CN207032329U - A kind of device for solving Equipment Foundations sedimentation - Google Patents

A kind of device for solving Equipment Foundations sedimentation Download PDF

Info

Publication number
CN207032329U
CN207032329U CN201720876737.9U CN201720876737U CN207032329U CN 207032329 U CN207032329 U CN 207032329U CN 201720876737 U CN201720876737 U CN 201720876737U CN 207032329 U CN207032329 U CN 207032329U
Authority
CN
China
Prior art keywords
equipment foundations
concrete layer
external concrete
steel
sedimentation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720876737.9U
Other languages
Chinese (zh)
Inventor
曹建强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG HUANNENG DESIGN INSTITUTE Co Ltd
Original Assignee
SHANDONG HUANNENG DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG HUANNENG DESIGN INSTITUTE Co Ltd filed Critical SHANDONG HUANNENG DESIGN INSTITUTE Co Ltd
Priority to CN201720876737.9U priority Critical patent/CN207032329U/en
Application granted granted Critical
Publication of CN207032329U publication Critical patent/CN207032329U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of device for solving Equipment Foundations sedimentation, belong to building field, its structure includes steel-pipe pile, external concrete layer and reinforcing bar, described external concrete layer includes two, it is separately positioned on the both sides of Equipment Foundations, and two external concrete layers are symmetrical arranged, each it is connected respectively by more reinforcing bars between external concrete layer and Equipment Foundations, the bottom of each external concrete layer is respectively at least provided with two steel-pipe piles.Compared with prior art, a kind of device for solving Equipment Foundations sedimentation of the present utility model, which has, carries the gravity of equipment and Equipment Foundations by steel-pipe pile, solves Equipment Foundations sedimentation, the features such as material cost is lower is more saved compared to injecting treatment scheme, thus there is good application value.

