Part I 1, and it is located at The top surface of the part of the lower section of second cement mortar adhered layer 5 forms inclined-plane, and the inclined-plane is lateral from neighbouring threshold stone 10 1 In trend from high to low inside toilet, make steam in toilet in the second mortar adhered layer 5 along the pre- laying 2 of the first waterproof Top surface is flowed to inside toilet at toilet threshold stone 10, bathroom door is kept relatively dry, reduces waterproof difficulty.It is preferred that , the distance between the top surface of the pre- laying 2 of the first waterproof and the lower surface of toilet floor tile 6 make toilet between 3 ~ 5cm Floor tile 6 is firmly installed by the second cement mortar adhered layer 5, and the water storage in the second cement mortar adhered layer is minimum.
To prevent the steam in the first cement mortar adhered layer 9 from penetrating into structure of capital construction layer Part II 14, the waterproof Pre- laying sets the 3rd waterproof to overlay layer 13, and its laying 2 pre- with the first waterproof forms one, and is overlay positioned at first waterproof The top of layer 2, and between the structure of capital construction layer Part II 14 and the first cement mortar adhered layer 9.Described 3rd waterproof overlays and lays waterproof layer 3 and fish tail and waterproof layer 4 successively between layer 13 and the first mortar adhered layer 9, described 3rd waterproof overlays the top surface of layer 13 laying waterproof layer 3, and is laid on the 3rd waterproof and overlays the waterproof layer of the top surface of layer 13 from institute Position 11 times structure of capital construction layer Part II top surface extensions in floor into the room of the first cement mortar adhered layer 9 are stated, and More than the seaming position of floor 11 and threshold stone 10 in the room.
Further, the waterproof layer for overlaying the top surface of layer 13 with being laid on the 3rd waterproof in the lower surface of threshold stone 10 Between and the lower surface of threshold stone 10 and the room under floor structure of capital construction layer Part II top surface waterproof layer it Between be coated with marine glue, prevent steam in the first cement mortar adhered layer 9 along the lower surface of threshold stone 10 and the three proofings Gap and the lower surface of threshold stone 10 and the upper table of structure of capital construction layer Part II 14 between the top surface waterproof layer of the pre- laying 13 of water Gap between the waterproof layer of face penetrates into floor 11 in room, is the second waterproof barrier of toilet threshold stone waterproof construction.
Certainly, it is to be also not limited to the example above to limitation of the present utility model, the utility model that described above, which is not, The variations, modifications, additions or substitutions that those skilled in the art are made in essential scope of the present utility model, Also the scope of protection of the utility model should be belonged to.

Claims (10)