Description

A kind of device for solving Equipment Foundations sedimentation
Technical field
A kind of building field is the utility model is related to, especially a kind of device for solving Equipment Foundations sedimentation.
Background technology
Equipment Foundations be typically seated in factory building foundation construction after the completion of backfill on, as backfill construct it is not up to standard, if It is possible that Equipment Foundations settle after standby installation and operation, slip casting measure can be used to carry out foundation stabilization under normal circumstances.As returned Banket thicker, grouting amount will be very big, and cost is higher, and grouting amount control is bad can also cause basic local arch to tilt.
Utility model content
Technical assignment of the present utility model is to provide a kind of Equipment Foundations that solve for above-mentioned deficiency of the prior art to sink The device of drop, a kind of device for solving Equipment Foundations sedimentation has passes through steel pipe pile by the gravity of equipment and Equipment Foundations Carry, solve Equipment Foundations sedimentation, the characteristics of material cost is lower is more saved compared to injecting treatment scheme.
Technical scheme is used by the utility model solves its technical problem:It includes steel-pipe pile, external concrete layer And reinforcing bar, described external concrete layer include two, the both sides of Equipment Foundations, and two external concrete layers are separately positioned on It is symmetrical arranged, is each connected respectively by more reinforcing bars between external concrete layer and Equipment Foundations, each external concrete layer Bottom respectively at least provided with two steel-pipe piles.
Described external concrete layer is separately positioned on the front and rear sides of Equipment Foundations.
The length of each described external concrete layer is consistent with the length and thickness of Equipment Foundations respectively with thickness.
The bottom of each described external concrete layer is respectively arranged with two steel-pipe piles, and two steel-pipe piles are separately positioned on The both ends of external concrete layer.
A diameter of 200-300mm of described steel-pipe pile.
The width of each described external concrete layer is 600mm.
The length of each described reinforcing bar is respectively 70 times of its diameter, and it stretches into the length of external concrete layer and stretched into The equal length of Equipment Foundations.
The length of described steel-pipe pile is height of the external concrete layer bottom surface to undisturbed soil supporting course.
The length of described steel pipe column is height of the external concrete layer bottom surface to factory building foundation top surface.
Compared to the prior art a kind of device for solving Equipment Foundations sedimentation of the present utility model, has with following prominent Beneficial effect:The gravity of equipment and Equipment Foundations is carried by steel-pipe pile, solves Equipment Foundations sedimentation, and compared at slip casting Reason scheme, more saves material, the features such as can reducing cost.
Brief description of the drawings
Accompanying drawing 1 is a kind of overlooking the structure diagram for the device for solving Equipment Foundations sedimentation;
Accompanying drawing 2 is a kind of left view structural representation for the device for solving Equipment Foundations sedimentation;
Accompanying drawing 3 is a kind of the first use state figure of the device of solution Equipment Foundations sedimentation;
Accompanying drawing 4 is a kind of second of use state figure of device for solving Equipment Foundations sedimentation;
Description of reference numerals:1st, steel-pipe pile, 2, external concrete layer, 3, reinforcing bar, 4, Equipment Foundations, 5, factory building foundation, 6, Undisturbed soil supporting course, 7, backfill.
Embodiment
A kind of device for solving Equipment Foundations sedimentation of the present utility model is made with reference to Figure of description 1 to accompanying drawing 4 following Explain.
A kind of device for solving Equipment Foundations sedimentation of the present utility model, its structure include steel-pipe pile 1, external concrete layer 2 and reinforcing bar 3, described external concrete layer 2 includes two, is separately positioned on the both sides of Equipment Foundations 4, and two external coagulations Soil layer 2 is symmetrical arranged, and is each connected respectively by more reinforcing bars 3 between external concrete layer 2 and Equipment Foundations 4, each external The bottom of concrete layer 2 is respectively at least provided with two steel-pipe piles 1.
Described external concrete layer 2 is separately positioned on the front and rear sides of Equipment Foundations 4.
The length of each described external concrete layer 2 is consistent with the length and thickness of Equipment Foundations 4 respectively with thickness.
The bottom of each described external concrete layer 2 is respectively arranged with two steel-pipe piles 1, and two steel-pipe piles 1 are set respectively Put at the both ends of external concrete layer 2.
A diameter of 200-300mm of described steel-pipe pile 1.
The width of each described external concrete layer 2 is 600mm.
The length of each described reinforcing bar 3 is respectively 70 times of its diameter, and it stretches into the length of external concrete layer 2 and stretched Enter the equal length of Equipment Foundations 4.
When the steel-pipe pile 1 of the both sides of Equipment Foundations 4 is not fallen within factory building foundation 5, the length of described steel-pipe pile 1 is Height of the external bottom surface of concrete layer 2 to undisturbed soil supporting course 6.
When the steel-pipe pile 1 of the both sides of Equipment Foundations 4 just falls on factory building foundation 5, the length of described steel-pipe pile is Height of the external bottom surface of concrete layer 2 to the top surface of factory building foundation 5.
Steel-pipe pile 1 uses galvanized steel pile tube 1, and external concrete layer 2 is connected with Equipment Foundations 4 by reinforcing bar 3, external mixed The end of steel-pipe pile 1 of the solidifying bottom of soil layer 2 gets to preferable original-pack native supporting course 6 or gets to factory building foundation 5 and pushes up through backfill 7 Face, because the weight of Equipment Foundations 4 is smaller, steel-pipe pile 1 can meet requirement for bearing capacity, prevent Equipment Foundations 4 from settling.
Illustrative embodiments listed above are only not to described by the utility model for understanding that the utility model is used The restriction of technical scheme, the those of ordinary skill about field, on the basis of technical scheme described in claim, it can also make Go out a variety of changes or deformation, all equivalent changes or deformation should all cover claims of the present utility model it It is interior.Part is not described in detail for the utility model, is the known technology of those skilled in the art of the present technique.

Claims (9)

1. a kind of device for solving Equipment Foundations sedimentation, it is characterized in that:It is described including steel-pipe pile, external concrete layer and reinforcing bar External concrete layer include two, be separately positioned on the both sides of Equipment Foundations, and two external concrete layers are symmetrical arranged, often It is connected respectively by more reinforcing bars between individual external concrete layer and Equipment Foundations, the bottom of each external concrete layer is respectively extremely Two steel-pipe piles are provided with less.
2. a kind of device for solving Equipment Foundations sedimentation according to claim 1, it is characterized in that:Described external concrete Layer is separately positioned on the front and rear sides of Equipment Foundations.
3. a kind of device for solving Equipment Foundations sedimentation according to claim 2, it is characterized in that:It is external mixed described in each The length of solidifying soil layer is consistent with the length and thickness of Equipment Foundations respectively with thickness.
4. a kind of device for solving Equipment Foundations sedimentation according to claim 1, it is characterized in that:It is external mixed described in each The bottom of solidifying soil layer is respectively arranged with two steel-pipe piles, and two steel-pipe piles are separately positioned on the both ends of external concrete layer.
5. a kind of device for solving Equipment Foundations sedimentation according to claim 1, it is characterized in that:Described steel-pipe pile it is straight Footpath is 200-300mm.
6. a kind of device for solving Equipment Foundations sedimentation according to claim 5, it is characterized in that:It is external mixed described in each The width of solidifying soil layer is 600mm.
7. a kind of device for solving Equipment Foundations sedimentation according to claim 1, it is characterized in that:Each described reinforcing bar Length is respectively 70 times of its diameter, and it stretches into the length of external concrete layer and stretches into the equal length of Equipment Foundations.
8. a kind of device for solving Equipment Foundations sedimentation according to claim 1, it is characterized in that:The length of described steel-pipe pile Spend for the height of external concrete layer bottom surface to undisturbed soil supporting course.
9. a kind of device for solving Equipment Foundations sedimentation according to claim 1, it is characterized in that:The length of described steel pipe column Spend for the height of external concrete layer bottom surface to factory building foundation top surface.
CN201720876737.9U 2017-07-18 2017-07-18 A kind of device for solving Equipment Foundations sedimentation Expired - Fee Related CN207032329U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720876737.9U CN207032329U (en) 2017-07-18 2017-07-18 A kind of device for solving Equipment Foundations sedimentation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720876737.9U CN207032329U (en) 2017-07-18 2017-07-18 A kind of device for solving Equipment Foundations sedimentation

Publications (1)

Publication Number Publication Date
CN207032329U true CN207032329U (en) 2018-02-23

Family

ID=61464914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720876737.9U Expired - Fee Related CN207032329U (en) 2017-07-18 2017-07-18 A kind of device for solving Equipment Foundations sedimentation

Country Status (1)

Country Link
CN (1) CN207032329U (en)

Similar Documents

Publication Publication Date Title
CN101591904B (en) Method for strengthening composite pile foundation by prepressing drainage and following grouting for drainage body
CN203795465U (en) Counterfort retaining wall structure suitable for deep and yielding ground foundation
DE112019002113T5 (en) Structure for lowering, reinforcing, lifting and leveling the pile foundation platform structure and construction methods therefor
CN103938634A (en) Deep foundation pit supporting structure and construction method
CN104060601B (en) The construction method of utilizing precast construction stake pile foundation to carry out ground processing
CN201288327Y (en) Toft foundation structure
CN207032329U (en) A kind of device for solving Equipment Foundations sedimentation
CN101967832B (en) Method for treating bottom structure of building in substation
CN109056790A (en) Stake three layers of retaining wall structure of support and construction method
CN206157792U (en) Complementary rectification reinforced structure of stake raft
CN107988906A (en) A kind of high intensity anchorage
CN207685849U (en) A kind of connection structure of concrete prefabricated cushion cap
CN203821399U (en) Deep foundation pit supporting structure
CN212835477U (en) Collapsible loess foundation structure
CN102943480A (en) Loess foundation pit supporting method
CN102953393B (en) Seismic box type cover structure for building liquefied foundation
CN106087976B (en) A kind of concrete prefabricated friction pile and pile sinking process
CN213979026U (en) Reinforcing structure of wisdom building site tower crane basis
CN210288469U (en) Soft soil foundation pile foundation cantilever retaining wall structure
CN203782727U (en) Soft soil foundation combined pile mesh structure
CN201943094U (en) Building foundation structure based on cement-based penetration-resistant waterproof coating
CN205604310U (en) A test device for studying pile foundation burden frictional resistance time effect
CN105525595A (en) Gabion-piled slab type debris flow retaining structure and implementation method thereof
CN205152972U (en) Become cross campshed of rigidity basis
CN201512803U (en) Structural layer used for preventing building from sinking and bottom layer structure in transformer substation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180223

Termination date: 20200718