1. a kind of toilet threshold stone waterproof construction, including threshold stone, the first cement mortar below the threshold stone are glued Paste layer, the second cement mortar adhered layer, fish tail and waterproof layer, waterproof layer, structure of capital construction layer below toilet floor tile;It is special Sign is, in addition to:
The pre- laying of waterproof, it includes:
The pre- laying of first waterproof, it is located under the first cement mortar adhered layer and the second cement mortar adhered layer Side, the waterproof layer and fish tail and waterproof layer are laid on the pre- laying of the first waterproof and the first cement mortar adhered layer, the Between two cement mortar adhered layers;
The pre- laying of second waterproof, it forms one with the pre- laying of the first waterproof, and positioned at the pre- laying of the first waterproof Top, and between the first cement mortar adhered layer and the second cement mortar adhered layer, the waterproof layer is laid on institute State between the pre- laying of the second waterproof and the first cement mortar adhered layer, the second cement mortar adhered layer;Second waterproof The contour shape of the longitudinal section of pre- laying is in inverted V-shaped, and the fish tail and waterproof layer is laid on except at the top of the pre- laying of second waterproof Outside waterproof layer and the first mortar adhered layer, the second cement mortar adhered layer between, the top is located at the threshold stone Lower section, and marine glue is coated between the top and threshold stone lower surface.
2. threshold stone waterproof construction in toilet according to claim 1, it is characterised in that the pre- laying of the second waterproof Top is adjacent to the seaming position of the threshold stone and toilet floor tile, and the marine glue is from the top of the pre- laying of the second waterproof Extend to described seaming position.
3. threshold stone waterproof construction in toilet according to claim 1, it is characterised in that the pre- laying of the second waterproof Threshold stone 2 ~ 3mm of lower surface described in distance from top.
4. threshold stone waterproof construction in toilet according to claim 1, it is characterised in that the pre- laying of the second waterproof Height is between 3 ~ 5cm;The width of the widest part of the longitudinal section of the pre- laying of the second waterproof is between 3 ~ 5cm.
5. threshold stone waterproof construction in toilet according to claim 1, it is characterised in that positioned at second cement mortar The top surface of the pre- laying of the first waterproof below adhered layer forms inclined-plane, and out of, the neighbouring threshold stone a lateral toilet Portion is in overbank from high to low.
6. threshold stone waterproof construction in toilet according to claim 5, it is characterised in that the pre- laying of the first waterproof The distance between lower surface of top surface and toilet floor tile is between 3 ~ 5cm.
7. threshold stone waterproof construction in toilet according to any one of claim 1 to 6, it is characterised in that
The structure of capital construction layer include Part I below the pre- laying of the first waterproof and positioned at the threshold stone Part II in adjacent room below floor, the Part II are higher than Part I;
The pre- laying of waterproof also overlays layer including the 3rd waterproof, and it forms one with the pre- laying of the first waterproof, and is located at The top of the pre- laying of first waterproof, and the Part II between the structure of capital construction layer is pasted with first cement mortar Between layer.
8. threshold stone waterproof construction in toilet according to claim 7, it is characterised in that overlay layer in the 3rd waterproof Described waterproof layer and fish tail and waterproof layer are equipped between the first cement mortar adhered layer.
9. threshold stone waterproof construction in toilet according to claim 8, it is characterised in that the 3rd waterproof overlays layer position In the lower section of the threshold stone, waterproof layer is equipped with the top surface that the 3rd waterproof overlays layer, and be laid on the three proofings The waterproof layer of the pre- laying top surface of water structure of capital construction under floor into the room from the position of the first cement mortar adhered layer The extension of layer Part II upper surface, and more than floor in the room and the seaming position of threshold stone.
10. threshold stone waterproof construction in toilet according to claim 9, it is characterised in that in the threshold stone and laying The capital construction knot under floor between the 3rd waterproof overlays the waterproof layer of layer top surface and in the threshold stone and the room Marine glue is coated between the waterproof layer of structure layer Part II top surface.
CN201720877852.8U 2017-07-19 2017-07-19 A kind of toilet threshold stone waterproof construction Expired - Fee Related CN207032521U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720877852.8U CN207032521U (en) 2017-07-19 2017-07-19 A kind of toilet threshold stone waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720877852.8U CN207032521U (en) 2017-07-19 2017-07-19 A kind of toilet threshold stone waterproof construction

Publications (1)

Publication Number Publication Date
CN207032521U true CN207032521U (en) 2018-02-23

Family

ID=61464882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720877852.8U Expired - Fee Related CN207032521U (en) 2017-07-19 2017-07-19 A kind of toilet threshold stone waterproof construction

Country Status (1)

Country Link
CN (1) CN207032521U (en)

Similar Documents

Publication Publication Date Title
CN104047356B (en) A kind of antiseep is bathed between defending and Antiseep method
CN104100011A (en) Toilet floor heating waterproof construction method and toilet floor heating waterproof system
CN106284706A (en) The construction method of external wall outer insulation rock cotton board
CN108487481A (en) A kind of antiseep assembled water stopping thresholds and its construction method
CN206205167U (en) A kind of indoor toilets threshold stone water proof structure
CN109750758A (en) The construction method that prefabricated sandwich heat preservation shear wall exterior wall is laterally stitched and vertically stitched
CN207110817U (en) Toilet threshold waterproof construction
CN204531883U (en) Shower house dash threshold constructs
CN206070602U (en) Resistance to plucking pile head node waterproof structure
CN207032521U (en) A kind of toilet threshold stone waterproof construction
CN206205168U (en) A kind of bathroom door pin waterproof treatment structure
CN206220272U (en) Ground hot water lays heating toilet doorway sealing damp proof insulation construction
CN206844380U (en) A kind of waterproof wall body structure
CN211286064U (en) Waterproof construction structure of kitchen guarding ground
CN205676931U (en) A kind of basement waterproofing base plate
CN104818835B (en) Toilet threshold stone waterproof structure and construction method
CN207714385U (en) A kind of mixing pile cut-pff wall and bottom plate connecting structure
CN207988424U (en) A kind of moisture-proof ground of rubble drainage layer draining
CN206233388U (en) A kind of waterproof system of toilet
CN208167997U (en) Waterproof construction at a kind of toilet threshold
CN211548589U (en) Dampproofing structure in bathroom
CN209653773U (en) A kind of shower cabinet threshold water-retaining structure
CN209260932U (en) A kind of accomodation ground seepage-proof structure
CN210767273U (en) Node processing structure at separation position of shower room and washing room
CN204609233U (en) Washroom threshold stone waterproof construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180223

Termination date: 20210719